6913G20Q300060.pdf
PDF 482 KB Posted
- Attached to
- Switcher Locomotive
- Solicitation number
- 6913G620Q300060
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6913G620Q300060 Cancelation.pdf | ||
| 6913G620Q300060 A0001.pdf | ||
| Attachment 1_6913G20Q300060.pdf | ||
| Attachment 2_6913G20Q300060.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
6913G6
Cambridge MA 02142-1001 55 Broadway
VOLPE NAT'L TRANSPORTATION SYS CNTR
VOLPE CODE 16. ADMINISTERED BYCODE
X
X
X
336510
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED OR6913G6
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
08/11/2020 1500 ET
07/23/2020
617-494-2128Daniel Leone (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
6913G620Q300060
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 30 V3352068OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
Portsmouth VA 23709 Mobile Crane Test Slab Norfolk Naval Shipyard
15. DELIVER TO
Cambridge MA 02142-1001 55 Broadway
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
1,500
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
VOLPE NAT'L TRANSPORTATION SYS CNTR
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
A firm fixed price purchase order is anticipated.
Delivery: 270 Days After Award
00100 One (1) Locomotive in accordance with the statement of work.
FOB: Destination
00200 Option 1: Electronic air brake system for Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
Daniel Leone
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
locomotive in accordance with the statement of work.
(Option Line Item)
90 Days After Award
00300 Option 2: Locomotive console radio, control stand mounted in accordance with the statement of work.
(Option Line Item)
90 Days After Award
00400 Option 3: Locomotive visual enhancement camera system in accordance with the statement of work.
(Option Line Item)
90 Days After Award
00500 Option 4: Locomotive cold weather package in accordance with the statement of work.
(Option Line Item)
90 Days After Award
00600 Option 5: Locomotive automatic engine start-stop system in accordance with the statement of work.
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
30 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 30
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6913G620Q300060
(Option Line Item)
90 Days After Award
00700 Option 6: Locomotive safety brake system, automatic brake application in accordance with the statement of work.
(Option Line Item)
90 Days After Award
00800 Option 7: Locomotive mounted hand-operated spotlight in accordance with the statement of work.
(Option Line Item)
90 Days After Award
00900 Delivery of Locomotive(CLIN 0100)
FOB: Destination
01000 Option 8: Extended Technical Field Support in accordance with the statement of work.
(Option Line Item)
270 Days After Award
01100 Option 9: Coupler extension links in accordance with the statement of work.
(Option Line Item)
90 Days After Award
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Request For Quotation No. 6913G20Q300060 Yard Industrial Switching Locomotive
(Continuation of SF 1449, block 20, Schedule of Supplies/Services)
This is a combined synopsis/solicitation no. 6913G20Q300060for commercial items prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a separate written solicitation will not be issued. This solicitation is being conducted IAW FAR Part 12, Acquisition of Commercial Items and pursuant to FAR Part 13, and Simplified Acquisition Procedures. This acquisition is being conducted using full and open competition and the Government intends to award a single firm fixed price purchase order. The applicable North American Industry Classification System (NAICS) Code is 336510, Railroad Rolling Stock Manufacturing, with a small business size standard of 1,500 employees. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2020-06.
The U.S. Department of Transportation, Volpe National Transportation Systems Center (Volpe Center), Cambridge, MA, 02142, is seeking to acquire one (1) switcher locomotive, options for locomotive components, extended locomotive field support and locomotive technical training as shown in below Contract Line Item Numbers (CLINS). Delivery for the locomotive shall be within 270 days after contract award though a shorter delivery time is acceptable and desired.
Information on delivery requirements of locomotive is provided in the Statement of work. It is noted upon delivery/acceptance the standard commercial warranty (12 months) will begin, which will extend the contract period accordingly. Based on the delivery requirements, inclusive of option CLINS if exercised, the total period of performance for this acquisition shall not exceed 21 months (1 year and 9 months).
The Government intends to award a single Firm-Fixed-Price Purchase Order as a result of this solicitation, however, reserves the right to make no awards depending on the quality of quotations. The Government is NOT offering commercial contract financing terms IAW FAR Subpart 32.2 for this acquisition. An award will be made to the lowest price, technically acceptable and responsible Offeror. The Offeror’s quotations shall include both technical information and pricing in accordance with FAR clause 52.212-1, Instructions to Offerors – Commercial Items, and its addenda in this solicitation.
Switcher Locomotive for Norfolk Naval Facility
1. SCOPE
This Statement of Work (SOW) specifies the manufacture and delivery of one (1) new Yard Industrial Switching Locomotive and necessary range of technical data, materials, and equipment necessary to ensure long-term compliance, operations, support, and maintenance for the locomotive. The locomotive required for this solicitation shall meet the range of requirements within this SOW. This SOW includes optional line items for accessories and an option for extended field support. The delivery destination is Norfolk Naval Shipyard (NNSY) located in Portsmouth, Virginia.
