Bid_Schedule_Derrick_Inspection_6923G519Q0862.pdf
PDF 77 KB Posted
- Attached to
- Stiffleg Derricks Inspections and Reports
- Solicitation number
- 6923G519Q0862
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SK-56-10slingcables.pdf | ||
| 327-CSR-35-1.pdf | ||
| Wage_Determinations.pdf | ||
| 52.212-3_Offeror_Representations_and_Certifications.pdf | ||
| STDCombined.pdf | ||
| Statement_of_Work_Derrick_Inspection.pdf | ||
| 326-CSG-35-1.pdf | ||
| FP36201-10A_log_pick-up_beam.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
6923G519Q0862
Furnish all plant, labor, equipment and materials and perform all work at Eisenhower and Snell Locks to inspect the stiff leg derricks at the upstream and downstream ends of Eisenhower and Snell Locks, in accordance with the contract drawings and these specifications.
BASIC REQUIREMENT-EISENHOWER LOCK
Item
No.
Description Quantity Unit Unit Price Total
1. Project Mobilization and Demobilization for work related to the downstream Eisenhower Lock derrick.
For The Job $__________ $__________
2. For the downstream Eisenhower Lock derrick: provide all plant, equipment and labor to inspect and provide a report for the derrick as described in Section C.
1 Each $__________ $__________
3. For the above derrick, provide all plant, equipment and labor to provide personnel access to the entire height of the derrick for inspection.
For The Job $__________ $__________
OPTIONAL REQUIREMENT-EISENHOWER AND SNELL LOCKS
Item
No.
Description Quantity Unit Unit Price Total
4. Project Mobilization and Demobilization for the remaining three derricks.
For The Job $__________ $__________
5. For each derrick: provide all plant, equipment and labor to inspect and provide a report for the derrick as described in
Section C.
3 Each $__________ $__________
6. For the above three derricks, provide all plant, equipment and labor to provide personnel access to the entire height of the derrick for inspection.
For The Job $__________ $__________
TOTAL-BASIC AND OPTIONAL REQUIREMENT ITEMS NO. 1-6 $__________
INSTRUCTIONS FOR BIDDERS:
• SLSDC will evaluate offers for initial award purposes by adding the prices for all Basic and Optional Requirement
Items.
• To be considered responsive bidders shall comply with the following:
o Submit resumes and qualifications of personnel as described in Section C.1.c and o Submit prices to provide all plant, equipment and personnel to access inspection personnel to all points of the derrick per Basic Requirement Item No. 3 and Optional Requirement No. 6, and o Be capable of completing any corrective work, either in-house or by means of subcontracted resources.
• SLSDC will award any or all Basic and Optional Requirement items in such combination as deemed to best advantage.
Signature ______________________________ Date:
File details come from the government source that posted it.