The Bid Opening date of March 13, 2018, at 2:00 p.m. EST will remain the same.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7318B000014 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sterling VA 20166-6511
EFLHD-CO
21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.
Federal Highway Administration
Sterling VA 20166-6511
EFLHD-AC
21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.
Federal Highway Administration
See Block 1403/01/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/08/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
IT Related Pur: IT PURCHASE-NO
Project: NP-GRSM 1B22
The purpose of this Amendment is to:
1. Update the Special Contract Requirements (J Pages), Section 634, to revise the requirements for permanent pavement markings.
2. Update the Plans to delete the requirement for taper milling adjacent to stone curb.
The Bid Opening date remains March 13, 2018, at 2:00 p.m. EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0001
Amendment Info
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project NP-GRSM 1B22
Great Smoky Mountains National Park Solicitation: 693C73-18-B-00014
The purpose of this Amendment is to:
1) Update the Special Contract Requirements (J Pages), Section 634, to revise the requirements for permanent pavement markings.
2) Update the Plans to delete the requirement for taper milling adjacent to stone curb.
The Bid Opening date remains March 13, 2018, at 2:00 p.m. EST.
SCR changes
Special Contract Requirement (J Pages) changes
1. Add the following to Subsection 634.03 of the Special Contract Requirements, page J-46:
Furnish thermoplastic pavement markings that will set to bear traffic in no more than 2 minutes when the air temperature is 50 °F, or no more than 10 minutes when the air temperature is 90 °F.
2. Delete Subsection 634.07 of the Special Contract Requirements, Page J-46, and substitute the following:
634.07. Delete the fourth paragraph and substitute the following:
For all pavement marking lines, apply thermoplastic at 90 mil dry film thickness.
3. Delete the text of the first paragraph of Subsection 634.07(a) of the Special Contract Requirements, Page J-46, and substitute the following:
Apply AASHTO Type 3 or Type 4 glass beads on the thermoplastic at a rate recommended by the manufacturer to meet the following retroreflectivity requirements as measured by a 30-meter mobile retroreflectometer in accordance with ASTM E1710 and as approved by the
CO:
Plan Sheet changes
Plan Sheet changes
Delete Plan Sheet B02, and substitute the amended Plan Sheet B02.
Plan Sheet B02, Typical Sections, modified to delete the variable depth milling note adjacent to stone curb.
B02
TYPICAL SECTIONS
NO SCALE
1.
5:
M
AX
11'-0" +/-
Travel lane
11'-0" +/-
Travel lane
11'-0" +/-
Auxiliary lane
PROPOSED PAVEMENT STRUCTUREEXISTING PAVEMENT STRUCTURE
Aggregate base, 6-inch depth
Asphalt concrete pavement, 8½-inch depth exist.
Match exist.
Match
CL Roadway
Existing ground varies
Do not disturb existing sidewalk (where applicable)
Do not disturb existing stone or asphalt curb
11'-0" to 12'-0"
Travel lane
PROPOSED PAVEMENT STRUCTURE
exist.
Match
Asphalt concrete pavement, 8½-inch depth
EXISTING PAVEMENT STRUCTURE
Aggregate base, 6-inch depth
Variable depth milling, 3'-0"
Variable width, 15-0" min.
Pull-off or parking area
NEWFOUND GAP ROAD
MP 30.44 to MP 30.74
Asphalt Concrete Overlay:
3'-0" shoulder
Profile grade
Varies Varies
* from MP 30.36 to 30.57 only
*Concrete curb
*Paved width, MP 30.44 to MP 30.57
Curbed median, variable
See Paving Summary for locations
Existing ground see Note 5
Recondition shoulder, -inch depth8 5Type IV roughness, Ultra-thin bonded wearing course, -inch depth8 5Type IV roughness, Ultra-thin bonded wearing course, NEWFOUND GAP ROAD
SCHEDULE A
3'-0"
NEWFOUND GAP ROAD EXISTING PULL-OFFS
during all asphalt overlay operations.
concrete islands, and manholes from asphalt concrete
7. Protect roadside elements such as stone curb, concrete curb,
6. Construct pavement transitions according to Detail E401-01.
Round hinge points as directed by the CO.
rollover is 8 percent for aggregate-topsoil course shoulders.
the finished top edge of pavement. Maximum shoulder elevation adjacent to the pavement edge, at ½-inch below establishment to disturbed areas. Maintain a final shoulder
Place 2 inches of aggregate-topsoil course and apply turf locations designated in the plans or as directed by the CO.
5. Recondition shoulders according to Subsection 303.04 at overlay.
cracks according to Section 414 prior to placing asphalt
4. Remove existing pavement markings and seal all
3. Limit asphalt overlay to within existing edge of pavements.
existing field conditions.
2. Match roadway cross slopes and superelevations to
No pavement borings were performed for this project.
1. Existing pavement depths taken from as-built drawings.
NOTES
AMENDMENT NO. 1 1
Deleted variable depth milling note. MH 02/26/18
DESCRIPTION BY DATE
REVISIONS
NO.
F e b
A
M M P
R O J E
C T S g r s m b P r o j_
D e v C
A D
D B g r s m b ty p .d g n
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
STERLING, VIRGINIA
STATE PROJECT
GREAT SMOKY MOUNTAINS NATIONAL PARK
No.
SHEET
188925
No.
PMIS
No.
NPS
NP-GRSM 1B22
60,919
NC,TN
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Solicitation: 693C73-18-B-00014 |
File details come from the government source that posted it.