Bridge_Inspection_Report_STR__4290-012P.pdf
PDF 5 MB Posted
- Attached to
- Colonial National Historical Park Federal contract opportunity
- Solicitation number
- 693C73-18-B-000028
About this file
Bridge Inspection Report_STR# 4290-012P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results_of_Bid_Opening_-_NP-COLO_1B37,_1D46.pdf | ||
| FP14_Eng.pdf | ||
| Halfway_Creek_As-Built.pdf | ||
| Bridge_Inspection_Report_STR__4290-011P.pdf | ||
| Plans_-_NP-COLO_1B37,_1D46.pdf | ||
| Kings_Creek_As-Built.pdf | ||
| Bridge_Inspection_Report_STR__4290-022P.pdf | ||
| Felgate's_Creek_As-Built.pdf | ||
| Certification_Program_for_Bridge_Temporary_Works.pdf | ||
| VETS-4212_Form.pdf | ||
| NEPA_(Categorical_Exclusion_Form).pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| IFB_Solicitation_-_NP-COLO_1B37,_1D46.pdf | ||
| Synopsis_-_NP-COLO_1B37,_1D46.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 4290-012P
KINGS CREEK BRIDGE INSPECTION DATE: 6/13/17
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER 0
# OF BEAMS, MAIN SPAN: .. 6 STRUCT. TOTAL LENGTH: .. 624.0 FT (190.2 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 48.0 FT (14.6 M)
WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 40.7 FT (12.4 M)
ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 38.0 FT (11.6 M)
PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1981
PROJ./PLAN REF. NO: ......... 1B27 / NONE SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1981-RECONSTRUCTION/NEW DECK. 1985-JOINT REPAIR. 2011-SUPERSTRUCTURE
REPAINTED, SUBSTRUCTURE REHAB.
LOCATION
COLONIAL NATIONAL HISTORICAL PARK MILE POINT: ..................... 6.97 (KM PT 11.22)
STATE: ................................. VIRGINIA LOCATION: 6.4 MILES NORTHWEST OF U.S. ROUTE
17.FACILITY CARRIED: ............ COLONIAL PARKWAY
FEATURE INTERSECTED: .. KINGS CREEK
STRUCTURE EVALUATION SUMMARY
This steel multi-beam bridge is in fair condition overall. Rehabilitation work was completed on this structure in 2011 under Project PRA-COLO 1A18 and Project PRA-COLO 1B35, including cleaning and repainting of the steel superstructure and rehabilitation of the substructure concrete.
The beam ends at the abutments exhibit moderate pitting predating the paint. Additional loss of section has been halted by the cleaning and painting of the beams; however, the bottom flanges at the abutments and at Pier #6 likely were not cleaned properly and are exhibiting some minor surface rusting. This condition should be monitored during future inspections to determine if spot painting is necessary in the future.
Additional problems include minor deterioration of the compression joint seals and adhesion failure throughout the pourable seal expansion joints over the abutments, minor widespread cracking of the deck surface and underside, shifted elastomeric bearing pads at the west abutment and Pier #1, and isolated areas of minor delamination throughout the pier caps, columns, and abutments. This structure is scheduled for rehabilitation under Project No.
COLO 1B37, 1D46. The scope of this project includes repair of all deteriorated concrete on the piers, deck underside and abutments, repair the sagging utility conduit, reseal the expansion joints at the abutments, and replace the compression seal joints over the piers.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: G. GOODLIN, Z. BAILEY
CONDITION ASSESSMENT:
GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 10/31/17
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 4290-012P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
61.4 REMOVE DRIFT AND FALLEN TREES FROM CHANNEL. 1 LS
222.7 INSTALL TYPE 3 OBJECT MARKERS AT END OF TIMBER APPROACH GUARDRAILS. 4 EA
58.8 REPAIR SAGGING UTILITY CONDUIT IN SPAN #12. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
59.1 RESET BEARING PAD FOR BEAM #6 AT WEST ABUTMENT AND ALL
BEARING PADS AT PIER #1.
1 LS
58.1 CLEAN AND SEAL DECK SURFACE. 1 LS
58.2 CLEAN AND RESEAL DECK EXPANSION JOINTS. CLEAN AND
RESEAL CURB EXPANSION JOINTS OVER ABUTMENTS.
1 LS
60.15 REPAIR AREA OF DELAMINATION AND SPALLING AT BEAM #1
BEARING SEAT, SPAN #12 AT PIER #12.
