This amendment modifies a solicitation for the OR DOT 20(3)/US 20 Upper Sunken Grade Slide Repair project. The solicitation is seeking bids for repair work including permanent ground anchors, soldier pile retaining walls, drilled shafts, structural concrete, and other earthwork and construction required to repair a landslide area on US Highway 20 in Oregon. The amendment revises test load sequences and bond length estimates for ground anchors, adds a section specifying requirements for soldier pile retaining walls, and updates related drawings and tables. The solicitation is seeking bids due by May 7, 2021 and is issued by the US Department of Transportation Federal Highway Administration with the Oregon Department of Transportation listed as the administering agency.

View the file

Other files

File Type Posted
OR DOT 20(3).pdf PDF
BidSum OR DOT 20(3).pdf PDF
QA_06-04-2021_2.pdf PDF
QA_06-04-2021.pdf PDF
Amendment A002.pdf PDF
OR DOT 20(3)_XS_USG.pdf PDF
OR DOT 20(3)_Earthwork_VolRpt_USG.PDF PDF
OR DOT 20(3)_XS_LSG.pdf PDF
OR DOT 20(3)_Earthwork_VolRpt_LSG.PDF PDF
IFB OR DOT 20(3).pdf PDF
OR_DOT_20(3)_Plans.pdf PDF
OR DOT 20(3)_Compiled_ESCP_Final.pdf PDF
DXF and XML files.zip ZIP file
OR DOT 20(3)_Survey_Control_USG.xlsx XLSX spreadsheet
OR_DOT_20(3)_SUP_USG.PDF PDF
OR DOT 20(3)XS_DRAINAGE.PDF PDF
OR DOT 20(3)_USG Final Geotech Report GR 22-20 Rev 2 signed.pdf PDF
OR_DOT_20(3)_SUP_LSG.PDF PDF
OR DOT 20(3)_Survey_Control_LSG.xlsx XLSX spreadsheet
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A001 05/20/2021 N/A See Box 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056721B000007

9B. DATED (SEE ITEM 11)

05/07/2021

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair

See page 2.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A001, dated 05-20-2021 OR DOT 20(3) Solicitation No. 69056721B000007 US 20 Upper Sunken Grade Slide Repair

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Pages iii through iv, SCR Table of Contents. Adds pages for Section 256, and revises starting page number for Section 263.

Pages F-5 through F-5a, Section 256, Permanent Ground Anchors. Revises Tables 256-1 and 256-2.

Page F-5b, Section 263, Soldier Pile Retaining Walls (Added Section). Revises starting page number for Section.

PLANS

Plan Sheet H.4 Revises table headings; table values for Test Loads and Lockoff Loads; and Estimated Bond Lengths for First Anchor from Top;

and adds Estimated Bond Lengths for Second Anchor from Top.

ENCLOSURES

Pages:

iii through iv F-5 through F-5b

Plan Sheets:

H.4 iii DIVISION 100

Special Contract Requirements Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair

SCR TABLE OF CONTENTS

SPECIAL CONTRACT REQUIREMENTS (SCR)

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.

DIVISION 100 GENERAL REQUIREMENTS

Section 101. — TERMS, FORMAT, AND DEFINITIONS ................................................. E-1 Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT .............................. E-2 Section 103. — SCOPE OF WORK ...................................................................................... E-3 Section 104. — CONTROL OF WORK ............................................................................... E-6 Section 105. — CONTROL OF MATERIAL ....................................................................... E-7 Section 106. — ACCEPTANCE OF WORK ........................................................................ E-9 Section 107. — LEGAL RELATIONS AND

RESPONSIBILITY TO THE PUBLIC ..................................................... E-11 Section 108. — PROSECUTION AND PROGRESS ......................................................... E-17 Section 109. — MEASUREMENT AND PAYMENT ....................................................... E-19

