Bridge Inspection Report_STR# 4290-022P

View the file

Other files for this federal contract opportunity

Other files attached to Colonial National Historical Park, newest first.
File Type Posted
Results_of_Bid_Opening_-_NP-COLO_1B37,_1D46.pdf PDF
Plans_-_NP-COLO_1B37,_1D46.pdf PDF
Kings_Creek_As-Built.pdf PDF
Bridge_Inspection_Report_STR__4290-012P.pdf PDF
FP14_Eng.pdf PDF
Halfway_Creek_As-Built.pdf PDF
Bridge_Inspection_Report_STR__4290-011P.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
IFB_Solicitation_-_NP-COLO_1B37,_1D46.pdf PDF
Felgate's_Creek_As-Built.pdf PDF
Certification_Program_for_Bridge_Temporary_Works.pdf PDF
VETS-4212_Form.pdf PDF
NEPA_(Categorical_Exclusion_Form).pdf PDF
Synopsis_-_NP-COLO_1B37,_1D46.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 4290-022P

HALFWAY CREEK BRIDGE INSPECTION DATE: 6/14/17

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... TEE BEAM NO. OF APPR. SPANS:

# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 851.7 FT (259.6 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 56.7 FT (17.3 M)

WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 36.7 FT (11.2 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 30.0 FT (9.1 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... 1D4 / NONE SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1985-Joint repair. 2004-Railing repair. 2003, 2008-Underwater insp. 2011-Concrete repairs to deck, super, and subst; Riprap placed at N Abut; Deck exp joints sealed.

LOCATION

COLONIAL NATIONAL HISTORICAL PARK MILE POINT: ..................... 15.36 (KM PT 24.72)

STATE: ................................. VIRGINIA LOCATION: 0.9 MILES SOUTH OF ROUTE 199.

FACILITY CARRIED: ............ COLONIAL PARKWAY

FEATURE INTERSECTED: .. HALFWAY CREEK

STRUCTURE EVALUATION SUMMARY

This concrete tee-beam bridge has some problem areas that are pressing and need to be addressed. Several areas of concrete spalling are present, primarily in the deck underside, beams, and substructure, and several previously repaired (in 2011) areas are deteriorating as well.

The delamination and spalling of the bearing areas at the pier caps appears to be progressing, as evidenced by a new spall on the south side of the west end of the Pier #14 cap. The spall has resulted in a loss of bearing for the full width of the steel bearing plate by up to 1/2" wide. The bridge plans indicate the bearing plate as actually the top flange of an embedded tee section, which provides significant capacity for the bearing for the time being. Regardless, to help ensure safe use of the bridge, this and other delaminated and spalled bearing areas should be addressed with a more comprehensive and effective repair project in the near future.

This structure is scheduled for rehabilitation under Project No. COLO 1B37, 1D46. The scope of this project includes repair of all deteriorated concrete on the piers, deck underside, abutments, beams and diaphragms, install scupper extensions, and reseal the deck expansion joints.

INSPECTION TEAM: G. GOODLIN, Z. BAILEY

CONDITION ASSESSMENT:

GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 10/31/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 4290-022P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

60.13,15 REMOVE UNSOUND CONCRETE FROM PIER CAPS AND COLUMNS,

CLEAN REBAR, AND PLACE NEW CONCRETE TO ORIGINAL

DIMENSIONS.

1 LS

58.1 CLEAN AND SEAL DECK SURFACE. 1 LS

58.2 CLEAN AND RESEAL DECK EXPANSION JOINTS AS NECCESSARY. 1 LS

58.7, 59.2 EXTEND SCUPPERS TO ALLOW DRAINAGE TO CLEAR CONCRETE

BEAMS.

1 LS

58.1,5,6, 59.2

CLEAN EXPOSED REBAR THROUGHOUT DECK UNDERSIDE,

RAILINGS, AND BEAMS AND COAT WITH AN APPROVED SEALANT.

1 LS

58.1 SEAL CRACKS IN DECK SURFACE AS NECESSARY. 1 LS

58, 59, 60 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)

PLUS PARK LOCATION FACTOR.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 4290-022P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

OTHER

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

FOUNDATIONS

CAPS AND/OR BEARING SEATS

PILE BENTS

WALLS AND/OR COLUMNS

PIER(S)

OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

F F N N N F N N G

N F

G N G G N G N N G G G

G(ENCLOSED SPAN)

F N F N G G N

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12.

