RFP SSO Program_Final 2.4.2020_01.pdf
PDF 755 KB Posted
- Attached to
- STATE SAFETY AND OVERSIGHT PROGRAM
- Solicitation number
- 69319520R000002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard Form -30 Amendment 0001-69319520R000002.pdf | ||
| RFP 69319520R000002_SSO Program_Final 2.4.2020_0001_Revised 2.20.2020.docx | DOCX document | |
| RFP Solicitation 69319520R000002.pdf | ||
| Questions_Responses_SSO-RFP-69319520R000002_02202020.xlsx | XLSX spreadsheet | |
| Attachment J-1 - Pricing Matrix_02202020_Amendment 0001.xlsx | XLSX spreadsheet | |
| SF-33 Solicitation No. 69319520R000002_State Safety and Oversight Program_02052020.pdf | ||
| Attachment J-1 - Pricing Matrix_02042020.xlsx | XLSX spreadsheet | |
| Attachment J-2- Past Performance Questionnaire_02042020.docx | DOCX document | |
| Attachment J-3 - Resume Template_02042020.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP/SOLICITATION No. 69319520R000002
State Safety Oversight Program
SECTION B: SUPPLIES OR SERVICES AND PRICES
B.1 Supplies or Services
The United States (U.S.) Department of Transportation (DOT), Federal Transit Administration (FTA), Office of Safety Review (TSO-20) is seeking professional contractor support to perform safety oversight activities in support of the State Safety Oversight (SSO) programs in accordance with the statement of work (SOW) in section C of this RFP/Solicitation.
This is a Total Small Business Set-Aside procurement for which we anticipate will result in award of more than one Indefinite Delivery, Indefinite Quantity (IDIQ) contract. The Government anticipates issuing Firm-Fixed Price (FFP), Labor Hour or a combination of both on respective issued/awarded task orders against the IDIQ contracts.
MAXIMUM QUANTITY: The minimum value specified herein, represents the total minimum amount of work effort (in terms of dollars) that the Government is required to order and the contractor is obligated to furnish as ordered, over the entire term of the contract. The total minimum value of this contract is $TBD. The government reserves the right to withhold this minimum amount if the vendor demonstrates consistent lack of interest in competing for orders throughout the life of the contract.
MAXIMUM QUANTITY: The maximum value of the contract specified herein, represents the total maximum amount of work effect (in terms of dollars) that the Government may require and the contractor is obligated to furnish if and as ordered, over the entire term of the contract. The total maximum value of this contract is $TBD.
B.2 Contract Definition – IDIQ Contract
The resulting contracts will be IDIQ in nature as defined at FAR 16.602 of the FAR and in Section I, FAR Clause 52.216-1, Contract Type, herein. Services provided by the Contractor under this requirement shall be secured by the issuance of FFP or LH level of effort task orders against the respective base contract.
B.3 North American Industry Classification System (NAICS) Code and Small Business Standard
The North American Industry Classification System (NAICS) Code for this acquisition is 541618, Other Management Consulting Services. The small business size standard is $16.5 Million for this NAICS code.
B.4 Contract Line Item Number (CLIN)
CONTRACT LINE ITEM NUMBERS
Number Brief Description CLIN 0001 Annual Submissions to FTA CLIN 0002 State Safety Oversight Audits CLIN 0003 Programmatic and Technical Support
CLIN 0004 Special Projects
CLIN 0005 Travel
CLIN 0006 Other Direct Costs (ODCs)
*NOTE: For each respective year after the base year, the CLIN number will change respectively yet remain the same title etc. For example, in the option year, CLIN 0001 will become CLIN 0101.
B.5 Contract Period of Performance
The contract period of performance is from date of award through a five-year period including a one (1) year base and four (4) one-year option periods. The Federal Acquisition Regulation (FAR) clause 52.217-8 “Option to Extend Services” NOV 1999, shall be incorporated into the resulting contracts, as referenced in Section I, in the event the Government requires continued performance of any services with the limits and at the rates specified in the contract beyond the five-year period of performance term.
The Period of Performance (POP) is anticipated as follows:
Performance Year Anticipated Period of Performance Base Year April 24, 2020 – April 23, 2021 Option Year One April 24, 2021 – April 23, 2022 Option Year Two April 24, 2022 – April 23, 2023 Option Year Three April 24, 2023 – April 23, 2024 Option Year Four April 24, 2024 – April 23, 2025
B.6 Pricing/Labor Rates Table
Contract Year Labor Category Hours Labor Rate Price Base Year
Program Manager 5,100 Senior Auditor 5,100
Auditor 4,600 Senior Analyst 4,900
Option Year 1 Program Manager 5,100 Senior Auditor 5,100
Auditor 4,600 Senior Analyst 4,900
Option Year 2 Program Manager 5,100 Senior Auditor 5,100
Auditor 4,600 Senior Analyst 4,900
Option Year 3 Program Manager 5,100 Senior Auditor 5,100
Auditor 4,600 Senior Analyst 4,900
Option Year 4 Program Manager 5,100 Senior Auditor 5,100
Auditor 4,600 Senior Analyst 4,900
*NOTE: The labor categories in the Pricing Matrix (Attachment J-1) shall be used for the total life of this contract. If the labor categories for this requirement change but within scope of the contract, a modification must be executed to clearly reflect this to ensure clarity concerning the labor categories authorized for use. This contract will be awarded to the contractor based within the pre-established labor rates as stated using the CLIN structure in the Pricing Matrix (Attachment J-1).
