Bridge Inspection Report_STR# 4290-012P

View the file

Other files for this federal contract opportunity

Other files attached to Colonial National Historical Park, newest first.
File Type Posted
Results_of_Bid_Opening_-_NP-COLO_1B37,_1D46.pdf PDF
FP14_Eng.pdf PDF
Halfway_Creek_As-Built.pdf PDF
Bridge_Inspection_Report_STR__4290-011P.pdf PDF
Plans_-_NP-COLO_1B37,_1D46.pdf PDF
Kings_Creek_As-Built.pdf PDF
Bridge_Inspection_Report_STR__4290-022P.pdf PDF
Felgate's_Creek_As-Built.pdf PDF
Certification_Program_for_Bridge_Temporary_Works.pdf PDF
VETS-4212_Form.pdf PDF
NEPA_(Categorical_Exclusion_Form).pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
IFB_Solicitation_-_NP-COLO_1B37,_1D46.pdf PDF
Synopsis_-_NP-COLO_1B37,_1D46.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE SUMMARY STRUCTURE NO. 4290-012P

KINGS CREEK BRIDGE INSPECTION DATE: 6/13/17

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... STEEL NO. OF MAIN SPANS:

MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ STRINGER/MULTI-BEAM or GIRDER 0

# OF BEAMS, MAIN SPAN: .. 6 STRUCT. TOTAL LENGTH: .. 624.0 FT (190.2 M)

DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 48.0 FT (14.6 M)

WEARING SURFACE: .......... MONOLITHIC CONCRETE DECK WIDTH: ...................... 40.7 FT (12.4 M)

ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 38.0 FT (11.6 M)

PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. 1981

PROJ./PLAN REF. NO: ......... 1B27 / NONE SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1981-RECONSTRUCTION/NEW DECK. 1985-JOINT REPAIR. 2011-SUPERSTRUCTURE

REPAINTED, SUBSTRUCTURE REHAB.

LOCATION

COLONIAL NATIONAL HISTORICAL PARK MILE POINT: ..................... 6.97 (KM PT 11.22)

STATE: ................................. VIRGINIA LOCATION: 6.4 MILES NORTHWEST OF U.S. ROUTE

17.FACILITY CARRIED: ............ COLONIAL PARKWAY

FEATURE INTERSECTED: .. KINGS CREEK

STRUCTURE EVALUATION SUMMARY

This steel multi-beam bridge is in fair condition overall. Rehabilitation work was completed on this structure in 2011 under Project PRA-COLO 1A18 and Project PRA-COLO 1B35, including cleaning and repainting of the steel superstructure and rehabilitation of the substructure concrete.

The beam ends at the abutments exhibit moderate pitting predating the paint. Additional loss of section has been halted by the cleaning and painting of the beams; however, the bottom flanges at the abutments and at Pier #6 likely were not cleaned properly and are exhibiting some minor surface rusting. This condition should be monitored during future inspections to determine if spot painting is necessary in the future.

Additional problems include minor deterioration of the compression joint seals and adhesion failure throughout the pourable seal expansion joints over the abutments, minor widespread cracking of the deck surface and underside, shifted elastomeric bearing pads at the west abutment and Pier #1, and isolated areas of minor delamination throughout the pier caps, columns, and abutments. This structure is scheduled for rehabilitation under Project No.

COLO 1B37, 1D46. The scope of this project includes repair of all deteriorated concrete on the piers, deck underside and abutments, repair the sagging utility conduit, reseal the expansion joints at the abutments, and replace the compression seal joints over the piers.

Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: G. GOODLIN, Z. BAILEY

CONDITION ASSESSMENT:

GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 10/31/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 4290-012P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

61.4 REMOVE DRIFT AND FALLEN TREES FROM CHANNEL. 1 LS

222.7 INSTALL TYPE 3 OBJECT MARKERS AT END OF TIMBER APPROACH GUARDRAILS. 4 EA

58.8 REPAIR SAGGING UTILITY CONDUIT IN SPAN #12. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

59.1 RESET BEARING PAD FOR BEAM #6 AT WEST ABUTMENT AND ALL

BEARING PADS AT PIER #1.