2. APPLICABLE DOCUMENTS
The locomotive must satisfy the following:
a. Association of American Railroads (AAR) Manual of Standards and Recommended Practices
Section-M, Locomotives and Locomotive Equipment
b. The Official Railway Equipment Register
c. Code of Federal Regulations (CFR) Title 49, Part 229 Railroad Locomotive Safety Standards
d. American Society of Mechanical Engineers, Boiler and Pressure Code Section IX, Welding
Qualifications
e. American Welding Society D15.1 - Railroad Welding Specification
f. American Iron and Steel Institute(AISI) Standards
3. CLIN 00100 – LOCOMOTIVE
3.1 General Description and Configuration
3.1.1 Locomotive Type: New, single or multi engine, railway yard-switching diesel-electric locomotive.
Locomotive shall be manufactured on a new frame.
3.1.2 Dimensions: Overall length not to exceed 45 ft., width not to exceed 10 ft 6 inches, and height not to exceed 15 ft.
3.1.3 Rail Gage: North American railway track gage, 56 ½ inches.
3.1.4 Weight: Appropriate to provide the required tractive effort but not to exceed 160,000 pounds fully serviced.
3.1.5 Curve negotiation: 109-foot radius curve coupled to 40-foot railway flatcar. Special alterations to the coupler system, such as extended couplers or using coupler extension links may be incorporated to meet this requirement. If special alterations or extended links are required for maneuvering the curves safely, these must be included as part of the CLIN 00100 deliverable.
3.1.6 Wheels:
a. New steel wheels rated for railway use with flange and tread meeting or exceeding AAR requirements
b. 33-inch wheel minimum diameter
c. Wheel sets conform to 49CFR 229.73
d. Automatic wheel flange lubricators on all wheels
3.1.7 Trucks: One axle or two axles per truck, one traction motor per axle.
3.1.8 Tractive Effort: 40,000 pounds minimum
3.1.9 Fuel Tank:
a. Minimum Capacity 400 US Gallons.
b. Fuel level sight glass and/or electronic gauges located on fuel tank.
c. Snyder fuel fitting on filler pipe.
3.1.10 Couplers: Coupler carrier system on both locomotive ends to allow the coupler to slide horizontally to accommodate curves while providing maximum pulling force coupled to 40-foot and 50-foot railway cars without the tendency to derail the locomotive or the railway cars. The coupler shall have alignment control via pneumatic or electronic actuators operable from a safe location on both sides of the locomotive.
3.1.11 The locomotive manufacturer shall select and install the appropriate coupler system, including type, dimensions (including nominal 34½ inches (87.6 cm) height from top of rail to center of coupling), and features. Photos of the current locomotive and coupler carrier system are included in Attachment 2.
3.1.12 Brakes:
a. AAR airbrake system compatible with 26L air brake schedule.
b. Basic duplex air end connection.
c. New brake rigging with single shoe design or double acting clasp design.
d. New composition brake shoes (if brake shoes are work more than 50% prior to delivery, a set of new brake shoes must be delivered and installed)
e. Emergency brake valve located in cab.
3.1.13 Emissions: Engine emissions shall meet or exceed current U.S. EPA Tier requirements for new built switcher locomotives at time of locomotive production.
3.1.14 Lighting/Illumination:
a. Dual headlights provided at both ends of the locomotive.
b. Hood/engine lights providing sufficient illumination for performing routine engine maintenance.
c. Step Lights
d. Roof mounted amber strobe light
e. Ditch lights
f. Cab lighting to provide sufficient illumination for all control instruments, meters, and gauges to enable the engine crew to make accurate readings from their normal positions in the cab.
3.1.15 Cab:
a. Steel fabricated cab and hood.
b. Cab heater and air conditioning shall be of sufficient size to maintain a temperature range of 68-72 degrees with an outside temperature range of 0-100 degrees. Air conditioner condensate drain tubing shall extend to below the cab.
c. AAR standard control stand operating console positioned for unobstructed operator visibility.
d. Enclosed cab with slide opening side windows.
e. Window awnings and padded sun visors.
f. Pneumatic or electric window wipers and washers, front and rear window defroster fans.
g. One operator adjustable seat and one cushion bench seat and one jump seat pending cab orientation.
h. Cab noise shall conform to CFR-49 sect. 229.121.
i. AAR Clean Cab, cab door cushion pads, door closure bars, flexible hinge guards, etc.
per AAR.
j. Non-skid flooring material approved for locomotives shall be applied to the floor.
k. Cab mounted First Aid kit and Fire Extinguisher.
l. Doors shall be equipped with interior deadbolt locks. The front door shall be equipped with an exterior slide lock with four (4) matching keys.
m. Gages: All gages and indicators to be clearly visible and readable under all lighting conditions.
n. The locomotive shall not be equipped with a toilet.