1 LS
58.1 SEAL CRACKS IN DECK SURFACE AS NECESSARY. 1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)
PLUS PARK LOCATION FACTOR.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 4290-012P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
F F N N N G G N G
N G
N G F F G F
N
F
G
F
58.1 MINOR WIDESPREAD TRANSVERSE CRACKING AND SCALING OF
DECK SURFACE. MINOR LONGITUDINAL CRACKING EXTENDING
FROM JOINTS OVER PIERS, ALL SPANS; ISOLATED LOCATIONS
ELSEWHERE. MINOR EDGE SPALLING OF DECK SURFACE ALONG
EXPANSION JOINTS AT ISOLATED LOCATIONS. MINOR SPALL IN
DECK SURFACE, SPAN #6 IN WESTBOUND LANE. MINOR SPALLING
OF DECK SURFACE IN NORTH SHOULDER, SPAN #13 AT WEST END.
MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK
UNDERSIDE AND UNDERSIDE OF OVERHANGS. MINOR
DELAMINATION OF UNDERSIDE OF SOUTH OVERHANG IN SPAN #2
AT PIER #2. MINOR DELAMINATION AND SPALLING OF UNDERSIDE
OF SOUTH OVERHANG IN SPAN #7 AT PIER #6. MINOR
DELAMINATION OF UNDERSIDE OF SOUTH OVERHANG IN SPAN #7
AT PIER #7. MINOR SPALLING AND TWO AREAS OF MINOR
DELAMINATION IN UNDERSIDE OF NORTH OVERHANG IN SPAN #8 AT
PIER #7. MINOR LONGITUDINAL CRACKING OF DECK UNDERSIDE IN
SPAN #13.
58.2 MINOR DETERIORATION AND SPLITTING OF COMPRESSION JOINT
SEALS WITH MINOR ACCUMULATION OF SAND AND DEBRIS.
EXPANSION JOINT FILLER MATERIAL IS MISSING AT RAILING JOINTS.
SEVERE DETERIORATION OF CURB JOINT FILLER MATERIAL OVER
ABUTMENTS. ADHESION FAILURE THROUGHOUT POURABLE SEAL
EXPANSION JOINT OVER EAST ABUTMENT AND AT ISOLATED
LOCATIONS OVER WEST ABUTMENT. MINOR ACCUMULATION OF
SAND AND GRAVEL WITH MINOR VEGETATION GROWTH IN
EXPANSION JOINT OVER EAST ABUTMENT.
58.5,6 MINOR MAP CRACKING OF CURBS. MINOR TRANSVERSE AND
VERTICAL CRACKING AND SPALLING OF CURBS AND RAILINGS WITH
EXPOSED REBAR DUE TO INADEQUATE CONCRETE COVER.
MINOR SPALLING WITH EXPOSED REBAR ON NORTH RAILING, SPAN
#5. MINOR VEHICLE SCRAPES ON SOUTH RAILING, SPAN #10.
58.7 MINOR ACCUMULATION OF DEBRIS ALONG BOTH CURBLINES.
MINOR RUSTING OF DRAIN GRATES. PREVIOUSLY REPORTED
PONDING ON DECK SURFACE WAS NOT OBSERVED DUE TO DRY
CONDITIONS AT TIME OF INSPECTION.
BREASTWALLS OR COLUMNS 1. F
PILE BENTS 2. N
CAPS AND/OR BEARING SEATS 3. G
BACKWALLS AND/OR BULKHEADS 4. G
FOUNDATIONS 5. N
WINGWALLS 6. G
WEEP HOLES 7. N
EXPANSION JOINTS 8. N
EROSION AND/OR SCOUR 9. F
SETTLEMENT OR DEFLECTION 10. G
SLOPE PROTECTION 11. N
OTHER 12. N
PIER(S)
G13. WALLS AND/OR COLUMNS
N14. PILE BENTS
F15. CAPS AND/OR BEARING SEATS
N16. FOUNDATIONS
F17. EROSION AND/OR SCOUR
G18. SETTLEMENT OR DEFLECTION
N19. OTHER
INSPECTION DATE: 6/13/17
STRUCTURE NO. 4290-012P FIELD INSPECTION REPORT
KINGS CREEK BRIDGE
ITEM REFERENCE AND REMARKS
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
1. ALIGNMENT
61. CHANNEL 6
G F N G N
MED
SUFF
13 FT.
9. STREAM BED COMPOSITION :
SAND, SILT
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS 7.
SETTLEMENT 6.
EROSION 5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS 2.
1. APPROACH SLABS G
F G F G G G F N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION 5.
EROSION AND/OR SCOUR 4.
FOUNDATION 3.
WEEP HOLES 2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
58.8 UTILITY CONDUITS ALONG OUTSIDE OF BEAM #6 AND ALONG EAST
ABUTMENT; CONDUIT IS SAGGING IN SPAN #12 NEAR PIER #11 DUE
TO BROKEN SUPPORT BRACKET.