1 LS

58.1 CLEAN AND SEAL DECK SURFACE. 1 LS

58.2 CLEAN AND RESEAL DECK EXPANSION JOINTS. CLEAN AND

RESEAL CURB EXPANSION JOINTS OVER ABUTMENTS.

1 LS

60.15 REPAIR AREA OF DELAMINATION AND SPALLING AT BEAM #1

BEARING SEAT, SPAN #12 AT PIER #12.

1 LS

58.1 SEAL CRACKS IN DECK SURFACE AS NECESSARY. 1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)

PLUS PARK LOCATION FACTOR.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 4290-012P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

F F N N N G G N G

N G

N G F F G F

N

F

G

F

58.1 MINOR WIDESPREAD TRANSVERSE CRACKING AND SCALING OF

DECK SURFACE. MINOR LONGITUDINAL CRACKING EXTENDING

FROM JOINTS OVER PIERS, ALL SPANS; ISOLATED LOCATIONS

ELSEWHERE. MINOR EDGE SPALLING OF DECK SURFACE ALONG

EXPANSION JOINTS AT ISOLATED LOCATIONS. MINOR SPALL IN

DECK SURFACE, SPAN #6 IN WESTBOUND LANE. MINOR SPALLING

OF DECK SURFACE IN NORTH SHOULDER, SPAN #13 AT WEST END.

MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE AND UNDERSIDE OF OVERHANGS. MINOR

DELAMINATION OF UNDERSIDE OF SOUTH OVERHANG IN SPAN #2

AT PIER #2. MINOR DELAMINATION AND SPALLING OF UNDERSIDE

OF SOUTH OVERHANG IN SPAN #7 AT PIER #6. MINOR

DELAMINATION OF UNDERSIDE OF SOUTH OVERHANG IN SPAN #7

AT PIER #7. MINOR SPALLING AND TWO AREAS OF MINOR

DELAMINATION IN UNDERSIDE OF NORTH OVERHANG IN SPAN #8 AT

PIER #7. MINOR LONGITUDINAL CRACKING OF DECK UNDERSIDE IN

SPAN #13.

58.2 MINOR DETERIORATION AND SPLITTING OF COMPRESSION JOINT

SEALS WITH MINOR ACCUMULATION OF SAND AND DEBRIS.

EXPANSION JOINT FILLER MATERIAL IS MISSING AT RAILING JOINTS.

SEVERE DETERIORATION OF CURB JOINT FILLER MATERIAL OVER

ABUTMENTS. ADHESION FAILURE THROUGHOUT POURABLE SEAL

EXPANSION JOINT OVER EAST ABUTMENT AND AT ISOLATED

LOCATIONS OVER WEST ABUTMENT. MINOR ACCUMULATION OF

SAND AND GRAVEL WITH MINOR VEGETATION GROWTH IN

EXPANSION JOINT OVER EAST ABUTMENT.

58.5,6 MINOR MAP CRACKING OF CURBS. MINOR TRANSVERSE AND

VERTICAL CRACKING AND SPALLING OF CURBS AND RAILINGS WITH

EXPOSED REBAR DUE TO INADEQUATE CONCRETE COVER.

MINOR SPALLING WITH EXPOSED REBAR ON NORTH RAILING, SPAN

#5. MINOR VEHICLE SCRAPES ON SOUTH RAILING, SPAN #10.

58.7 MINOR ACCUMULATION OF DEBRIS ALONG BOTH CURBLINES.

MINOR RUSTING OF DRAIN GRATES. PREVIOUSLY REPORTED

PONDING ON DECK SURFACE WAS NOT OBSERVED DUE TO DRY

CONDITIONS AT TIME OF INSPECTION.