(END OF SECTION B)
SECTION C: DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
C.1 BACKGROUND
The Federal Transit Administration’s (FTA) Office of Safety Review (TSO-20) within the Office of Transit Safety and Oversight (TSO) is charged with delivering programs that ensure the highest possible level of safety and security for the nation’s public transportation systems. The State Safety Oversight Program (SSOP), currently managed by TSO-20, focuses on the development of standards, criteria, plans, procedures, and processes for implementation by states and rail transit agencies (RTAs). The SSOP seeks to address minimum regulatory requirements and to enhance safety and security practices.
TSO-20 requires contractor support to perform safety oversight activities of State Safety Oversight (SSO) programs. TSO-20’s core functions are collecting safety data on rail transit agencies (RTA), conducting audits of SSO agencies State Safety Oversight Agencies (SSOA) that oversee RTAs, and providing outreach and technical assistance to those same RTAs and SSOAs. If the FTA identifies a significant level of risk to safety, they may use TSO-20 resources to perform additional interventions into the safety management or oversight activities at public transportation systems or SSOAs. The authorities for TSO-20’s program activities are found in the Public Transportation Safety Program, (49 U.S.C. § 5329) (2017).
C.2 SCOPE
The objectives of this project are to assist FTA’s Office of Safety Review with the following:
- Evaluation of the development and implementation of state oversight and rail transit agency safety and security programs as per applicable regulations, requirements and FTA guidance;
- Identification, development, and delivery of technical assistance and training to guide state and rail transit agency program development and implementation;
- Responses to industry and government inquiries and needs related to FTA’s safety and security program implementation;
- Coordination with other FTA programs to ensure a systems approach to delivery of its safety and security program.
DESCRIPTION/SPECIFICATIONS
Contract Line Item Number (CLIN) 0001: Annual Submissions to FTA
The State Safety Oversight Rule, 49 Code of Federal Regulation (CFR) § Part 674 (2016) requires SSOAs to submit information to the FTA on an annual basis:
• 674.13(a)(7) – “The SSOA [must report] the status of safety of each [RTA] to the Governor, the FTA, and the board of directors … of the [RTA]”
• 674.27(b) – “An SSOA must submit its SSO program standard … to FTA”
• 674.39 – “On or before March 15 of each year, an SSOA must submit … to FTA:”
o The SSO Program Standard o Evidence of compliance with 49 CFR Part 672 o A summary of oversight activities for the preceding 12 months o A summary of triennial audits for the preceding 12 months o Evidence of review and approval of any changes to RTA [agency safety plans] o Self-Certification of compliance with 49 CFR Part 674
To facilitate the collection of this information, TSO-20 has developed a web-based tool that SSOAs can use to make their submissions. We require contract support to evaluate and validate these submissions. Annual reports, once validated, will be reviewed and certified by the TSO-20 staff.
Anticipated Level of Effort: 2000 hours; 1 FTE.
CLIN 0002: State Safety Oversight Audits
Forty-Nine CFR Part 674.11 states that the FTA will audit each SSOA at least once every three years. TSO requires contract support to perform these audits. There are 31 SSOAs in 30 States.
All but two—Hawaii and Puerto Rico—are in the Continental United States. Audit procedures and contractor responsibilities are defined in the Audit SOP and the Auditor’s Guide (*NOTE:
Will be provided after contract award etc.)
Anticipated Level of Effort: approximately 400-500 hrs per audit; approximately 12 audits per year; 5000-6000 hrs./year; 2.5-3 FTE.
CLIN 0003: Programmatic and Technical Support
Federal public transportation law (49 USC $ 5329(e)(9)) requires the FTA to “continually evaluate the implementation of a State safety oversight program by a State safety oversight agency.” This continuous evaluation usually begins with regular phone calls with each State program. Regular calls sometimes evolve into more complex inquiries and investigations. We occasionally require a contractor to support this process by providing context, data analysis, or other forms of subject matter expertise.
TSO may occasionally undertake other finite projects that require contractor support similar to that described in the paragraph above. FTA will, from time to time, endeavor to improve the knowledge-base of the industry in various relevant fields by developing guidance, such as documents and presentations, and to provide a forum for networking and exchanging ideas. We require subject matter expert consultants to assist with developing and presenting guidance materials, and to attend and participate in workshops and other opportunities for networking and training.
TSO will require contractor support in the following task areas:
• Assist in development or improvement of procedural manuals and guidance documents
• Assist in development of presentations and training
• Assist in developing new policies, procedures, and practices
• Give presentations and training
• Attend training, workshops, and conferences
• Provide context and analysis
• Audit-related activities such as interviews and inspections
This support may be directed toward the FTA, SSOAs, RTAs, or the public transit industry at large. Anticipated Level of Effort: When awarding task orders, the Government may award hours for specific projects and may also award hours under this CLIN for un-planned assistance to be used on an ‘as-needed’ basis within scope of the SOW. The Government’s needs in this CLIN will vary from year to year. The Government anticipates needing no more than 6000 hours per year; 3 FTE.