3.2 ELECTRICAL/ELECTRONICS:
a. Microprocessor control system to provide maximum wheel/rail adhesion and minimum wheel slip with memory, fault code readout, tracing/troubleshooting.
b. Speed indicator accurate to within +/- 1 mile per hour (MPH) for speeds up to 10 MPH.
c. Engine non-resettable duty cycle hour meter.
d. Wiring and cabling insulated per AAR.
e. Outlets – Minimum one (1) 12 volt dc outlet and one (1) 110 volt ac outlet in cab.
f. The locomotive shall have a working event recorder. The event recorder shall store operating data including speed, throttle position, faults and data to assist in diagnostics in addition to history of operations. The event recorder shall allow for download of history data.
g. Locomotives shall be pre-wired for communications radio and antenna for a console mounted programmable radio with handset holder.
h. On board provisions to monitor and troubleshoot as many system parameters and fault data as practical. If external software is required for monitoring and troubleshooting, a laptop, connection cable, and all required software shall be provided. The laptop shall not be equipped with a camera.
i. Locomotive shall be equipped with operative crossing bell and horn in compliance with CFR49 Part 229.129.
j. New electrical cabinets with weather seals and ventilation as required. External cabinets will have means to drain out in event of water intrusion.
k. All doors and cover plates guarding high voltage equipment shall be marked “Danger High Voltage” or “Danger”.
l. Grounding lug easily accessible during refueling operations.
m. All wires, cables, terminal strips, breakers and switches to be clearly identified and labeled and referenced in appropriate schematics.
n. No wireless transmission of data from the locomotive shall be allowed. There shall be no wireless or cellular systems installed aboard the locomotive.
3.3 PAINT: Contractor shall follow AAR Requirements for surfaces that are not to be painted.
Ferrous metal surfaces to be painted shall be cleaned by sandblasting, commercial grade grit blasting, or mechanical or chemical means to remove all existing loose paint or other materials.
Ferrous surfaces requiring finish painting shall be primed with one coat of rust inhibiting high solids, low volatile organic compound (VOC) urethane compatible primer. Dry film thickness to be in accordance with the paint manufacturer's instructions. Finish paint shall be two coats dry film thickness of each coat to be 1.2 to 1.8 mils (0.03 to 0.46 mm). Paint thickness shall be 4-mil minimum dry thickness combined primer and topcoat or in accordance with the paint manufacturer's instructions. The paint system compliant status total volatile organic compounds (VOC) shall be less than 3.5-lbs/gal (0.419 kg/liter). Paint Specifications for Locomotive, shall conform to AAR Standard M-1001 Section C, Part II, Section 5.2.
Paint Classification: Polyurethane Substrate: Primed Steel Pre-treatment: Sandblasted Federal Color Standard (595B): White # 17925
Black # 17038 Yellow # 13538 Red # 11105
3.3.1 Application to Locomotive:
a. Locomotive body: Yellow
b. Underframe: Black
c. Handrails and steps: Black
d. Trucks: Black
e. Cab interior: Manufacturer’s beige, gray or tan enamel
f. Stenciling: Black locomotive prefix (USN) and the road numbers located below USN stencil on cab. Black (United States Navy) to be located on both sides of low hood configuration (no smaller than 9-inch tall lettering equally spaced). Black for all other stenciling required by AAR.
g. Locomotive number will be defined at a later date.
h. Chevron striping on front (angled 45-degree, downward toward the center) 6-inch (15
cm) black and yellow stripes equally spaced.
i. Locomotive Identification shall comply with 49 CFR section 229.11.
3.3.2 Additional markings shall be in accordance with AAR Section L– Lettering and Marking of
Cars, as applicable. Adhesive backed film markings must be applied at surface temperatures between 40 and 100-degrees Fahrenheit (4 0C and 37.8 0C).
3.3.3 A manufacturer’s builder tag permanently mounted to include manufacturer, Locomotive model number, serial number, date manufactured.
3.3.4 Grab irons, uncoupling levers, and sill steps shall be painted safety yellow. Only component Contractor will paint telescoping portions of uncoupling lever.
3.3.5 Locomotive shall comply with Reflectorization Rules, 49 CFR Section 224.
3.3.6 Touch-Up Painting. All disturbed surfaces shall be returned to original condition prior to acceptance unless such condition is required for the equipment or system being supplied.
3.4 Training. The Contractor shall schedule and provide training at the Navy Yard at least two (2) weeks prior to the start of any training, the Contractor shall provide a course outline for Government review and comment. Contractor to provide on-site operator training, hands-on maintenance, service and troubleshooting training stressing the importance of system interactions and long-term preventative maintenance and operation. The Contractor shall provide training on site for eight (8) operators / maintenance technicians / engineers for three
(3) consecutive, eight hour work days in the operations and systems of the new equipment.
These days are exclusive of time required for offload, assembly and set-up. Operations and systems training shall include equipment set up, systems explanations and features, routine maintenance, programming, and safety practices and procedures. An operator’s manual shall be provided for each student. Two sets of special tools required to perform all maintenance functions will be provided during training, technical manuals and other applicable documents used to identify parts and service manuals required to perform maintenance shall be utilized during the training activities. Training shall take place within 14 days following locomotive delivery and acceptance. The course outline shall include:
a. Equipment included in training.
b. Intended audience.
c. Location of training.
d. Objectives.
e. Subjects covered including description.
f. Duration of training on each subject.
g. Methods (classroom lecture, video, site walk-through, actual operational demonstrations, written handouts, etc.).
h. Instructor and instructor qualifications for each subject.
