PROJECT DESCRIPTION Anchorage.pdf

PDF 83 KB Posted

Attached to
AK ANCHORAGE T 2016 (1), Connecting Anchorage Trail Improvements
Solicitation number
69056721B000007
Issued by

About this file

This document provides details for a federal contract opportunity to improve trails in Anchorage, Alaska. The project scope involves replacing three pedestrian bridges on the Tour of Anchorage trail and performing trail surfacing improvements over 0.32 miles. Work will include installing three pre-fabricated steel truss bridges between 60-95 feet in length on either pile-supported foundations or spread footings. Bridges will be 12 feet wide with timber decks. The estimated price range for the project is between $1,000,000 and $2,000,000. The tentative completion date is September 2023. The solicitation number is 69056721B000007 and is identified as a pre-solicitation notice issued by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
ak-a2020161_preliminary plans.pdf PDF
Connecting Anchorage_Prelim Letter_2021.pdf PDF
PROJECT DESCRIPTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK ANCHORAGE T 2016(1), Connecting Anchorage Trail Improvements

The work consists of Replacement of three pedestrian bridges on the Tour of Anchorage trail, trail surfacing improvements. Three pre-fabricated steel truss bridges. Two bridges will be on pile supported foundations, one on spread footings. Bridges will be 12 feet wide and be between 60-95 feet long. Deck will be timber.

Project length: 0.32 Miles

Tentative Fixed Completion Date: September 2023 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: between $1,000,000 and $2,000,000

Location: Anchorage Alaska