CLIN 0004: Special Projects
The monitoring process described above will sometimes lead the FTA to intervene in the oversight program or operations of an FTA recipient, pursuant to our authority found in 49 USC 5329 and 49 CFR Part 670. Possible interventions could include:
• Investigations or inspections at RTAs
• On-site inquiries or investigations at SSOAs
• Direct administration of an SSO program
• Imposing prohibitions or restrictions on an RTA
The number, size, scope, and frequency of such interventions can’t be predicted. If such an activity is required, one or more task orders would be awarded pursuant to the FAR Subpart
16.5. For a large-scale or long-term intervention beyond the anticipated LOE for this CLIN, FTA would pursue alternate means to complete it.
Contractor requirements could include, without being limited to, the following:
• Support planning the activity
• Perform inspections of transit agency facilities and infrastructure such as track and power systems
• Conduct personnel interviews, document reviews, and analyses of data and information
• Evaluate the implementation of safety procedures in a public transit system’s operations
• Monitor and evaluate hazard and corrective action plan (CAP) identification and resolution
• Investigate accidents and incidents
• Develop and document procedures for performing safety oversight
• Ensure transition of responsibilities from FTA back to the responsible oversight agency
• Create briefings, presentations, and reports
Anticipated Level of Effort: The Government does not intend to award more than 6000 hours (3 FTE) per year on this CLIN, but there is no guarantee that we will require any work at all under this CLIN for the entire POP of resulting contracts. Because of that uncertainty, the Government does not expect the contractor to maintain personnel on staff waiting to perform this work. If the Government were to require support for such an event, we would expect the contractor to acquire the necessary expertise using existing personnel, short-term hires, subcontractors, or other means. The contractor must include in their proposal a plan for making these personnel adjustments. All personnel adjustments must be in accordance with the qualifications and experience specified in the respective approved labor categories.
CLIN 0005: Travel
Travel and Per Diem authorized under this the resulting contracts for which task orders will be issued shall be reimbursed according to the requirements of FAR 31.205-46 entitled "Travel Cost," and with the Government Travel Regulations (GTR) in effect at the time of travel. Travel by air shall be reimbursed at actual not to exceed coach fare. Travel subsistence reimbursement shall be authorized under the rates and conditions of the Federal Travel Regulations (FTR) in effect at the time of travel throughout the period of performance of this contract. The Government revises the Per Diem rates to reflect changes to these amounts or to the travel regulations. Before contractors book any travel, they must submit a travel plan to the COR, and the COR must approve that plan. Payment cannot be guaranteed for travel booked without prior approval.
CLIN 0006: Other Direct Costs (ODCs)
Occasionally, the contractor may incur other direct costs not associated with travel. This may include printing or shipping materials or paying a conference entrance fee if considered authorized, allowable and reasonable. These costs will be reimbursed directly according to the FAR and must be within scope of the base IDIQ contract and issued/awarded task orders. All ODCs must be pre-approved by the Contracting Officer’s Representative (COR) and documented as such prior to incurring costs and seeking payment for them.
(END OF SECTION C)
SECTION D: PACKAGING AND MARKING
All packing, packaging and mailing of reports or submittals shall be accomplished in the most economical and efficient manner and in accordance with the best commercial practices.
All information submitted to the Contracting Officer and the Contracting Officer's Representative shall be clearly marked with the legal name of the organization/contractor, the contract number, and/or modification number as appropriate and the identification of the submission. Additional packaging and marking requirements will be specified, as necessary, in the resulting contract.
(END OF SECTION D)
SECTION E: INSPECTION AND ACCEPTANCE
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following address:
http://www.acquisition.gov.
52.246-4 INSPECTION OF SERVICES- FIXED PRICE (AUG 1996)
52-246-6 INSPECTION-TIME-AND-MATERIAL AND LABOR-HOUR (MAY 2001)
E.1 Inspection/Acceptance
The Contracting Officer or the Contracting Officer's Representative (COR), at the U.S.
Department of Transportation, FTA Headquarters, Washington, DC, will perform final inspection and acceptance of all items and services called for in the resulting contract. The Contracting Officer reserves the right to designate other Government agents as authorized representatives upon unilateral written notice to the Contractor, which may be accomplished in the form of a transmittal of a copy of the authorization.
E.2 Contracting Officer (CO) or Contracting Officer’s Representative (COR) Inspection and Acceptance) The Contracting Officer and Contracting Officer’s Representative (COR) at the Department of Transportation, Federal Transit Administration, Washington, DC, will perform final inspection and acceptance of all deliverables called for by this contract. The Contracting Officer reserves the right to designate other Government agents as authorized representatives upon unilateral written notice to the Contractor, which may be accomplished in the form of a transmittal of a copy of the authorization.