3.5 Documentation. The Contractor shall provide parts manuals, service manuals and operator’s manuals that meet the requirements described below as a minimum.
a. Parts/Service Manual. The locomotive parts/service manual shall be designed to provide quick access to information for the experienced and novice user. The parts/service manual will provide a description for all mechanical assemblies and all special tooling required for performing repairs if failure occurs. Safety will be announced in appropriate areas.
b. Operator’s Procedure Manual. The Contractor shall supply a stand-alone Operator’s Procedure
Manual. The Yard Switcher locomotive operator’s Procedure Manual will contain a step-by-step process for starting and shutting down the locomotive. This shall include all safety warnings and safety related operations. Manuals and supporting documentation quantities are described in the following sections.
c. Documentation Package. Technical data descriptions used to describe parts, assemblies and equipment shall consist of data such as specifications, standards, drawings, photographs, sketches, and descriptions, and the necessary assembly and general arrangement drawings, etc. required to indicate the physical characteristics, location, and function of the item.
The complete documentation package consists of the following:
(1) Locomotive dimensions and capacities
(2) Component (part) identification
(3) Maintenance Manual (including troubleshooting guide)
(4) Operator’s Procedure Manual (described above)
(5) Parts/Service Manual (described above)
(6) Lubrication Orders
(7) Electrical schematics and wiring diagrams
(8) Diagrams of all water, fuel, air, and lube systems
(9) All certifications, tests, repairs and inspections
(10) Safety Certification Form (See Attachment A, Safety Certification for Locomotive)
(11) Manufacturer’s Parts catalog (with pricing index if available)
Note: all electronically formatted documentation shall be compatible with and submitted within Adobe Acrobat Reader and have the ability to be electronically reproduced for Government use.
3.6 Spare Parts/Maintenance Items. The Contractor shall submit a recommended spare parts list with the proposal, which shall be incorporated as part of the contract. Spare parts are those items recommended by the manufacturer to be kept on hand for quick and immediate maintenance access. This list shall identify the parts required to support the locomotive for one year of service. A one year supply of spare parts as identified in the spare parts list shall be delivered with the locomotive and shall be inspected for completeness before acceptance. This does not include fuel and lube oil.
3.7 Tools. Any special and unique tools necessary to perform preventative and corrective maintenance to be provided.
3.8 Prior to Locomotive Delivery
3.8.1 After contract award but not less than one (1) week prior to delivery of locomotive to destinations the Contractor shall provide complete Documentation Packages (as described above) for the locomotive by road number per locomotive. Documentation Package quantities and locations are described below:
a. One (1) CD or DVD copy to the Volpe Center, Cambridge, MA
b. One (1) CD or DVD copy and one (3) hard copies in binder form to the U.S. Navy (to be determined) NOTE: The Contractor shall also provide to the Volpe Center and the U.S. Navy the authority to copy and distribute for their use, the documentation described herein.
4. OPTION CLIN 00200 – ELECTRONIC AIR BRAKE SYSTEM
4.1 The locomotive shall have an AAR electronically controlled pneumatic brake system with self-test feature and fault tracing capability and compatible with 26L air brake schedule.
5. OPTION CLIN 00300 – RADIO
5.1 The locomotive shall have a programmable trunking capable radio (make and model with frequencies will be defined at a later date).
6. OPTION CLIN 00400 – CAMERA SYSTEM
6.1 The locomotive shall have a camera system. At minimum, the system shall include four (4) cameras with split screen monitor: two (2) cameras in the front and two (2) cameras in the rear to monitor coupling and track path. Cameras and monitor shall be hard-wired and not utilize wireless transmission.
7. OPTION CLIN 00500 – COLD WEATHER PACKAGE
7.1 The locomotive shall have a Cold Weather Package to ensure the locomotive and locomotive engine are operable in freezing temperatures.
8. OPTION CLIN 00600 – AUTOMATIC ENGINE START/STOP SYSTEM
8.1 The locomotive shall have an Automatic Engine Start/Stop System with manual override capability.
9. OPTION CLIN 00700 – AUTOMATIC BRAKE APPLICATION SYSTEM
9.1 The locomotive shall have an Automatic Brake Application System. While locomotive is in operation, brakes are not applied, and there is no run command, the brakes shall be automatically applied within 45 seconds and the power shut off.
10. OPTION CLIN 00800 – SPOTLIGHT
10.1 The locomotive shall have a spotlight operable from the operator’s seat. The spotlight may be manual or electronic controlled.