59.1,2,6,7 MINOR BULGING OF ELASTOMERIC BEARING PADS. NO ANCHOR
BOLTS PRESENT AT ANY BEARINGS. ELASTOMERIC BEARINGS AT
PIER #1 HAVE SLID OUT UP TO 1" BEYOND FACE OF BEARING SEAT.
BEAM #6 ELASTOMERIC BEARING AT WEST ABUTMENT HAS SLID
OUT 2" BEYOND FACE OF BEARING SEAT.
MODERATE PITTING PREDATING PAINT ON BEAM END BOTTOM
FLANGES (3/8" REMAINING, 5/8" ORIGINAL) AND WEBS (1/8"
REMAINING, 5/8" ORIGINAL) AT ABUTMENTS. MINOR RUSTING OF
BEAM END BOTTOM FLANGES AT BOTH ABUTMENTS AND PIER #6.
MINOR PITTING PREDATING PAINT ON TOP OF BOTTOM FLANGES
ON EXTERIOR SIDES (1/2" REMAINING) THROUGHOUT.
MINOR VERTICAL CRACKING IN END DIAPHRAGMS AT WEST
ABUTMENT. MINOR SPALLING OF END DIAPHRAGM WITH EXPOSED
REBAR, BAY #5 IN SPAN #8 AT PIER #7.
60.1 MINOR SCALING OF ABUTMENT BREASTWALLS. MINOR EDGE
SPALLING ALONG TOP OF WEST ABUTMENT BREASTWALL AT
ISOLATED LOCATIONS. 12" DIAMETER AREAS OF DELAMINATION ON
WEST ABUTMENT BREASTWALL UNDER BAYS #2 AND #5. MINOR
DELAMINATION OF EAST ABUTMENT BREASTWALL UNDER BAYS #3
AND #5. MINOR SPALLING OF NORTH END OF EAST ABUTMENT
BREASTWALL.
60.4 MINOR VERTICAL CRACKING OF EAST ABUTMENT BACKWALL.
MINOR SPALLING OF NORTH END OF EAST ABUTMENT BACKWALL.
MINOR SPALLING AND MAP CRACKING OF REPAIR AT SOUTH END
OF WEST ABUTMENT BACKWALL. MODERATE SPALL IN FACE OF
WEST ABUTMENT BACKWALL, NORTH END AT HAUNCH AREA.
60.7 WEEP HOLES BURIED AT BOTH ABUTMENTS.
60.9 MODERATE EROSION WITH EROSION TROUGHS OF WEST
ABUTMENT SLOPE; MINOR AT EAST ABUTMENT.
FIELD INSPECTION REPORT STRUCTURE NO. 4290-012P
ADDITIONAL ITEM REFERENCE AND REMARKS
60.13,15 MINOR VERTICAL AND MAP CRACKING OF PIER CAPS AT ISOLATED BEARING AREAS AND UNDERSIDES OF PIER CAPS AT ENDS. MINOR DELAMINATION AND CRACKING IN UNDERSIDE OF PIER #2 CAP BETWEEN NORTH AND CENTER COLUMNS. MINOR DELAMINATION IN UNDERSIDE OF PIER #3 CAP AT NORTH END. MINOR MAP CRACKING OF PREVIOUS REPAIR WITH EFFLORESCENCE ON BOTH ENDS OF PIER #5 CAP. MINOR DELAMINATION IN UNDERSIDE OF PIER #6 CAP BETWEEN SOUTH AND CENTER COLUMNS. MINOR DELAMINATION
AND SPALLING OF BEAM #1 BEARING SEAT, SPAN #12 AT PIER #12.
MINOR VERTICAL CRACKING OF PIER COLUMNS (BOTH CONCRETE AND GRANITE PORTIONS WHERE VISIBLE).
MINOR SPALL WITH EXPOSED REBAR AT TOP OF NORTH COLUMN AT PIER #4, NORTH SIDE.
60.17, 61.2 MODERATE LOCALIZED SCOUR DUE TO MEANDERING CHANNEL AT PIER #12; MINOR AT PIER #10.
61.4 FALLEN TREES IN UPSTREAM AND DOWNSTREAM CHANNELS ALONG WEST CHANNEL BANK. MINOR DRIFT
ACCUMULATION AT COLUMNS OF PIERS IN CHANNEL AND ALONG CHANNEL BANKS.