E.3 Government Contract Quality Assurance
The Government intends to do quality assurance to monitor the quality of the contractor’s performance. The oversight provided for in the order and by the Government’s monitoring, will help to ensure that service levels reach and maintain the required levels throughout the contract term. Further, the Government’s quality assurance monitoring will provide the COR with a proactive way to avoid unacceptable or deficient performance, and provides verifiable input for the required Past Performance Information Assessments. Thus, the contractor must ensure that deliverables meet the Government’s acceptance.
E.4 Standards of Work Contractors are required to meet these standards/measures in the performance of their work:
• Adherence to Direction – Contractor shall follow all contract requirements and technical direction from the delegated COR.
• Customer Service – Contractor shall act with professionalism and be respectful and courteous at all times.
• Deadline Adherence – Time is of the essence in the performance of all grant accrual activities.
Contractor shall meet deadlines for all tasks and deliverables. As required, the necessary approvals or responses prior to submission of deliverable or completion of task shall be received and documented. If any party fails to respond to contractor in a timely manner, possibly affecting their adherence to deadline, the contractor shall elevate that failure to respond to the COR. The contractor shall request an adjustment of deadline for cause from the COR, in advance of deadline.
• Written Deliverable Typographical Accuracy and Formatting – Written deliverables shall be:
spelled correctly, grammatically correct, free of typographical errors, formatted correctly and consistently, accurate in the use of professional salutations, and provided in a software type/version that meets the needs of the receiving office.
• Precision in Written Deliverables – Written deliverables shall be: thorough, accurate, clear, concise, professional, consistent, and thorough in their use of citations of relevant requirements or materials.
• Quality Assurance/Quality Control – Contractor shall employ adequate quality assurance / quality control methods to ensure all activities and deliverables meet the performance requirements.
(END OF SECTION E)
SECTION F: DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
52.242-15 Stop-Work Order (AUG 1989)
F.2 Place of Performance The contractor must provide all resources necessary for the support of this requirement. The primary work site for this effort is at the Government location.
F.3 Period of Performance The anticipated period of performance shall begin on April 24, 2020 and end on April 23, 2025.
This period is subject to change based upon when the contracts resulting from this RFP/Solicitation are awarded.
F. 4 Interim and Post Award Evaluation Contractor Performance
1. Contractor Performance Evaluations
Interim and final evaluations of contractor performance will be prepared on this contract in accordance with FAR 42.15. The final performance evaluation will be prepared as soon as possible after completion of all required work.
Interim and final evaluations will be provided to the contractor as soon as practicable after completion of the evaluation. The contractor may elect to review evaluation and submit additional information or a rebuttal statement within thirty days. Any contractor response is voluntary.
Any disagreement between the parties regarding an evaluation will be referred to an individual one level above the Contracting Officer, whose decision is final.
Copies of the evaluations, contractor responses and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.
2. b. Electronic Access to Contractor Performance Evaluations in the Contractor Performance Assessment Reporting System (CPARS)
As of January 15, 2019, the Past Performance Information Retrieval System (PPIRS.gov) is officially retired to conclude its merger with the Contract Performance Assessment Reporting System (CPARS.gov). After that date, the PPIRS name will only appear in the Federal Acquisition Regulation.
Data from PPIRS has been merged into CPARS.gov, making CPARS the official system for past performance information. This merge simplifies functions such as creating and editing performance and integrity records, changes to administering users and running reports, generating performance records, and viewing/managing performance records.
Users will now have one location and one account to perform all functionality. Federal users with a Common Access Card (CAC) or a Personal Identity Verification (PIV) card or a contractor with a Public Key Infrastructure (PKI) certificate, will log in using the Accept/Login with PKI button. Federal users who don’t use PKI/PIV or a contractor who doesn’t have a PKI certificate will log in using their email address and a password. Upon using CPARS.gov for the first time, users are required to reset their password to securely log on to the merged system. To help prevent unauthorized access, a one-time access code is needed when using a password to log in.
(END OF SECTION F)
SECTION G: CONTRACT ADMINISTRATION DATA
The Government will establish regular periods for contract level program reviews. Conflict of Interest shall be addressed by the COR and/or CO prior to the initial contract award. If potential conflicts of interest come up after contract award, the contractor must submit an Organizational Conflict of Interest (OCI) Mitigation Plan to the Government for review and approval.
Senior/Lead Contracting Officer (CO) Mrs. Stephanie Cooke-Nwadibia U.S. Department of Transportation Federal Transit Administration Office of Acquisition Management 1200 New Jersey Ave. S.E.
4th Floor - East Building, Rm: E42-117 Washington, DC 20590 Phone number: 202-366-7072 Email address: stephanie.cooke-nwadibia@dot.gov
Contract Specialist (CS) Ms. Teddy Cosia U.S. Department of Transportation Federal Transit Administration Office of Acquisition Management 1200 New Jersey Ave. S.E.
4th Floor - East Building, Rm: E42-216 Washington, DC 20590 Phone number: 202-366-1073 Email address: teddy.cosia.ctr@dot.gov
Contracting Officer’s Representative (COR) T B D
The Contracting Officer (CO) holds the contractual authority for the resulting contracts. The CO alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, and requirements. The CO may delegate certain other responsibilities to the Contracting Officer’s Representative (COR). The CO is the only individual who can legally commit or obligate the Government or authorize any changes that affect the contract price, delivery schedule, period of performance or other terms and conditions.