BREASTWALLS OR COLUMNS 1. F

PILE BENTS 2. N

CAPS AND/OR BEARING SEATS 3. G

BACKWALLS AND/OR BULKHEADS 4. G

FOUNDATIONS 5. N

WINGWALLS 6. G

WEEP HOLES 7. N

EXPANSION JOINTS 8. N

EROSION AND/OR SCOUR 9. F

SETTLEMENT OR DEFLECTION 10. G

SLOPE PROTECTION 11. N

OTHER 12. N

PIER(S)

G13. WALLS AND/OR COLUMNS

N14. PILE BENTS

F15. CAPS AND/OR BEARING SEATS

N16. FOUNDATIONS

F17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

INSPECTION DATE: 6/13/17

STRUCTURE NO. 4290-012P FIELD INSPECTION REPORT

KINGS CREEK BRIDGE

ITEM REFERENCE AND REMARKS

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

1. ALIGNMENT

61. CHANNEL 6

G F N G N

MED

SUFF

13 FT.

9. STREAM BED COMPOSITION :

SAND, SILT

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS 7.

SETTLEMENT 6.

EROSION 5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

1. APPROACH SLABS G

F G F G G G F N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION 5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDS D.

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA. 1

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

58.8 UTILITY CONDUITS ALONG OUTSIDE OF BEAM #6 AND ALONG EAST

ABUTMENT; CONDUIT IS SAGGING IN SPAN #12 NEAR PIER #11 DUE

TO BROKEN SUPPORT BRACKET.

59.1,2,6,7 MINOR BULGING OF ELASTOMERIC BEARING PADS. NO ANCHOR

BOLTS PRESENT AT ANY BEARINGS. ELASTOMERIC BEARINGS AT

PIER #1 HAVE SLID OUT UP TO 1" BEYOND FACE OF BEARING SEAT.

BEAM #6 ELASTOMERIC BEARING AT WEST ABUTMENT HAS SLID

OUT 2" BEYOND FACE OF BEARING SEAT.

MODERATE PITTING PREDATING PAINT ON BEAM END BOTTOM

FLANGES (3/8" REMAINING, 5/8" ORIGINAL) AND WEBS (1/8"

REMAINING, 5/8" ORIGINAL) AT ABUTMENTS. MINOR RUSTING OF

BEAM END BOTTOM FLANGES AT BOTH ABUTMENTS AND PIER #6.

MINOR PITTING PREDATING PAINT ON TOP OF BOTTOM FLANGES

ON EXTERIOR SIDES (1/2" REMAINING) THROUGHOUT.

MINOR VERTICAL CRACKING IN END DIAPHRAGMS AT WEST

ABUTMENT. MINOR SPALLING OF END DIAPHRAGM WITH EXPOSED

REBAR, BAY #5 IN SPAN #8 AT PIER #7.

60.1 MINOR SCALING OF ABUTMENT BREASTWALLS. MINOR EDGE

SPALLING ALONG TOP OF WEST ABUTMENT BREASTWALL AT

ISOLATED LOCATIONS. 12" DIAMETER AREAS OF DELAMINATION ON

WEST ABUTMENT BREASTWALL UNDER BAYS #2 AND #5. MINOR

DELAMINATION OF EAST ABUTMENT BREASTWALL UNDER BAYS #3

AND #5. MINOR SPALLING OF NORTH END OF EAST ABUTMENT

BREASTWALL.

60.4 MINOR VERTICAL CRACKING OF EAST ABUTMENT BACKWALL.

MINOR SPALLING OF NORTH END OF EAST ABUTMENT BACKWALL.

MINOR SPALLING AND MAP CRACKING OF REPAIR AT SOUTH END

OF WEST ABUTMENT BACKWALL. MODERATE SPALL IN FACE OF

WEST ABUTMENT BACKWALL, NORTH END AT HAUNCH AREA.