222.1 MINOR POPOUTS IN BOTH APPROACH SLABS.
222.2 MINOR TEARS AND ADHESION FAILURES IN RELIEF JOINT FILLER; MINOR SAND AND GRAVEL ACCUMULATION
PRESENT. RELIEF JOINT MATERIAL MISSING AT WEST APPROACH FOR 5'L.
222.3 MINOR CHECKING AND SPLITTING OF TIMBER APPROACH GUARDRAILS. SEVERE DECAY OF NORTH GUARDRAIL
TERMINAL AT EAST APPROACH.
222.4 MODERATE SPALLING OF WEST APPROACH ROADWAY (3-1/2'L TOTAL X 6"W X 2-1/2"D), APPROXIMATELY 50' FROM STRUCTURE. MINOR DELAMINATION OF WEST APPROACH SHOULDERS ALONG RELIEF JOINT. MINOR SPALLING OF EAST APPROACH ROADWAY, EASTBOUND LANE ADJACENT TO APPROACH SLAB RELIEF JOINT. MODERATE SPALLING OF EAST APPROACH ROADWAY (4'L X 4"W X 2"D), APPROXIMATELY 50' FROM STRUCTURE.
222.6 MINOR SETTLEMENT (1/2") OF APPROACH SHOULDERS.
222.7 "KINGS CREEK" SIGN AT NORTH SIDE OF EAST APPROACH AND SOUTH SIDE OF WEST APPROACH. NO TYPE 3
OBJECT MARKERS AT ENDS OF TIMBER APPROACH GUARDRAILS.
222.8 BRIDGE IS ON SAG; CURVES AT BOTH APPROACHES.
STRUCTURE LOAD RATING STRUCTURE NO. 4290-012P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 26 24
HS 20 18 34 31
TYPE 3 18 16 31 28
TYPE 3S2 29 26 49 44
TYPE 3-3 35 32 59 54
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 8/15
LOAD RATING CONTROLLED BY: BENDING MOMENT CAPACITY OF STEEL BEAMS
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-012P
STRUCTURE IDENTIFICATION
(201) PARK: COLONIAL NATIONAL HISTORICAL PARK (1) STATE: ....................................... 513 - VIRGINIA (VA)
(202) STRUCTURE NAME: .......... KINGS CREEK BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 199 - YORK
(204) STRUCTURE NUMBER: ..... 4290-012P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 3 - NORTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... KINGS CREEK
(207) ROAD SECTION NO: .......... 012P (7) FACILITY CARRIED: .................. COLONIAL PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 4290012P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 6.4 MILES NORTHWEST OF U
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 1B27 (11) MILE POINT: ............................. 6.97 (KM PT 11.22)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
3 - STEEL
02 - STRINGER/MULTI-BEAM or GIRDER
48.0 FT (14.6 M)
624.0 FT (190.2 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 20.0 TONS (18.1 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 34.0 TONS (30.8 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. YES
(221) SPECIAL STUDY DATE: INSP. EVERY: 60 MONTHS - LAST INSP. : 6/13
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-012P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 37°16'23.10" (51) CURB TO CURB WIDTH: ........... 38.0 FT (11.6 M)
(17) LONGITUDE: ......................... 76°36'19.90" (52) DECK WIDTH: ............................ 40.7 FT (12.4 M)
(19) DETOUR LENGTH: ............... 10 MI (16 KM) (32) APPR. ROADWAY WIDTH: ........ 42.0 FT (12.8 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 30.0 FT (9.1 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 3591 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2007 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 3950 (47) TOTAL HORIZ. CLEARANCE: .... 38.0 FT (11.6 M)
(115) YEAR OF FUTURE ADT: ..... 2027 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.50 FT (0.76 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