In accordance with the Transportation Acquisition Regulation (TAR) 1252.242-73 (b) Dissemination of Contract Information (See Section I), the Contracting Officer cannot authorize the COR or any other representative to sign documents (i.e., contracts, contract modifications, appointments, conflict resolutions, etc.) that require the signature of the Contracting Officer.
In accordance with TAR 1252.242-73 (See Section I), Contracting Officer’s Representative TAR Clause (OCT 1994), (a) The Contracting Officer may designate Government personnel to act as the Contracting Officer's Representative (COR) to perform functions under the contract such as review and/or inspection and acceptance of supplies, services, including construction and other functions of a technical nature. The Contracting Officer will provide a written notice of such designation to the Contractor within five working days after contract award or for construction, not less than five working days prior to giving the contractor the notice to proceed.
The designation letter will set forth the authorities and limitations of the COR under the contract.
(b) The Contracting Officer cannot authorize the COR or any other representative to sign documents (i.e., contracts, contract modifications, etc.) that require the signature of the Contracting Officer.”
G.2 COR Assignment
Upon contract award, the Contracting Officer’s Representative will be designated.
The COR has the authority to monitor the technical progress of the services that are required under the resulting contracts. This includes visits to the contractor’s place of performance, meetings, and telephone conversations with the contractor’s personnel, inspection, acceptance, or rejection of the contracted items and other duties that may be authorized by the contracting officer. The COR cannot authorize or order the cessation of contract work nor delete, change, or waive any of the technical requirements or other terms and conditions of the resulting contracts.
If a change (monetary or otherwise) to the contract is desired, the contractor must submit a written request to the contracting officer for consideration. If appropriate, the change will be effected by a contract modification, after discussions and/or negotiations.
Whenever a difference of opinion between the contractor and the COR occurs, the contracting officer or contract specialist should be contacted immediately for resolution. The contractor should also contact the contracting officer or contract specialist when the COR cannot be contacted on a technical matter and for assistance on all other matters pertaining to the resulting contracts.
G.3 Billing Instructions
The Contractor shall submit invoices for payment utilizing Standard Form (SF) 1034, “Public Voucher for Purchases and Services Other Than Personal,” to include supporting documentation for all costs/prices claimed in the performance of this contract. The Standard Form 1034 can be obtained from the “Federal Acquisition Regulations”, Part 53-301.1034 (see website at http://acquisition.gov). The Contractor shall submit one copy of all vouchers, including the final voucher to one of the three designated FTA Document Imaging Center noted below: (NOTE:
Please “mark” the final voucher “FINAL”)
The Contractor's failure to comply with the instructions below and/or in the invoice template will render the invoice as improper, and resubmission of the invoice will shall be required in order to http://acquisition/ http://acquisition/ obtain invoice payment. If the instructions change after contract award, the respective revised information will be provided in the documentation.
G.3.1 General Instructions
FTA’S METHOD OF INVOICE TRANSMITTAL-eInvoicing
The Contractor shall submit the invoice through the Delphi eInvoicing System.
G.3.2 Delphi eInvoicing Access
Authorization for a vendor to gain access to the eInvoicing System is granted by a request from the FTA Project Manager/COR who must complete the required Delphi User Access form, specific for external vendors, as is shown in the respective attachment to be provided. The vendor must provide the FTA project manager/COR, with the name of the authorized employee, within their organization, who will have the responsibility to request funds within the eInvoicing System. The FTA project manager or COR must obtain this person’s email address and make reference to their specific project number(s) as applicable where funds will be drawn down upon. The completed User Access Forms are then forwarded to FTA eInvoicing at FTAEinvoicing@dot.gov and the FTA Delphi Security Officer(s). The FTA Delphi Security Officers are located in the Office of Budget and Policy, Office of Financial Systems, TBP-40.
G.3.3 FAA, Enterprise Service Center’s (ESC) eInvoicing Help Desk
Access to the new Delphi eInvoicing System is granted by the FAA, Enterprise Service Center’s (ESC) eInvoicing Help Desk. The FTA Delphi Security Officer will forward all Delphi User Access Request Forms directly to the eInvoicing Help Desk on behalf of the FTA Approving Officials and Vendors. Once access is granted, the eInvoicing Help Desk will email the vendor to validate the recipient’s identity, provide training materials, and assist users in navigating within the eInvoicing System.
Vendors may contact the eInvoicing Help Desk by calling 405-954-3000, pushing option 4, and listening to the message pertaining to the Delphi eInvoicing process.
G.4 Submission of Vouchers
Vouchers may be submitted monthly. The FTA PO number, voucher number, contract number and task order number must be clearly listed on every voucher that’s submitted.
In addition, the name of the COR should also be listed on every voucher that’s submitted.
G.5 Method of Payment and Procedure
G.5.5.1 Payments under this contract shall be made under the Department of Treasury’s Automated Clearing House (ACH) system. Under this system, the funds will be wired (electronically transferred or EFT) to the contractor’s financial institution pursuant to FAR 52.232-34.
