Bridge Inspection Report_STR# 4290-011P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_Opening_-_NP-COLO_1B37,_1D46.pdf | ||
| FP14_Eng.pdf | ||
| Halfway_Creek_As-Built.pdf | ||
| Plans_-_NP-COLO_1B37,_1D46.pdf | ||
| Kings_Creek_As-Built.pdf | ||
| Bridge_Inspection_Report_STR__4290-022P.pdf | ||
| Bridge_Inspection_Report_STR__4290-012P.pdf | ||
| Felgate's_Creek_As-Built.pdf | ||
| Certification_Program_for_Bridge_Temporary_Works.pdf | ||
| VETS-4212_Form.pdf | ||
| NEPA_(Categorical_Exclusion_Form).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| IFB_Solicitation_-_NP-COLO_1B37,_1D46.pdf | ||
| Synopsis_-_NP-COLO_1B37,_1D46.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 4290-011P
FELGATE'S CREEK BRIDGE INSPECTION DATE: 6/13/17
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... PRESTRESSED CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER 0
# OF BEAMS, MAIN SPAN: .. 7 STRUCT. TOTAL LENGTH: .. 275.5 FT (84.0 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 76.0 FT (23.2 M)
WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 55.7 FT (17.0 M)
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 44.0 FT (13.4 M)
PIER FOUNDATION(S): ........ PILE BENT YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 1B27 / NONE SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1985-JNT REPAIR, 2003-HURR. ISABEL CAUSED SEVERE EROSION @ D/S WINGS & APPR
RDWYS; REPAIRED W/ STABILIZED SOIL & RIPRAP.
LOCATION
COLONIAL NATIONAL HISTORICAL PARK MILE POINT: ..................... 5.85 (KM PT 9.41)
STATE: ................................. VIRGINIA LOCATION: 4.4 MILES NORTHWEST OF ROUTE 238.
FACILITY CARRIED: ............ COLONIAL PARKWAY
FEATURE INTERSECTED: .. FELGATE'S CREEK
STRUCTURE EVALUATION SUMMARY
This prestressed concrete multi-beam bridge is in fair to good condition overall. The main problem is widespread deterioration of the concrete superstructure and substructure elements, including cracking, delamination, and spalling with exposed rebar. The unsound concrete should be removed, the rebar cleaned, and new concrete should be placed to the original dimensions. Additional problems include moderate settlement, erosion, and undermining of the southeast drainage flume, and minor to moderate cracking of deck surface. This structure is scheduled for rehabilitation under Project No. COLO 1B37, 1D46. The scope of this project includes repair of all deteriorated concrete on the bent caps, diaphragms, beams, abutments and deck underside, install riprap at the west abutment, fill the undermining at the southeast drainage flume, reseal the expansion joints, and perform concrete injection at construction joints on the deck surface.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: G. GOODLIN, Z. BAILEY
CONDITION ASSESSMENT:
GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 10/31/17
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 4290-011P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
222.5,6 FILL AND STABILIZE EROSION AND UNDERMINING AND SEAL GAP AT SOUTHEAST
DRAINAGE FLUME.
1 CY
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58.6, 59.2,6, 60.15
REMOVE UNSOUND CONCRETE THROUGHOUT STRUCTURE,
CLEAN REBAR, AND PLACE NEW CONCRETE TO ORIGINAL
DIMENSIONS.
1 LS
58.1 CLEAN AND SEAL DECK SURFACE. 1 LS
58.1 SEAL CRACKS IN DECK SURFACE AS NECESSARY. 1 LS
58.2 CLEAN AND RESEAL EXPANSION JOINTS OVER ABUTMENTS. 1 LS
60.9, 61.2,3 PLACE ADDITIONAL SCOUR COUNTER MEASURE ALONG WEST
ABUTMENT AND WEST DOWNSTREAM CHANNEL BANK TO
PREVENT FURTHER EROSION.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)
PLUS PARK LOCATION FACTOR.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 4290-011P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
G G N N N F N N G
N G
N G G G G G
N
F
G
F
58.1 MINOR TO MODERATE TRANSVERSE, LONGITUDINAL, AND
DIAGONAL CRACKING OF DECK SURFACE (PRIMARILY END SPANS).
MINOR TRANSVERSE CRACKING AND SPALLING OF DECK SURFACE
ALONG CONSTRUCTION JOINTS.