DIVISION 150 PROJECT REQUIREMENTS

Section 152. — CONSTRUCTION SURVEY AND STAKING ....................................... E-25 Section 153. — CONTRACTOR QUALITY CONTROL .................................................. E-28 Section 154. — CONTRACTOR SAMPLING AND TESTING ........................................ E-33 Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS ........................... E-34 Section 156. — PUBLIC TRAFFIC .................................................................................... E-39 Section 157. — SOIL EROSION AND SEDIMENT CONTROL...................................... E-42

DIVISION 200 EARTHWORK

Section 201. — CLEARING AND GRUBBING .................................................................. F-1 Section 204. — EXCAVATION AND EMBANKMENT .................................................... F-2 Section 208. — STRUCTURE EXCAVATION AND BACKFILL FOR

SELECTED MAJOR STRUCTURES ........................................................ F-4

DIVISION 250 SLOPE REINFORCEMENT AND RETAINING WALLS

Section 256. — PERMANENT GROUND ANCHORS ....................................................... F-5 Section 263. — SOLDIER PILE RETAINING WALLS (ADDED SECTION) ................ F-5b

Revised by Amendment A001 iv DIVISION 100

Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair

DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS

Section 403. — ASPHALT CONCRETE ........................................................................... F-10

DIVISION 550 BRIDGE CONSTRUCTION

Section 552. — STRUCTURAL CONCRETE ................................................................... F-11 Section 555. — STEEL STRUCTURES ............................................................................. F-16 Section 562. — TEMPORARY WORKS ........................................................................... F-17 Section 565. — DRILLED SHAFTS................................................................................... F-18

DIVISION 600 INCIDENTAL CONSTRUCTION

Section 617. — GUARDRAIL ............................................................................................ F-19 Section 622. — RENTAL EQUIPMENT ............................................................................ F-21 Section 623. — GENERAL LABOR .................................................................................. F-22 Section 625. — TURF ESTABLISHMENT ....................................................................... F-23 Section 633. — PERMANENT TRAFFIC CONTROL ...................................................... F-25 Section 634. — PERMANENT PAVEMENT MARKINGS .............................................. F-26 Section 635. — TEMPORARY TRAFFIC CONTROL ..................................................... F-27 Section 647. — ENVIRONMENTAL MITIGATION (ADDED SECTION) .................... F-42

DIVISION 700 MATERIAL

Section 703. — AGGREGATE ............................................................................................ G-1 Section 705. — ROCK ......................................................................................................... G-4 Section 708. — PLASTIC PIPE ........................................................................................... G-5 Section 710. — FENCE AND GUARDRAIL ...................................................................... G-6 Section 713. — ROADSIDE IMPROVEMENT MATERIAL ............................................ G-7

F-5

Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair

DIVISION 250

SLOPE REINFORCEMENT

AND RETAINING WALLS

Section 256. — PERMANENT GROUND ANCHORS

Construction Requirements

256.08 Testing and Stressing. Amend as follows:

Delete Table 256-1 and substitute the following:

Table 256-1 Performance Test Load Sequence

Test Sequence

Test Load Increment

AL 0.25FDL 0.50FDL 0.75FDL

1.00FDL

(Load-Hold Test) Reduce to

Lockoff Load 1 • • 2 • • • 3 • • • • 4 • • • • 10 minutes * •

AL = Alignment load (no greater than 5 percent of FDL (0.05FDL) applied to the ground anchor before setting the movement recording devices. Zero dial gauges after the first setting of A).

FDL = Factored design load.

* Hold the load to within 2 percent and measure and record the ground anchor movement during the load-hold test at 1, 2, 3, 4, 5, 6, and 10 minutes. When the ground anchor movement between 1 minute and 10 minutes exceeds 0.04 inches (1 millimeter), maintain the maximum test load an additional 50 minutes and record the movement at 20, 30, 40, 50, and 60 minutes.

Delete Table 256-2 and substitute the following:

Table 256-2 Proof Test Load Sequence

Test Load Increment

AL 0.25FDL 0.50FDL 0.75FDL

1.00FDL

(Load-Hold Test) Reduce to

Lockoff Load

• • • • 10 minutes * •

AL = Alignment load. See alignment load note in Table 256-1.