11. CLIN 00900 – LOCOMOTIVE DELIVERY
At 30 days prior to delivery, the Contractor shall notify the Government representatives of a proposed arrival date at NNSY. The Government representatives will initiate and inform the Contractor of the entry requirements to get Contractor personnel into the shipyard. Upon request, the Contractor shall supply all required information and/or documentation for personnel entry. Contractor personnel shall include all truck driver(s) and all manufacturer personnel who assist with delivery and assembly. Normal Shipyard business hours are 7:30am to 4:00pm Monday through Friday excluding federal holidays
11.1 Transportation
11.1.1 The Contractor shall deliver the locomotive to the following address:
Norfolk Naval Shipyard Mobile Crane Test Slab
Portsmouth, VA 23709
11.2 The locomotive may be delivered by rail or over the road. Locomotive delivery method shall be specified with proposal.
11.3 The Contractor shall provide to the government representative certified documentation of the locomotive weight, operator manuals, and certification documents.
11.4 General Test and Inspection Information
11.4.1 Test at Origin.
a. Operational Test – Locomotive will be operationally tested meeting all specifications. To be tested at no load for proper operation of all manual controls, electronics, mechanisms and accessories. After initial warm-up, locomotive to be fully cycle tested.
b. Performance Test – Locomotive to be tested using the manufacturers testing plan.
11.4.2 Test at Destination.
Acceptance Testing shall be conducted prior to Acceptance.
a. Locomotives with flatcar in tow must be able to remain in control with no tendency to de-rail maneuvering a 109-foot radius curve.
b. Operate successfully as designed, pulling full load, and on encapsulated rail throughout Norfolk Naval Shipyard, Portsmouth Virginia.
11.4.3 General Inspection. All manufacturing, inspection and tests shall be conducted and documented by a shop which has AAR M-1003 certification, uses AAR approved practices and procedures and is recognized by the railroad industry. If the shop does not have AAR M-1003 certification, an alternate quality assurance certification shall be deemed acceptable if the Contractor can prove equivalency and provide cross-reference to the AAR M-1003 requirements (e.g. ISO 9001).
If transportation to destination is by rail, the Contractor’s facilities must be serviced by a railhead and be serviced by a recognized railroad. The facilities must recognize and adhere to OSHA and EPA requirements and standards. Each locomotive shall be certified in writing that each locomotive meets the specifications and minimum requirements of the specifications contained herein The Government reserves the right to inspect the locomotive prior to any re-work/repair work proposed. Inspections may occur at the location of manufacture. Final acceptance will take place at the destined U.S. Navy installation facilities. The Government shall verify specification compliance at the point of final acceptance. The following check list shall apply:
a. Exterior
(1) General overall appearance is clean and structurally correct as originally designed
(2) Structural damage is nonexistent
(3) No evidence of locomotive body sag or twist
(4) Must be free from any corrosion or oxidation
(5) Must be properly stenciled
(6) Hood, doors and end arrangements conform to standards and operate properly
b. Underframe
(1) The underframe shall be damage-free and structurally intact and have legible manufacturer’s builder plates
c. Couplers
(1) Check coupler castings and coupler pockets for repairs or cracks
(2) Check for proper height of coupler
(3) Check and measure coupler knuckle for operation and condition
(4) Check coupler alignment control and operation
d. Brakes
(1) Check air brake cylinders and valves
(2) Check reservoirs
(3) Check all brake rigging
(4) Check hand brake for operation and correct application
(5) Check all safety hangers
(6) Check for correct AAR/DOT pneumatic piston travel
(7) Air brakes shall be tested and adjusted until satisfactory performance is obtained
e. Safety Appliances
(1) Check for proper clearances and applications
(2) Check to ensure handholds and sill steps installed are secured properly
(3) Check Strobe light visibility
f. Trucks
(1) Springs
(2) Wheels and tire defects per 49CFR 229.75
g. Miscellaneous
(1) Electrical circuits tested for continuity and load capacity
(2) Speed recorder
(3) Bell and horn
(4) Safety devices and markings including reflective tape
(5) Cooling system
(6) Protective devices
(7) Low voltage circuits and equipment
(8) Water tightness (including window seals)
11.5 Locomotive Offload, Assembly, and Set-up (if on-site assembly is required)
11.5.1 The Shipyard can provide a 150-ton crane and rigging service for the offload and assembly of equipment. Except for the crane and rigging services associated with the offload and assembly, the Contractor will provide all personnel, tools, and equipment necessary to make operational. The Contractor is responsible to provide any specialized rigging gear, written instructions for assembly, and key personnel to instruct/guide Navy personnel with the assembly process. The equipment shall remain the property of the Contractor until the Government accepts it.
11.5.2 Offload. The Contractor shall provide supervision and personnel necessary to perform the offload at the destination work site. The Contractor shall instruct the carrier that the equipment shall be offloaded only under the supervision of a representative of the Contractor.