WIDESPREAD MINOR TRANSVERSE CRACKING WITH
EFFLORESCENCE ON DECK UNDERSIDE AND UNDERSIDE OF
OVERHANGS; MODERATE OVER BENTS. MINOR DIAGONAL
CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE AT
ABUTMENTS. MINOR DIAGONAL CRACKING WITH EFFLORESCENCE
ON DECK HAUNCHES EXTENDING FROM BEAM TOP FLANGES.
MINOR DELAMINATION AND SPALLING WITH EXPOSED REBAR ON
UNDERSIDE OF NORTH DECK OVERHANG AT CENTER BENT.
58.2 MINOR CRACKING OF POURED JOINT SEALS OVER ABUTMENTS;
MINOR ACCUMULATION OF DEBRIS IN JOINTS.
58.5,6 MINOR VERTICAL CRACKING WITH EFFLORESCENCE AND MINOR
SPALLING OF CURBS AND RAILINGS IN SEVERAL LOCATIONS; SOME
WITH EXPOSED REBAR.
MINOR COLLISION DAMAGE TO SOUTH RAILING, SPAN #2 NEAR
EAST BENT. MINOR SPALLING OF GROUT PAD AT ISOLATED BASE
PLATES OF POSTS FOR PEDESTRIAN RAILING. ANCHOR BOLT NUTS
ON PEDESTRIAN RAILING NOT COMPLETELY THREADED; NUTS
HOLD WATER, CAUSING MINOR RUSTING. 6" DROP-OFF AT EAST
END OF PEDESTRIAN WALKWAY AT EAST APPROACH; UP TO 2"
DROP-OFF AT WEST APPROACH.
58.7 MINOR ACCUMULATION OF DEBRIS ALONG SOUTH CURBLINE OF
PEDESTRIAN WALKWAY.
58.8 UTILITY PIPE (11" DIAMETER) HANGING FROM DECK UNDERSIDE,
SOUTH SIDE, BETWEEN BEAMS #1 AND #2. MINOR RUSTING OF
UTILITY HANGER RODS.
BREASTWALLS OR COLUMNS 1. G
PILE BENTS 2. N
CAPS AND/OR BEARING SEATS 3. N
BACKWALLS AND/OR BULKHEADS 4. N
FOUNDATIONS 5. N
WINGWALLS 6. G
WEEP HOLES 7. N
EXPANSION JOINTS 8. N
EROSION AND/OR SCOUR 9. G
SETTLEMENT OR DEFLECTION 10. G
SLOPE PROTECTION 11. N
OTHER 12. N
PIER(S)
N13. WALLS AND/OR COLUMNS
G14. PILE BENTS
F15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS
G17. EROSION AND/OR SCOUR
G18. SETTLEMENT OR DEFLECTION
N19. OTHER
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
G F F G N
MED
SUFF
7 FT.
SILT, SAND, ROCK
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS 7.
SETTLEMENT 6.
EROSION 5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
1. APPROACH SLABS G
G F G F F G F N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION 5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES 2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.2 MINOR DIAGONAL CRACKING OF BOTTOM FLANGE OF BEAMS AT
ISOLATED ENDS. MINOR SPALLING ON BOTTOM OF BEAM #3, SPAN
#1 NEAR EAST BENT. MINOR SPALLING WITH EXPOSED STIRRUP
ON UNDERSIDE OF BEAM #7, SPAN #1, AT 2/3 POINT FROM EAST
ABUTMENT. MINOR SPALLING WITH EXPOSED STIRRUP ON BEAM
#5, SPAN #2, 1/4 POINT FROM CENTER BENT. MINOR
HONEYCOMBING ON BOTTOM OF BEAM #2, SPAN #3, AT MIDSPAN.
59.6 MINOR TO MODERATE CRACKING, DELAMINATION, AND SPALLING
OF CLOSURE DIAPHRAGMS WITH EXPOSED REBAR ADJACENT TO
BEAMS. MODERATE DELAMINATION AND SPALLING WITH EXPOSED
REBAR OF CLOSURE DIAPHRAGM AT EAST BENT, NORTH END;
MODERATE SPALL (8"L X 8"H X 3"D) WITH EXPOSED REBAR ON
SOUTH END. MINOR HONEYCOMBING OF CLOSURE DIAPHRAGM
BETWEEN BEAMS #3 AND #4 ON EAST FACE OF EAST BENT. MINOR
MAP CRACKING WITH MOISTURE STAINS ON INTERMEDIATE
DIAPHRAGMS.
60.1,4 INTEGRAL BACKWALLS AT BOTH ABUTMENTS. MINOR VERTICAL
AND HORIZONTAL CRACKING WITH EFFLORESCENCE ON BOTH
ABUTMENT BREASTWALLS AND BACKWALLS.
