Form FHWA-201 (Rev. 11-67)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence. PRWI 11(3) - MEMORANDUM cc: TS Reading, Hydraulics, HD, All w/ attachment
M:\PROJECTS\prwi\11(3)\Techserv\Geotech\Reports\Preliminary Memo\PRWI 11(3) Geotech Memo 2015-02-19.docx
SUBJECT: Project PRWI 11(3) – Soil Profile
TO MESSAGE/COMMENT FROM/DATE
J. Wilson, Project Manager
Through:
A. Teikari Supervisor Highway Engineer
This memorandum summarizes the results of our subsurface exploration and laboratory testing within Prince William Forest Park (PRWI) in Prince William County, Virginia.
GENERAL PROJECT INFORMATION
Project Description
The purpose of this project is to resurface and rehabilitate the South Branch Quantico Creek Bridge and perform streambank stabilization near abutments.
No undermining scour is evident at either bridge abutment, but a subsurface exploration plan was performed to verify depths to bearing strata. A Project Location Map is included as Figure 1 of Appendix A.
GEOLOGIC SETTING
Regional Geology
The Geologic Map of the National Parks in the National Capital Region1 shows the project site to be located within metavolcanic and metasedimentary rocks of the Chopawamsic Formation, Upper Ordovician. These rocks are derived from an island arc, and range in composition from rhyolite to andesite to basalt. A Site Geologic Map is included as Figure 2 of Appendix A.
Soil Survey
According to the United States Department of Agriculture Web Soil Survey2 for Prince William County, Virginia (2013), the project site is located within the Hatboro-Codorus complex (27A) soil unit. This soil unit is derived from alluvium, and consists of silt loam, silty clay loam, and sandy loam. A Soil Survey Map is included as Figure 3 of Appendix A.
PROCEDURES AND RESULTS
General
EFLHD’s Subsurface Exploration Team drilled two (2) soil borings (B-1 and B-2) at the site. Borings were drilled using a CME 750 All-Terrain Vehicle (ATV)-mounted rotary drill rig. Boring B-1 was drilled in the vicinity of the northern abutment and extended to a depth of 20.9 ft below existing site grades, while Boring B-2 was drilled in the vicinity of the southern abutment and
C. Lynch Geotechnical
M.
Abouzakhm Division Geotechnical
S. Whittemore Technical Services
02/19/2015 extended to a depth of 15.5 ft below existing site grades.
Borings were laid out in the field by EFLHD field personnel by referencing ground surface topography, measuring distances from existing surface features, and estimating right angles. Due to the methods used to locate the borings in the field, boring locations shown in Appendix B should be considered approximate Ground surface elevations at the boring locations were determined from topography plans provided by the EFLHD Survey Division. A Boring Location Map is included in Appendix B and the Boring Logs are included in Appendix C. A Subsurface Profile is also included in Appendix C.
Sampling and Field Testing
The borings were advanced using 3-¾ -inch (inside diameter) hollow-stem augers. Standard Penetration Tests (SPT) were performed using a 2-¼ -inch (outside diameter) split-spoon sampler in accordance with appropriate AASHTO guidelines. SPT soil samples were recovered by driving the split-spoon sampler 24 inches, or until refusal, into the undisturbed soil under the action of a 140-pound automatic hammer free-falling 30 inches. The number of hammer blows required to advance the split-spoon sampler through the middle 12 inches of the 24-inch sample interval is designated as the “Standard Penetration Resistance” or N-value. Split-spoon refusal is defined as 50 blows per 1-inch of penetration of the split-spoon sampler. The N-values and the number of blows required to advance the sampler through each 6-inch interval was recorded on field boring logs. N-values reported in the logs presented in Appendix C represent the field-measured values. Recovered soils were placed into glass sample jars, labeled, and transported to EFLHD Material Testing Laboratory in Sevierville, Tennessee.
Laboratory Testing
A laboratory testing program was conducted on representative soil samples recovered during the subsurface exploration. The primary purpose of the testing program was to aid in classification and evaluation of the engineering properties of soils present at the site. Laboratory testing included gradation analysis by sieve (AASHTO T 11/T 27) and classification (AASHTO M 145/ASTM D2487). All tests were conducted in general accordance with applicable ASTM/AASHTO standard test methods. The results of the laboratory testing program are presented in Appendix D and are summarized in Table 1 below:
Table 1 - Summary of Laboratory Testing Results
* = combined sample
Subsurface Conditions
In general, soils encountered in the borings can be divided into three strata:
PAVEMENT AND BASE COURSE – The borings encountered a 1± ft thick layer of pavement and base course.