7 - Countermeasures installed to
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1981-RECONSTRUCTION/NEW DECK. 1985-JOINT REPAIR. 2011-SUPERSTRUCTURE REPAINTED, SUBSTRUCTURE REHAB.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:76�36'19.90 http:37�16'23.10
APPENDIX STRUCTURE NO. 4290-012P
PHOTOGRAPHS STRUCTURE NO. 4290-012P
PHOTO #1 - LOOKING EASTBOUND TOWARD YORKTOWN
FLOW
PHOTO #2 - NORTH (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW OF STRUCTURE LOOKING EAST
PHOTO #4 - TYPICAL TRANSVERSE AND LONGITUDINAL CRACKING OF
DECK SURFACE, SPAN #1 SHOWN (PHOTO FROM 6/9/15 INSPECTION
REPORT)
PHOTO #5 - SPALL IN DECK SURFACE, SPAN #6
IN WESTBOUND LANE
PHOTO #6 - ADHESION FAILURE OF POURABLE
SEAL EXPANSION JOINT OVER WEST
ABUTMENT; ALSO NOTE ACCUMULATION OF
SAND AND GRAVEL WITH VEGETATION
GROWTH IN EXPANSION JOINT
PHOTO #7 - TYPICAL DETERIORATION OF CURB JOINT FILLER
MATERIAL OVER ABUTMENTS, NORTH CURB JOINT OVER EAST
ABUTMENT SHOWN
PHOTO #8 - SPALLING WITH EXPOSED REBAR ON NORTH RAILING IN
SPAN #5
PHOTO #9 - SPALLING WITH EXPOSED REBAR
DUE TO INADEQUATE CONCRETE COVER AT
NORTH RAILING POST IN SPAN #5
PHOTO #10 - MISSING RELIEF JOINT MATERIAL
IN WEST APPROACH PAVEMENT (PHOTO
FROM 6/9/15 INSPECTION REPORT)
PHOTO #11 - SPALLING OF EAST APPROACH ROADWAY
APPROXIMATELY 50' FROM STRUCTURE
PHOTO #12 - TYPICAL CHECKING OF TIMBER APPROACH GUARDRAILS,
NORTH GUARDRAIL AT WEST APPROACH SHOWN
PHOTO #13 - DECAY OF NORTH GUARDRAIL TERMINAL AT EAST
APPROACH
PHOTO #14 - GENERAL UNDERSIDE VIEW OF STRUCTURE IN SPAN #1
LOOKING EAST
PHOTO #15 - TYPICAL TRANSVERSE CRACKING OF DECK UNDERSIDE,
BAY #1 OF SPAN #1 NEAR EAST ABUTMENT SHOWN (PHOTO FROM
6/9/15 INSPECTION REPORT)
PHOTO #16 - TYPICAL PITTING PREDATING PAINT ON BEAM BOTTOM
FLANGES AND WEBS AT ABUTMENT ENDS, BEAM #4 AT EAST
ABUTMENT SHOWN; ALSO NOTE RUSTING OF BEAM END BOTTOM
PHOTO #17 - TYPICAL RUSTING OF BEAM END BOTTOM FLANGES,
BEAMS #2 AND #3 IN SPAN #6 ON PIER #6 SHOWN (PHOTO FROM 6/9/15
INSPECTION REPORT)
PHOTO #18 - TYPICAL BULGING OF ELASTOMERIC BEARING PADS,
BEAM #5 AT WEST ABUTMENT SHOWN; ALSO NOTE RUSTING OF BEAM
END
PHOTO #19 - BEAM #6 ELASTOMERIC BEARING AT WEST ABUTMENT
SLID OUT BEYOND FACE OF BEARING SEAT
PHOTO #20 - BEAM #4 ELASTOMERIC BEARING IN SPAN #1 AT PIER #1
SLID OUT BEYOND FACE OF BEARING SEAT (PHOTO FROM 6/9/15
INSPECTION REPORT)
PHOTO #21 - UTILITY CONDUIT ALONG OUTSIDE OF BEAM #6 IS
SAGGING IN SPAN #12 NEAR PIER #11 DUE TO BROKEN SUPPORT
BRACKET
PHOTO #22 - EROSION TROUGHS AT EAST ABUTMENT SLOPE
PHOTO #23 - TYPICAL VERTICAL AND MAP CRACKING OF PIER CAPS AT
ISOLATED BEARING AREAS, EAST SIDE OF PIER #9 CAP BELOW BEAM
#5 SHOWN (PHOTO FROM 6/9/15 INSPECTION REPORT)
PHOTO #24 - DELAMINATION AND SPALLING OF BEAM #1 BEARING
SEAT IN SPAN #12 AT PIER #12 (PHOTO FROM 6/9/15 INSPECTION
REPORT)
PHOTO #25 - SPALL WITH EXPOSED REBAR AT
TOP OF NORTH COLUMN AT PIER #4, NORTH
SIDE
PHOTO #26 - TYPICAL VERTICAL CRACKING OF
PIER COLUMNS, NORTH SIDE OF NORTH
COLUMN AT PIER #5 SHOWN
PHOTO #27 - TYPICAL DRIFT ACCUMULATION AT COLUMNS OF PIERS IN
CHANNEL AND ALONG CHANNEL BANKS, NORTH COLUMN AT PIER #10
SHOWN (PHOTO FROM 6/9/15 INSPECTION REPORT)
PHOTO #28 - LOCALIZED SCOUR DUE TO MEANDERING CHANNEL AT
PIER #12
PHOTO #29 - VIEW FROM BRIDGE LOOKING UPSTREAM
PHOTO #30 - VIEW FROM BRIDGE LOOKING DOWNSTREAM