FDL = Factored design load.

* Hold the load to within 2 percent and measure and record the ground anchor movement during the load-hold test at 1, 2, 3, 4, 5, 6, and 10 minutes. When the ground anchor movement between 1 minute and 10 minutes exceeds 0.04 inches (1 millimeter), maintain the maximum test load an additional 50 minutes, recording movement at 20, 30, 40, 50, and 60 minutes.

F-5a DIVISION 250

Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair

(This page intentionally left blank)

F-5b DIVISION 250

Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair

Section 263. — SOLDIER PILE RETAINING WALLS

(ADDED SECTION)

Description

263.01 This work consists of constructing permanent soldier pile retaining wall.

Material

263.02 Conform to the following Sections and Subsections:

Drilled Shafts 565 Geocomposite Drain 714.02 Lean Concrete Backfill 614 Permanent Ground Anchors 256 Piling 715 Reinforcing Steel 554 Steel Structures 555 Structural Concrete 552 Timber Structures 557 Underdrains, Sheet Drains, and Pavement Edge Drains 605

Construction Requirements

263.03 Qualifications. Submit the following for acceptance at least 30 days before drilling for soldier piles. Acceptance of the Contractor’s personnel and installation plan does not relieve the Contractor of the responsibility for obtaining the required results in the completed work.

(a) Professional engineer. Provide an on-site professional geotechnical engineer, professional engineering geologist, or professional geologist with at least 3 years of experience in the design and construction of soldier pile walls or drilled shafts to log subsurface profiles.

(b) Other personnel. A résumé for each individual describing their experience on at least 5 soldier piles retaining wall projects of similar scope and complexity over the past 5 years.

Include project names, locations, and contract information for project owners.

263.04 General. Check existing site conditions for conformance with the plans. Provide logs of material condition descriptions from roadway surface to bottom of drilled shafts.

Verify limits of wall installation. Backfill according to Section 208.

If proposing an alternate construction method, submit to the CO for approval 14 days prior to beginning of construction according to Subsection 104.03. See Section 257 for Contractor-designed retaining walls.

C RoadwayL

Not to Scale

OFFSET DETAIL

L C Ground anchor

C HP Pile

L θ

R T

O ff s e t

(r a d ia l to r o a d w a y

HP Pile

DRILLED SHAFT TOLERANCES

CL CL HP Pile

CL HP Pile

Not to Scale

3" 3"

S. FEUZE B. ROBINSON N. MARSHALL AS SHOWN

L

Working line

& C HP PileL

4 D the front face of the HP pile flange.

Timber lagging is to be placed against

H.4

SOLDIER PILE SCHEDULE

C HP PileL

TYPICAL ELEVATION

" = 1'-0"4

1SCALE:

shaft 30" Ø Drilled

Elevation C

Elevation D

Elevation A

Elevation 1 lagging Timber

Face of HP pile

Face of HP pile Elevation 2

Top of shaft

Bottom of shaft

Top of HP pile

BLOCK OUT DETAIL

Block out

CL Pile & Shaft

Elevation B

Bottom of Wall

(Underdrain not shown for clarity)

1 5/19/21 NM Updated test & lockoff loads, bond lengths

1 1

SHEET

NO.

PROJECT

STATE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALECHECKED BYDRAWN BY

DESIGNED BYREVISIONSBYDATENO.

REVISIONS

BY

DATE

NO.

/1

/2

N

F L

H B ri d g e

W F

L \R

G

O R

U p p e r S u n k e n G ra d e W a ll\

R G

\C A

D D

F ile s \D

G N

F ile s \r g s o ld ie r p ile s c h e d u le

.d g n

RG3189- of 7

OR

SAMIR SIDHOM

WILLAMETTE NATIONAL FOREST

LINN COUNTY, OREGON

ODOT 20(3)

US 20 UPPER SUNKEN GRADE SLIDE REPAIR

MAY 2021

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A001
Sheet H.4.pdf
rg3189 soldier pile schedule