Plans_-_NP-COLO_1B37,_1D46.pdf

PDF 17 MB Posted

Attached to
Colonial National Historical Park Federal contract opportunity
Solicitation number
693C73-18-B-000028
Issued by
Department of Transportation Federal Highway Administration

About this file

Plans

View the file

Other files for this federal contract opportunity

Other files attached to Colonial National Historical Park, newest first.
File Type Posted
Results_of_Bid_Opening_-_NP-COLO_1B37,_1D46.pdf PDF
FP14_Eng.pdf PDF
Halfway_Creek_As-Built.pdf PDF
Bridge_Inspection_Report_STR__4290-011P.pdf PDF
Kings_Creek_As-Built.pdf PDF
Bridge_Inspection_Report_STR__4290-022P.pdf PDF
Bridge_Inspection_Report_STR__4290-012P.pdf PDF
Felgate's_Creek_As-Built.pdf PDF
Certification_Program_for_Bridge_Temporary_Works.pdf PDF
VETS-4212_Form.pdf PDF
NEPA_(Categorical_Exclusion_Form).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
IFB_Solicitation_-_NP-COLO_1B37,_1D46.pdf PDF
Synopsis_-_NP-COLO_1B37,_1D46.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g n

NO. DATE BY REVISIONS NO. DATE BY REVISIONS

GENERAL NOTES:

Concrete: 150 pcf.

Lap splices 30 bar diameters unless otherwise shown.

Furnish reinforcing steel conforming to AASHTO M 31 (ASTM A615), Grade 60 deformed.

Provide 2-inch cover for reinforcing steel unless otherwise noted.

CONSTRUCTION:

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Use uncoated reinforcing steel unless otherwise noted.

-inch, unless otherwise noted.4 3Chamfer exposed edges

SCOPE OF WORK:

R01

No scale

A C

T U

A L F I L E R

C O

L O

B

D

G N .D

G N

AASHTO H15

GENERAL NOTES AND INDEX

Contact utility companies and locate all utilities before proceeding work.

conditions.

configuration of the surrounding area, adjust dimensions of the work to fit existing dimensions of the proposed work in this Contract are dependent on the dimensions of

Verify all controlling field dimensions before ordering or fabricating any material. Where

AD

Joint Repair Detail

Concrete Repair Detail

Concrete Repair - Span 3 Reflective Deck

Concrete Repair - Span 1 Reflective Deck

Concrete Repair - Bent 3

Concrete Repair - Bent 2

Concrete Repair - Bent 1

Felgate's Creek Bridge Typical Section

Felgate's Creek Bridge Plan and Elevation

Concrete Repair - Pier 6 Reflective Deck

Concrete Repair - Pier 12 East Face

Concrete Repair - Pier 12 West Face

Concrete Repair - Pier 11 East Face

Concrete Repair - Pier 11 West Face

Concrete Repair - Pier 10 East Face

Concrete Repair - Pier 10 West Face

Concrete Repair - Pier 9 East Face

SHEET NO. SHEET TITLESPECIFICATIONS:

Design:

Construction:

DESIGN LOADS:

Dead loads:

Live loads:

MATERIALS:

Reinforcing Steel:

Structural Concrete:

SHEET NO. SHEET TITLE

AASHTO LRFD Bridge Design Specifications, Seventh Edition, 2014 with 2016 Interim Revisions.