60.7 WEEP HOLES BURIED AT BOTH ABUTMENTS.

60.9 MODERATE EROSION WITH EROSION TROUGHS OF WEST

ABUTMENT SLOPE; MINOR AT EAST ABUTMENT.

FIELD INSPECTION REPORT STRUCTURE NO. 4290-012P

ADDITIONAL ITEM REFERENCE AND REMARKS

60.13,15 MINOR VERTICAL AND MAP CRACKING OF PIER CAPS AT ISOLATED BEARING AREAS AND UNDERSIDES OF PIER CAPS AT ENDS. MINOR DELAMINATION AND CRACKING IN UNDERSIDE OF PIER #2 CAP BETWEEN NORTH AND CENTER COLUMNS. MINOR DELAMINATION IN UNDERSIDE OF PIER #3 CAP AT NORTH END. MINOR MAP CRACKING OF PREVIOUS REPAIR WITH EFFLORESCENCE ON BOTH ENDS OF PIER #5 CAP. MINOR DELAMINATION IN UNDERSIDE OF PIER #6 CAP BETWEEN SOUTH AND CENTER COLUMNS. MINOR DELAMINATION

AND SPALLING OF BEAM #1 BEARING SEAT, SPAN #12 AT PIER #12.

MINOR VERTICAL CRACKING OF PIER COLUMNS (BOTH CONCRETE AND GRANITE PORTIONS WHERE VISIBLE).

MINOR SPALL WITH EXPOSED REBAR AT TOP OF NORTH COLUMN AT PIER #4, NORTH SIDE.

60.17, 61.2 MODERATE LOCALIZED SCOUR DUE TO MEANDERING CHANNEL AT PIER #12; MINOR AT PIER #10.

61.4 FALLEN TREES IN UPSTREAM AND DOWNSTREAM CHANNELS ALONG WEST CHANNEL BANK. MINOR DRIFT

ACCUMULATION AT COLUMNS OF PIERS IN CHANNEL AND ALONG CHANNEL BANKS.

222.1 MINOR POPOUTS IN BOTH APPROACH SLABS.

222.2 MINOR TEARS AND ADHESION FAILURES IN RELIEF JOINT FILLER; MINOR SAND AND GRAVEL ACCUMULATION

PRESENT. RELIEF JOINT MATERIAL MISSING AT WEST APPROACH FOR 5'L.

222.3 MINOR CHECKING AND SPLITTING OF TIMBER APPROACH GUARDRAILS. SEVERE DECAY OF NORTH GUARDRAIL

TERMINAL AT EAST APPROACH.

222.4 MODERATE SPALLING OF WEST APPROACH ROADWAY (3-1/2'L TOTAL X 6"W X 2-1/2"D), APPROXIMATELY 50' FROM STRUCTURE. MINOR DELAMINATION OF WEST APPROACH SHOULDERS ALONG RELIEF JOINT. MINOR SPALLING OF EAST APPROACH ROADWAY, EASTBOUND LANE ADJACENT TO APPROACH SLAB RELIEF JOINT. MODERATE SPALLING OF EAST APPROACH ROADWAY (4'L X 4"W X 2"D), APPROXIMATELY 50' FROM STRUCTURE.

222.6 MINOR SETTLEMENT (1/2") OF APPROACH SHOULDERS.

222.7 "KINGS CREEK" SIGN AT NORTH SIDE OF EAST APPROACH AND SOUTH SIDE OF WEST APPROACH. NO TYPE 3

OBJECT MARKERS AT ENDS OF TIMBER APPROACH GUARDRAILS.