G.5.5.2 Prior to the submission of Voucher No. 1, the Contractor shall insure that the information contained in the TFS Form 3881, “Payment Information Form-ACH Vendor Payment System,” will be provided upon contract award. Or alternatively, TFS Form 3881 can be obtained from the Treasury’s website at http://fms.treas.gov/pdf/3881.pdf or the Contracting Office. The cover page to the Contract award should accompany the TFS Form 3881, and be faxed to FTA at (405) 954-9776.
FTA’s designated office for electronic funds transfer information is:
Mailing Address:
U.S. Department of Transportation Federal Transit Administration Office of Financial Management, TBP-50 1200 New Jersey Ave., 5th Floor – East Bldg. E54-465 Washington, DC 20590 Telephone number: 202-366-0992 Person to Contact: Mr. Michael Whitaker
G.6 Status of Payments
Contractors can track the status of payments for vouchers through the Department of Treasury’s “Internet Payment Platform” system, a system developed by the U.S. Department of Treasury’s Financial Management Service (FMS), to provide participating Federal agencies with a method of making remittance information available to vendors through the Internet.
Contractors may register with the Department of Treasury to obtain payment statuses by logging on: https://www.ipp.gov/. Any changes shall be submitted in writing to the Contracting Officer. It is the Contractor’s responsibility to furnish these changes promptly to avoid payments to erroneous addresses or bank accounts. Failure to provide the requested informational changes to the Contracting Officer may result in delays in the payment of vouchers. Any such delays shall be considered the Contractor’s responsibility.
G.7 Post Award Evaluation and Contractor Performance G.7.1 Contractor Performance Evaluations Interim (after one year of performance) and final evaluations of contractor performance will be prepared for the contract awarded in accordance with FAR 42.15. The final performance evaluations will be prepared as soon as possible after completion of all required work under this contract.
Interim and final evaluations will be provided to the contractor as soon as practicable after completion of the evaluation. The contractor may elect to review the evaluation and submit additional information or a rebuttal statement within thirty days. Any contractor response is voluntary. Any disagreement between the parties regarding an evaluation will be referred to an individual one level above the Contracting Officer, whose decision is final.
Copies of the evaluations, contractor responses and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.
G.7.2 ELECTRONIC ACCESS TO CONTRACTOR PERFORMANCE EVALUATIONS
The U.S. Department of Transportation uses Contractor Performance Assessment Reporting System (CPARS) to record and maintain interim and final past performance information.
Contractors that have internet capability may access evaluations through a secure web site for review and comment by completing the registration form that can be obtained at the following URL: http://www.cpars.gov.
The registration process requires the contractor to identify an individual that will serve as a primary contact and who will be authorized access to the evaluation for review and comment. In addition, the contractor will be required to identify a secondary contact who will be responsible for notifying the cognizant contracting official in the event the primary contact is unavailable to process the evaluation within the required 30-day time period. Once the contractor is registered and a performance evaluation has been prepared and is ready for comment, CPARS will send an email to the contractor representative notifying that individual that a performance evaluation is electronically available for review and comment.
G.8 Post Award Conference / Periodic Progress Meetings
The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart
42.5. The Contracting Officer (CO), Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings, the CO or COR shall apprise the contractor of how the government views the contractor's performance and the contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
G.9 Equitable Adjustment in the Case of Termination by DOT
If the resultant contract is terminated, by DOT, for default or for the convenience of the Government, DOT will request a Termination Settlement Proposal from the Contractor. And in the event of a termination, the dollar amount payable by DOT to the contractor shall be the LEAST (i.e., the LOWEST) of the following amounts: (a) The dollar-amount arrived at, by DOT, in an Equitable Adjustment after DOT’s review of the Termination Settlement Proposal submitted to DOT by the contractor; or (b) the costs (and the associated fee) actually, allocable, allowable and reasonably incurred by the contractor during performance of the contract up to the time of its termination, and not previously reimbursed to the contractor by DOT; or (c) the dollar amount that can be paid to the contractor from the contract’s cumulative obligated funding that remains available and that has not previously been used to make payments to the contractor.
G.10 Funds Availability—Limitation of Funds
The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
(END OF SECTION G)
SECTION H: SPECIAL CONTRACT REQUIREMENTS
H.1 Executive Order 13693 Planning for Federal Sustainability (March 19, 2015) This specific executive order was signed on March 15, 2015. EO 13693 introduces new requirements and expands upon requirements established by EO 13514, EO 13423, the Energy Policy Act (EPA) of 2005, and the Energy Independence and Security Act (EISA) of 2007. The following are some goals of the EO 13693 which federal agencies are required to achieve:
Greenhouse Gas (GHG) Emissions Reduction and Reporting Energy Conversation and Renewable Energy Sustainable Acquisition Performance Contracting Strategic Sustainability Performance Plan
H.2 Excluded Functions and Responsibilities Functions and responsibilities directly involved or associated with the management of any FTA Office are expressly excluded from this contract or order issued hereunder. The parties hereby agree that any instructions, directives, or orders issued under this contract involving such management functions and responsibilities shall be null and void. The following activities are representative of the excluded functions and responsibilities that cannot be provided by the contractor under this contract or order issued hereunder:
(1) Policy making or management of FTA operations;
(2) Program or project management;
(3) Technical management of Government contracts;
(4) Government purchasing, contracting, contract administration, acceptance of materials and/or performance, and pay and accounting therefore;
(5) Direction or supervision of other Government contracts or Government agencies, or otherwise acting as an agent to obligate or commit in any capacity;
(6) Clerical and other administrative type functions required to be performed by civil service personnel; and
(7) Supervision of Government employees.
