6923G222B000001 - Amendment 0001.pdf
PDF 967 KB Posted
- Attached to
- VARISTY TEAM ROOM RENOVATIONS
- Solicitation number
- 6923G222B000001
About this file
This document contains an invitation for bids for renovations to the Varsity Team room at the USMMA in Kings Point, New York. The solicitation number is 6923G222B000001 and seeks fixed price bids to upgrade the space in accordance with the statement of work and attachments. Key requirements include replacing ceilings, installing lockers and shoe racks, upgrading HVAC, electrical, and plumbing systems, and adding a wash down area and meeting room. The acquisition is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. Bids are due by July 19, 2022 and the pre-bid site visit was held on June 28. The award will be a firm-fixed price contract and all bidders must be registered in SAM. Bonding and Buy American compliance are required.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
6923G222B000001 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
6923G2
KINGS POINT NY 11024-1699
300 STEAMBOAT ROAD
USMMA PROCUREMENT
MARITIME ADMINISTRATION
07/13/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/15/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide all updated information to all prospective offerors and post Answer sheets to RFIs.
a. Incorporate Answer sheet, see below
b. Floor Plan Updated - Attachment 5
c. Added Sprinkler plan - Attachment 6
d. Added Shoe rack sketch - Attachment 7
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
NarineA Highlight
NarineA Highlight
NarineA Highlight
NarineA Typewritten Text
NarineA Typewritten Text
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 15
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6923G222B000001/0001
e. Codify Site-visit conducted on 07/06/2022
f. Incorporate sign-in sheets from Site-visits
LIST OF CHANGES:
Bids due date : 15-JUL-22 changed to 19-JUL-22
Solicitation due time : 10:00 AM changed to 10:30
AM
Solicitation due time zone : ET changed to ES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
NarineA Highlight
NarineA Highlight
NarineA Highlight
ATTACHMENT 4
IFB # 6923G222B000001 – VARISTY TEAM ROOM RENOVATIONS
Question & Answer Form
# Company IFB Section Question Response Change to IFB? Description of
Change
Technical/
Contractual
1 BCC SOW 3.1.4 Please provide a spec for the
PVC ceiling. Acoustic lay-in;
planks; sheet material?
Based on Armstrong
Model #PL 6201 or equal.
2 BCC SOW
3.1.11
Please provide a current sprinkler plan to determine what modifications are required to meet code with new layout.
See attached sprinkler plan.
3 BCC SOW
3.1.12
Please provide a spec for the
“shoe racks”.
12”X12”X12” PVC
4 BCC SOW
3.1.18
Please provide design details for the wash-down area. The basin must be elevated for water to flow into pump system. Is the basin wood framed, concrete, pre-fabricated?
Pre-fabricated basin with concrete base.
5 BCC SOW
3.1.19
Please provide a spec for the new 200 amp panel.
208 Volt, 3 phase, 60
HZ. 200 amp, 4 wire, Main Breaker Over
Current Device. 10 kA IC
6 BCC SOW
3.1.20
Please provide a plan for the fire alarm system and components.
See revised plan. Fire
Alarm system is
Honeywell.
7 BCC SOW
3.1.21
Please provide a spec for the heater and desired controls or sequence of operations.
Provide start/stop. The fan shall start when damper is proven open by end switch.
8 BCC SOW
3.1.22
Please provide a spec for the
HVAC controls or sequence of operations for equipment called for.
Provide start/stop. The fan shall start when damper is proven open by end switch.
9 BCC Drawings – floor plan
There is an existing door from shell storage into women’s locker room. Please confirm this door is to be removed and opening to be closed with what material.
See revised floor plan.
10 BCC Drawings –
Mechanical
1st floor
For the vertical duct runs in the shop/garage, they are to be insulated and fire stopped
No sheet rock enclosure required.
per spec, do they need to have a sheetrock enclosure?
11 BCC Drawings –
Mechanical
1st floor
On the new wall between the locker rooms, there are rectangles drawn with no label. Please specify what these are.
The boxes are shoe racks.
12 BCC Drawings –
Electrical
The electrical plans do not show EXIT signs and emergency lights. Please advise if required and locations.
Please see revised floor plan.