222.8 BRIDGE IS ON SAG; CURVES AT BOTH APPROACHES.

STRUCTURE LOAD RATING STRUCTURE NO. 4290-012P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 26 24

HS 20 18 34 31

TYPE 3 18 16 31 28

TYPE 3S2 29 26 49 44

TYPE 3-3 35 32 59 54

DESIGN LOADING: H15 (M13.5)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 8/15

LOAD RATING CONTROLLED BY: BENDING MOMENT CAPACITY OF STEEL BEAMS

REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-012P

STRUCTURE IDENTIFICATION

(201) PARK: COLONIAL NATIONAL HISTORICAL PARK (1) STATE: ....................................... 513 - VIRGINIA (VA)

(202) STRUCTURE NAME: .......... KINGS CREEK BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 199 - YORK

(204) STRUCTURE NUMBER: ..... 4290-012P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 3 - NORTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... KINGS CREEK

(207) ROAD SECTION NO: .......... 012P (7) FACILITY CARRIED: .................. COLONIAL PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 4290012P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 6.4 MILES NORTHWEST OF U

(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 1B27 (11) MILE POINT: ............................. 6.97 (KM PT 11.22)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

3 - STEEL

02 - STRINGER/MULTI-BEAM or GIRDER

48.0 FT (14.6 M)

624.0 FT (190.2 M)

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

3 - SPREAD FOOTING ON PILES

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 1 - MONOLITHIC CONCRETE

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION: .............. 0 - NONE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 20.0 TONS (18.1 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 34.0 TONS (30.8 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 6/17 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. YES

(221) SPECIAL STUDY DATE: INSP. EVERY: 60 MONTHS - LAST INSP. : 6/13

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4290-012P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 37°16'23.10" (51) CURB TO CURB WIDTH: ........... 38.0 FT (11.6 M)

(17) LONGITUDE: ......................... 76°36'19.90" (52) DECK WIDTH: ............................ 40.7 FT (12.4 M)

(19) DETOUR LENGTH: ............... 10 MI (16 KM) (32) APPR. ROADWAY WIDTH: ........ 42.0 FT (12.8 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 30.0 FT (9.1 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 6.0 FT (1.8 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 6.0 FT (1.8 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 3591 (34) SKEW ANGLE: ............................ 0 °

(30) YEAR OF ADT: ...................... 2007 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 3950 (47) TOTAL HORIZ. CLEARANCE: .... 38.0 FT (11.6 M)

(115) YEAR OF FUTURE ADT: ..... 2027 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.50 FT (0.76 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1111

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

7 - Countermeasures installed to

2 - REHAB/RECONSTRUCTION

C - MODERATE

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1981-RECONSTRUCTION/NEW DECK. 1985-JOINT REPAIR. 2011-SUPERSTRUCTURE REPAINTED, SUBSTRUCTURE REHAB.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:76�36'19.90 http:37�16'23.10

APPENDIX STRUCTURE NO. 4290-012P

PHOTOGRAPHS STRUCTURE NO. 4290-012P

PHOTO #1 - LOOKING EASTBOUND TOWARD YORKTOWN

FLOW

PHOTO #2 - NORTH (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW OF STRUCTURE LOOKING EAST

PHOTO #4 - TYPICAL TRANSVERSE AND LONGITUDINAL CRACKING OF

DECK SURFACE, SPAN #1 SHOWN (PHOTO FROM 6/9/15 INSPECTION

REPORT)

PHOTO #5 - SPALL IN DECK SURFACE, SPAN #6

IN WESTBOUND LANE

PHOTO #6 - ADHESION FAILURE OF POURABLE

SEAL EXPANSION JOINT OVER WEST

ABUTMENT; ALSO NOTE ACCUMULATION OF

SAND AND GRAVEL WITH VEGETATION

GROWTH IN EXPANSION JOINT

PHOTO #7 - TYPICAL DETERIORATION OF CURB JOINT FILLER

MATERIAL OVER ABUTMENTS, NORTH CURB JOINT OVER EAST

ABUTMENT SHOWN

PHOTO #8 - SPALLING WITH EXPOSED REBAR ON NORTH RAILING IN

SPAN #5

PHOTO #9 - SPALLING WITH EXPOSED REBAR

DUE TO INADEQUATE CONCRETE COVER AT

NORTH RAILING POST IN SPAN #5

PHOTO #10 - MISSING RELIEF JOINT MATERIAL

IN WEST APPROACH PAVEMENT (PHOTO

FROM 6/9/15 INSPECTION REPORT)