H.3 Non-Personal Service
As stated in the Office of Federal Procurement Policy (OFPP) Letter 92-1, dated September 23, 1992, “Inherently Governmental Functions,” (See FAR 2.101 for definition of ‘inherently government function’), no personal services shall be performed under this contract. Contractor employees will not be directly supervised by the Government. All individual employee assignments, and daily work direction, shall be given by the applicable employee supervisor. If the Contractor believes any Government action or communication has been given that would create a personal services relationship between the Government and any Contractor employee, the Contractor shall promptly notify the Contracting Officer of this communication or action.
The Contractor shall not perform any inherently governmental actions under this contract. No Contractor employee shall hold him or herself out to be a Government employee, agent, or representative. Contractor employees shall not state orally or in writing, at any time that he or she is acting on behalf of the Government. In all communications with third parties in connection with this contract, Contractor employees shall identify themselves as Contractor employees and specify the name of the company for which they work.
In all communications with other Government Contractors in connection with this contract, Contractor employees shall state that they have no authority to in any way change the contract and that if the other Contractor believes this communication to be a direction to change their contract, they should notify the Contracting Officer for that contract and not carry out the direction until a clarification has been issued by the Contracting Officer.
The Contractor shall insure that all of its employees working on this contract are informed of the substance of this clause. Nothing in this clause shall limit the Government's rights in any way under any other provision of the contract, including those related to the Government's right to inspect and accept the services to be performed under this contract. The substance of this clause shall be included in all subcontracts at any tier.
H.4 Contractor Personnel Maintenance of Professional Conduct
All personnel assigned by the Contractor to work under this contract must be acceptable to the Government in their personal and professional conduct. Any person in the Contractor’s organization or in any subcontractor’s organization, who is deemed by the Contracting Officer or the COR whose conduct may affect the performance of the Contractor or the image of the FTA, shall be immediately removed from the assignment on the contract. The reason for removal must be documented in writing by the Contracting Officer. Employment and staffing difficulties are not adequate justification for failing to meet established schedules and if they impair performance, the Contractor may be subject to default. Any security violations, denials or revocations of security clearances may be construed as grounds for immediate removal from premises and the contract. The Contractor and its employees, subcontractors and or consultants shall only conduct business covered by this contract during periods paid for by the Government.
Contractor personnel shall abide by the normal rules and regulations applicable to Government and grantee premises on which they work, including any applicable safety and security regulations.
H.5 Section 508 Compliance
All electronic and information technology deliverables required under the resulting contracts must comply with Section 508 of the Rehabilitation Act and the Access Board Standards available for viewing at http://www.section508.gov. The Rehabilitation Act of 1973, as amended (Rehab Act) prohibits discrimination based on disability in programs conducted by federal agencies, in programs receiving federal financial assistance, in federal employment and in the employment practices of federal contractors. Unless otherwise indicated, the contractor represents by signature on the resulting contract that all deliverables shall comply with the Access
Board standards and with the Rehabilitation Act of 1943 as amended (Rehab Act).
EIT
Standard
EIT Standard Descriptions
Applicable to the Current
Requirement Yes No
1194.21 Software Applications and Operating Systems X
1194.22 Web-based Intranet and Internet Information and
Applications X
1194.23 Telecommunications Products X
1194.24 Video and Multimedia Products X
1194.25 Self- Contained, Closed Products X
1194.26 Desktop and Portable Computers X
1194.31 Functional Performance Criteria X
1194.41 Information, Documentation and Support X
H.6 U. S Department of Transportation (DOT) Contractor Personnel Security and Agency Access (NOV 2011)
Contractor personnel will be provided with identification badges and necessary access to facilities used to provide the services set forth in this contract based on the criterion below.
The following definitions are provided:
• "Agency Access" means access to DOT facilities, sensitive information, information systems or other DOT resources.
• "Applicant" is a contractor employee for whom the contractor submits an application for a DOT identification card.
• "Contractor Employee" means prime contractor and subcontractor employees who require agency access to perform work under a DOT contract.
• "Identification Card" (or "ID card") means a government issued or accepted identification card such as a Personal Identity Verification (PIV) card, a PIV-Interoperable (PlV-I) card from an authorized PIV-l issuer, or a non-PIV card issued by DOT, or a non- PIV card issued by another Federal agency and approved by DOT. PIV and PIV-l cards have physical and electronic attributes that other (non-PIV) ID cards do not have.
• "Issuing Office" means the DOT entity that issues identification cards to contractor employees.