11.5.3 Material Handling Requirements. The Original Equipment Manufacturers (OEM) recommended lifting plan shall be provided. OEM designed specific purpose rigging gear, as opposed to general purpose rigging gear such as standard wire rope slings, rings, and shackles shall be provided with the equipment. Any specialized rigging gear provided by the Contractor will become property of the government. The Government will provide general purpose rigging gear. The Government will inspect and certify the readily commercially available general purpose rigging gear. The Contractor’s specialized rigging gear shall be marked to show its capacity or specific product to be lifted and the gear shall be inspected by the Government in accordance with NAVFAC P-307 paragraph
14.4.2 and 14.4.3. Any lifting operation in support of a Contractor shall require prior approval of the Shipyard Point of Contact. The Contractor shall provide any additional equipment, (such as forklifts, Bobcats, manlifts, etc.) necessary for continuous support of the assembly and shall provide qualified operators. The Contractor shall provide a lifting sketch, as described below, 90 days prior to arrival of equipment. Lifting sketches, as a minimum, shall identify the following:
a. The weight of the load.
b. The location of the center of gravity.
c. The minimum capacity/length of slings.
d. The minimum capacity of other standard rigging gear.
e. The attachment (lifting) points for the load.
(1) The attachment point for multiple leg lifts shall be sized such that each attachment point can support half the load's weight at the anticipated lift angle.
(2) The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load's weight.
f. Limitations on allowable orientations for any parts making up the lifting assembly.
g. For single vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.
h. A minimum D/d ratio of 1 (one) shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings. A minimum D/d ratio of 1 (one) shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.
(1) "D" represents the diameter of the object the sling passes over.
(2) "d" represents the diameter of the sling.
(3) Table 14-3 of NAVFAC P-307 lists efficiency factors at the various D/d ratios.
i. Components in each handling assembly shall be sized based on the worst case distribution of loads. NOTE: When making a two-, three-, or four-point lift, the handling gear shall be sized so that two legs can support the load without exceeding the working load limit (WLL) at the lift angle expected, unless equalizing method is used.
j. When the Contractor requires non-standard gear (i.e., round stock lifting bars) be provided, written instructions shall be provided to the designated shipyard official to ensure:
(1) The proper material is being used.
(2) The item is certified.
(3) Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e., eccentricity of the bearing points).
Ensure Lifting Sketch and details are included in the technical manuals.
11.5.4 Assembly and Set-Up. The Contractor shall provide all tools, labor, materials, and field supervision necessary to assemble, connect, equip, and make operational the equipment, program, and test the system as discussed herein. Special equipment, including measuring equipment, required by the Contractor to make the equipment operational and perform the tests specified herein shall be furnished by the Contractor and shall remain the property of the Contractor. The Government shall furnish no tools or equipment. Services required to make the system operational include, but are not limited to:
a. Remove subassemblies and components from packaging
b. Assemble components and subassemblies
c. Perform mechanical and structural alignments as required and specified by the original equipment manufacturer.
d. Connect hoses, pipes, cables, couplings, and fasteners
e. Provide and charge lubrication and operational fluids, and purge undesirable gasses
f. Route and connect conduit and wiring for power and controls
g. Make ready and operational all requisite electrical equipment
h. Load required software
i. Set and adjust operating parameters
j. Perform pre-operational inspections
k. Perform operational inspections and tests.
Upon completion of assembly, the Contractor is responsible to provide all necessary operating fluids for start-up and initial operation. The Contractor shall provide training to key personnel to instruct/guide NNSY personnel (operators, engineers, technicians, and mechanics) on the locomotive operating characteristics, operating functions, safety devices, error codes, error code reporting, etc., as specified in Section 3.4.
11.5.5 Field Supervisor. The Contractor shall provide a full-time (start of assembly to final acceptance) field supervisor to direct assembly integration, and testing of the equipment. He or she shall be capable of reading, writing, and conversing fluently in the
English language. The field supervisor shall have full authority to implement field decisions expeditiously. No work shall be accomplished when the field supervisor is not in the immediate work area. The field supervisor shall be identified to the receiving activity prior to start of offload. The field supervisor shall be responsible for coordinating with the receiving activity for any security clearances for all Contractor personnel expected to perform on-site work. The Government Point of Contact will be notified of any change in personnel performing this duty.
11.5.6 Receiving Activity Point of Contact. The Government’s receiving activity will designate a
Point of Contact who will be responsible for appropriate surveillance and coordination of all services to be performed under this contract. The Point of Contact shall serve as the Contractor’s primary contact for all interaction with other Shipyard and Government activities. The Contractor’s Field Supervisor will be notified of any change in personnel performing this duty.
11.5.7 Touch-Up Painting. The Contractor shall provide all labor, equipment, and materials to properly touch-up paint equipment surfaces disturbed by the execution of this specification. Disturbed surfaces shall be returned to original condition unless such condition is required for the equipment or system being supplied. Operations at NNSY shall be performed in a manner consistent with air pollution control practices for minimizing emissions. If any Volatile Organic Hazardous Air Pollutant (VOHAP) containing materials are being used, containers shall be free of all defects and remain closed unless materials are being added to or removed from them.
11.5.8 Facility Regulations. The assembly site will be occupied. The Contractor shall comply with all regulations, including safety practices, environmental directives and security restrictions governing the operation on the premises. Assembly, integration, test, and acceptance shall be performed in a manner not to unreasonably interrupt or interfere with the Norfolk Naval Shipyard’s normal business processes. Work performed outside the normal working hours of Norfolk Naval Shipyard shall be done only with written approval of Norfolk Naval Shipyard at no additional cost to the Government. The Contractor shall be responsible for security of their property.