60.6 MINOR VERTICAL AND MAP CRACKING OF WINGWALLS; MINOR
VEGETATION GROWTH. MINOR DELAMINATION ALONG
CONSTRUCTION JOINT AT SOUTHWEST WINGWALL.
60.9, 61.2,3,4 EROSION CAUSED BY HURRICANE ISABEL REPAIRED IN 2003 AT
DOWNSTREAM WINGWALLS; RIPRAP ADDED AT DOWNSTREAM
WINGWALLS AND ALONG WEST ABUTMENT; MINOR TO MODERATE
DISPLACEMENT OF RIPRAP WITH FILTER FABRIC EXPOSED. MINOR
TO MODERATE EROSION OF DOWNSTREAM CHANNEL BANKS (UP
TO 4'D, WEST DOWNSTREAM CHANNEL BANK). MINOR DRIFT
ACCUMULATION ON RIPRAP SLOPE IN FRONT OF WEST ABUTMENT
AND ON WEST DOWNSTREAM CHANNEL BANK.
60.14 MINOR PEELING OF PROTECTIVE COATING ON PILES; MODERATE
BARNACLE ACCUMULATION. MINOR VERTICAL CRACKING WITH
EFFLORESCENCE AND RUST STAINING ON NUMEROUS PILES.
60.15 MINOR VERTICAL AND MAP CRACKING OF EAST BENT CAP, SOME
WITH RUST STAINING; MINOR HORIZONTAL CRACKING WITH RUST
STAINING AND MODERATE DELAMINATION AND SPALLING (7'L TOTAL
X 18"H X 1"D) WITH EXPOSED REBAR ON WEST FACE.
MINOR VERTICAL CRACKING OF CENTER BENT CAP; SEVERAL
AREAS OF MINOR SPALLING AND DELAMINATION OF BOTH FACES
ALONG BOTTOM EDGE OF CAP. MODERATE DELAMINATION AND
SPALLING (FULL LENGTH X UP TO FULL WIDTH X UP TO 1"D) OF
UNDERSIDE OF CENTER BENT CAP WITH EXPOSED AND RUSTED
REBAR CHAIRS AND STIRRUPS. MINOR TO MODERATE HORIZONTAL
CRACKING AT BOTTOM OF EAST AND WEST FACES.
EXPOSED AND RUSTED REBAR CHAIRS ON UNDERSIDE OF WEST
BENT CAP; MODERATE SPALL (5'L X 1'W X 1"D) WITH EXPOSED
REBAR BETWEEN PILES #1 AND #2.
ADDITIONAL ITEM REFERENCE AND REMARKS
222.2 MINOR VEGETATION GROWTH IN RELIEF JOINTS; MODERATE ADHESION FAILURE OF RELIEF JOINTS.
222.3 MINOR TO MODERATE CHECKING, SPLITTING, SPLINTERING (UP TO 10'L X 2"W X 2"D), AND SHAKING OF TIMBER
APPROACH GUARDRAILS.
222.4 MINOR SPALL IN EASTBOUND LANE OF WEST APPROACH ROADWAY. MINOR TRANSVERSE CRACKS AND MINOR
DELAMINATION IN EASTBOUND LANE OF EAST APPROACH ROADWAY.
222.5,6 MINOR SETTLEMENT (UP TO 1") OF APPROACH PAVEMENT AND SHOULDERS ADJACENT TO APPROACH SLAB AT BOTH APPROACHES. MODERATE SETTLEMENT UP TO 5" WITH A 1-1/4" GAP BETWEEN SOUTH DRAINAGE FLUME AND EAST APPROACH SLAB; GAP CAN BE PROBED UP TO 9"D. SOUTH DRAINAGE FLUME AT WEST APPROACH
SETTLED 3".
MODERATE EROSION AND UNDERMINING OF SOUTH DRAINAGE FLUME (5'L X 10"H X 2' UNDER) NEAR BOTTOM AT EAST APPROACH. MINOR EROSION AND UNDERMINING OF SOUTH DRAINAGE FLUME (4'L X 4"W X UP TO 6"
UNDER) NEAR BOTTOM AT WEST APPROACH.
222.7 TYPE 3 OBJECT MARKERS AT ENDS OF TIMBER APPROACH GUARDRAILS. "FELGATES CREEK" AND "NO FISHING FROM BRIDGE" SIGNS AT NORTH SIDE OF EAST APPROACH AND SOUTH SIDE OF WEST APPROACH.
"GOVERNMENT PROPERTY NO TRESPASSING" SIGN MOUNTED TO NORTH SIDE OF BEAM #7 IN CENTER SPAN.