• "Local Security Servicing Organization" means the DOT entity that provides security services to the DOT organization sponsoring the contract.
1. Risk and Sensitivity Level Designations — For contracts requiring access to DOT facilities, sensitive information, information systems or other DOT resources, the contractor employees will be required to complete background investigations, identity proofing, and government identification card application procedures to determine suitability for access. DOT will assign a risk and sensitivity level designation to the overall contract and/or to contractor employee positions by category, group or individual. The risk and sensitivity level designations will be the basis for determining the level of personnel security processing required for contractor employees.
IF THE DESIGNATED RISK: THE BACKGROUND INVESTIGATIONS IS: TBD
Low: National Agency Check with Written Inquiries (NACI) Moderate: Minimum Background Investigation (MBI) High: Background Investigation (BI)
Contractor employees may also be required to obtain security clearances (i.e., Confidential, Secret, or Top Secret). National Security work designated "special sensitive," "critical sensitive," or "non-critical sensitive" will determine t h e l e v e l of clearance required f o r contractor Employees. Personnel security clearances for national security contracts in DOT will be processed according to the Department of Defense National Industrial Security Program Operating Manual
(NISPOM).
2. Pre-screening o f Contractor E m p l o y e e s - The c o n t r a c t o r m u s t pre-screen i n d i v i d u a l s designated for employment under any DOT contract by verifying minimal suitability.
3. Requirements to ensure that only quality candidates are considered for contract employment, and to mitigate the burden on the Government of conducting background investigations on objectionable applicants. The contractor must exercise due diligence in pre-screening all employees prior to submission to DOT for agency access. DOT may decline to grant agency access to a contractor employee for reasons including, but not limited to:
a. Conviction of a felony, a crime of violence, or a misdemeanor involving moral turpitude.
b. Falsification of information entered on forms or of other documents submitted.
c. Improper conduct including criminal, infamous, dishonest, immoral, or notoriously disgraceful conduct or other conduct adverse to the Government regardless of whether the conduct is directly related to the contract.
d. Any behavior judged to pose a potential threat to DOT facilities, sensitive information, information systems or other resources.
Citizenship and Alien Status - The contractor must monitor an alien's continued authorization for employment in the United States. The contractor must provide documentation to the Contracting Officer or the Contracting Officer's Representative during the background investigation process that validates that the E-Verify requirement has been met for each contractor employee (see http://www.uscis.gov.
Background Investigation and Adjudication — The contractor employee must have a favorable adjudication of background investigation before DOT will issue an ID card to the contractor employee granting access to DOT facilities, sensitive information, information systems or other DOT resources. DOT may accept favorable adjudications of background investigations from other Federal agencies when applicants have held PIV cards issued by those agencies with no break in service. DOT may also accept PIV-I (interoperable) cards issued by an authorized PIV-I issuer as evidence of identity. A favorable adjudication does not preclude DOT from initiating a new investigation when deemed necessary. At a minimum, the FBI National Criminal History Check (fingerprint check) must be favorably completed before a DOT identification card can be issued. Each contractor must use the Office of Personnel Management's (OPM) e-QIP system to complete any required investigative forms. Instructions for obtaining fingerprints will be provided by the COR or CO. The DOT Office of Security, M- 40, or a DOT organization delegated authority by M-40, is responsible for adjudicating the suitability of contractor employees.
4. Agency Access Denied — Upon contract award, DOT will initiate the agency access procedure for all contractor employees requiring access to DOT facilities, sensitive information, information systems and other DOT resources for contract performance. DOT may deny agency access to any individual about whom an adverse suitability determination is made.
Failure to submit the required security information or to truthfully answer all questions shall constitute grounds for denial of access. The contractor must not provide agency access to contractor employees until the COR or CO provides notice of approval, which is authorized only by the DOT Office of Security (M-40) or a DOT organization delegated authority by M-40.
5. Identification Card Application Process - The COR will be the DOT ID card Sponsor and point of contact for the contractor's application for a DOT ID card. The COR shall review and approve the DOT ID card application before an ID card is issued to the applicant.
6. Personal Identity Verification Card - An applicant may be issued either a Personal Identity
Verification (PIV) card that meets the standards of Homeland Presidential Security Directive (HSPD-12), or an applicant may be issued a non-PIV card. Generally, a non-PIV card will be issued for contracts that expire in six months or less, including option periods. The COR may request the issuing office to waive the six-month eligibility requirement when it is in DOT's interest for contract performance.
The applicant must complete a DOT on-line application for a PIV card. For a non-PIV card, the applicant must complete and submit a hard copy of Form 1681 to the COR/Sponsor. Regardless of the type of card to be issued (PIV or non-PIV), the applicant must appear in-person to provide two forms of identity source documents in original form to DOT. The identity source documents must come from the list of acceptable documents included in Form 1-9, OMB No. 1115-0136, Employment Eligibility Verification. At least one document must be a valid State or Federal government-issued picture identification. For a PIV card, the applicant may be required to appear in-person a second time for enrollment and activation.
7. Identification Card Custody and Control — The contractor is responsible for the custody and control of all forms of government identification issued by DOT to contractor employees for access to DOT facilities, sensitive information,…