13.

14.

15.

16.

17.

18.

19.

58.1 WIDESPREAD MINOR TO MODERATE MAP, LONGITUDINAL, AND

DIAGONAL CRACKING (UP TO 1/16"W) AND WIDESPREAD SCALING

OF DECK SURFACE. MINOR TRANSVERSE CRACKING OF DECK

SURFACE IN SPANS #1 AND #2. MINOR EDGE SPALLING OF DECK

SURFACE ALONG EXPANSION JOINTS AT ISOLATED LOCATIONS.

NUMEROUS REPAIRED AREAS IN DECK SURFACE; ISOLATED AREAS

OF DELAMINATION AND SPALLING REMAIN. MAP CRACKING OF

REPAIRS AT ISOLATED LOCATIONS.

NUMEROUS REPAIRED AREAS IN DECK UNDERSIDE; MINOR

CRACKING OF REPAIRS. MINOR SPALLING OF DECK UNDERSIDE

WITH EXPOSED REBAR DUE TO INADEQUATE CONCRETE COVER AT

ISOLATED LOCATIONS, ESPECIALLY NEAR SCUPPERS. MINOR

DELAMINATION OF DECK UNDERSIDE AT ISOLATED LOCATIONS.

MINOR TRANSVERSE, LONGITUDINAL, AND DIAGONAL CRACKING,

SOME WITH EFFLORESCENCE, ON DECK UNDERSIDE; SOME

CRACKS HAVE REFLECTED THROUGH FROM DECK SURFACE.

MINOR VERTICAL CRACKING OF OUTSIDE FACES OF DECK;

NUMEROUS REPAIRED AREAS.

58.2 ISOLATED LOCATIONS OF MINOR TEARS OR MISSING SECTIONS

AND ADHESION FAILURE OF DECK EXPANSION JOINT SEALANT.

58.5 MINOR VERTICAL AND MAP CRACKING AND SCALING OF CURBS.

NUMEROUS REPAIRED AREAS IN CURBS; ISOLATED AREAS OF

MINOR SPALLING REMAIN.

SURVEY MARKER ON EAST CURB AT BOTH APPROACHES.

58.6 MINOR CRACKING OF RAILINGS AT EXPANSION JOINTS AND

ELSEWHERE. MINOR SPALLING WITH EXPOSED REBAR ON

RAILINGS AT ISOLATED AREAS.

58.7 MINOR ACCUMULATION OF SAND AND GRAVEL ALONG CURBLINES.

MINOR TO MODERATE ACCUMULATION OF SAND AND DEBRIS

ALONG SIDEWALK. SEE ALSO 59.2.

59.1 MODERATE RUSTING OF STEEL BEARING PLATES WITH MINOR

SECTION LOSS.

N G G G F N

N

F

G

F

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 8

G G N G G

LOW

SUFF

12 FT.

SILT

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS 7.

SETTLEMENT 6.

EROSION 5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

1. APPROACH SLABS F

G G G G G F G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION 5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 1

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

59.2,6 REINFORCED CONCRETE TEE-BEAM SUPERSTRUCTURE;

SCUPPERS DRAIN DIRECTLY ONTO INSIDE FACE OF EXTERIOR

BEAMS, RESULTING IN MODERATE SCALING.

NUMEROUS REPAIRED AREAS IN BEAMS AND DIAPHRAGMS; MINOR

CRACKING OF REPAIRS. MINOR DELAMINATION ON UNDERSIDE OF

BEAMS AT ISOLATED LOCATIONS. WIDESPREAD MINOR CRACKING

AND ISOLATED AREAS OF MINOR SPALLING WITH EXPOSED REBAR

ON BEAMS AND DIAPHRAGMS. MINOR VERTICAL CRACKING OF

EXTERIOR FACE OF BEAMS. MINOR TO MODERATE DIAGONAL

CRACKING AND MINOR DELAMINATION OF ENDS OF EXTERIOR

BEAMS. MODERATE SPALLING OF BEAM ENDS DUE TO RUSTING OF

BEARING PLATES AT ISOLATED LOCATIONS. SEE ALSO 59.1.