FILL – Underneath the base course, fill materials were encountered and extended to depths of 14 feet to 15.5 feet below existing site grade in borings B-1 and B-2, respectively, and consists of clayey silt and sandy silt. SPT N-values ranged from 4 to 16 blows per foot (bpf).
SILTY SAND – Underneath the fill materials, residual soils were encountered in boring B-1 and extended to a depth of 20.9 feet below exiting site grades. This stratum consists of silty sand and SPT N-values ranged from 1 to 4 bpf.
BEDROCK – Bedrock was encountered underneath the silty sand stratum in boring B-1 and the fill stratum in boring B-2 and extended to the termination depths of the soil borings.
B or in g
S am p le
D ep th ft
S am p le
N o.
G ra ve l
S an d
P as si n g
#2
S ie ve
F in es
D in
A
S H
T O
C la ss
D es cr ip ti on
B-1 15-17 J-7 14.2 54.5 31.4 0.0071 A-2-4 Silty Sand
B-2 10-15 J-5 & J-6* 13.9 40.4 45.7 0.0041 A-4 Sandy Silt
References:
1 Southworth, S. and Denenny, D. (2006). Geologic Map of the National
Parks in the National Capital Region, Washington, D.C., Virginia, Maryland, and West Virginia: U.S. Geological Survey Open-File Report 2005-1331, U.S. Geological Survey, Reston, VA.
http://pubs.usgs.gov/of/2005/1331/
2 Soil Survey Staff, Natural Resources Conservation Service, United States
Department of Agriculture. Web Soil Survey. Available online at http://websoilsurvey.nrcs.usda.gov/. Accessed November 7, 2014.
Appendices:
Appendix A – Figures Appendix B – Boring Location Map Appendix C – Boring Logs and Subsurface Profile Appendix D – Laboratory Testing Results Appendix E – Representative Photographs
APPENDIX A
Figures
REG
NP-PRWI 11(3)
TOTAL
SHEETS
SHEET
NO.
PROJECT
STATE
NC 1VA
FIGURE 1
PROJECT LOCATION MAP
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
Source: Southworth, S. and Denenny, D. (2006). Geologic Map of the National Parks in the National Capital Region, Washington, D.C., Virginia, Maryland, and West Virginia. USGS, Reston, VA.
1 1
SHEET
NO.
TOTAL
SHEETS
NC VA NP-PRWI 11(3)STERLING, VIRGINIA
FIGURE 2
GEOLOGIC MAP
REG STATE PROJECTU.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
NC
SHEET
NO.
PROJECT
STATEREG
PRWI 11(3)
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
2VA
FIGURE 3
SOIL SURVEY MAP EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
TOTAL
SHEETS
PRWI 11(3)
TOTAL
SHEETS
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
NC VA PRWI 11(3) 2 2STERLING, VIRGINIA
FIGURE 3
SOIL SURVEY MAP
REG STATE PROJECT
SHEET
NO.
APPENDIX B
Boring Location Maps
M
P R
O J E
C T
S p r w i\ (3
T e c h s e r v G e o te c h C
A D
D P
R W I (3 F in a l
B o r in g
L o c a ti o n a p .d g n
:0
:5
-N o v -2
:0
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
REG STATE PROJECT SHEET NO.
