This amendment modifies a solicitation for the OR DOT 20(3)/US 20 Upper Sunken Grade Slide Repair project. The solicitation is seeking bids for repair work including permanent ground anchors, soldier pile retaining walls, drilled shafts, structural concrete, and other earthwork and construction required to repair a landslide area on US Highway 20 in Oregon. The amendment revises test load sequences and bond length estimates for ground anchors, adds a section specifying requirements for soldier pile retaining walls, and updates related drawings and tables. The solicitation is seeking bids due by May 7, 2021 and is issued by the US Department of Transportation Federal Highway Administration with the Oregon Department of Transportation listed as the administering agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OR DOT 20(3).pdf | ||
| BidSum OR DOT 20(3).pdf | ||
| QA_06-04-2021_2.pdf | ||
| QA_06-04-2021.pdf | ||
| Amendment A002.pdf | ||
| OR DOT 20(3)_XS_USG.pdf | ||
| OR DOT 20(3)_Earthwork_VolRpt_USG.PDF | ||
| OR DOT 20(3)_XS_LSG.pdf | ||
| OR DOT 20(3)_Earthwork_VolRpt_LSG.PDF | ||
| IFB OR DOT 20(3).pdf | ||
| OR_DOT_20(3)_Plans.pdf | ||
| OR DOT 20(3)_Compiled_ESCP_Final.pdf | ||
| DXF and XML files.zip | ZIP file | |
| OR DOT 20(3)_Survey_Control_USG.xlsx | XLSX spreadsheet | |
| OR_DOT_20(3)_SUP_USG.PDF | ||
| OR DOT 20(3)XS_DRAINAGE.PDF | ||
| OR DOT 20(3)_USG Final Geotech Report GR 22-20 Rev 2 signed.pdf | ||
| OR_DOT_20(3)_SUP_LSG.PDF | ||
| OR DOT 20(3)_Survey_Control_LSG.xlsx | XLSX spreadsheet |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 05/20/2021 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056721B000007
9B. DATED (SEE ITEM 11)
05/07/2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 05-20-2021 OR DOT 20(3) Solicitation No. 69056721B000007 US 20 Upper Sunken Grade Slide Repair
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Pages iii through iv, SCR Table of Contents. Adds pages for Section 256, and revises starting page number for Section 263.
Pages F-5 through F-5a, Section 256, Permanent Ground Anchors. Revises Tables 256-1 and 256-2.
Page F-5b, Section 263, Soldier Pile Retaining Walls (Added Section). Revises starting page number for Section.
PLANS
Plan Sheet H.4 Revises table headings; table values for Test Loads and Lockoff Loads; and Estimated Bond Lengths for First Anchor from Top;
and adds Estimated Bond Lengths for Second Anchor from Top.
ENCLOSURES
Pages:
iii through iv F-5 through F-5b
Plan Sheets:
H.4 iii DIVISION 100
Special Contract Requirements Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair
SCR TABLE OF CONTENTS
SPECIAL CONTRACT REQUIREMENTS (SCR)
The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.
DIVISION 100 GENERAL REQUIREMENTS
Section 101. — TERMS, FORMAT, AND DEFINITIONS ................................................. E-1 Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT .............................. E-2 Section 103. — SCOPE OF WORK ...................................................................................... E-3 Section 104. — CONTROL OF WORK ............................................................................... E-6 Section 105. — CONTROL OF MATERIAL ....................................................................... E-7 Section 106. — ACCEPTANCE OF WORK ........................................................................ E-9 Section 107. — LEGAL RELATIONS AND
RESPONSIBILITY TO THE PUBLIC ..................................................... E-11 Section 108. — PROSECUTION AND PROGRESS ......................................................... E-17 Section 109. — MEASUREMENT AND PAYMENT ....................................................... E-19
DIVISION 150 PROJECT REQUIREMENTS
Section 152. — CONSTRUCTION SURVEY AND STAKING ....................................... E-25 Section 153. — CONTRACTOR QUALITY CONTROL .................................................. E-28 Section 154. — CONTRACTOR SAMPLING AND TESTING ........................................ E-33 Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS ........................... E-34 Section 156. — PUBLIC TRAFFIC .................................................................................... E-39 Section 157. — SOIL EROSION AND SEDIMENT CONTROL...................................... E-42
DIVISION 200 EARTHWORK
Section 201. — CLEARING AND GRUBBING .................................................................. F-1 Section 204. — EXCAVATION AND EMBANKMENT .................................................... F-2 Section 208. — STRUCTURE EXCAVATION AND BACKFILL FOR
SELECTED MAJOR STRUCTURES ........................................................ F-4
DIVISION 250 SLOPE REINFORCEMENT AND RETAINING WALLS
Section 256. — PERMANENT GROUND ANCHORS ....................................................... F-5 Section 263. — SOLDIER PILE RETAINING WALLS (ADDED SECTION) ................ F-5b
Revised by Amendment A001 iv DIVISION 100
Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair
DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS
Section 403. — ASPHALT CONCRETE ........................................................................... F-10
DIVISION 550 BRIDGE CONSTRUCTION
Section 552. — STRUCTURAL CONCRETE ................................................................... F-11 Section 555. — STEEL STRUCTURES ............................................................................. F-16 Section 562. — TEMPORARY WORKS ........................................................................... F-17 Section 565. — DRILLED SHAFTS................................................................................... F-18
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 617. — GUARDRAIL ............................................................................................ F-19 Section 622. — RENTAL EQUIPMENT ............................................................................ F-21 Section 623. — GENERAL LABOR .................................................................................. F-22 Section 625. — TURF ESTABLISHMENT ....................................................................... F-23 Section 633. — PERMANENT TRAFFIC CONTROL ...................................................... F-25 Section 634. — PERMANENT PAVEMENT MARKINGS .............................................. F-26 Section 635. — TEMPORARY TRAFFIC CONTROL ..................................................... F-27 Section 647. — ENVIRONMENTAL MITIGATION (ADDED SECTION) .................... F-42
DIVISION 700 MATERIAL
Section 703. — AGGREGATE ............................................................................................ G-1 Section 705. — ROCK ......................................................................................................... G-4 Section 708. — PLASTIC PIPE ........................................................................................... G-5 Section 710. — FENCE AND GUARDRAIL ...................................................................... G-6 Section 713. — ROADSIDE IMPROVEMENT MATERIAL ............................................ G-7
F-5
Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair
DIVISION 250
SLOPE REINFORCEMENT
AND RETAINING WALLS
Section 256. — PERMANENT GROUND ANCHORS
Construction Requirements
256.08 Testing and Stressing. Amend as follows:
Delete Table 256-1 and substitute the following:
Table 256-1 Performance Test Load Sequence
Test Sequence
Test Load Increment
AL 0.25FDL 0.50FDL 0.75FDL
1.00FDL
(Load-Hold Test) Reduce to
Lockoff Load 1 • • 2 • • • 3 • • • • 4 • • • • 10 minutes * •
AL = Alignment load (no greater than 5 percent of FDL (0.05FDL) applied to the ground anchor before setting the movement recording devices. Zero dial gauges after the first setting of A).
FDL = Factored design load.
* Hold the load to within 2 percent and measure and record the ground anchor movement during the load-hold test at 1, 2, 3, 4, 5, 6, and 10 minutes. When the ground anchor movement between 1 minute and 10 minutes exceeds 0.04 inches (1 millimeter), maintain the maximum test load an additional 50 minutes and record the movement at 20, 30, 40, 50, and 60 minutes.
Delete Table 256-2 and substitute the following:
Table 256-2 Proof Test Load Sequence
Test Load Increment
AL 0.25FDL 0.50FDL 0.75FDL
1.00FDL
(Load-Hold Test) Reduce to
Lockoff Load
• • • • 10 minutes * •
AL = Alignment load. See alignment load note in Table 256-1.
FDL = Factored design load.