MODERATE CRACKING, DELAMINATION, AND SPALLING OF WEST

FACE OF BEAM #1 AT NORTH ABUTMENT. MINOR LONGITUDINAL

CRACK WITH EFFLORESCENCE ALONG INTERFACE BETWEEN BOTH

SIDES OF BEAM #2 AND DECK NEAR NORTH ABUTMENT.

MINOR VERTICAL CRACKING OF END DIAPHRAGMS.

59.10 DECK AND SUPERSTRUCTURE APPEAR TO HAVE SHIFTED

LATERALLY AT SEVERAL SPANS (UP TO 1"); NO CHANGE SINCE LAST

INSPECTION.

60.1 MINOR VERTICAL AND MAP CRACKING OF ABUTMENT

BREASTWALLS. MINOR CRACKING WITH EFFLORESCENCE ON

SOUTH ABUTMENT BREASTWALL, BOTH SIDES.

60.6 MINOR TO MODERATE HORIZONTAL AND MAP CRACKING WITH

EFFLORESCENCE ON WINGWALLS.

60.11 NORTH ABUTMENT SLOPE PROTECTED WITH RIPRAP.

60.12 ENCLOSED SPANS AT BOTH ABUTMENTS.

ADDITIONAL ITEM REFERENCE AND REMARKS

60.13,15 NUMEROUS REPAIRED AREAS IN PIER COLUMNS; MINOR CRACKING OF REPAIRS. MINOR VERTICAL CRACKING, DELAMINATION, AND SPALLING OF PIER COLUMNS (BOTH CONCRETE AND GRANITE PORTIONS);

EFFLORESCENCE AND RUST STAINING AT SOME LOCATIONS. MODERATE SPALLING WITH EXPOSED REBAR AT

ISOLATED LOCATIONS .

NUMEROUS REPAIRED AREAS IN PIER CAPS. MINOR CRACKING, SPALLING, AND DELAMINATION OF SEVERAL PIER CAPS DUE TO INADEQUATE CONCRETE COVER AT ISOLATED LOCATIONS. MINOR TO MODERATE SPALLING WITH EXPOSED REBAR BELOW BEARINGS AT ISOLATED LOCATIONS. MODERATE SPALL (21"W X 38"H X 6"D) WITH EXPOSED REBAR IN PREVIOUSLY REPAIRED AREA AT SOUTHWEST CORNER OF PIER #14, RESULTING IN LOSS OF

BEARING FOR FULL WIDTH OF BEARING PLATE X UP TO 1/2"W.

MODERATE VERTICAL CRACKING WITH HEAVY EFFLORESCENCE AT CENTERLINE OF BOTH EXTERIOR FACES OF

EACH PIER EXTENDING FULL HEIGHT OF COLUMNS AND CAPS.

61.2 MINOR EROSION OF SOUTH CHANNEL BANK BELOW STRUCTURE.

222.1 MINOR EDGE SPALLING OF BOTH ABUTMENT SLABS ALONG JOINTS. MINOR MAP AND TRANSVERSE CRACKING OF NORTH ABUTMENT SLAB; MODERATE FULL-DEPTH DIAGONAL CRACKING OF SOUTHEAST CORNER.

222.2 MINOR DETERIORATION OF RELIEF JOINT SEALS AT BOTH APPROACHES. MINOR VEGETATION GROWTH AT

SOUTH APPROACH RELIEF JOINTS.

222.3 MINOR TO MODERATE CHECKING AND SPLINTERING OF TIMBER APPROACH GUARDRAILS; VEGETATION GROWTH

AT TRANSITIONS.

222.7 REFLECTORS ON ENDS OF NORTHWEST AND SOUTHEAST PARAPETS ARE NOT VISIBLE BEHIND TIMBER

APPROACH GUARDRAILS.

"HALFWAY CREEK" SIGN AT WEST SIDE OF NORTH APPROACH AND EAST SIDE OF SOUTH APPROACH.

STRUCTURE LOAD RATING STRUCTURE NO. 4290-022P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 20 18 33 30

HS 25 23 42 38

TYPE 3 23 21 39 35

TYPE 3S2 36 33 60 54

TYPE 3-3 44 40 74 67

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 1/15

LOAD RATING CONTROLLED BY: BEAM MOMENT CAPACITY

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-022P

STRUCTURE IDENTIFICATION

(201) PARK: COLONIAL NATIONAL HISTORICAL PARK (1) STATE: ....................................... 513 - VIRGINIA (VA)

(202) STRUCTURE NAME: .......... HALFWAY CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 095 - JAMES CITY

(204) STRUCTURE NUMBER: ..... 4290-022P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 3 - NORTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... HALFWAY CREEK

(207) ROAD SECTION NO: .......... 022P (7) FACILITY CARRIED: .................. COLONIAL PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 4290022P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.9 MILES SOUTH OF ROUTE

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 1D4 (11) MILE POINT: ............................. 15.36 (KM PT 24.72)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

1 - CONCRETE

04 - TEE BEAM

56.7 FT (17.3 M)

851.7 FT (259.6 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 25.0 TONS (22.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 42.0 TONS (38.1 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. YES

(221) SPECIAL STUDY DATE: INSP. EVERY: 60 MONTHS - LAST INSP. : 6/13

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-022P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(51) CURB TO CURB WIDTH: ........... 30.0 FT (9.1 M)

(16) LATITUDE: ............................. 37°14'01.90"

(17) LONGITUDE: ......................... 76°41'49.30"

(19) DETOUR LENGTH: ............... 5 MI (8 KM)

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ... 00

(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN

(42B) SERVICE UNDER: .............. 5 - WATERWAY

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ... N - NONE

(38) NAVIGATION CONTROL?: ... 0

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

36.7 FT (11.2 M)

40.0 FT (12.2 M)

30.0 FT (9.1 M)

5.0 FT (1.5 M)

5.0 FT (1.5 M)

0 - NO MEDIAN

0 °

NO

30.0 FT (9.1 M)

3.0 FT (0.9 M)

0.0 FT (0.0 M)

1 - FULL HEIGHT (NO PARAPE

1 - CONCRETE

1 - CONTINUOUS RAIL

2.50 FT (0.76 M)

99.99 FT (99.99 M)

0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1111

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

T - Tidal. Low risk. Not yet evalu

2 - REHAB/RECONSTRUCTION

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1985-Joint repair. 2004-Railing repair. 2003, 2008-Underwater insp. 2011-Concrete repairs to deck, super, and subst; Riprap placed at N Abut;

Deck exp joints sealed.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:76�41'49.30 http:37�14'01.90

APPENDIX STRUCTURE NO. 4290-022P

PHOTOGRAPHS STRUCTURE NO. 4290-022P

PHOTO #1 - LOOKING NORTH TOWARD WILLIAMSBURG

FLOW

PHOTO #2 - EAST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW OF STRUCTURE LOOKING SOUTH

PHOTO #4 - TYPICAL DIAGONAL CRACKING AND WIDESPREAD

SCALING OF DECK SURFACE, SPAN #15 SHOWN

PHOTO #5 - TYPICAL DIAGONAL CRACKING AND WIDESPREAD

SCALING OF DECK SURFACE, SPAN #1 SHOWN; ALSO NOTE EDGE

SPALLING OF DECK SURFACE ALONG EXPANSION JOINTS

PHOTO #6 - TYPICAL TRANSVERSE CRACKING OF DECK SURFACE IN

SPANS #1 AND #2, SPAN #1 SHOWN

PHOTO #7 - TYPICAL REPAIRED AREAS IN

DECK SURFACE WITH MAP CRACKING, SPAN

#10 SHOWN

PHOTO #8 - TYPICAL TEARS AND ADHESION

FAILURE OF DECK EXPANSION JOINT

SEALANT, JOINT OVER PIER #9 SHOWN

PHOTO #9 - TYPICAL SPALLING AND CRACKING REPAIRED AREA OF

CURBS, WEST CURB IN SPAN #12 AT PIER #12 SHOWN

PHOTO #10 - TYPICAL SCALING OF CURBS, WEST CURB IN SPAN #5 AT

PIER #4 SHOWN

PHOTO #11 - TYPICAL SPALLING WITH EXPOSED REBAR ON RAILINGS,

WEST RAILING IN SPAN #13 SHOWN

PHOTO #12 - DECK AND SUPERSTRUCTURE APPEAR TO HAVE SHIFTED

LATERALLY AT SEVERAL SPANS, SHIFTED RAILING IN SPAN #4 OVER

PIER #3 SHOWN

PHOTO #13 - FULL-DEPTH DIAGONAL

CRACKING OF NORTH ABUTMENT SLAB AT

SOUTHEAST CORNER

PHOTO #14 - TYPICAL DETERIORATION OF

RELIEF JOINT SEALS AT BOTH APPROACHES,

SOUTH APPROACH SHOWN

PHOTO #15 - REFLECTOR AT END OF

NORTHWEST PARAPET NOT VISIBLE BEHIND

TIMBER APPROACH GUARDRAIL; ALSO NOTE

TYPICAL CRACKING OF RAILINGS

PHOTO #16 - GENERAL UNDERSIDE VIEW OF

STRUCTURE IN SPAN #2 LOOKING NORTH

PHOTO #17 - TYPICAL DIAGONAL CRACKING, SOME WITH

EFFLORESCENCE, ON DECK UNDERSIDE, SPAN #15 BETWEEN BEAMS

#4 AND #5 SHOWN

PHOTO #18 - TYPICAL SPALLING OF DECK UNDERSIDE WITH EXPOSED

REBAR AT ISOLATED LOCATIONS, ESPECIALLY NEAR SCUPPERS,

BETWEEN BEAMS #1 AND #2 IN SPAN #4 SHOWN

PHOTO #19 - TYPICAL VERTICAL CRACKING OF

OUTSIDE FACES OF DECK AND EXTERIOR

FACE OF BEAMS, EAST SIDE IN SPAN #2

SHOWN

PHOTO #20 - SCUPPERS DRAIN DIRECTLY

ONTO INSIDE FACE OF EXTERIOR BEAMS,

SPAN #15 AT BEAM #1 SHOWN

PHOTO #21 - CRACKING, DELAMINATION, AND

SPALLING OF WEST FACE OF BEAM #1 AT

NORTH ABUTMENT

PHOTO #22 - TYPICAL DELAMINATION ON

UNDERSIDE OF BEAMS; BEAM #2 IN SPAN #4

SHOWN; ALSO NOTE TYPICAL SPALLING WITH

EXPOSED REBAR ON BEAMS

PHOTO #23 - TYPICAL LONGITUDINAL CRACK WITH EFFLORESCENCE

ALONG INTERFACE BETWEEN BOTH SIDES OF BEAM #2 AND DECK

NEAR NORTH ABUTMENT, WEST SIDE SHOWN

PHOTO #24 - TYPICAL SPALLING WITH EXPOSED REBAR ON

DIAPHRAGMS, BETWEEN BEAMS #1 AND #2 IN SPAN #3 AT PIER #2

SHOWN

PHOTO #25 - CRACKING ON EXTERIOR SIDE

OF WEST BEAM ENDING ON PIER #14

PHOTO #26 - TYPICAL CRACKING WITH

EFFLORESCENCE ON SIDES OF SOUTH

ABUTMENT BREASTWALL, EAST SIDE SHOWN

PHOTO #27 - TYPICAL HORIZONTAL AND MAP CRACKING WITH

EFFLORESCENCE ON WINGWALLS, NORTHWEST WINGWALL SHOWN

PHOTO #28 - EROSION OF SOUTH CHANNEL BANK BELOW STRUCTURE

PHOTO #29 - SPALL WITH EXPOSED REBAR IN

PREVIOUSLY REPAIRED AREA AT SOUTHWEST

CORNER OF PIER #14

PHOTO #30 - SPALL WITH EXPOSED REBAR IN

PREVIOUSLY REPAIRED AREA AT SOUTHWEST

CORNER OF PIER #14

PHOTO #31 - CLOSE-UP OF PREVIOUS PHOTO; NOTE LOSS OF

BEARING

PHOTO #32 - TYPICAL SPALLING WITH EXPOSED REBAR ON PIER CAPS

BELOW BEARINGS, SOUTH SIDE OF PIER #4 SHOWN

PHOTO #33 - TYPICAL VERTICAL CRACKING

WITH EFFLORESCENCE AT CENTERLINE OF

EXTERIOR FACES OF PIERS, EAST COLUMN AT

PIER #1 SHOWN; ALSO NOTE TYPICAL

DELAMINATION OF PIER CAPS AND COLUMNS

WITH RUST STAINING

PHOTO #34 - UPSTREAM CHANNEL

PHOTO #35 - DOWNSTREAM CHANNEL