222.8 CURVE AT WEST APPROACH.
STRUCTURE LOAD RATING STRUCTURE NO. 4290-011P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 10 9 36 33
HS 13 12 53 48
TYPE 3 13 12 49 44
TYPE 3S2 16 15 64 58
TYPE 3-3 19 17 65 59
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 2/15
LOAD RATING CONTROLLED BY: BEAM MOMENT CAPACITY
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-011P
STRUCTURE IDENTIFICATION
(201) PARK: COLONIAL NATIONAL HISTORICAL PARK (1) STATE: ....................................... 513 - VIRGINIA (VA)
(202) STRUCTURE NAME: .......... FELGATE'S CREEK BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 199 - YORK
(204) STRUCTURE NUMBER: ..... 4290-011P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 3 - NORTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... FELGATE'S CREEK
(207) ROAD SECTION NO: .......... 011P (7) FACILITY CARRIED: .................. COLONIAL PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 4290011P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 4.4 MILES NORTHWEST OF R
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 1B27 (11) MILE POINT: ............................. 5.85 (KM PT 9.41)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
5 - PRESTRESSED CONCRETE
02 - STRINGER/MULTI-BEAM or GIRDER
76.0 FT (23.2 M)
275.5 FT (84.0 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
4 - PILE BENT
4 - PILE BENT
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 13.0 TONS (11.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 53.0 TONS (48.1 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. YES
(221) SPECIAL STUDY DATE: INSP. EVERY: 60 MONTHS - LAST INSP. : 6/13
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-011P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 44.0 FT (13.4 M)
(16) LATITUDE: ............................. 37°16'26.50"
(17) LONGITUDE: ......................... 76°35'10.20"
(19) DETOUR LENGTH: ............... 10 MI (16 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
55.7 FT (17.0 M)
44.0 FT (13.4 M)
36.0 FT (11.0 M)
6.0 FT (1.8 M)
6.0 FT (1.8 M)
0 - NO MEDIAN
0 °
NO
44.0 FT (13.4 M)
0.0 FT (0.0 M)
8.8 FT (2.7 M)
1 - FULL HEIGHT (NO PARAPE
1 - CONCRETE
1 - CONTINUOUS RAIL
2.50 FT (0.76 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
7 - Countermeasures installed to
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-JNT REPAIR, 2003-HURR. ISABEL CAUSED SEVERE EROSION @ D/S WINGS & APPR RDWYS; REPAIRED W/ STABILIZED SOIL &
RIPRAP.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:76�35'10.20 http:37�16'26.50
APPENDIX STRUCTURE NO. 4290-011P
PHOTOGRAPHS STRUCTURE NO. 4290-011P
PHOTO #1 - LOOKING WESTBOUND TOWARD WILLIAMSBURG
FLOW
PHOTO #2 - SOUTH (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW OF STRUCTURE LOOKING WEST
PHOTO #4 - TYPICAL ACCUMULATION OF DEBRIS ALONG SOUTH
CURBLINE OF PEDESTRIAN WALKWAY, SPAN #1 SHOWN
PHOTO #5 - TYPICAL TRANSVERSE CRACKING
OF DECK SURFACE, SPAN #4 NEAR WEST
ABUTMENT IN EASTBOUND LANE SHOWN
(PHOTO FROM 6/2/15 INSPECTION REPORT)
PHOTO #6 - TYPICAL TRANSVERSE CRACKING
AND SPALLING OF DECK SURFACE ALONG