INDEX OF BRIDGE PLAN SHEETS

Concrete Repair - Pier 9 West Face

Concrete Repair - Pier 8 East Face

Concrete Repair - Pier 8 West Face

Concrete Repair - Pier 7 East Face

Concrete Repair - Pier 7 West Face

Concrete Repair - Pier 6 East Face

Concrete Repair - Pier 6 West Face

Concrete Repair - Pier 5 East Face

Concrete Repair - Pier 5 West Face

Concrete Repair - Pier 4 East Face

Concrete Repair - Pier 4 West Face

Concrete Repair - Pier 3 East Face

Concrete Repair - Pier 3 West Face

Concrete Repair - Pier 2 East Face

Concrete Repair - Pier 2 West Face

Kings Creek Bridge Typical Section

Kings Creek Bridge Plan and Elevation

Scupper Extension Detail

Concrete Repair - Span 15 Reflective Deck Plan

Concrete Repair - Span 13 & 14 Reflective Deck Plan

Concrete Repair - Span 12 Reflective Deck Plan

Concrete Repair - Span 10 & 11 Reflective Deck Plan

Concrete Repair - Span 9 Reflective Deck Plan

Concrete Repair - Span 7 Reflective Deck Plan

Concrete Repair - Span 5 & 6 Reflective Deck Plan

Concrete Repair - Span 4 Reflective Deck Plan

Concrete Repair - Span 1 Reflective Deck Plan

Concrete Repair - Abutment 2 North Face

Concrete Repair - Pier 14 South Face

Concrete Repair - Pier 14 North Face

Concrete Repair - Pier 13 South Face

Concrete Repair - Pier 13 North Face

Concrete Repair - Pier 12 South Face

Concrete Repair - Pier 12 North Face

Concrete Repair - Pier 11 South Face

Concrete Repair - Pier 10 South Face

Concrete Repair - Pier 10 North Face

Concrete Repair - Pier 9 South Face

Concrete Repair - Pier 9 North Face

Concrete Repair - Pier 8 South Face

Concrete Repair - Pier 8 North Face

Concrete Repair - Pier 7 South Face

Concrete Repair - Pier 7 North Face

Concrete Repair - Pier 6 South Face

Concrete Repair - Pier 6 North Face

Concrete Repair - Pier 5 South Face

Concrete Repair - Pier 5 North Face

Concrete Repair - Pier 4 South Face

Concrete Repair - Pier 3 South Face

Concrete Repair - Pier 3 North Face

Concrete Repair - Pier 2 South Face

Concrete Repair - Pier 2 North Face

Concrete Repair - Pier 1 South Face

Concrete Repair - Abutment 1 South Face

Halfway Creek Bridge Typical Section

Halfway Creek Bridge Plan and Elevation

General Notes and Index

Furnish Class A(AE) concrete and Shotcrete, unless otherwise noted.

1. Clean and seal the deck surface.

Schedule D: Structure Numbers 4290-011P, 4290-012P, 4290-022P at top of deck.

fill, clean and reseal joints, and perform structural concrete injection at construction joints

2. Install riprap at West Abutment, fill undermining at sout side drainage flume with flowable beams, abutments, and deck underside. Remove cofferdams.

1. Install cofferdams, locate and repair all deteriorated concrete on the bent caps, diaphragms, Schedule C: Structure Number 4290-011P - Felgate's Creek Bridge over the piers.

2. Clean and reseal joints at abutments, and replace compression seal joints repair sagging utility conduit.

1. Locate and repair all deteriorated concrete on the piers, deck underside, abutments and

Schedule B: Structure Number 4290-012P - Kings Creek Bridge

2. Clean and reseal deck joints.

beams, and diaphragms. Install scupper extensions.

1. Locate and repair all deteriorated concrete on the piers, deck underside, abutments, Schedule A: Structure Number 4290-022P - Halfway Creek Bridge

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

41932

222535 VA NP-COLO 1B37, 1D46

PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY

Phillip BoinskeAD PCB of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

COLONIAL NATIONAL HISTORICAL PARK

BRP-1257

KINGS CREEK BRIDGE, FELGATE'S CREEK BRIDGE

REHABILITATION OF HALFWAY CREEK BRIDGE,

74 June 2018 u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Bridge Length: 750'-0"

PLAN AND ELEVATION

50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0" 50'-0"

750'-0"

WEST ELEVATION

PLAN

25'-0"

(Typ.)

R02

Elev. 19.40

Sta. 810+75

Begin Bridge

Elev. 19.04

Sta. 818+25

End Bridge

L Colonial ParkwayC

(Typ.)

Concrete repair pier joint (Typ.)

Clean and reseal

Abutment 1LC

Pier 1LC

Pier 2LC

Pier 3LC

Pier 4LC

Pier 5LC

Pier 6LC

Pier 7LC

Pier 8LC

Pier 9LC

Pier14LC

Abutment 2LC

Pier 10LC

Pier 11LC

Pier 12LC

A C

T U

A L F I L E R

H a lf w a y

C r e e k P

E .D

G N

Halfway creek

Elev. 19.40

Sta. 810+75

Begin Bridge

-10

-20

MWL : 0.57

MWH : 3.0

-30

Elev. 19.04

Sta. 818+25

End Bridge

50'-0" 50'-0"

N

1" = 30'-0"

(Typ.)

Exist. scupper, to be extended

50'-0"50'-0"

Pier 13LC line

Existing ground

Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix

1. See "AS-BUILT" plans.

Note:

Varies

(See Note 1)

JEG

HALFWAY CREEK BRIDGE

SCHEDULE A AND D

Clean and seal deck surface limit surface

Clean and seal deck

STATE PROJECT

NUMBER

SHEET

NO.NO.

41932 222535

NPSPMIS

VA NP-COLO 1B37, 1D46

AD Phillip BoinskePCB

Structure Number

DATE

U.S. DEPARTMENT OF TRANSPORTATION

BRP-1257

4290-022P

74of June 2018 u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

CL Structure

TYPICAL SECTION

AD

36'-0"

C

1'-7"

"4 38'-6 "4

38'-6 "4 38'-6 "4

38'-6

3'-0"

(Typ.)