PHOTO #11 - SPALLING OF EAST APPROACH ROADWAY

APPROXIMATELY 50' FROM STRUCTURE

PHOTO #12 - TYPICAL CHECKING OF TIMBER APPROACH GUARDRAILS,

NORTH GUARDRAIL AT WEST APPROACH SHOWN

PHOTO #13 - DECAY OF NORTH GUARDRAIL TERMINAL AT EAST

APPROACH

PHOTO #14 - GENERAL UNDERSIDE VIEW OF STRUCTURE IN SPAN #1

LOOKING EAST

PHOTO #15 - TYPICAL TRANSVERSE CRACKING OF DECK UNDERSIDE,

BAY #1 OF SPAN #1 NEAR EAST ABUTMENT SHOWN (PHOTO FROM

6/9/15 INSPECTION REPORT)

PHOTO #16 - TYPICAL PITTING PREDATING PAINT ON BEAM BOTTOM

FLANGES AND WEBS AT ABUTMENT ENDS, BEAM #4 AT EAST

ABUTMENT SHOWN; ALSO NOTE RUSTING OF BEAM END BOTTOM

PHOTO #17 - TYPICAL RUSTING OF BEAM END BOTTOM FLANGES,

BEAMS #2 AND #3 IN SPAN #6 ON PIER #6 SHOWN (PHOTO FROM 6/9/15

INSPECTION REPORT)

PHOTO #18 - TYPICAL BULGING OF ELASTOMERIC BEARING PADS,

BEAM #5 AT WEST ABUTMENT SHOWN; ALSO NOTE RUSTING OF BEAM

END

PHOTO #19 - BEAM #6 ELASTOMERIC BEARING AT WEST ABUTMENT

SLID OUT BEYOND FACE OF BEARING SEAT

PHOTO #20 - BEAM #4 ELASTOMERIC BEARING IN SPAN #1 AT PIER #1

SLID OUT BEYOND FACE OF BEARING SEAT (PHOTO FROM 6/9/15

INSPECTION REPORT)

PHOTO #21 - UTILITY CONDUIT ALONG OUTSIDE OF BEAM #6 IS

SAGGING IN SPAN #12 NEAR PIER #11 DUE TO BROKEN SUPPORT

BRACKET

PHOTO #22 - EROSION TROUGHS AT EAST ABUTMENT SLOPE

PHOTO #23 - TYPICAL VERTICAL AND MAP CRACKING OF PIER CAPS AT

ISOLATED BEARING AREAS, EAST SIDE OF PIER #9 CAP BELOW BEAM

#5 SHOWN (PHOTO FROM 6/9/15 INSPECTION REPORT)

PHOTO #24 - DELAMINATION AND SPALLING OF BEAM #1 BEARING

SEAT IN SPAN #12 AT PIER #12 (PHOTO FROM 6/9/15 INSPECTION

REPORT)

PHOTO #25 - SPALL WITH EXPOSED REBAR AT

TOP OF NORTH COLUMN AT PIER #4, NORTH

SIDE

PHOTO #26 - TYPICAL VERTICAL CRACKING OF

PIER COLUMNS, NORTH SIDE OF NORTH

COLUMN AT PIER #5 SHOWN

PHOTO #27 - TYPICAL DRIFT ACCUMULATION AT COLUMNS OF PIERS IN

CHANNEL AND ALONG CHANNEL BANKS, NORTH COLUMN AT PIER #10

SHOWN (PHOTO FROM 6/9/15 INSPECTION REPORT)

PHOTO #28 - LOCALIZED SCOUR DUE TO MEANDERING CHANNEL AT

PIER #12

PHOTO #29 - VIEW FROM BRIDGE LOOKING UPSTREAM

PHOTO #30 - VIEW FROM BRIDGE LOOKING DOWNSTREAM