20Q000050 Q and A 2020-8-14.pdf
PDF 86 KB Posted
- Attached to
- Slope Scaling and Debris Removal
- Solicitation number
- 69056720Q000050
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 69056720Q000050_A0002.pdf | ||
| 69056720Q000050_A0001.pdf | ||
| 20Q000050 Q and A.pdf | ||
| 69056720Q000050.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLOPE SCALING AND DEBRIS REMOVAL
RFQ No. 69056720Q000050
QUESTIONS AND ANSWERS
Update: 8/14/2020 11:31 AM and adds Questions 2 and 3
1. Can a moveable rockfall barrier coupled with 1" steel plates be used as rockfall protection for the road and masonry wall on this project in lieu of k rails and 18" unclassified borrow?
Use of movable a rockfall barrier with 1-inch steel plates or precast concrete barrier with 18-inches of unclassified borrow is acceptable and will be addressed in Amendment 0001 to the solicitation.
2. In regards to Section 7 guardrail removal – Stockpiling: It appears the guardrail removal is roughly 6 miles from the scaling portion of the work. Under subsection 4 it states "stones are to be stockpiled on pallets, at the site they were removed from”. Is this portion of the road going to be closed longer than work takes?
Yes
3. Does FHWA plan on keeping the road closed and the stones stockpiled where they were removed?
Yes