1'-9"

(Typ.)

EXTENSION DETAIL")

(See "SCUPPER

Extend scupper

16'-6" 16'-6"

R03

L Colonial Parkway

A C

T U

A L F I L E R

H a lf w a y C r e e k T y p

X S .D

G N

16'-6"1'-6" 13'-4" 7" 3'-1" 1'-0"

TYPICAL SECTION

" = 1'-0"2

29'-10"

Superstructure

Existing Concrete seat (Typ.)

Existing bearing

Substructure

Existing Concrete

(See Note 1)

Varies Varies

(See Note 1)

1. See "AS-BUILT" plans.

Note:

EXTENSION DETAIL")

(See "SCUPPER Extend scupper

Clean and seal deck surface limit

HALFWAY CREEK BRIDGE

SCHEDULE A AND D

surface Clean and seal deck

STATE PROJECT

NUMBER

SHEET

NO.NO.

41932 222535

NPSPMIS

DATE

U.S. DEPARTMENT OF TRANSPORTATION

BRP-1257

6" Exposed rebar

ELEVATION

1'-0"

A

A

VIEW A-A

SOUTH FACE

CONCRETE REPAIR - ABUTMENT 1

36'-0"

CL Structure

1'-9"

5'-0" 2'-6"

(Typ.)

R04

A C

T U

A L F I L E R

A b u tm e n t-

S

F .D

G N

16'-9" 16'-9"1'-3" 1'-3"

" = 1'-0"2

1JEG

LEGEND:

- Spall - Crack

Reinforcement

- Exposed and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to Subsection 552.19

1. Repair all spalls as shown in the "CONCRETE REPAIR DETAIL" sheet.

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

PROJECT TEAM LEADER DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY

U.S. DEPARTMENT OF TRANSPORTATION

BRP NO.

STATE PROJECT

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

PCB June 2018

2'-0"

3'-0"

ELEVATION

A

A

VIEW A-A

SOUTH FACE

CONCRETE REPAIR - PIER 1

16'-6"1'-6"

36'-0"

CL Structure

16'-6" 1'-6"

3'-0"

(Typ.)

R05

A C

T U

A L F I L E R

P ie r S

F .D

G N

5" = 1'-0"2

2'-6"

JEG/BMJ

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Note:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

4" Exposed rebar4" Exposed rebar4" Exposed rebar

NORTH FACE

CONCRETE REPAIR - PIER 2

16'-6" 16'-6"1'-6" 1'-6"

CL Structure

3'-0"

(Typ.)

R06

3'-0"

A

A

VIEW A-A

A C

T U

A L F I L E R

P ie r N

F .D

G N

" = 1'-0"2

1JEG/BMJ

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

1. Epoxy coat all exposed reinforcement according to

Note:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

2'-0"

CONCRETE REPAIR - PIER 2

16'-6"1'-6"

36'-0"

CL Structure

16'-6" 1'-6"

R07

A C

T U

A L F I L E R

P ie r S

F .D

G N

3'-0"

(Typ.)

3'-0"

A

A

VIEW A-A

7" = 1'-0"2

1JEG/BMJ

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Note:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

2'-0"

A

A

VIEW A-A

CONCRETE REPAIR - PIER 3

36'-0"

1'-6"

CL Structure

16'-6" 16'-6"1'-6"

", 2'-0" Long crack

R08

A C

T U

A L F I L E R

P ie r N

F .D

G N

3'-0"

(Typ.)

3'-0"

" = 1'-0"2

1JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

A

VIEW A-A

2'-0"

16'-6"1'-6"

36'-0"

16'-6" 1'-6"

CONCRETE REPAIR - PIER 3

R09

A C

T U

A L F I L E R

P ie r S

F .D

G N

3'-0"

(Typ.)

A

" = 1'-0"2

1JEG/BMJ

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Note:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

A

A

VIEW A-A

3'-0"

4" Exposed rebar 8" Exposed rebar

CONCRETE REPAIR - PIER 4

1'-6"

1'-6"

R10

A C

T U

A L F I L E R

P ie r S

F .D

G N

3'-0"

(Typ.)

16'-6"16'-6"

Long crack

", 1'-6"

" = 1'-0"2

1JEG/BMJ

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all cracks as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

" = 1'-0"

1Scale:

Scale: 1" = 1'-0"

East face

9"

9"

As shown

CONCRETE REPAIR - PIER 5

", 2'-6" Long crack

R11

" = 1'-0"2 1Scale:

VIEW A-A

3'-0"

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r N

F .D

G N

BB

SECTION B-B

JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

ELEVATION

CL Structure

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske rebar

8" Exposed

" = 1'-0"2 1Scale:

East face

1'-0"

Scale: 1" = 1'-0"

3'-0"

1'-6"

" = 1'-0"2 1Scale:

VIEW A-A

1'-0"

1'-0"

As shown

CONCRETE REPAIR - PIER 5

R12

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r S

F .D

G N

BB

SECTION B-B

JEG/BMJ

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

" = 1'-0"2 1Scale:

West face

Scale: 1" = 1'-0"

3'-0"

1'-6"

" = 1'-0"2 1Scale:

VIEW A-A

A

A

2'-6"

2'-6"

6"

As shown

CONCRETE REPAIR - PIER 6

1'-0"

R13

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r N

F .D

G N

SECTION B-B

BB

JEG/BMJ

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Note:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1Scale:

East face

Scale: 1" = 1'-0"

3'-0"

" = 1'-0"2 1Scale:

VIEW A-A

1'-0"

6"

"2

1'-0"

"2

Scale: 1" = 1'-0" Scale: 1" = 1'-0"

2'-0"

East face

West face

2" exposed rebar

As shown

CONCRETE REPAIR - PIER 6

R14

(Typ.)

A C

T U

A L F I L E R

P ie r S

F .D

G N

6"

SECTION B-B SECTION C-C SECTION D-D

BB

C C

D D

JEG/BMJ

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

VIEW A-A

CONCRETE REPAIR - PIER 7

R15

6"

", 2'-0" Long crack

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r N

F .D

G N

" = 1'-0"2

1JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1Scale:

3'-0"

" = 1'-0"2 1Scale:

VIEW A-A

Scale: 1" = 1'-0"

West face

2'-8"

6"

As shown

CONCRETE REPAIR - PIER 7

CL Structure

16'-6" 1'-6"

R16

VIEW C-C

" = 1'-0"

1Scale:

C

C

1'-0"

3'-0"

(Typ.)

6"

A C

T U

A L F I L E R

P ie r S

F .D

G N

6"

SECTION B-B

BB

Long crack

", 3'-0"

JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

A

A

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1Scale:

3'-0"

" = 1'-0"2 1Scale:

VIEW A-A

A

A

Scale: 1" = 1'-0"

East face

1'-6"

6"

C

C

Scale: 1" = 1'-0"

VIEW C-C

3'-0"

As shown

CONCRETE REPAIR - PIER 8

6"

R17

6" Exposed rebar

3'-0"

(Typ.)

6"

A C

T U

A L F I L E R

P ie r N

F .D

G N

BB

SECTION B-B

JEG/BMJ

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1Scale:

3'-0"

" = 1'-0"2 1Scale:

VIEW A-A

Scale: 1" = 1'-0"

West face

6"

1'-0"

6"

East face

1'-0"

4'-0"

2'-6"

16'-6"1'-6"

36'-0"

As shown

CONCRETE REPAIR - PIER 8

", 1'-3" Long crack

R18

A C

T U

A L F I L E R

P ie r S

F .D

G N

3'-0"

(Typ.)

BB

SECTION B-B

JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

A

A

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

VIEW A-A

1'-6" rebar

4" Exposed

CONCRETE REPAIR - PIER 9

16'-6"1'-6"

R19

6"

A C

T U

A L F I L E R

P ie r N

F .D

G N

" = 1'-0"2

CL Structure

JEG/BMJ

A

A

3'-0"

(Typ.)

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

VIEW A-A

2'-10"

CONCRETE REPAIR - PIER 9

16'-6"1'-6"

36'-0"

R20

A C

T U

A L F I L E R

P ie r S

F .D

G N

" = 1'-0"2

1JEG/BMJ

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Note:

A

A

3'-0"

(Typ.)

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

VIEW A-A

1'-6"

1'-0"6"

CONCRETE REPAIR - PIER 10

16'-6"1'-6"

36'-0"

R21

A C

T U

A L F I L E R

P ie r N

F .D

G N

Long crack

", 5'-0" 8

Long crack

", 3'-0" 8

" = 1'-0"2

1JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

A

A

3'-0"

(Typ.)

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

VIEW A-A

2'-0"

CONCRETE REPAIR - PIER 10

CL Structure

16'-6" 1'-6"

2'-6"

R22

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r S

F .D

G N

" = 1'-0"2

Long crack

", 3'-0" 8

JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1Scale:

3'-0"

" = 1'-0"2 1Scale:

VIEW A-A

" = 1'-0"2 1Scale:

VIEW B-B

6"

West face

6"

1'-9"

1'-0"9"

4'-0"

B

B

16'-6"1'-6"

36'-0"

CL Structure

CONCRETE REPAIR - PIER 11

", 1'-0" Long crack

R23

1'-0"

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r S

F .D

G N

CC

Long crack

", 2'-0"

Scale: 1" = 1'-0"

SECTION C-C

JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

3'-0"

VIEW A-A

1'-6"

CONCRETE REPAIR - PIER 12

16'-6"1'-6"

CL Structure

16'-6" 1'-6"

", 4'-0" Long crack

R24

A C

T U

A L F I L E R

P ie r N

F .D

G N

" =1'-0"2

1JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

3'-0"

(Typ.)

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1Scale:

" = 1'-0"2 1Scale:

VIEW A-A

East face

6"

1'-0"

3'-0"

Scale: 1" = 1'-0"

6"6"

East face

4" Exposed rebar

6"

CONCRETE REPAIR - PIER 12

16'-6"1'-6"

36'-0"

CL Structure

16'-6" 1'-6"

1'-3"

R25

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r S

F .D

G N

SECTION B-B

Scale: 1" = 1'-0"

SECTION C-C

BB

C C

JEG/BMJ

A

A

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1Scale:

" = 1'-0"2 1Scale:

VIEW A-A

East face

3'-0"

Scale: 1" = 1'-0"

4"

West face

6" 4"

1'-6" 3'-6"

1'-0"

6"

1'-6"

6"

CONCRETE REPAIR - PIER 13

16'-6"1'-6"

36'-0"

CL Structure

16'-6" 1'-6"

1'-0"

VIEW C-C

" = 1'-0"

1Scale:

C

12" Exposed rebar

R26

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r N

F .D

G N

SECTION B-B

C

BB

Long crack

", 5'-6"

JEG/BMJ

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

3. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

VIEW B-B

B

B

3'-7"2'-0"

R27

CONCRETE REPAIR - PIER 13

16'-6"1'-6"

36'-0"

CL Structure

16'-6" 1'-6"

", 2'-0" Long crack

", 2'-0" Long crack

3'-0"

VIEW A-A

A C

T U

A L F I L E R

P ie r S

F .D

G N

3'-0"

(Typ.)

" = 1'-0"2

1JEG/BMJ

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

3. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

ELEVATION VIEW A-A

VIEW B-B

B B

1'-9"

6"

1'-9"

6" Exposed rebar rebar 12" & 6" Exposed

R28

NORTH FACE

CONCRETE REPAIR - PIER 14

16'-6"1'-6"

36'-0"

CL Structure

16'-6" 1'-6"

A C

T U

A L F I L E R

P ie r N

F .D

G N

" = 1'-0"2 face North

JEG/BMJ

3'-0"

(Typ.)

A

A LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

3. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

ELEVATION VIEW A-A

1'-8"

1'-6"

R29

SOUTH FACE

CONCRETE REPAIR - PIER 14

16'-6"1'-6"

36'-0"

CL Structure

16'-6" 1'-6"

6"

", 5'-0" Long crack

3'-0"

(Typ.)

A C

T U

A L F I L E R

P ie r S

F .D

G N

" = 1'-0"2

1JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

A

A

2'-6"

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1'-0"

A

A

VIEW A-A

R30

NORTH FACE

CONCRETE REPAIR - ABUTMENT 2

2'-6"

(Typ.)

A C

T U

A L F I L E R

A b u tm e n t-

N

F .D

G N

CL Structure

16'-9"1'-3" 16'-9" 1'-3"

" = 1'-0"2

1JEG

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Note:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

1Scale:

A

A

"1'-0"

" = 1'-0"8 3Scale:

PLAN

50'-0"

1'-0"

REFLECTIVE DECK

CONDRETE REPAIR - SPAN 1

R31

VIEW A-A

As shown 31

A C

T U

A L F I L E R

R e fl e c ti v e D e c k S p a n .D

G N

CL Structure

L Abutment 1 L Pier 1C C

JEG

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

PLAN

A

VIEW A-A

1'-6"

50'-0"

6" Exposed rebar

2'-1"

3'-0"

2'-1"

1'-6"

1'-6"

1'-0"

REFLECTIVE DECK

CONCRETE REPAIR - SPAN 4

3"

R32

A C

T U

A L F I L E R

R e fl e c ti v e D e c k S p a n .D

G N

CL Structure

" = 1'-0"8

L Pier3 L Pier 4C C

JEG

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

12" Exposed rebar

JG 33

R33

A C

T U

A L F I L E R

R e fl e c ti v e D e c k S p a n

.D

G N

12" Exposed rebar

REFLECTIVE DECK

CONCRETE REPAIR - SPAN 5 & 6

CL Structure

" = 1'-0"8

L Pier 5C

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

1. Epoxy coat all exposed reinforcement according to

Note:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

B

50'-0"

6"

A

A

1'-6"

REFLECTIVE DECK

CONCRETE REPAIR - SPAN 7

B

"4 31'-5

"4 31'-5

"4 31'-5

"4 31'-5 4

VIEW B-B

R34

A C

T U

A L F I L E R

R e fl e c ti v e D e c k S p a n .D

G N

4"

4"

CL Structure

" = 1'-0"2

4" Exposed rebar

L Pier 6 L Pier 7C C

VIEW A-A

JEG

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

" = 1'-0"8 3Scale:

PLAN

50'-0"

C

C

" = 1'-0"8 3Scale:

VIEW A-A

1'-3"

B

B D

D

Scale: 1" = 1'-0"

5'-0"

A C

T U

A L F I L E R

R e fl e c ti v e D e c k s p a n .D

G N

12" Exposed rebar

A

A

1'-0"12" Exposed rebar 2'-0"

" = 1'-0"8 3Scale:

VIEW B-B

" = 1'-0"8 3Scale:

VIEW C-C

" = 1'-0"8 3Scale:

VIEW D-D

9" 9"

6"

6" 6"

West faceEast face

Scale: 1" = 1'-0"

6"

2'-0" Exposed rebar

2'-0" Exposed rebar

R35

REFLECTIVE DECK

CONCRETE REPAIR - SPAN 9

As shown

CL Structure

East face

SECTION E-E

SECTION F-F

F

F

E

E

L Pier 8 L Pier 9C C

1'-4"

JEG

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

50'-0"

VIEW A-A

A

A

12" Exposed rebar

VIEW B-B VIEW C-C

2'-6" Exposed rebar6"

12" Exposed rebar

B

B

CC

1'-0"

R36

(Typ.)

6" Exposed rebar

A C

T U

A L F I L E R

R e fl e c ti v e D e c k S p a n

.D

G N

REFLECTIVE DECK

CONCRETE REPAIR - SPAN 10 & 11

L StructureC

" = 1'-0"8

L Pier 10C

JEG

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

50'-0"

A

A

A C

T U

A L F I L E R

R e fl e c ti v e D e c k S p a n

.D

G N

VIEW A-A VIEW B-B

B

B

12" Exposed rebar12" Exposed rebar 12" Exposed rebar

6" Exposed rebar

6" Exposed rebar

6" Exposed rebar

12" Exposed rebar 6" Exposed rebar

R37

REFLECTIVE DECK

CONCRETE REPAIR - SPAN 12

CL Structure

" = 1'-0"8

L Pier 11 L Pier 12

JEG

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

C C

Subsection 552.19 and as directed by the CO.

1. Epoxy coat all exposed reinforcement according to

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

C

T U

A L F I L E R

R e fl e c ti v e D e c k S p a n

.D

G N

VIEW B-B VIEW C-C

C

C

12" Exposed rebar

6" Exposed rebar

VIEW A-A

B

B

A A

1'-6"

1'-0"

6" Exposed rebar

12" Exposed rebar

6" Exposed rebar

6" Exposed rebar

6" Exposed rebar

R38

REFLECTIVE DECK

CONCRETE REPAIR - SPAN 13 & 14

CL Structure

" = 1'-0"8

L Pier 13C

JEG

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske

C

T U

A L F I L E R

R e fl e c ti v e D e c k S p a n

.D

G N

VIEW C-C VIEW D-D

C

C

VIEW A-A

B B

"1

1'-0"3"

VIEW B-B

1'-6"

10'-0"

2'-0"

3'-0"

A A

D D

6" exposed rebar

REFLECTIVE DECK

CONCRETE REPAIR - SPAN 15

R39

CL Structure

" = 1'-0"8

L Pier 14C

JEG

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

Structure Number

-J u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d g

NUMBER

SHEET

BRIDGE PLAN SHEET

NO.NO.

41932 222535

NPSPMIS

COLONIAL NATIONAL HISTORICAL PARK

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

4290-022P

74ofAD Phillip Boinske u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

"8

"8

(Typ.)

Existing girder

(Typ.)

Existing curb

(Typ.)

Existing deck

6" Min.

(See Note 1)

New scupper extension

1'-9"

SCUPPER EXTENSION DETAIL

(Typ.)

structural tubing

" 2 1Existing 9" x 5" x

AD AD

Varies

30°

30°

R40

A C

T U

A L F I L E R

S c u p p e r

E x t_

D e t.

D G

N

" = 1'-0"2

Notes:

1. Match new scupper extension dimensions, gauge and color to existing or provide alternate scupper extension design as approved by the CO.

2. Field verify existing scupper dimension.

STATE PROJECT

NUMBER

SHEET

NO.NO.

41932 222535

NPSPMIS

DATE

U.S. DEPARTMENT OF TRANSPORTATION

HALFWAY CREEK BRIDGE

SCHEDULE A

BRP-1257

u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

Bridge Length: 287'-0"

Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Exp. Fix Fix FixExp. Exp.Exp.

R41

(Typ.)

abutment joint

Clean and reseal

CL Abutment 1

CL Pier 1

Elev. 19.45

Sta. 362+65.71

End Bridge

A C

T U

A L F I L E R

K in g s

C r e e k P

E .D

G N

-0.62%

N

41AD

PLAN AND ELEVATION

-10

-20

MWH : 0.89

Elev. 22.57

Sta. 356+42.29

Begin Bridge

MWL : -1.37

Elev. 19.45

Sta. 362+65.71

End Bridge

Elev. 22.57

Sta. 356+42.29

Begin Bridge

1" = 30'-0"

48'-0" 48'-0" 48'-0" 48'-0" 48'-0" 48'-0" 48'-0" 48'-0" 48'-0" 48'-0" 48'-0" 48'-0" 48'-0"

CL Pier 2 CL Pier 3 CL Pier 4 CL Pier 5 CL Pier 6 CL Pier 7 CL Pier 8 CL Pier 9 CL Pier 10 CL Pier 11 CL Pier 12

CL Abutment 1

Creek

Kings

13 Spans @ 48'-0" 624'-0"

10'-0" 10'-0"

L BridgeC

PLAN

24'-0" 12'-0"12'-0" line

Existing ground

(Typ.)

Scupper

JEG

Clean and seal deck surface limit

KINGS CREEK BRIDGE

SCHEDULE B AND D

surface

Clean and seal deck

(Typ.)

precompressed hybrid seal joints at abutments and piers with

Replace compression seal joints

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

41932

222535 NP-COLO 1B37, 1D46VA

Phillip BoinskePCB of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

COLONIAL NATIONAL HISTORICAL PARK

BRP-1257

4290-012P u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

C

40'-11"

L Structure

4'-0""2 11'-5 15'-0" 15'-0" 4'-0" "2

11'-5

9"

TYPICAL SECTION

"2 13'-5 7'-6" 3'-0" 3'-0" 6'-6" 7'-6" "2

13'-5

9"

R42

A C

T U

A L F I L E R

K in g s

C r e e k

T y p

X S .D

G N

NEAR PIER NEAR ABUTMENT

1.4%

6'-6"

TYPICAL SECTION

2'-6"

(Typ.)

" = 1'-0"2

1AD

seat (Typ.)

Existing bearing substructure

Existing concrete

1.4%

(See Note 1) Utility Conduit

JEG

Clean and seal deck surface limit

KINGS CREEK BRIDGE

SCHEDULE B AND D

by the CO.

conduit to bottom flange of girder as directed

1. Replace missing anchor clips connecting utility

Note:

surface

Clean and seal deck deck

Existing concrete

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

41932 of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

COLONIAL NATIONAL HISTORICAL PARK

BRP-1257

4290-012P u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

2'-6"

2'-6"

5'-0" 13'-2" 13'-2" 5'-0"

36'-4"

3'-6"2'-6"

1'-0"

1'-0"

1'-4"

8"

2'-0"

7'-0"

B B

VIEW B-B

VIEW D-D

D D

C

C

1'-0"

(Typ.)

As shown

1'-0"

Face of column

WEST FACE

CONCRETE REPAIR - PIER 2

ELEVATION

A

A

VIEW A-A

1'-0" 1'-0"

1'-8"

AD 43

R43

A C

T U

A L F I L E R

K in g 's C r e e k P ie r

W F .D

G N

VIEW C-C SECTION E-E

E E

North face South face

Scale: 1" = 1'-0"

" = 1'-0"2 1Scale:

" = 1'-0"2 1Scale: " = 1'-0"2

1Scale: " = 1'-0"2 1Scale:

JEG/BMJ

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Note:

" = 1'-0"2 1Scale:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

41932

PROJECT TEAM LEADER

of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

COLONIAL NATIONAL HISTORICAL PARK

BRP-1257Phillip Boinske

4290-012P

KINGS CREEK BRIDGE

SCHEDULE B

u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

2'-6"

5'-0" 13'-2" 13'-2" 5'-0"

36'-4"

3'-6"

2'-0"

1'-3" 1'-3"

2'-6"

1'-6"

2'-0"

1'-6"

6"

1'-6"

As shown

(Typ.)

"1

10"

ELEVATION

" = 1'-0"2 1Scale:

A

A

VIEW A-A

EAST FACE

CONCRETE REPAIR - PIER 2

6"

Scale: 1" = 1'-0"

AD 44

R44

A C

T U

A L F I L E R

K in g 's C r e e k P ie r

E F .D

G N

2'-6"

SECTION B-B

BB

South face

JEG/BMJ

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Note:

" = 1'-0"2 1Scale:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

41932

PROJECT TEAM LEADER

of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

COLONIAL NATIONAL HISTORICAL PARK

BRP-1257Phillip Boinske

4290-012P

KINGS CREEK BRIDGE

u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

5'-0" 13'-2" 13'-2" 5'-0"

36'-4"

2'-6"

D DB B

" = 1'-0"2 1Scale:

1'-0"

" = 1'-0"2 1Scale:

VIEW D-D

" = 1'-0"2 1Scale:

VIEW C-C

" = 1'-0"2

1Scale:

VIEW B-B

"2 12'-11

1'-0" 2'-0"

1'-6"

1'-0"

6"

2'-6"

(Typ.)

Face of column

As shown

4290-012P

Missing anchor bolt

WEST FACE

CONCRETE REPAIR - PIER 3

A

A

ELEVATION

", 2'-0" Long crack16

", 3'-0" Long crack16

Scale: 1" = 1'-0"

AD

R45

A C

T U

A L F I L E R

K in g 's C r e e k P ie r

W F .D

G N

6"

SECTION E-E

E E

C

C

North face

JEG/BMJ

VIEW A-A

" = 1'-0"2 1Scale:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 564.08.

3. Replace all missing anchor bolts according to

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

41932 of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

COLONIAL NATIONAL HISTORICAL PARK

BRP-1257

4290-012P

KINGS CREEK BRIDGE

u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

5'-0" 13'-2" 13'-2" 5'-0"

36'-4"

2'-6"

" = 1'-0"2 1Scale:

1'-6"

1'-3"

1'-0"

1'-9"

As shown

2'-6"

(Typ.)

", 5'-0" Long crack16

EAST FACE

CONCRETE REPAIR - PIER 3

ELEVATION

chamfer

", 2'-6" Long crack on8

1'-0"

AD

sheet for repair area

- PIER 3 WEST FACE"

See "CONCRETE REPAIR

Scale: 1" = 1'-0"

R46

A C

T U

A L F I L E R

K in g 's C r e e k P ie r

E F .D

G N

SECTION B-B

B B

North face

JEG/BMJ

DETAIL" sheet.

2. Repair all cracks as shown in the "CONCRETE REPAIR

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

A

A

VIEW A-A

" = 1'-0"2 1Scale:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

41932 of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

COLONIAL NATIONAL HISTORICAL PARK

BRP-1257

4290-012P

KINGS CREEK BRIDGE

u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

5'-0" 13'-2" 13'-2" 5'-0"

36'-4"

2'-6"

6" 1'-3"

9"

2'-0"

C

C

E E

" = 1'-0"2 1Scale:

VIEW C-C

" = 1'-0"2 1Scale:

VIEW E-E

1'-8"

1'-0"

As shown

2'-6"

(Typ.)

Missing anchor boltMissing anchor boltMissing anchor bolt Missing anchor bolt

WEST FACE

CONCRETE REPAIR - PIER 4

AD

Scale: 1" = 1'-0" Scale: 1" = 1'-0"

1'-3"

6"

4" Exposed rebar

R47

A C

T U

A L F I L E R

K in g 's C r e e k P ie r

W F .D

G N

B B D D

SECTION D-DSECTION B-B

North face South face

JEG/BMJ

A

A

VIEW A-A

ELEVATION

" = 1'-0"2 1Scale:

" = 1'-0"2 1Scale:

LEGEND:

- Spall - Crack

Reinforcement

- Exposed

Subsection 564.08.

3. Replace all missing anchor bolts according to

Subsection 552.19 and as directed by the CO.

2. Epoxy coat all exposed reinforcement according to

DETAIL" sheet.

1. Repair all spalls as shown in the "CONCRETE REPAIR

Notes:

NPS

NO.NO.

PMIS STATE PROJECT

NUMBER

SHEET

41932 of

DATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BRP NO.BRIDGE PLAN SHEET

COLONIAL NATIONAL HISTORICAL PARK

BRP-1257

4290-012P

KINGS CREEK BRIDGE

u n -2

1:

P

M M

P R

O J E

C T

S c o lo 1D

B r id g e M ic r o s ta ti o n B r id g e

D e s ig n

F il e s P

R O J E

C T

S .d

This is the start of the file's text. The full file is on GovTribe.