* Hold the load to within 2 percent and measure and record the ground anchor movement during the load-hold test at 1, 2, 3, 4, 5, 6, and 10 minutes. When the ground anchor movement between 1 minute and 10 minutes exceeds 0.04 inches (1 millimeter), maintain the maximum test load an additional 50 minutes, recording movement at 20, 30, 40, 50, and 60 minutes.
F-5a DIVISION 250
Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair
(This page intentionally left blank)
F-5b DIVISION 250
Project: OR DOT 20(3), US 20 Upper Sunken Grade Slide Repair
Section 263. — SOLDIER PILE RETAINING WALLS
(ADDED SECTION)
Description
263.01 This work consists of constructing permanent soldier pile retaining wall.
Material
263.02 Conform to the following Sections and Subsections:
Drilled Shafts 565 Geocomposite Drain 714.02 Lean Concrete Backfill 614 Permanent Ground Anchors 256 Piling 715 Reinforcing Steel 554 Steel Structures 555 Structural Concrete 552 Timber Structures 557 Underdrains, Sheet Drains, and Pavement Edge Drains 605
Construction Requirements
263.03 Qualifications. Submit the following for acceptance at least 30 days before drilling for soldier piles. Acceptance of the Contractor’s personnel and installation plan does not relieve the Contractor of the responsibility for obtaining the required results in the completed work.
(a) Professional engineer. Provide an on-site professional geotechnical engineer, professional engineering geologist, or professional geologist with at least 3 years of experience in the design and construction of soldier pile walls or drilled shafts to log subsurface profiles.
(b) Other personnel. A résumé for each individual describing their experience on at least 5 soldier piles retaining wall projects of similar scope and complexity over the past 5 years.
Include project names, locations, and contract information for project owners.
263.04 General. Check existing site conditions for conformance with the plans. Provide logs of material condition descriptions from roadway surface to bottom of drilled shafts.
Verify limits of wall installation. Backfill according to Section 208.
If proposing an alternate construction method, submit to the CO for approval 14 days prior to beginning of construction according to Subsection 104.03. See Section 257 for Contractor-designed retaining walls.
C RoadwayL
Not to Scale
OFFSET DETAIL
L C Ground anchor
C HP Pile
L θ
R T
O ff s e t
(r a d ia l to r o a d w a y
HP Pile
DRILLED SHAFT TOLERANCES
CL CL HP Pile
CL HP Pile
Not to Scale
3" 3"
S. FEUZE B. ROBINSON N. MARSHALL AS SHOWN
L
Working line
& C HP PileL
4 D the front face of the HP pile flange.
Timber lagging is to be placed against
H.4
SOLDIER PILE SCHEDULE
C HP PileL
TYPICAL ELEVATION
" = 1'-0"4
1SCALE:
shaft 30" Ø Drilled
Elevation C
Elevation D
Elevation A
Elevation 1 lagging Timber
Face of HP pile
Face of HP pile Elevation 2
Top of shaft
Bottom of shaft
Top of HP pile
BLOCK OUT DETAIL
Block out
CL Pile & Shaft
Elevation B
Bottom of Wall
(Underdrain not shown for clarity)
1 5/19/21 NM Updated test & lockoff loads, bond lengths
1 1
SHEET
NO.
PROJECT
STATE
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALECHECKED BYDRAWN BY
DESIGNED BYREVISIONSBYDATENO.
REVISIONS
BY
DATE
NO.
/1
/2
N
F L
H B ri d g e
W F
L \R
G
O R
U p p e r S u n k e n G ra d e W a ll\
R G
\C A
D D
F ile s \D
G N
F ile s \r g s o ld ie r p ile s c h e d u le
.d g n
RG3189- of 7
OR
SAMIR SIDHOM
WILLAMETTE NATIONAL FOREST
LINN COUNTY, OREGON
ODOT 20(3)
US 20 UPPER SUNKEN GRADE SLIDE REPAIR
MAY 2021
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A001 |
| Sheet H.4.pdf |
| rg3189 soldier pile schedule |