VA
1 OF 1NC
PRINCE WILLIAM FOREST PARK
100'50'0
Approximate Scale in Feet
Boring
LEGEND
BORING LOCATION MAP
SOUTH FORK QUANTICO CREEK
TIMBER BRIDGE, SCENIC DRIVE OVER
Coordinate System: US State Plane 1983
Zone: Virginia North 4501
Project Datum: NAD 1983 (Conus)
Vertical Datum: NAVD 1988
Geoid Model: GEOID12A(Conus)
Coordinate Units: US survey feet
Distance Units: US survey feet
Height Units: US survey feet
B-1
B-2
97.3811807601.036891654.45 B-2
96.9911807579.676891733.72 B-1
TBAR98.1411807644.036891464.984005
TBAR97.4511807632.686891604.074004
TBAR96.6511807595.866891748.494003
TBAR96.9011807557.476891844.444002
TBAR107.6111807357.176891985.304001
TBAR130.7411807171.046892283.224000
NAIL90.7911807162.336891910.61203
NAIL90.3611807289.576891891.40202
NAIL89.1711807481.046891751.57201
NAIL83.9111807616.526891703.16110
NAIL91.4011807978.456891546.48102
NAIL87.7711807802.606891684.96101
NAIL88.7611807701.536891719.55100
RemarksElev.EastingNorthingPoint
Control Points Coordinate Listing
NAIL
NAIL
NAI
L
TBAR
TBAR
TBAR
4005TBAR
LIMIT
WEIGHT
TONS
14" Ø si gnN o B ic yc le
M ar ke r x4 T ra il
NO
PA
RK
ING
Clo sed sig n Foo t Tr ail
2" P
VC
5" A lum.
Pipe
N
E 11807600
N
E 11807600
NNORTHNO
PAR
KING
NO
PARKING
FLOW
SCENIC
DRIV
E
QUANTICO CREEK
SOUTH FORK
APPENDIX C
Boring Logs and Subsurface Profile
J-1
J-2
J-3
J-4
J-5
J-6
J-7
J-8
J-9
1.0
6.0
14.0
20.9
2.0
1.5
1.3
1.0
0.9
1.4
1.1
0.2
0.4
0.4-ft asphalt pavement and aggregate base course.
Medium stiff to stiff, mottled orange to brown, CLAYEY SILT. (Moist)
-FILL-
Very loose to loose, light brown SANDY SILT, with some mica and medium, rounded gravel. (Moist to wet)
-FILL-
Very loose to loose, dark brown and grey, SILTY SAND [A-2-4]. (Wet)
Fractured pieces of dark grey basalt at base of stratum.
Bottom of borehole and auger refusal at 20.9 feet.
5-5-6-8
5-9-6-6
2-2-3-2
2-2-6-4
2-2-2-4
2-1-0-1
1-2-3-4
4-2-2-3
1-50/4"
Standard Penetration Test Data
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Inspector:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
At Completion:
Completed:
Hole Diameter:
Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/AutomaticHammer Wt. & Type:
P. Cloudy, Warm
Encountered at:
After
Northing: 6891734 Easting: 11807580
Caved at:
Hammer Drop:
Project Name:
N o.
Prince William Forest Park, Prince William County, VA Project Datum:
(Blows / ft)
97.0 ft
Undisturbed (UD)
10/22/14
R ec ft)
Water Content %
Project Location: Boring Location:
La ye r
D ep th ft)
T yp e
Weather:
SAMPLE
S P
T B lo w s pe r in . Plastic Limit
Boring was backfilled with auger cuttings and topped with cold patch asphalt upon completion.
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
Penetrometer (PP in tsf) Rock Core (RQD in %)
Surface Elevation:
Sample Types:
BORING LOG
N/A
10/22/14 D. Hutchins R. KingsleyOperator:
North Abutment - Scenic Drive hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
PRWI 11(3) - Timber Bridge over South Fork Quantico Creek
Density, Color, Plasticity, Size, Proportions, Moisture
D ep th S ca le ft)
E le va tio n (f ee t)
HSA
B-1
P P
US State Plane NAD 1983, Virginia North 4501
3.75 in.
B O
R
IN
G L
O G
/2
9/
:0
M
:\P R
O
JE
C T
S \P
R W
I\
(3
T E
C H
S E
R V
\G E
O T
E C
H \S
U B
S U
R F
A C
E I
N V
E S
T
IG
A T
IO
N
\B O
R
IN
G L
O G
S \P
R W
I
(3
G P
J
96.0
91.0
83.0
76.1
Sheet: 1 of 1
4"
J-1
J-2
J-3
J-4
J-5
J-6
J-7
1.0
8.0
15.5
1.7
0.9
0.9
1.4
0.4
0.6
0.0
0.35-ft asphalt pavement and aggregate base course.
Medium stiff to stiff, mottled orange, red and brown, CLAYEY SILT with lenses of brown silty sand and coarse gravel. (Moist)
-FILL-
Loose, light brown SANDY SILT, with some wood fibers [A-4]. (Moist)
-FILL-
Fractured pieces of dark grey basalt and white quartz at base of stratum.