CONSTRUCTION JOINTS, SPAN #3 NEAR WEST
BENT SHOWN
PHOTO #7 - TYPICAL SPALLING OF GROUT PAD AT BASE PLATES OF
POSTS FOR PEDESTRIAN RAILING; ALSO NOTE TYPICAL RUSTING OF
ANCHOR BOLT NUTS
PHOTO #8 - TYPICAL CHECKING, SPLINTERING, AND SHAKING OF
TIMBER APPROACH GUARDRAILS, NORTH GUARDRAIL AT WEST
APPROACH SHOWN
PHOTO #9 - TYPICAL ACCUMULATION OF
DEBRIS IN POURED JOINT SEALS OVER
ABUTMENTS, WEST EXPANSION JOINT
SHOWN; ALSO NOTE TYPICAL CRACKING OF
JOINT SEALS
PHOTO #10 - TYPICAL ADHESION FAILURE OF
RELIEF JOINTS, EAST APPROACH SLAB
RELIEF JOINT IN EASTBOUND LANE SHOWN;
ALSO NOTE TYPICAL VEGETATION GROWTH
(PHOTO FROM 6/2/15 INSPECTION REPORT)
PHOTO #11 - SPALL IN EASTBOUND LANE OF WEST APPROACH
ROADWAY; ALSO NOTE TYPICAL ADHESION FAILURE OF RELIEF
JOINTS
PHOTO #12 - SETTLEMENT OF SOUTH DRAINAGE FLUME AT EAST
APPROACH WITH A GAP THAT CAN BE PROBED UP TO 9" DEEP
PHOTO #13 - GENERAL UNDERSIDE VIEW OF
STRUCTURE IN SPAN #2 LOOKING WEST
PHOTO #14 - TYPICAL TRANSVERSE
CRACKING WITH EFFLORESCENCE ON DECK
UNDERSIDE, BETWEEN BEAMS #5 AND #6 IN
SPAN #4 SHOWN
PHOTO #15 - TYPICAL DIAGONAL CRACKING
WITH EFFLORESCENCE ON DECK UNDERSIDE
AT ABUTMENTS, BETWEEN BEAMS #5 AND #6,
SPAN #4 NEAR WEST ABUTMENT SHOWN
(PHOTO FROM 6/2/15 INSPECTION REPORT)
PHOTO #16 - TYPICAL TRANSVERSE
CRACKING WITH EFFLORESCENCE ON
UNDERSIDE OF OVERHANGS, NORTH
OVERHANG OVER CENTER BENT SHOWN
(PHOTO FROM 6/2/15 INSPECTION REPORT)
PHOTO #17 - SPALLING WITH EXPOSED
STIRRUP ON UNDERSIDE OF BEAM #5, SPAN
#2 (PHOTO FROM 6/2/15 INSPECTION REPORT)
PHOTO #18 - TYPICAL DIAGONAL CRACKING
OF BOTTOM FLANGE OF BEAMS AT ISOLATED
ENDS, BEAM #3 IN SPAN #1 AT EAST BENT
SHOWN (PHOTO FROM 6/2/15 INSPECTION
REPORT)
PHOTO #19 - SPALL WITH EXPOSED REBAR ON
CLOSURE DIAPHRAGM AT EAST BENT, SOUTH
END
PHOTO #20 - TYPICAL VERTICAL CRACKING
WITH EFFLORESCENCE ON ABUTMENT
BREASTWALLS, WEST ABUTMENT
BREASTWALL SHOWN (PHOTO FROM 6/2/15
INSPECTION REPORT)
PHOTO #21 - HORIZONTAL CRACKING WITH RUST STAINING NEAR
BOTTOM OF EAST BENT CAP, WEST FACE NEAR SOUTH END (PHOTO
FROM 6/2/15 INSPECTION REPORT)
PHOTO #22 - HORIZONTAL CRACKING AT BOTTOM OF CENTER BENT
CAP, WEST FACE SHOWN; ALSO NOTE TYPICAL PEELING OF
PROTECTIVE COATING AND BARNACLE ACCUMULATION ON PILES
PHOTO #23 - CLOSE UP OF HORIZONTAL CRACKING AT BOTTOM OF
CENTER BENT CAP, EAST FACE UNDER BEAM #5 SHOWN; ALSO NOTE
TYPICAL AREAS OF SPALLING AND DELAMINATION (PHOTO FROM
PHOTO #24 - DELAMINATION AND SPALLING WITH EXPOSED REBAR,
WEST FACE OF EAST BENT CAP NEAR NORTH END
PHOTO #25 - TYPICAL DELAMINATION AND SPALLING OF UNDERSIDE
OF CENTER BENT CAP WITH EXPOSED AND RUSTED REBAR CHAIRS
AND STIRRUPS; BETWEEN PILES #3 AND #4 SHOWN (PHOTO FROM
PHOTO #26 - SPALL WITH EXPOSED REBAR ON WEST BENT CAP, EAST
SIDE AT PILE #1 (PHOTO FROM 6/2/15 INSPECTION REPORT)
PHOTO #27 - TYPICAL VERTICAL CRACKING
WITH RUST STAINING ON NUMEROUS PILES;
PILE #6, WEST BENT SHOWN (PHOTO FROM
6/2/15 INSPECTION REPORT)
PHOTO #28 - DISPLACEMENT OF RIPRAP
ALONG WEST ABUTMENT WITH FILTER FABRIC
EXPOSED
PHOTO #29 - VIEW FROM BRIDGE LOOKING UPSTREAM
PHOTO #30 - VIEW FROM BRIDGE LOOKING DOWNSTREAM