12. Warranty
12.1 The warranty shall start on the same day the locomotive is accepted by the Volpe Center at the final destination. Standard commercial warranty shall apply. A copy of the warranty shall be included as an attachment to the contract.
13 OPTION CLIN 01000 – EXTENDED FIELD SUPPORT
13.1 Extended Field Support
This option shall include travel and labor coverage for field service personnel to perform repairs in the field during the time period when parts are covered under the basic commercial warranty until the period of performance contract end date. This shall include up to two separate service trips allowing three days on-site per trip. On-site support will take place at Norfolk Naval Shipyard, Portsmouth, VA, 23709.
14 OPTION CLIN 01100 – COUPLER EXTENSION LINKS
14.1 The Contractor shall provide and deliver a quantity of six (6) coupler extension links. The coupler extension links are used to provide additional articulation between fully-loaded 80-ton railcars. The coupler extension links shall use Type-E bottom shelf design and be 24 inches in length pin-to-pin. The links shall be able to be used in both pulling and pushing operations.
14.2 Acceptance of the coupler extension links will be at the final destination in Portsmouth, Virginia.
Acceptance will require inspection for carrier damage at the destination prior to any payment to the contractor. The delivery destination is:
Norfolk Naval Shipyard Portsmouth, VA 23709
15 PERIOD OF PERFORMANCE
The period of performance for the Base CLINS (0100 and 0900) shall be delivered within 270 calendar days after award. Options will be exercised no later than 90 days after award and run concurrently with the base items. All work must be complete by this date.
15. Sustainable Acquisition Requirement:
To the maximum extent possible and consistent with the Federal Acquisition Regulations Part 23, the Government requires during the performance of the work under this Statement of Work (SOW) the Contractor to provide or use products that are: energy efficient (ENERGY STAR® or Federal Energy Management Program (FEMA)-designated); water-efficient; biobased; environmentally preferable (e.g., EPEATregistered, or non-toxic or less toxic alternatives); non-ozone depleting; or made with recovered materials. Unless otherwise identified in this SOW, each recovered materials or biobased product provided and delivered must meet, but may exceed, the minimum recovered materials or biobased content of an EPA- or USDA designated product. The sustainable acquisition requirements specified herein apply only to products that are required to be: (1) delivered to the Government during contract performance; (2) acquired by the contractor for use in performing services (including construction) at a Federally controlled facility; (3) furnished by the contractor for use by the Government; or (4) specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance.
Section 2.0 CONTRACT ADMINISTRATION DATA
2.1 Transportation Acquisition Regulation Clause 1252.242-73 CONTRACTING OFFICER’S TECHNICAL
REPRESENTATIVE OCT 1994
(a) The Contracting Officer may designate Government personnel to act as the Contracting Officer's Technical Representative (COTR) to perform functions under the contract such as review and/or inspection and acceptance of supplies, services, including construction, and other functions of a technical nature. The Contracting Officer will provide a written notice of such designation to the Contractor within five working days after contract award or for construction, not less than five working days prior to giving the contractor the notice to proceed. The designation letter will set forth the authorities and limitations of the COTR under the contract.
(b) The Contracting Officer cannot authorize the COTR or any other representative to sign documents (i.e., contracts, contract modifications, etc.) that require the signature of the Contracting Officer.
(End of clause)
CONTRACT ADMINISTRATION RESPONSIBILITIES
Contracting Officer (CO): The CO has the overall responsibility for this contract. The CO alone is authorized to take actions on behalf of the Government to amend, modify, or deviate from the contract terms, conditions, requirements, specifications, details and/or delivery schedules. The CO may delegate certain other responsibilities to his/her authorized representatives. The Contracting Officer is:
Daniel J. Leone 617-494-2128 Daniel.leone@dot.gov U.S. Department of Transportation The Volpe Center (V-221) 55 Broadway Cambridge, MA 02142-1001
Contracting Officer's Representative (COR or COTR): A COR will be designated by the CO for this contract. The responsibilities of the COR include but are not limited to: inspecting and monitoring the Contractor's work;
determining the adequacy of performance by the Contractor in accordance with the terms and conditions of this contract; acting as the Government's representative in charge of work at the site to ensure compliance with contract requirements in so far as the work is concerned; and advising the CO of any factors which may cause delay in performance of the work. The COR does not have the authority to make new assignments of work or to issue directions that cause an increase or decrease in the price of this contract or otherwise affect any other contract terms. The COR will be responsible for the duties defined in paragraph 2.1 clause 1252.242-7 CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE. The COR is:
Barry Mickela U.S. Department Of Transportation (US DOT) John A. Volpe National Transportation Systems Center Infrastructure Engineering and Deployment Division, V-335 55 Broadway, Kendall Square Cambridge, MA 02142 Email: Barry.Mickela@dot.gov Office: 617-494-3589
2.3 PAYMENT
All invoices, including supporting documentation, are to be submitted electronically (e.g. PDF format) via email to volpeinvoices@faa.gov (all lower case). The CO, and COR shall be copied or forwarded a copy of the e-mail. A cover email must accompany each invoice and provide the applicable information in the fields listed below:
Invoice Date:
Supplier Name:
Invoice Amount:
Invoice Number:
Contract No. /CLIN No.:
Terms/Discount:
Performance Period:
Notes:
The Government may at its sole discretion arrange for a Contractor to review invoices and supporting data submitted for payment under the provisions of this contract. The Contractor reviewing invoices and supporting data will perform this function in accordance with contract provisions which prohibit disclosure of proprietary financial data or use of such data for any purpose other than to perform accounts payable services. Payments will be made upon final delivery and acceptance of the identified items in this procurement.