Bottom of borehole and auger refusal at 15.5 feet.
10-8-8-9
5-5-4-6
3-8-7-6
4-3-2-2
2-5-5-5
8-50/2"
Standard Penetration Test Data
Boring Began:
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Inspector:
MATERIAL DESCRIPTION
Boring No.:
Groundwater Depth:
At Completion:
Completed:
Hole Diameter:
Boring Method:
Rock Core Diam:
Vane Shear
30 in.
140 lbs/AutomaticHammer Wt. & Type:
P. Cloudy, Warm
Encountered at:
After
Northing: 6891654 Easting: 11807601
Caved at:
Hammer Drop:
Project Name:
N o.
Prince William Forest Park, Prince William County, VA Project Datum:
(Blows / ft)
97.4 ft
Undisturbed (UD)
10/22/14
R ec ft)
Water Content %
Project Location: Boring Location:
La ye r
D ep th ft)
T yp e
Weather:
SAMPLE
S P
T B lo w s pe r in . Plastic Limit
Boring was backfilled with auger cuttings and topped with cold patch asphalt upon completion.
Liquid Limit
SPT
U. S. DEPARTMENT OF TRANSPORTATION
Penetrometer (PP in tsf) Rock Core (RQD in %)
Surface Elevation:
Sample Types:
BORING LOG
N/A
10/22/14 D. Hutchins R. KingsleyOperator:
South Abutment - Scenic Drive hrs
Remarks:
Auger Cuttings
G ra ph ic
L og
PRWI 11(3) - Timber Bridge over South Fork Quantico Creek
Density, Color, Plasticity, Size, Proportions, Moisture
D ep th S ca le ft)
E le va tio n (f ee t)
HSA
B-2
P P
US State Plane NAD 1983, Virginia North 4501
3.75 in.
B O
R
IN
G L
O G
/2
9/
:0
M
:\P R
O
JE
C T
S \P
R W
I\
(3
T E
C H
S E
R V
\G E
O T
E C
H \S
U B
S U
R F
A C
E I
N V
E S
T
IG
A T
IO
N
\B O
R
IN
G L
O G
S \P
R W
I
(3
G P
J
96.4
89.4
81.9
Sheet: 1 of 1
2"
APPENDIX D
Laboratory Testing Results
SOIL DATA
NO.
AASHTODESCRIPTION
DEPTHSAMPLE
SOURCESYMBOL
Project No.:
Project:
Client:
Particle Size Distribution Report
P E
R C
E N
T F
IN
E
R
100 10 1 0.1 0.01 0.001200 GRAIN SIZE - mm
% + 3"
% GRAVEL
CRS. FINE
% SAND
CRS. MEDIUM FINE
% FINES
SILT CLAY
in in in
1- 1/ in in
3/ in
1/ in
3/ in
#4 #1
#2
#3
#4
#6
#1
#1
#2
0.0 0.0 14.2 5.8 14.1 34.5 31.4
(ft.)
PRWI 11(3)
Prince Wiliam Forest Pk.
FHWA/EFLHD
Scenic Dr. B-1/J-7 15-17
Particle Size Distribution Report
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
0.0 0.0 13.9 5.4 16.2 18.8 45.7
Scenic Dr. B-2/J-5,6 10-15
Silty Sand
Sandy Silt
A-2-4
A-4
APPENDIX E
Representative Photographs
E-1
Photo 1. Apparent rock outcrop, highly fractured, at south abutment ground line, looking east.
Photo 2. Stream bank erosion upsteam of south abutment, looking south, showing alluvial deposits above bedrock outcrop at water line. Voids are likely washed-out sandy lenses.
E-2
Photo 3. CME 750 drilling for boring B-2, looking north.
Photo 4. Sample recovery for B-1, sample J-6, from depths of 13.0 to 15.0 feet (bottom of sample at right).
Photo 5. Sample recovery for B-2, sample J-2, from depths of 3.0 to 5.0 feet (bottom of sample at right).
Photo 6. Sample recovery for B-2, sample J-6, from depths of 13.0 to 13.8 feet (bottom of sample at right).
| 2015-02-19T14:35:34-0500 | |
| MOUNIR A ABOUZAKHM |
| 2015-02-19T14:41:46-0500 | |
| CHRISTOPHER M LYNCH |
File details come from the government source that posted it.