13 BCC General Please advise on location for bid submission and public opening
Refer to Solicitation notice. An additional amendment will be post by 07/15/22.
14 BLHCI Drawings –
Floor plan
Does a wall needs to be built between the team meeting room & conference area?
This wall is not reflected in the solicitation.
No.
15 ISE n/a Are there any specs?
Drawings & spec file is limited to five drawings.
Items provided are the
SOW and five drawings.
ISE
n/a
Aside from Federal holidays, are there any dates when the project area will be unavailable? If so, please provide.
No
17 PINB Scope -
Plumbing
What type and size is the washdown tub or base?
Large shower stall size.
18 PINB Scope -
HVAC
What size flex duct needed for tie into existing duct?
Flex duct to be the same size as duct connection.
19 PINB Scope -
Carpentry
The sheetrock size says 1/2" doubled, are you sure you don't want 5/8" fire rated.
The metal door jams will need to fit new wall.
Revise the wall type to
5/8” sheetrock
20 PINB Scope -
Carpentry
There is an existing door in the area where the women’s
See revised floor plan.
locker room is going to be. Is this door being removed?
21 PINB Scope -
Plumbing
Is PEX or copper tubing being used plumbing water lines?
Water Lines to be copper.
22 PINB General I did not see any plans for sprinkler, please advise.
See attached sprinkler drawing.
23 K2CG Scope -
3.1.6
The new glass double doors entering the new Team
Meeting Room, are these doors to be a storefront type, or full metal doors with full glass?
See section 3.1.6 in the
SOW.
24 K2CG Scope -
3.1.15
The new lockers to be installed which run along an outside wall, are we to install the lockers up to the foundation block protruding past the exterior wall and brace back to the exterior wall, or are we also building walls with sheetrock flush with the foundation to fasten the lockers securely?
Install lockers at base along footing. Secure lockers to wall with steel brackets.
25 K2CG Scope -
3.1.4
3.1.18
According to the sow, only the drying room will have the ceiling. Is the drying room the same room as the
Washdown shown on the plans? What is the proposed ceiling height? PVC walls and ceiling, FRP panels?
Based on Armstrong
Model #PL 6201 or equal.
26 K2CG General -
Plumbing
At the site visit, the new wall separating storage area from the Washdown area, we were told the new wall was to be constructed at the existing overhead steel. On the plans it shows the wall closer to the new locker rooms, please advise
Refer to floor plans.
27 K2CG General -
Carpentry
At the site visit, it was mentioned that a wall was to be built in the new Team
Meeting room separating an area from the table area and new double doors. It is not
No wall at that location.
shown on the plans, is this wall to be built?
28 K2CG General -
Carpentry
Old door to be closed is not shown on the plans, can you please advise on exact location?
Please see revised drawing.
29 K2CG Scope -
3.1.12
3.1.17
The SOW informs us to include new shoe racks, drying racks, and hangers.
These come in many forms, models, price ranges. Any specific model in mind for these items?
12”X12”X12” PVC.
Provide PVC hangars and rods.
30 K2CG Scope -
3.1.26
Painting of floor only in the new constructed rooms only?
Epoxy floor paint? Any specified product?
Based on Sherwin
Williams
B70 W 0021 16 or equal. Blue.
31 K2CG Scope -
3.1.30
Alternate #1: Due to a wide variety of styles, models, prices, etc., can you specify what appliances, tables, chairs, cabinets you want for the Meeting Room?
Base selection on
Standard models.
32 ASI Scope -
3.1.15
Are substitutions allowed for the brand of lockers being installed?
YES, IAW FAR Clause
52.211-6, Brand Name or Equal. Specs will need to be provided.
33 MFSC General Will unvaccinated individuals be barred from this job?
NO, there is not a federal mandate at this time.
34 MFSC General Will the sign-sheet be submitted?
YES, See solicitation updated attachments
35 MFSC General Will the deadline date be extended?
YES, see SF-30
July 19, 2022.
36 USMMA General Is bonding required? Yes, all bids must be submitted with a 20% bid guarantee. Upon
Award this must be converted to a 100% payment & performance bond.
37 USMMA General Does the materials & equipment need to conform to Buy American Act?
YES, all items provided must meet BAA & TAA compliance.
File details come from the government source that posted it. Updated .