2.4 PERFORMANCE EVALUATIONS
In accordance with FAR Subpart 42.15; Contractor Performance Information, the Government shall prepare evaluations of contractor performance for contracts that exceed $250,000. Performance evaluations will be accomplished at the completion of the base year and at the completion of each exercised option period. The Government uses the Contractor Performance Assessment Reporting System (CPARS) as the primary method to complete evaluations (www.cpars.gov). Completed past performance evaluations may be accessed in the Past Performance Information Retrieval System (PPIRS) at www.ppirs.gov.
The Contractor is required to register in CPARS and shall have 14 calendar days in which to respond to Government comments. The Government will consider any comments provided by the Contractor before finalizing a past performance evaluation and will attach the Contractor’s comments to the final report.
mailto:volpeinvoices@faa.gov http://www.ppirs.gov/
Section 3.0 SPECIAL CONTRACT REQUIREMENTS
3.1 NON-PERSONAL SERVICES (SEP 2009)
No personal services as defined in Part 37 of the FAR shall be performed under this contract. No contractor employee will be directly supervised by the Government. All individual employee assignments and daily work direction shall be given by the contractor’s supervisor. If the contractor believes any Government action or communication has been given that would create a personal services relationship between the Government and any contractor employee, the contractor shall promptly notify the Contracting Officer of this communication or action.
The Contractor shall not perform any inherently governmental functions under this contract. No contractor employee shall hold him or herself out to be a Government employee, agent, or representative. In all communications with third parties in connection with this contract, contractor employees shall identify themselves as contractor employees and specify the name of the company for which they work. In all communication with other government contractors in connection with this contract, the contractor employees shall state that they have no authority to in any way change the contract and that if the other contractor believes this communication to be a direction to change their contract, they should notify the Contracting Officer for that contract and not carry out the direction until a clarification has been issued by the Contracting Officer.
The Contractor shall ensure that all of its employees working on this contract are informed of the substance of this clause. Nothing in this clause shall limit the Government’s rights in any way under any other provision of the contract, including those related to the Government’s right to inspect and accept the services to be performed under this contract. The substance of this clause shall be included in all subcontracts at any tier.
3.2 SALES TAX EXEMPTION (SEP 2009)
The Volpe Center, as part of the Department of Transportation, an agency of the United States, is an exempt purchaser. Accordingly, all purchases of personal property by this organization are exempt from state and local taxation. The Contractor will be provided with tax exemption certificates for the purpose of obtaining an exemption under this procurement for purchases under this procurement. Notwithstanding the terms of the Federal, State, and Local Taxes clause, the Contractor shall state separately on its vouchers the amount of state sales tax and the Government agrees to either pay the amount of the tax to the Contractor or, where the amount of the tax exceeds $250.00, to provide evidence necessary to sustain the exemption.
PART II – CONTRACT CLAUSES
FAR 52.252-2, Clauses Incorporated by Reference (IBR) (FEB 1998)
This contract incorporates one or more clauses, by reference, with the same force and effect as if they were given in full text.
Upon request, the CO will make their full text available. Also the full text of a clause may be accessed electronically at these addresses:
FAR: http://www.acquistion.gov/far TAR: http://www.dot.gov/ost/m60/tamtar/tar.htm TAM: http://www.dot.gov/ost/m60/earl/tamcomplete.htm
The following Federal Acquisition Regulation (FAR) clauses are incorporated by reference:
52.202-1 Definitions NOV 2013
52.203-12 Limitation on Payments to Influence Certain Federal OCT 2010 Transactions
52.203-17 Contractor Employee Whistleblower Rights and Requirement APR 2014 To Inform Employees of Whistleblower Rights
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber MAY 2011
Content Paper
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-13 System for Award Management Maintenance OCT 2018
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.204-19 Incorporation by Reference of Representations and DEC 2014 Certifications
52.204-21 Basic Safeguarding of Covered Contractor Information Systems JUN 2016
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011
52.223-10 Waste Reduction Program MAY 2011
52.223-17 Affirmative Procurement of EPA-designated Items in Service AUG 2018 and Construction Contracts
52.223-18 Encouraging Contractor Policies to Ban Text AUG 2011 Messaging While Driving
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.228-5 Insurance – Work on a Government Installation JAN 1997…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .