ak-a2020161_preliminary plans.pdf
PDF 20 MB Posted
- Solicitation number
- 69056721B000007
About this file
This document provides details for a federal pre-solicitation opportunity to improve connecting trails in Anchorage, Alaska. The Department of Transportation Federal Highway Administration is seeking proposals under solicitation number 69056721B000007 to address specifications outlined in the attached preliminary plans document. Interested vendors should review the presolicitation notice and preliminary plans for requirements regarding the scope of trail improvements, response timeframe, and evaluation criteria. The opportunity appears aimed at enhancing connectivity and accessibility of trails in the Anchorage area through infrastructure upgrades or additional routes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PROJECT DESCRIPTION Anchorage.pdf | ||
| Connecting Anchorage_Prelim Letter_2021.pdf | ||
| PROJECT DESCRIPTION.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chugach State Park
JBER
Military Reservation
Knik Arm
Turnagain
Arm
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
A
C ov er S he et
.d w g
U S C
J an ua ry
:3
PM
TYPE OF CONSTRUCTION:
SPECIFICATION:
B. STOKES
PROJECT MANAGER
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PLANS PREPARED FOR
FAR NORTH BICENTENNIAL PARK
MUNICIPALITY OF ANCHORAGE
ALASKA
PLANS FOR PROPOSED PROJECT
Chief of Engineering, Western Federal Lands Highway Division
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
LENGTH 0.352 MILES
N
0 1.5 3
AK ANCHORAGE T 2016(1) A.1
A. GENERAL INFORMATION
A.1 TITLE SHEET
A.2 PLAN SYMBOLS AND ABBREVIATIONS
A.3 VICINITY MAP
B. SUMMARIES
B.1-2 SUMMARY OF QUANTITIES
C. TYPICAL SECTION(S)
C.1 TYPICAL SECTION
D. PLAN-PROFILE
D.1 TABULATION OF PLAN QUANTITIES
D.2-14 PLAN AND PROFILE - TOUR OF ANCHORAGE TRAIL
D.15 SURVEY CONTROL
E. EROSION CONTROL
E.1 TABULATION OF EROSION CONTROL QUANTITIES
E.2-7 EROSION CONTROL PLAN AND PLAN - TOUR OF
ANCHORAGE TRAIL
E.8-9 EROSION CONTROL STANDARD DETAILS
F. LANDSCAPING PLANS
F.1 TABULATION OF LANDSCAPING QUANTITIES
F.2-4 LANDSCAPING PLAN - TOUR OF ANCHORAGE TRAIL
F.5 STAKING DETAIL
G. TEMPORARY TRAFFIC CONTROL
G.1 TABULATION OF TEMPORARY TRAFFIC CONTROL
QUANTITIES
G.2 TEMPORARY TRAFFIC CONTROL PLAN - TOUR OF
ANCHORAGE TRAIL
G.3 SPECIAL SIGN PANEL DETAILS
G.4 SIGN INSTALLATION - WOOD POSTS
H. BRIDGE CONSTRUCTION PLANS
H.1-9 BRIDGE SHEETS
H.10 RIPRAP DETAILS AND TABULATION OF QUANTITIES
See Sheet A.3 for Vicinity Map
SCALE IN MILES
INDEX TO SHEETS
DESCRIPTION
PLANS PREPARED BY
D es ig ne d by
T
S
TE
PH
EN
S
/2
C he ck ed b y:
L.
O
V
ER
B
EC
K
/2
PRELIMINARY - NOT FOR CONSTRUCTION
NOTE:
1. Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
PROPOSEDEXISTING
Trail
Lake, Pond or Reservoir; Marshland
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Sections
Pipe Culvert with Headwall
Underdrain
Building
Riprap
Top of Cut Toe of Fill Transition
Spring or Seep
Concrete Barrier
FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, STEAM = steam, T = telephone, TV = CATV, W = water
BH
CP GPS
JH
TP
Material Source; Bore Hole; Test Pit
DI
Slope Stake Limits
Pipe Culvert with Drop Inlet
Miscellaneous Utility Features EM = electric meter, T = telephone pedestal, TV = CATV pedestal, UP = transformer or junction box, WF = water fountain
Box Culvert
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Right-of-Way Line with Monument
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Permanent Easement
Construction Easement
36 31
Section Corner (Found, Projected)
36 31
SEC.
SEC.
Property Line w/Found Property Corner
400Parcel Number
Large Creek or River
EL. 1234.56 N
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
- no symbol -wall face
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
Wattle
T
Poles (Power, Telephone, Joint Use, Light, Support w/Anchor)
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
4 Section Line
16 Section Line
4 Section Corner (Found, Projected)
16 Section Corner (Found, Projected)
Railroad
Intermittent Drainage or Small Creek
Signs (single, double post; portable)
NO SCALE
Control Point (Terrestrial and GPS); Jump Hub
W west
D
DHV
dia.
diag.
diaph.
dist.
drwg(s).
E e El. 94.16 ft elev.
emb.
EP
EQ or eq.
ER
EW
exc.
exp. jt.
east superelevation rate elevation with number elevation embankment edge of pavement equation edge of road edge of water excavation expansion joint diameter design hourly volume diameter diagonal diaphragm distance drawing(s) ga.
galv.
gage (gauge) galvanized hdwl.
hex.
HW
headwall hexagon high water fin.
flg.
ft2 ft3 ftg.
finish flange square foot cubic foot (feet) footing
ID
jt.
inside diameter joint
L lam.
lat.
LNFT
long.
LPSM
Ls
lt. or LT
LW
length of curve lamination latitude linear foot (feet) longitudinal lump sum length of spiral left low water
N
NC
north normal crown
o. c.
o. to o.
OD
OG
on center out to out outside diameter original ground
PC
PCC
PCS
PI
pl.
POC
POS
POT
PS
PSC
PST
PT
pvmt.
point of curve point of compound curve point of curve to spiral point of intersection plate point on curve point on spiral point on tangent point of tangent to spiral point of spiral to curve point of spiral to tangent point of tangent pavement
R R.
R/W rdwy.
reinf.
reqd.
rt. or RT rte.
radius range right-of-way roadway reinforcement required right route
T T.
TBM
thd.
TS
Ts typ.
tangent distance township temporary bench mark thread point of tangent to spiral tangent distance (spiraled curve) typical
V vph
VPI
design speed vehicles per hour vertical point of intersection yd2 yd3 square yard cubic yard(s)
S
SADT
SC
sec.
shldr.
SLRY
spa.
SQFT
SQYD
SRS
SS
ST
STA, Sta.
std.
stgr.
stiff.
struc.
STS
sym.
south seasonal average daily traffic point of spiral to curve section shoulder slurry unit spacing, spaces or spaced square foot square yard point of spiral to reverse spiral point of spiral to spiral (no curve) point of spiral to tangent station standard stringer stiffener structural point of spiral to tangent spiral symmetrical
CUFT
culv.
CUYD
cubic foot (feet) culvert cubic yard(s) matl.
max.
MGAL
min.
mon.
material maximum thousand gallon minimum monument
NOTE:
1. Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
C
∆c Ø θs total central angle curve central angle diameter spiral central angle abut.
ADT
AH
appr.
BK
BM
BP
br.
brg.
abutment average daily traffic ahead approach back bench mark balance point bridge bearing cc or c. to c.
clr.
CMP
col.
conc.
conn.
constr. jt.
cont.
CS
ctrs.
center to center centerline clear corrugated metal pipe column concrete connection construction joint continuous point of curve to spiral centers
M.L.
M.P.
main line mile post
R/W
P/E
TCE
P/E
R/W
Obliterate Roadway
AK ANCHORAGE T 2016(1) A.2
SHEET
NUMBERSTATE PROJECT
pn da nc se rv er 1\
PR
O
JE
C
TS
\2
0\
C on ne ct in g
A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
A
Pl an
S ym bo ls a nd
A bb re vi at io ns .d w g
U
S C
O ct ob er
:2
PM
W101-1
PLAN SYMBOLS
AND ABBREVIATIONS
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
U.S. CUSTOMARY DETAIL
DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
PRELIMINARY - N
OT FOR CONSTRUCTION
XXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XX XXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXX XX XXXXXX
XXX
XXX
XXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XX
XXXXXXXXXX
XXXXXX
XXXX
XXXXXXXX
XXX
XXXXXXXXXXXXXX
XXXX
XXXX
XXXXXXXX
XXX
XX
XX
XXXXXXX
XXXXXXX
XXX
XX
XXXXXXX XXXX
XXXXXXXX
XXXXXX
XXXXX
XX
XXXXXXXXXXXXXXXXXXXXXXX
XXXX
XXXX
XXXXX
XX
XXXX XXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXX
XXXX
XXXXX
XXXXXXXXXXXXXXXXXX
XXXX
XXXX
XX
XX
XX
XXXXXXXXXXXXXX
XXXX
XXXXXX
XXX
XXXXXXXXXXXXXXXXX
XXXX
XXXXXX
XXX
XXXXXXXXXXXXXX
XXXX
XXXXXX
XX
XXXXXXXXXXXXXX
XXXXX
XXXX XXXX
XXXX
XXXXXXXXXXXXXXXXXXX
XXXX
XXX
XXXXXXXXXX
XXXX
XX
XXXX XXXXXXX XXXXXXXXX
XXX
X
XX
XXXX
XXXX
X
XXXX
XXX
XXXXXXXX
XXXXXXXXXXXXXXXXXX XXXXXXXXXXXX XXXX XXXXXXXX XXXXXXXXXXXXXXXXXXX XXXX XXXXXXXX XXXX XXXXXXXXXXXXXXXXXXXX XXXXXXXX XXXXXXXXX XXXXXXXXXXXXXXXX XXXXX XXXXXXXX XXXXXXXXXXXXX XXX
XXX
XX
XX
XX
XX
XX
XXXX
XXXXX
XXXX XXXX XXXXXXX XXX XXX XXXXXXXXXX
XX
X
XX
XX
XX
XX
XXXXXXXXXXXX
XX
XX
XX
XX
XX
XX XXX XXXXX XXX XXXXXXXXXXXXXX XXXX XXXXXXX XXX XXXXXXXXXXXX XXXX XXXXXXX XXX XXXXXXXXXXXX XXXX XXXXXXX XXX XXXXXXXXXXXX XXXX XXXXXXX XXX XXXXXXXXXXXXXXXXX
XX
XX
XX
XX
XX
XX
XX
XXXX
XXXXXX
XXXXXXXX
XXXXXX
XX
XX
X
XX
XX
XX
XX
XXX
XXXXX
XXXXXXXXXX
XX
XX
XX
X
XX
XX
XX
XX
XX
X
XX
XXXXXXXXXXX
XX
XX
X
XX
XX
XX
XX
XXXX
XX
XXX
XXXXX
XXXXXXXX
XX
XX
XX
X
XX
XX
XX
XXXXXXXXXX
XX
XX
X
XX
XX
XXXX
XXXX XXXX
XXXXXXXX XXXXXXXXXXXXX XXXXXXXX XXXXXXXXXXXXXXXX XX
XX
XX
XX
XX
XX
XX
XXX
X
XXXXXXXXXX XX XXXXXXXXXXXXXXXXX XX XXXXXXXXXXXXXXXXX XX XX
XX
XX
XX
XX
XX
XX
XX
X
XX
X
XX
XXXXXX
XXXXXX
XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXX XXXXXXXXXXXXX
XXXXX
XXXXXXXXXXXXXXXXXXXXXXXXX XX XXXXXXXXX XXXXXXXXXXXXXXX XX XXXXXXXXXXXXXXX XXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXX XX XXXXXXXXXXXXXXX XXXXXXX XXXXXXXXXXX XX XXXXXXX X
XXXXXXXX
XXXXXX
XXXXXXX
XXXXXXXXXXXXXXX
XX
X
XX
X
XX
XXX
XXXXXXX
XX
X
XX
X
XXXX
XXXXXXX
XXXXX XXXXX
XXXXXXXX
XX
XXXXX
XX
XX
XX
XX
XX
XXX
XXXXX
XXX XXXX XXX
XXXXXX XXXX XXXXXXXX
XX
XX
XX
XX
XXXXXXXXXX XXXXXXXXXXXXXXXXX XXXXXXXXXXXXXX XX
XX
XX
X
XX XX XXXXX XXX XXXX XXXXX
XXX
X
XX XX
XXX
X
XXXXX
XX X
X
XXXX
XXXXX
X
X
XXXX
XXXXXXXXXXXX
XX XX XXX XXX XXXX XXXXXXXX XXXXXX X XXX XXXX
XX
XX
X XXX
XXXXXXX
X
XX
XX
X
XX
XXXXXX
XX
XX
XXXXX
XXXXXXX
X
XXX
XX
XXXXXXXX
X
X
X
XXXXXXXXXX
X
X
XXXX XXXXXXXX
X
XXXXXXXX
X
XX
X
XXXXX
XXXXXXXXXXXX XXXXXXXX XXXXXXXXX XXXXXXX XXXXXX XXX XXXXXXXXXXXXXX XXXXXXXXXXXX XXXXXXXXXX XXXXXXX XXXXXX XXXXXXXXXXXXX XXXXXXXXXXXXXX XXXXX XX XXX XXXXXXX
XXX
XXXXXX
XXXX
XXXX
XXXXX
XX
X
XX
X
XX
XXX
XXXX XX
XXXX
XX
XXXXXX XXXXXXXXXXXXXXXXXX XXXXXXXXXXXXX XXXXXXXXXXXX XXXXXX XXXXXXXXXXXXXXX
XXX
XX
XX
XX
X XXX
XXXX
XX
XXX
XX
XXX
XXXXXXXX
XX
XXXXXXXX
XX
XXXX
XX
XX
XX
XX
XXX
XX
XX
X X
XX
XX X
XX
XX
XX
X
XXXXXXXX XXXXXXXXXXXXXXXX XXXX XXXXXXXXXXXX
XX XXXX XXXX
XXXXXX
XXXX
XXX
XXXX
XX
XXX
XX
X
X
XXX
XX X
X
XXX
XX
XX
XX
XX
XX
XX
XXX
XXXX
XXXX X
XX
XXXXXXXX
XX XXXXXX
X
XX
X
XXXXXXX
XXXXXX
XXXXX
X
XXXXXXXX
XXX
X
XX XXXX
XXX
X
XXXXXXXXXX
X
XXX
X
XXXXXXX
XXXXXX
XXXXX
X
X
XXXXXXXXXXXX
XX
XX
XX
XXXXXXXX
XXXX
XXXXXXXXXXXXXX
XXXXXXXXXXXX
XXXXXXXXXXX
XXXXX
XXXX
XXXXXXXX
XXX
XXX
XXXXX
XXX
XXX
XXX
XXX
XX
XXXXXXXXXXXXXX
X
X
XXX
X
XXXXXXX
XXXXXX
XXXXX
X
X
XX
XX
XX
XX
XXXX
XX
XXXXXX
XX
XXX
XX XXXXXXXXXXXXXXX X
XX
XX XXXXXXXXXXXXXX XXX X XXX XXXXXX XXXXX XXXXXX XXXXXXXXXXXXX XXX
XXX XX XXXXXXXX XX XXXXX
XXXXXX
XXX
XX
XX
X
X
XXXXX
XX
X
X
XX
XXXXX
X XXXXXXX
XXXX
XXXXXXX
XXXX
XXXXXXXX XXXXXXXXXXXXXXX X
XXXXXXXXXXXXXX
XXX XXXXXXXXXXXXXX X XXXX
XXXXXXXXXXXXXXX X XXXXXXXXXXXXXXX X XXXXXXXXXXXXXXXX X XXXXXXXXXXXXXXXX X XXXXXXXXXXXXXXX X XXXX XXXX XXXX XXXX XXXX XXXXXXXXXX XXXXXX XXXX XXXXXX XXXX XXXXX XXX XXX XXXXXXXXXXXX XXXXXXX XXXXXXX X XXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXX
XXX
XXXXX
XXXXXXXXXXXXXXXX
XX
X
XX
X
XX
XXX XX
X
XX
XXXXXXX
XXX
X
XX
XX
XX
XX
XXXXXXX
XXXXXX
XXX
X
XX
XXXXXXXXXXX
XXX
X
XX
XXX
XXX
X
XX XXX XXX
XX
XXXX
XXXXXX XXXXXXXXX
X
XXXXXXXXXX
XX
XXXXXXXXXXXXXXXXXXXXXXX XXXXX XXXXX XXX XXXXX XXXXXXX XXXXXXX XXXXXXXXX XXXX XXXXXXXXXXXXXX XXXX XXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX XXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXX XXXXXXXXXXX XXXXXXX XXXXXX XXXXXX X
XX
XXXX
XXXXXXXX
XXXX
XXXX
XXXXXXXXXXX
XX
XX
X
X
X
X
X
X
X
X
X
X
X
X
XXXX XXXXXXXXX
X
XXXX XXXX XXXXXXX
X
XXXXXXX XXXXXXX
X
XX
XXXXXX
XX
XXXXXXXXXXXXXXXXXXXXXXXX
XXXXXX
X
XXX X
XX
XXX XXX XXX
XXXXXXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXXXXXXXX
XXX
XXXXXXXXX
XXXXXXXXX
XXXX
XXXX XXXXXX XXXX X XXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXX XXXX XXXX XXXX
XXXX
XXXXXXXX
XX
XXXXXXXXX
X
XX
XXXXXXXX
XXXX
XXX
XXXXXXXXXXXX
XXXX
XXXXXXXX
XXX
XXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXX XXXXXXXXXXXXXXX XXXXXXX
XX
X
XX
X
XXXXXXXXXXX
BEGIN PROJECT
AK ANCHORAGE T 2016(1)
TOUR OF ANCHORAGE TRAIL - EAST
12+45.00
Elm ore Rd
B on ifa ce
P kw y
Pa tt er so n S t
B ax te r
R d
M ul do on
R d
Dowling Rd
Campbell
Dr. M L K Jr Ave
C am pb el l A ir st ri p
R d
E Tudor Rd
Fork North
Cam pbell
Creek
Fo rkSouth
Ca m pb ell A irs tri p
END PROJECT
AK ANCHORAGE T 2016(1)
TOUR OF ANCHORAGE TRAIL - EAST
94+25.80
Science
Ce nt er R d CAMPBELL CREEK
SCIENCE CENTER
JOINT BASE
ELMENDORF-RICHARDSON
ALASKA
BOTANICAL
GARDEN
FAR NORTH
BICENTENNIAL
PARK
CHUGACH STATE PARK
N G as lin e Tr ai l
BUREAU OF LAND
MANAGEMENT
Tour of Anchorage Trail
Sheilds Trail
Bl ue
D ot
T ra il
SOUTH FORK CAMPBELL
CREEK BRIDGE (SIDE)
SOUTH FORK CAMPBELL
CREEK BRIDGE (MAIN)
NORTH FORK CAMPBELL
CREEK BRIDGE
END PROJECT
AK ANCHORAGE T 2016(1)
TOUR OF ANCHORAGE TRAIL - WEST
97+25.00
BEGIN PROJECT
AK ANCHORAGE T 2016(1)
TOUR OF ANCHORAGE TRAIL - WEST
95+00.00
Musher 6-Mile
Loop Trail
BEGIN WORK
AK ANCHORAGE T 2016(1)
TOUR OF ANCHORAGE TRAIL - EAST
29+00.00
END WORK
AK ANCHORAGE T 2016(1)
TOUR OF ANCHORAGE TRAIL - EAST
79+25.00
RESUME WORK
AK ANCHORAGE T 2016(1)
TOUR OF ANCHORAGE TRAIL - EAST
74+70.00
Creek
PAUSE WORK
AK ANCHORAGE T 2016(1)
TOUR OF ANCHORAGE TRAIL - EAST
42+95.00
N
0 750 1500 FT
A.3
VICINITY MAP
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
A
V ic in ity
M ap
.d w g
U S
J an ua ry
:1
A M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
EN
S
1/
C he ck ed b y:
L.
V
ER
B
EC
K
Turf Establishment
Turf Establishment
Turf Establishment Turf Establishment
1' Clear Width
1' Clear Width
5' Travel Width
5' Travel Width
5' Travel Width
5' Travel Width
Varies 0'-2.5' 1.5'
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
C 1-
Ty pi ca l S ec tio ns
.d w g
U S C
J an ua ry
:0
PM
ANCHORAGE T 2016(1)AK
D es ig ne d by
T.
S
TE
PH
EN
S
/2
C he ck ed b y:
L.
O
V
ER
B
EC
K
/2
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY REMARKS
20221-1000 REMOVAL, INDIVIDUAL TREES SQFT 780
20410-0000 SELECT BORROW CUYD 450
20701-0600 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE A SQYD 4,480
30202-2100 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE TON 520 BASED ON 1.97 TONS/CUYD
TYPICAL SECTION
SUBEXCAVATION GUIDE
STATION LT/RT
29+00 to 30+25 RT
30+12 to 30+25 LT
30+60 to 31+92 LT
32+45 to 32+65 RT
32+52 to 32+65 LT
33+38 to 33+59 LT/RT
76+52 to 76+75 RT
76+62 to 76+75 LT
77+18 to 77+80 LT/RT
D.1
TABULATION OF
PLAN QUANTITIES
ITEM NO. DESCRIPTION TOTALS UNIT REMARKS
20101-0000 CLEARING AND GRUBBING 0.8 ACRE
20301-0400 REMOVAL OF BRIDGE SOUTH FORK SIDE 1 EACH Contract Quantity
20301-0400 REMOVAL OF BRIDGE SOUTH FORK MAIN 1 EACH Contract Quantity
20301-0400 REMOVAL OF BRIDGE NORTH FORK 1 EACH Contract Quantity
20302-2100 REMOVAL OF PIPE CULVERT 40 LNFT
20401-0000 ROADWAY EXCAVATION 700 CUYD
20402-0000 SUBEXCAVATION 650 CUYD
20403-0000 UNCLASSIFIED BORROW 2,915 CUYD
21101-1000 ROADWAY OBLITERATION, METHOD 1 160 SQYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
:2
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
∆ = 13° 16' 10" R = 135.00' T = 15.70' L = 31.27'
N71° 50' 15"W N58° 34' 05"W
Line to be constructed
BLM Trail 0.05 Miles
State of Alaska Property Lin e
Slope stake limits
Existing path to Campbell Science Center parking area
MOA Property Lin e
Widened construction turnout
P.
C
2+
.1
P.
T.
.4
8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00
-2.390%
-2.890%
+0.230%
3.
0.
3.
SSD = 238'
K = 16
50' VC
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
T.
TE
PH
C he ck ed
V
ER
B
D.2
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 12+45.00 N=321528.35 E=367451.74 El=253.85
BEGIN PROJECT
N
24524524
∆ = 35° 08' 29" R = 100.00'
T = 31.67' L = 61.33'
∆ = 31° 55' 23" R = 183.00' T = 52.34' L = 101.96'
∆ = 5° 22' 03" R = 300.00' T = 14.06' L = 28.10'
∆ = 19° 55' 34" R = 150.00'
T = 26.35' L = 52.17'
∆ = 4° 33' 58" R = 300.00'
T = 11.96' L = 23.91'
∆ = 5° 00' 30" R = 350.00' T = 15.31' L = 30.59'
N88° 49' 06"W
N66° 28' 12"W
N53° 40' 37"W
S86° 1 0' 24"W
N61° 54' 14"W
Line to be constructed
Slope stake limits MOA Property Lin e
MOA Property Lin e
M O
A Property Line M
O A Property Line
Widened construction turnout
P.
C
2+
.1
P.
C.
.5
P.
C
7+
.9
P.
C
5+
.8
P.
C.
.9
P.
C
6+
.1
P.
T.
.3
P.
T.
.8
P.
T.
.8
P.
T.
.0
P.
T.
.5
P.
T.
.0
15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00
+1.000% +0.090%
-1.880%
-1.440%
-1.380% -2.000%
7.
6.
4.
2.
4.
SSD = 454'
K = 26
40' VC
3.
K = 10.0
30' VC
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
TE
PH
C he ck ed
V
ER
B
D.3
N
∆ = 13° 31' 51" R = 120.00' T = 14.24' L = 28.34'
∆ = 103° 42' 56" R = 70.00' T = 89.14' L = 126.71'
∆ = 46° 08' 48" R = 120.00' T = 51.12' L = 96.65'
∆ = 8° 01' 01" R = 150.00'
T = 10.51' L = 20.99'
∆ = 6° 14' 41" R = 150.00'
T = 8.18' L = 16.35'
∆ = 11° 01' 10" R = 120.00' T = 11.58' L = 23.08'
N6° 47' 14"W
N1° 13' 48"E
N67° 21' 30"W
N73° 36' 11"W
N53° 40' 37"W
S6 6°
9'
2"
W
S7 7°
0'
2" W
Line to be constructed
Slope stake limits
MOA Property Line
MOA Pr op ert y L ine
30+00
P.C
+98
.2
P.C
+54
.30
P.
C.
.6
P.
C
2+
.1
P.C .: 2
6+06.21
P.C
+54
.93
P.
C.
.0
P.T .: 2
9+26.57
P.T
+81
.01
P.T .: 2
5+66.30
P.
T.
.3
P.
T.
.8
P.T
+29
.29
P.T
+75
.9
P.
T.
.3 9 MOA Pr op ert y L ine
N6° 44' 37"E
23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00
70 2
-0.870% -1.210%
-0.180% -2.000%
-2.110%
-2.540% +1.724%
0.
9.
7.
29+94 233.81
SSD = 558'
K = 25
30' VC
3.
SSD = 1241'
K = 37
20' VC
5.
SSD = 380'
K = 16
30' VC
1.
K = 7.0
30' VC
5.
K = 20.7
40' VC
Construct per plan
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
D.4
N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 29+00.00 N=322007.48 E=366030.59 El=232.20
BEGIN WORK
∆ = 68° 15' 09" R = 140.00' T = 94.88' L = 166.77'
∆ = 16° 40' 35" R = 170.00' T = 24.92' L = 49.48'
∆ = 34° 01' 11" R = 90.00' T = 27.53' L = 53.44'
∆ = 60° 47' 47" R = 50.00' T = 29.33' L = 53.05'
N16° 37' 53"E
N50° 51' 50"E
N9
' 5 8"
W
N84° 53' 01"E
Remove existing bridge
Line to be constructed
MOA
Pr op er ty Lin e
+0
+00
P.
C.
: 3 5+
.4
P.
C.
: 3 0+
.4
P.
C
3+
.4
P.C
+85
.20
P.
C.
.0
P.
T.
.2
P.T
+39
.93
P.
T.
: 3 4+
.9
P.
T.
.2
N6°
' 3 7"E
30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00
1,466
21 362 40
-2.560% +1.810% +0.500%+0.500% -0.500%
5.
SSD = 450'
K = 60
100' VC
4.
SSD = 232'
K = 10
30' VC
4.
SSD = 674'
K = 20
20' VC
2.
K = 6.9
30' VC
3.
K = 20.0
20' VC
Install prefabricated steel bridge
See Section H for details30
.0
.9
8 Install prefabricated steel bridge
See Section H for details
.7
.6
Construct per plan
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
D.5
N
∆ = 32° 58' 06" R = 123.00' T = 36.40' L = 70.77'
∆ = 23° 00' 59" R = 165.00'
T = 33.59' L = 66.28'
∆ = 9° 36' 36" R = 200.00'
T = 16.81' L = 33.55'
∆ = 15° 55' 45" R = 500.00' T = 69.96' L = 139.01'
∆ = 6° 23' 28" R = 200.00' T = 11.17' L = 22.31'
∆ = 5° 39' 33" R = 200.00' T = 9.89' L = 19.75'
N10° 58' 20"E
N11° 5 8' 20"W
N11° 02' 39"E
N1° 26' 03"E
N16° 37' 53"E
P.
T.
.8
Line to be constructed Slope stake limits
P.
C.
.1
P.
C
3+
.0
P.
C
2+
.8
P.
C
0+
.0
P.
C
9+
.1
P.
C
8+
.0
P.
T.
.3
P.
T.
.3
P.
T.
.0
P.
T.
.4
P.
T.
.8
N17° 21' 48"E
38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00
+3.230%
+1.630%
+5.320%
+6.230%
-0.210%
+0.150%
4.
SSD = 185'
K = 24
130' VC
1.
SSD = 237'
K = 10
30' VC
7.
K = 13.6
50' VC
3.
K = 12.4
80' VC
4.
K = 19.9
50' VC
5.
K = 20.3
30' VC
Existing Ground Profile Grade
Construct per plan
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
D.6
N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 42+95.00 N=323142.51 E=366558.87 El=246.68
PAUSE WORK
026026
26526526
∆ = 66° 15' 57" R = 165.00' T = 107.70' L = 190.83'
∆ = 26° 19' 00" R = 495.00' T = 115.72' L = 227.36'
∆ = 9° 23' 52" R = 250.00'
T = 20.55' L = 41.01'
∆ = 70° 22' 47" R = 60.00' T = 42.31' L = 73.70'
S8 1°
6'
9"
W
N32° 27' 54"WN23° 04' 02"W
N49° 23' 02"W
N20° 59' 46"E
Line to be constructed
Slope stake limits Path to ADOT&PF maintenance yard
Widened construction turnout
+00
P.
C
1+
.9
P.
C.
.4
P.
C
9+
.8
P.C
+99
.80
P.T.: 53+07.77
P.
T.
.7
P.
T.
.8
P.
T.
.5
45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00
+5.740%
+0.710% +0.230%
5.
3.
SSD = 167'
K = 14
70' VC
6.
SSD = 162'
K = 19
130' VC
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
TE
PH
C he ck ed
V
ER
B
D.7
N
23023023
26026
∆ = 18° 10' 31" R = 200.00' T = 31.99' L = 63.44'
∆ = 13° 10' 18" R = 150.00'
T = 17.32' L = 34.48'
∆ = 28° 55' 30" R = 185.00' T = 47.72' L = 93.40'
∆ = 8° 38' 21" R = 200.00'
T = 15.11' L = 30.16'
∆ = 7° 11' 18" R = 135.00' T = 8.48' L = 16.94'
∆ = 7° 04' 01" R = 165.00' T = 10.19' L = 20.35'
∆ = 6° 38' 49" R = 165.00' T = 9.58' L = 19.14'
S88° 20' 10"W
N84° 00' 28"W S88° 48' 13"W
N78° 01' 29"W
N69° 23' 08"W
S81° 41' 22"W
S81° 16' 09"W
Line to be constructedSlope stake limits
P.
C
9+
.4
P.
C
7+
.6
P.
C
5+
.4
P.
C.
.8
P.
C
8+
.5
P.
C
4+
.6
P.
C
3+
.8
P.
T.
.8
P.
T.
.0
P.
T.
.8
P.
T.
.0
P.
T.
.7
P.
T.
.5
P.
T.
.7
P.
T.
.2
53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00
-6.620%
-8.420%
+0.170% -3.450%
-10.570%
-1.680%
5.
SSD = 209'
K = 14
50' VC
9.
SSD = 158'
K = 18
130' VC
3.
SSD = 389'
K = 22
40' VC
5.
K = 5.8
50' VC
58+82 224.83 K = 6.7
60' VC
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
TE
PH
C he ck ed
V
ER
B
D.8
N
∆ = 62° 14' 29" R = 225.00' T = 135.84' L = 244.42'
∆ = 79° 26' 11" R = 120.00'
T = 99.69' L = 166.37'
∆ = 10° 18' 07" R = 250.00' T = 22.54' L = 44.95'
∆ = 26° 15' 11" R = 170.00' T = 39.64' L = 77.89'
S77° 49' 01"W
N65° 37' 41"W
S88° 07' 08"W
Line to be constructed
Widened construction turnout60
+0
P.
C.
: 6 5+
.6
P.
C.
: 6 3+
.3
P.
C
0+
.0
P.
C
2+
.9
P.
T.
.0
P.
T.
: 6 5+
.7
P.
T.
.0
P.
T.
: 6 2+
.8
P.
T.
.8
N
S3 4°
' 0
7" W
60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00
-1.910% -2.360% -0.560% +0.240% -2.920%
+1.600%
-7.200%
-5.320%
2.
SSD = 213'
K = 16
60' VC
3.
SSD = 235'
K = 16
50' VC
5.
SSD = 203'
K = 18
70' VC
8.
SSD = 363'
K = 11
20' VC
3.
K = 23.1
50' VC
3.
K = 26.9
70' VC
5.
K = 5.7
30' VC
4.
K = 14.8
20' VC
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
D.9
N
∆ = 67° 39' 45" R = 120.00' T = 80.43' L = 141.71'
∆ = 28° 05' 15" R = 170.00' T = 42.52' L = 83.34'
∆ = 6° 41' 48" R = 300.00' T = 17.55' L = 35.06'∆ = 7° 10' 21"
R = 150.00' T = 9.40' L = 18.78'
∆ = 12° 02' 16" R = 200.00' T = 21.09' L = 42.02'
∆ = 6° 23' 30" R = 200.00' T = 11.17' L = 22.31'
N67° 33' 17"W
N73° 56' 46"W
N54° 44' 09"W N61° 54' 30"W
N0° 06' 28"E
Line to be constructed
Widened construction turnout
+00
N
P.
C.
.5
P.
C.
: 6 8+
.4
P.C
+05
.19
P.
C
9+
.4
P.
C
9+
.1
P.
C.
.8
P.T
+35
.26
P.
T.
.7
P.
T.
: 6 7+
.0
P.T .: 7
5+
.25
P.
T.
.1
P.
T.
.1
P.
T.
.1
N82 ° 4
9'
"W
68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00
+1.720%
+1.925%-0.813%
-6.560%
-4.962%
69+25 215.16
SSD = 160'
K = 19
160' VC
67+60 212.32 K = 6.5
30' VC
9.
K = 14.5
60' VC
7.
K = 18.3
50' VC
6.
K = 25.0
40' VC
Construct per plan
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
D.10
N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 74+70.00 N=324221.25 E=364332.90 El=199.50
RESUME WORK
∆ = 22° 51' 44" R = 100.00'
T = 20.22' L = 39.90'
∆ = 105° 36' 37" R = 50.00' T = 65.88' L = 92.16'
∆ = 2° 59' 40" R = 250.00' T = 6.53' L = 13.07'
N16° 03' 28"W
N25° 46' 47"E
N7 9°
9'
1" W
N7 6°
0'
"W
Line to be constructed
Remove existing bridge
Inactive overhead line
+00
∆ = 41° 50' 14" R = 90.00' T = 34.40' L = 65.72'
N6° 48' 17"E
P.
C.
.8
P.C .: 7
8+93.54
P.
C.
: 7 6+
.6
P.
C.
.1
P.C
+52
.74P.T .: 7
8+14.53
P.T
+85
.70
P.
T.
.5
P.
T.
: 7 5+
.2
P.T
+65
.8
Obliterate existing trail
Obliterate existing trail
Obliterate existing trail
75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00
22 160
-0.500%
-1.290%
-2.637% +2.597%
+1.440%
-4.788% +0.955%
-2.150% 75+05 200.19
SSD = 181'
K = 15
70' VC
9.
SSD = 230'
K = 10
30' VC
2.
SSD = 255
K = 11
30' VC
6.
SSD = 239'
K = 16
50' VC
3.
SSD = 263'
K = 15
40' VC
9.
SSD = 175'
K = 9
40' VC
5.
K = 7.0
40' VC
2.
K = 13.9
50' VC
8.
K = 5.7
30' VC
Install prefabricated steel bridge
See Section H for details
.2
.2
Construct per plan
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
D.11
N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 79+25.00 N=324660.83 E=364353.85 El=196.60
END WORK
0 ∆ = 90° 17' 15" R = 50.00' T = 50.25' L = 78.79'
∆ = 8° 23' 17" R = 200.00' T = 14.67' L = 29.28'
∆ = 6° 31' 08" R = 200.00' T = 11.39' L = 22.75'
∆ = 4° 00' 13" R = 250.00' T = 8.74' L = 17.47'
∆ = 1° 53' 45" R = 350.00'
T = 5.79' L = 11.58'
N17° 50' 08"E
N9° 26' 51"E
N11° 19' 00"E
N9° 25' 15"E
N
' 1 1"
W
L
Slope stake limits
MOA property line
Musher 6-Mile Loop Trail
MOA property line
M O
A p ro pe rt y lin e
M O
A p ro pe rt y lin e
Line to be constructed
N13° 27' 05"E
Widened construction turnout
P.C.: 83+64.07
P.
C.
.7
P.
C
6+
.5
P.
C.
.8
P.C.: 90+72.93
P.
C
0+
.3
P.
T.
.8
P.
T.
.5
P.
T.
.8
P.
T.
.2
P.
T.
.9
83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00
-4.060% -0.640% +0.780%+1.140% +5.410%
-1.190%+0.660%
-1.000%
0.
SSD = 388'
K = 17
30' VC
3.
SSD = 175'
K = 15
70' VC
4.
SSD = 379'
K = 22
40' VC
5'
0.
K = 14.0
30' VC
0.
K = 6.5
30' VC
2.
K = 32.4
60' VC
1.
K = 9.8
30' VC
0.
K = 21.1
30' VC
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
TE
PH
C he ck ed
V
ER
B
D.12N
∆ = 10° 21' 27" R = 180.00' T = 16.31' L = 32.54'
∆ = 11° 00' 21" R = 125.00'
T = 12.04' L = 24.01'
∆ = 2° 56' 57" R = 250.00'
T = 6.44' L = 12.87'
∆ = 3° 38' 52" R = 300.00'
T = 9.55' L = 19.10'
N9° 25' 15"E
N1° 38' 06"W
N12° 22' 12"E
N8° 43' 20"E N12° 38' 28"W
Line to be constructed
Slope stake limits
Tour of Anchorage - West
Existing Campbell Creek Trail (paved)
Tour of Anchorage - West Tie-in at 90+93.55
M O
A pr op er ty li ne M
O A
R ig ht o f w ay
Existing Campbell Creek Trail (paved)
MOA property line
MOA property line
P.
C
2+
.7
P.
C
3+
.0
P.
C
1+
.7
P.C.: 90+72.93
P.
C
0+
.3
P.
T.
.3
P.
T.
.0
P.
T.
.8
P.
T.
.7
P.
T.
.9
90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00
+3.330% -4.180% -0.170%+0.660%
+3.207%
3.
7.
SSD = 158'
K = 19
140' VC
3.
K = 18.7
50' VC
3.
K = 10.0
40' VC
3.
K = 8.9
30' VC
Existing Ground
Profile Grade
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
EXC.
CUYD
EMB.
CUYD
SUB.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
TE
PH
C he ck ed
V
ER
B
D.13N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 94+25.80 N=325809.98 E=364056.75 El=193.80
END PROJECT
+3
N17° 17' 15"W N88 ° 0
6'
"W
Slope stake limits
Existing Campbell Creek Trail (paved)
Line to be constructed
Tour of Anchorage - East Tie-in at 90+93.55
∆ = 70° 49' 17" R = 152.47' T = 108.40' L = 188.46'
P.
C.
: 9 5+
.8
P.
T.
: 9 7+
.3
N12° 22' 12"E
MOA property line
MOA property line
94+00 95+00 96+00 97+00 98+00
-0.830% -4.470%
-1.270%
-3.140%
-2.070%
3.
8.
2.
SSD = 370'
K = 16
30' VC
0.
SSD = 193'
K = 5
20' VC96
0.
K = 8.7
20' VC
8.
K = 8.3
20' VC
EMB.
CUYD
EXC.
CUYD
EMB.
CUYD
EXC.
CUYD
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
D .1
-1
P& P
S he et s.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
TE
PH
C he ck ed
V
ER
B
D.14
N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - West 97+25.00 N=325619.78 E=363881.90 El=188.19
END PROJECT
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage - West
95+00.00 N=325481.18 E=364035.88
El=193.36
BEGIN PROJECT
GPK FILE DATED: N/A
ANC BOWL 2000 COORDINATES MOA 72 GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
3000 326465.239 367548.221 235.603 61°10'45.77092" -149°46'35.01872" 259.776 0.999889382 PID:BBGM13 'DOT GPS OPTICS'' SS ROD W/ CAP 1.
3001 317851.013 364273.962 230.456 61°09'21.05266" -149°47'42.34592" 254.495 0.999889352 PID:BBDC50 'ANCHORAGE CA' BRASS DISK
3002 322303.129 366021.357 227.032 61°10'04.83727" -149°47'06.43721" 251.148 0.999889659 CP20101, SET REBAR & ALUM. CAP
3003 322423.315 366283.634 231.082 61°10'06.01222" -149°47'01.08203" 255.227 0.999889487 CP20102, SET REBAR & ALUM. CAP
3004 322045.643 366185.698 229.636 61°10'02.29649" -149°47'03.10408" 253.78 0.999889547 CP20103, SET REBAR & ALUM. CAP
3005 321998.253 365961.146 237.088 61°10'01.83711" -149°47'07.68513" 261.206 0.999889174 CP20104, SET REBAR & ALUM. CAP
3006 324461.367 364395.865 195.468 61°10'26.14080" -149°47'39.43793" 219.324 0.999891039 CP20105, SET REBAR & ALUM. CAP 2.
3007 324406.771 364229.720 192.876 61°10'25.60833" -149°47'42.82927" 216.715 0.99989115 CP20106, SET REBAR & ALUM. CAP
3.
Anchorage Bowl 2000 is a local surface grid coordinate system expressed in U.S. Survey Feet developed by the Alaska Department of Transportation and Public Facilities (ADOT&PF), as a modification to Alaska State Plane Zone 4 (ASP Z4), NAD83(92). Anchorage Bowl 2000 preserves a State Plane Bearing Basis while providing ground distances at the project location.
To convert from the local ANC Bowl 2000 ground coordinates to NAD83 State Plane Alaska Zone 4 perform the following:
ADD +2296868.6878’ N, +1312517.4904’ E to ANC Bowl 2000 local ground coordinates.
SCALE the resultant using 0.9998910192
To convert from NAD83 State Plane Alaska Zone 4 to local ANC Bowl 2000 ground coordinates perform the following:
SCALE the State Plane Coordinates Using 1.000108993 SUBTRACT +2296868.6878’ N, +1312517.4904’ E from the resultant.
All elevations for the project are based upon the MOA 72 vertical control network. The Datum is Mean Sea Level (MSL) Greater Anchorage Area Borough (GAAB) 1972 adjustment, and the unit of measure is U.S. Survey feet.
PROJECT : ANCHORAGE T 2016(1)
DATE OF FIELD WORK : 04/28/20 - 4/30/20
DATE OF FINAL ADJUSTMENT : 05/07/20
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : ANC BOWL 2000
EPOCH DATE : N/A
VERTICAL DATUM : MOA 72
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\Z . S ur ve y\
. D el iv er ab le s\ R ep or ts
D
.1 5-
SU
R
VE
Y 7-
D ec
-2
2:
P
M M
W
A S S O
N
/2
I.
B R O
W N
/2
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.15
SHEET
NUMBER
ANCHORAGE T 2016(1)AK
SURVEY CONTROLPRELIMINARY - N
Permit: 123456789
SWPPP
Contact: First Last Phone: 123-456-7890
SWPPP NOTICE SIGN [1]
[1] See SCR Subsection 107.01A(d) and plans for installation locations. Back border and text on white background. Fabricate sign panel from aluminum. Adjust text as needed for specific project information. Install signs in accordance to Section 635.
FOOTNOTE:
42"
3"
4"C
3.5"
2.5"B
3"
2"C
14"
2" 2"C
BORDER R = 11
8" TH = 5 8" IN = 38"
E.1
TABULATION OF
EROSION CONTROL
QUANTITIES
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E1 -7
E ro si on
C on tr ol
P la n.
dw g
U S an ua ry
1:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
C he ck ed b y:
L
O V
ER
B
ITEM NO. DESCRIPTION UNIT QUANTITY
15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,710
15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 2
LOCATION LT/RT QUANTITY
(FT) REMARKS
12+45 to 12+85 LT 65 Along toe of slope
21+90 to 22+50 LT 75 Along toe of slope
29+50 to 30+27 LT/RT 200 Along toe of slope
30+58 to 32+70 LT/RT 530 Along toe of slope
33+35 to 34+10 LT/RT 200 Along toe of slope
48+00 to 48+62 LT 75 Along toe of slope
61+50 to 62+08 LT 75 Along toe of slope
73+48 to 74+10 LT 75 Along toe of slope
76+10 to 76+77 LT/RT 160 Along toe of slope
77+12 to 77+80 LT/RT 180 Along toe of slope
84+52 to 85+13 LT 75 Along toe of slope
TOTAL 1,710
Construction Entrance
SWPPP Notice Sign
E.2
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 12+45.00 N=321528.35 E=367451.74 El=253.85
BEGIN PROJECT
EROSION CONTROL
PLAN AND PLAN
12+45 TO 22+50
Fiber roll
Clearing limit
Flow arrows
Wetlands
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E1 -7
E ro si on
C on tr ol
P la n.
dw g
U S C
J an ua ry
1:
A
M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T.
S
TE
PH
EN
S
/2
C he ck ed b y:
L.
O
V
ER
B
EC
K
/2
N
N
EROSION CONTROL LEGEND
Campb Cam pbell Creek Wetlands
30+00
Install fiber roll
Install fiber roll
Install fiber roll
C am pb el l C re ekCa m pb ell
C re ek
Wetlands
Wetlands
Install fiber roll
Widened construction turnout
+00
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E1 -7
E ro si on
C on tr ol
P la n.
dw g
U S an ua ry
1:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
C he ck ed b y:
L
O V
ER
B
E.3
EROSION CONTROL
PLAN AND PLAN
22+50 TO 37+50
N
N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 29+00.00 N=322007.48 E=366030.59 El=232.20
BEGIN WORK
Fiber roll
Clearing limit
Flow arrows
Wetlands
EROSION CONTROL LEGEND
00 45
Path to
ADOT&PF
maintenance yard
Install fiber roll
Widened construction turnout
+00
E.4
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E1 -7
E ro si on
C on tr ol
P la n.
dw g
U S an ua ry
1:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
C he ck ed b y:
L
O V
ER
B
EROSION CONTROL
PLAN AND PLAN
37+50 TO 52+50
N N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 42+95.00 N=323142.51 E=366558.87 El=246.68
PAUSE WORK
Fiber roll
Clearing limit
Flow arrows
Wetlands
EROSION CONTROL LEGEND
Widened construction turnout
Install fiber roll
+0
E.5
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E1 -7
E ro si on
C on tr ol
P la n.
dw g
U S an ua ry
1:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
C he ck ed b y:
L
O V
ER
B
EROSION CONTROL
PLAN AND PLAN
52+50 TO 67+50
N
N
Fiber roll
Clearing limit
Flow arrows
Wetlands
EROSION CONTROL LEGEND
+00
Install fiber roll
Install fiber roll
Install fiber roll
Wetlands
+00
E.6
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E1 -7
E ro si on
C on tr ol
P la n.
dw g
U S an ua ry
1:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
C he ck ed b y:
L
O V
ER
B
EROSION CONTROL
PLAN AND PLAN
67+50 TO 82+50
N
N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 74+70.00 N=324221.25 E=364332.90 El=199.50
RESUME WORK
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 79+25.00 N=324660.83 E=364353.85 El=196.60
END WORK
Fiber roll
Clearing limit
Flow arrows
Wetlands
EROSION CONTROL LEGEND
97+38
SWPPP Notice Sign
E.7
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E1 -7
E ro si on
C on tr ol
P la n.
dw g
U S an ua ry
1:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
C he ck ed b y:
L
O V
ER
B
EROSION CONTROL
PLAN AND PLAN
82+50 TO 94+25
95+00 TO 97+25
N N
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - East 94+25.80 N=325809.98 E=364056.75 El=193.80
END PROJECT
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - West 97+25.00 N=325619.78 E=363881.90 El=188.19
END PROJECT
AK ANCHORAGE T 2016(1)
CONNECTING ANCHORAGE
TRAIL IMPROVEMENTS
Tour of Anchorage Trail - West 95+00.00 N=325481.18 E=364035.88 El=193.36
BEGIN PROJECT
Fiber roll
Clearing limit
Flow arrows
Wetlands
EROSION CONTROL LEGEND
NO SCALE
SpacingSlope
STAKES REQUIRED
1:4 or flatter 1:3 1:2 1:1
Flo w
To e of f ill s lo pe
ELEVATION
PLAN
Runoff from disturbed areas
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Existing ground (typ.)
Flow direction
Slope
Direction of runoff from disturbed areas
Direction of runoff
Slope
Fill slo pe Direction of runoff
Existing ground Backfilled and compacted soil to match ground level
Flow wood stakes. See Note 2.
Pay limits
Pay limits
Stagger joints (typ.)
Drive stakes at each end and at 4-foot spacing until wattle is secure to slope. Live stakes may be used for permanent installations. Do not crush wattle while staking.
Overlap wattles 12-inch minimum. Drive stakes at 6-inches from wattles end angles towards the adjacent wattles and space stakes at 4-foot max.
1.
2.
PROPERLY STAKED AND ENTRENCHED SEDIMENT WATTLE
ALTERNATE SEDIMENT WATTLE JOINT DETAIL
SLOPE PROTECTION INSTALLATION
WATTLE SPACING
Wattle length
SEDIMENT WATTLE STAKING DETAIL
SEDIMENT WATTLE LAPPING DETAIL
Sediment wattle
Sediment wattle larger than wattle
Step 1: Excavate trench and install sediment wattles
Step 2: Backfill soil against sediment wattles
Stakes required for each wattle
Place excavated material on uphill side of sediment wattle
Sediment wattle
Install wattles along contours
NOTE:
(ft)
AK ANCHORAGE T 2016(1) E.8
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E8 S ed im en t
W at tle .d w g
U
S an ua ry
0:
A M
W157-20
SEDIMENT WATTLE
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 10/2014
REVISED: 7/2016
U.S. CUSTOMARY DETAIL
DETAIL
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NOTE:
STABILIZED CONSTRUCTION EXIT
Use this entrance for construction vehicles only.
Construct drainage ditches along entrance as directed.
Provide temporary drainage culvert where entrance crosses existing drainage ditches.
Minimize tracking onto paved paths and roadways by removing built up sediment.
Adjust length to fit field conditions as approved.
1.
2.
3.
4.
Existing paved roadway
Filter rock
Separation-stabilization geotextile, class 2, type E
Construct radius to allow turning movement of typical truck using exit
50' (typ.)
Pro vid e fu ll w idth of ingres s / egres s a rea
12' (t yp.)
6" (min.)
E.9
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
E9 C on st ru ct io n
En tr an ce
.d w g
U S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
STABILIZED
CONSTRUCTION EXIT
F.1
TABULATION OF
LANDSCAPING
QUANTITIES
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
F.
La nd sc ap in g
Q ua nt iti es .d w g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
ITEM NO. DESCRIPTION UNIT QUANTITY REMARKS
15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 150
62501-0000 TURF ESTABLISHMENT ACRE 0.7
62635-2000 CUTTINGS, WILLOW STAKING EACH 500
South Fork Campbell Creek Side Channel
℄ Trail & structure
Turf establishment, typ Limits of temporary excavation, typ
Limits of temporary excavation, typ
Ordinary High Water (OHW) Turf establishment, typ
Toe of Riprap (daylight), typ
Toe of Riprap (embedded), typ
Existing bridge to be removed
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
F.
S ou th F or k
TO
A
S id
e) L an ds ca pi ng P la n.
dw g
U
S an ua ry
1:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
N
LANDSCAPING PLAN
SOUTH FORK CAMPBELL
CREEK (SIDE)
F.2
Toe of fill
Riprap
Turf establishment
Willow staking
Wetlands
LANDSCAPING PLAN LEGEND
South Fork Campbell Creek
Existing bridge to be removed
Ordinary high water (OHW)
Edge of proposed trail widening
℄ Trail & structure
Limits of temporary excavation, typ
Turf establishment, typ
Slope stake limit
Slope stake limit
N
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
F.
S ou th F or k
TO
A
M ai
n) L an ds ca pi ng P la n.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
F.3
LANDSCAPING PLAN
SOUTH FORK CAMPBELL
CREEK MAIN
Toe of fill
Riprap
Turf establishment
Willow staking
Wetlands
LANDSCAPING PLAN LEGEND
North Fork Campbell Creek
Existing bridge to be removed
Ordinary High Water (OHW)
℄ Trail & structure
Toe of Riprap (embedded), typ
Limits of temporary excavation, typ
Toe of Riprap (daylight), typ
Turf establishment, typ
Turf establishment, typ
Willow staking
Willow staking
Slope stake limit
N
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
F.
N or th F or k
N or th T
O A L an ds ca pi ng P la n.
dw g
U
S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
F.4
LANDSCAPING
PLAN NORTH FORK
CAMPBELL CREEK
Toe of fill
Riprap
Turf establishment
Willow staking
Wetlands
LANDSCAPING PLAN LEGEND
WILLOW STAKING DETAIL
1/3 willow stem length above ground
Turf Establishment
2/3 willow stem length below ground
Unclassified Borrow
TopsoilToe of slope protection.
e.g. fiber roll
Creek
Ordinary High Water
Feltleaf willow planted no deeper than 1/2 the stem length below OHW
F.5
TYPICAL STAKING
DETAIL
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
F.
Li ve
S ilt at io n D et ai l.d w g
U S an ua ry
0:
A M
ANCHORAGE T 2016(1)AK
D es ig ne d
S
TE
PH
C he ck ed
V
ER
B
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
G 1-
Te m po ra ry
T ra ff ic
C on tr ol
P la n.
dw g
U S an ua ry
0:
A
M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
C he ck ed b y:
L
O V
ER
B
TABULATION OF
TEMPORARY TRAFFIC
CONTROL QUANTITIES
ITEM NO. DESCRIPTION UNIT QUANTITY
63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6
SIGN NO. MUTCD REF.
NO. SIGN LEGEND
SIGN
SIZE
(IN)
NO. OF
SIGNS
QUANTITY
(SQFT)
1 REF-1, SEE H.4 TRAIL CLOSED 48 x 30 6 60
2 M4-8a END DETOUR 24 x 18 2 6
3 M4-9aR BIKE/PEDESTRIAN DETOUR (RIGHT) 30 X 24 6 30
4 M4-9aL BIKE/PEDESTRIAN DETOUR (LEFT) 30 X 24 7 35
TOTAL 131
G.1
E Tudor Rd
El m or e
R d
Ca m pb el l A irs tr ip
R d
Dowling Rd
E 64th Ave
E 65th Ave
E 66th Ave Sc ien ce
C en te r D r.
Ca m be ll C re ek A irs tri p
Dr. M L K Jr Ave
N
0 375 750 FT
G.2
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
G 1-
Te m po ra ry
T ra ff ic
C on tr ol
P la n.
dw g
U S an ua ry
1:
A
M
ANCHORAGE T 2016(1)AK
D es ig ne d
TE
PH
C he ck ed
V
ER
B
TEMPORARY TRAFFIC
CONTROL PLAN -
TOUR OF ANCHORAGE TRAIL
North Fork Campbell Creek Bridge to be removed and replaced
South Fork Campbell Creek Bridge (Side) to be removed and replaced
South Fork Campbell Creek Bridge (Main) to be removed and replaced
Allowable Access Route
Bicycle Detour Route
Potential Staging Area
Parking Area
Existing Trail
Stream
Roadway Centerline
Existing Building
Cambell Creek Science Center
South Fork Campbell
Creek
North Fork Campbell Creek
Alaska DOT&PF Lot
Begin Project
End Project
MOA-owned Ballfields
Existing Access Trail Tour of Anchorage Trail
Musher's Trail
Homecoming Trail
R on dy C ut O ff T ra il
Shields Trail
B lu e D ot T ra il
Barricade, Type
Ref-1
M4-9aL
M4-8a
M4-8a
M4-9aR
M4-9aR
M4-9aL
M4-9aL
M4-9aL
M4-9aR
M4-9aR
Barricade, Type 3
Barricade, Type 3
Barricade, Type 3
Ref-1
Ref-1
Ref-1
Campbell Airstrip Trailhead
End Work
Resume Work
Begin Work
Pause Work
G.3
SHEET
NUMBERSTATE PROJECT
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
G 1-
Te m po ra ry
T ra ff ic
C on tr ol
P la n.
dw g
U S an ua ry
0:
A
M
ANCHORAGE T 2016(1)AK
D es ig ne d by
T
S
TE
PH
C he ck ed b y:
L
O V
ER
B
SPECIAL SIGN PANEL
DETAILS
48"
30"
0.75"
5"
8"
4"
8"
5"
19"19"
1.875"
14" 14"
REF - 1
0.5"
(Black lettering and borders on orange background)
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
D
Break-away holes.
See post detail (typ.)
S ee
N ot e
S ee
N ot e
1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
See Note 4
Ed ge o f tr av el ed w ay
Ed ge o f pa ve d sh ou ld er
C
On tangent alignment 93°
Long side of post
D
90°
93° per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NO SCALE
NOTE:
Field drill holes through post parallel to sign face.
See table for hole size
0.6X 0.2X
STANDARD APPROVED FOR USE 6/2005
REVISED:
DRAFT: 10/2017
SIGN INSTALLATION
WOOD POSTS
635-14
200'
Attach sign panels with a minimum of 2 - 14" dia. bolts use 7' minimum mounting height for main sign and 6' minimum mounting height for secondary sign.
Use 7' minimum spacing between posts for sign posts 6" x 6" or larger.
lateral offset of 2' may be used. In areas with curbs, a minimum lateral distance of 1' behind the face of
Diamond ≤ 48"
> 13' 12' - 16'
> 17' > 30'
< 10
10 - 20 10 - 20 20 - 50 50 - 65 50 - 65 65 - 95 65 - 95
4 x 4 4 x 6 6 x 6 4 x 4 4 x 6 6 x 6 4 x 6 4 x 6 6 x 6
(INCH) (INCH)
(INCH)
1.5
1.5
1.5 1.5
(SQFT)
4"
5' m in
4' m in
6' - 12'
Diamond ≤ 36" Other Shapes ≤ 48"
Diamond ≤ 48" Other Shapes ≤ 12'
STATE PROJECT SHEET
NUMBER
G.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
AK
J:
\2
0\
C on ne ct in g A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
G
S ig n In st al la tio n
W oo d Po st s-sh ift ed .d w g
U
S C
/3
/2
2/ 3/
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
ANCHORAGE T 2016 (1)
SPECIFICATIONS:
Construction:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 (U.S. Customary Units).
Design:
AASHTO LRFD Bridge Design Specifications 9th Edition.
AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges 2nd Edition.
Camber:
Provide bridges cambered to account for dead load of structure and deck plus an additional 1% of total bridge span at the midpoint of the span.
DESIGN LOADS:
Dead Loads:
Concrete: 150 pcf Lateral Earth Pressure: equivalent fluid weight of soil, 0.012 kcf
Live Loads:
Pedestrian live load: 90 psf
AASHTO H-10
PistenBully 100 (16.5k total)
Seismic Design Criteria:
PGA 0.55g Ss 1.25g S 0.5g Site class C Liquefaction potential low AASHTO 7% probability of excedance in 75 years
MATERIALS:
Cast-in-place Concrete:
Furnish class D (AE) for abutments.
F'c = 5,000 psi at 28 days.
Chamfer exposed edges of all concrete 3/4" unless noted otherwise on the plans.
Reinforcing Steel:
Furnish reinforcing steel conforming to AASHTO M31, Grade 60 deformed, epoxy coated.
Provide 2" cover for reinforcing steel unless noted otherwise.
Structural Steel:
Furnish high-strength low alloy structural steel conforming to ASTM A847 Grade 50 truss steel and floor beam system unless noted otherwise.
Timber:
Provide Treated Douglas Fir #2 or #1 or better, S4S per WCLIB Grading Rules.
Approach rails:
Provide Treated Douglas-Fir #2 or #1 or better, or approved equal for all rail lumber.
Welding:
Perform all welding in accordance with the current AASHTO/AWS D1.5 Bridge Welding Code.
GEOTECHNICAL REPORT:
For boring logs and other geotechnical information, see Final Geotechnical Report number WFL GR15-20, dated January 2021.
BRIDGES GENERAL NOTES
7' -6
16'-0"
1' -8
Ty p
PISTENBULLY 100
9' -2
ESTIMATE
ITEM NO. DESCRIPTION REMARKS
55201-0800 STRUCTURAL CONCRETE, CLASS D (AE)
55401-2000 REINFORCING STEEL, EPOXY COATED
55504-0000 PRE-FABRICATED STEEL BRIDGE
SOUTH FORK CAMPBELL SIDE
55601-1300 BRIDGE RAILING, TIMBER
SHEET INDEX
SHEET NO. DRAWING TITLE
Bridges General NotesH.1
South Fork Campbell Creek TOA (Side)H.2
South Fork Campbell Creek TOA (Main)H.3
H.4
H.5
H.6
H.7
H.8
H.9
North Fork Campbell Creek Abutment Details
North Fork Campbell Creek TOA
Approach Rail Details
Bar List
Typical Bridge Section
Track, typ
H.10 Riprap Details and Tabulation of Quantities
South Fork Campbell Creek Abutment Details
UNIT
CUYD
LB
LPSM
LNFT
QUANTITY
5,100
ALL
55102-2200 STEEL PIPE PILE, IN PLACE EACH 8
55504-0000 PRE-FABRICATED STEEL BRIDGE
SOUTH FORK CAMPBELL MAIN
LPSM ALL
55504-0000 PRE-FABRICATED STEEL BRIDGE
NORTH FORK CAMPBELL
LPSM ALL
Contract Quantity
Contract Quantity
Contract Quantity
Approach Railing
1/
/2
/2
J:
\2
0\
C on ne ct in g
A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
H .1
B ri dg e G en er al N ot es
.d w g
[D ef au lt]
STATE PROJECT SHEET
NUMBER
NO. DATE BY REVISIONS
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
BRP NO.DATEBRIDGE PLANSCALEPROJECT TEAM LEADCHECKED BYDRAWN BYDESIGNED BY
STRUCTURE NO. STRUCTURE NAME LOCATION
1/15/2021 BHMBJHPND
FAR NORTH BICENTENNIAL PARK
ANCHORAGE T 2016(1)AK H.1
BRIDGES GENERAL NOTESPRELIMINARY - N
60'
Existing ground (at centerline)
Approach rail, typ
Q2
Q50
CIP backwall, typ
+0.500%
1 above grade, typ
1.75
Profile Grade
Pile, typ Placed riprap, Method A, Class 2
(Abutment Face)
1 below grade, typ
Placed riprap, Method A, Class 1 (Road Embankment)
Placed riprap, Method A, Class 1 (Road Embankment)
5.0' Transition
Approach fill, 1:2 slope, typ
+0.500%
2' ty p
2' M in
Low chord elev. ±232.08' Elevation to be verified following contractor selection of bridge
Limits of subexcavation Limits of subexcavation
Ordinary High Water (OHW)
Begin bridge Sta. 30+12.00
Elev. 233.91' ℄ Trail & structure
End bridge Sta. 30+71.98 Elev. 234.21'
Edge of trail
Pile, typ
CIP backwall, typ
Placed riprap, Method A, Class 2
Toe of Riprap (daylight), typ
South Fork Campbell Creek Side Channel
Existing bridge (to be removed)
N 6°44'37.04" E
Approach railing, typ
R2.0 ', t yp
Toe of Riprap (embedded), typ
25.0' Placed riprap, Method A, Class 1
25.0' Placed riprap, Method A, Class 1
25.0' Placed riprap, Method A, Class 1
5.0' Transition from embedded toe to daylight toe, typ
3.3' typ
Slope stake limit Slope stake limit
1/
/2
/2
J:
\2
0\
C on ne ct in g
A nc ho ra ge T ra il
Im pr ov em en ts
\G
D ra w in gs \C iv il\
H .2
S ou th F or k
TO
A
S id
e) P la n
E le va tio n.
dw au lt]
STATE PROJECT SHEET
NUMBER
NO. DATE BY REVISIONS
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
OFFICE OF FEDERAL LANDS HIGHWAY
BRP NO.DATEBRIDGE PLANSCALEPROJECT TEAM LEADCHECKED BYDRAWN BYDESIGNED BY
STRUCTURE NO. STRUCTURE NAME LOCATION
1/15/2021 BHMBJHPND
FAR NORTH BICENTENNIAL PARK
ANCHORAGE T 2016(1)AK
N
PLAN
ELEVATION
HYDRAULICS
Q2 60 cfs 1.7 227.9' Q50 3.1 229.7' Q100 3.5 230.3'
Q Vm WS EL.
270 cfs 340 cfs
Riprap, Class 2 (Abutment Face) Top Elev 230.7' Bottom Elev 223.0' 1:1.75 Slope Above Grade 1:1 Slope Below Grade
Riprap, Class 1 (Road Embankment) Top Elev 230.7' Bottom Elev Toe of Slope Slope to Match Embankment Grade
SOUTH FORK CAMPBELL
CREEK TOA (SIDE)
Q500 4.5 230.9'550 cfs
H.2
SF CC TOA (SIDE) BRIDGE
1" = 10'
South Fork Campbell Creek
N 50°51'49.59" E
Pile, typ
Cip backwall, typ
Existing bridge (to be removed)
End bridge Sta. 33+49.68 Elev. 234.76'
Ordinary high water (OHW)
Begin bridge Sta. 32+54.71 Elev. 234.29'
Edge of trail
℄ Trail & structure
Toe of Riprap (daylight), typ
Approach rail, typ
R2 .0 ty p
25.0' Placed riprap, Method A, Class 1
Placed riprap, Method A, Class 2
Toe of Riprap (embedded), typ
5.0' Transition from embedded toe to daylight toe, typ
3.3' typ
25…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .