QA_02-25-2021.pdf

PDF 107 KB Posted

Attached to
MT 14203(1), Maiden Road Federal contract opportunity
Solicitation number
69056720B000025
Issued by
Department of Transportation Federal Highway Administration

About this file

This document contains questions and answers related to a federal contract solicitation for road construction work. The solicitation is for the MT 14203(1) Maiden Road project issued by the Montana Department of Transportation and involves asphalt paving, grading, drainage, and other work along 9.458 miles of road north of Lewistown, Montana. The estimated price range for the contract is $5 million to $7 million and work must be completed in the fall of 2021. The questions and answers provide clarification on requirements for prevailing wages, sign posts, box culvert installation, antistrip additives, permits, control points, concrete pouring, and centerline specifications.

View the file

Other files for this federal contract opportunity

Other files attached to MT 14203(1), Maiden Road, newest first.
File Type Posted
BidSum Maiden Road.pdf PDF
QA2_02-26-2021.pdf PDF
QA2_02-25-2021.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
QA_02-04-2021.pdf PDF
A001_Hyperlinks to Added Physical Data Files.docx DOCX document
Amendment A001.pdf PDF
mt-1420301_Plans.pdf PDF
mt-1420301_Horizontal Alignment_MAIN01.pdf PDF
mt-1420301_Earthwork_TTC03.pdf PDF
mt-1420301_100_XS_Culvert02.pdf PDF
mt-1420301_Vertical Alignment_PRO_TTC03.pdf PDF
IFB Maiden Road.pdf PDF
GM 13-18 Geotechnical Recommendations.pdf PDF
mt-1420301_Vertical Alignment_PRO_CULVERT3.pdf PDF
mt-1420301_Vertical Alignment_PRO_TTC02.pdf PDF
mt-1420301_Horizontal Alignment_TTC03.pdf PDF
mt-1420301_100_XS_TTC03.pdf PDF
mt-1420301_Earthwork_TTC02.pdf PDF
mt-1420301_Vertical Alignment_PRO_CULVERT2.pdf PDF
mt-1420301_100_XS_Culvert03.pdf PDF
mt-1420301_Horizontal Alignment_TTC02.pdf PDF
mt-1420301_100_XS_TTC02.pdf PDF
mt-1420301_Earthwork_Culvert03.pdf PDF
mt-1420301_Earthwork_Culvert02.pdf PDF
mt-1420301_Right-of-Way.pdf PDF
Maiden_Road_ControlSheet.xlsx XLSX spreadsheet
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT 14203(1)

Maiden Road

# General Technical Question Answer Date

1 X

Regarding the Prevailing Wages for this project and specifically concerning Executive Order 13706 for paid sick leave, is this contract ( Notice ID 69056720B000025 MT 14203(1), Maiden Road ) covered by EO 13706?

See FAR Clause 52.222‐62. 2/4/2021

2 X Do you have a plan holders list for this project yet? If so, could you send it our way.

Please see solicitation listing on BetaSAM.gov for interested contractors.

2/22/2021

3 X

SCR 633.04 specifies permanent sign posts of aluminum, galvanized steel, or corrosion resistant steel or combination thereof. Plan sheet No. 1.4 is for wood posts. If steel posts are required, what type of steel posts and are breakaway’s required?

This will be addressed under Amendment A002

2/24/2021

4 X

Special Contract Requirements ‐ 108.01 c. States do not perform work associated with box culvert @ 293+61 & box culvert @ 374+92 until receiving written approval from the CO.

Question ‐ What circumstances /stipulations are required or conditions need to exist for the CO to give approval for the work to start at these locations?

This will be addressed under Amendment A002

2/24/2021

Check General or Technical

5 X

Special Contract Requirements – 401.03 States that “If type I (liquid) antistrip additive is included in the JMF, the minimum liquid antistrip additive is the minimum amount required to meet the design parameter in Table 401‐1A. Questions – If a type I (liquid) antistrip additive is not utilized in the JMF (to my knowledge, MDOT does not yet allow for liquid antistrips), does the Table 401‐1A requirement apply at all, to this project?

In accordance with Subsection 401.03, Table 401‐1A only apply when Type 1 (liquid) antistrip is included in the JMF.

2/24/2021

6 X

Section H of the IFB contains NWP verification under 404 of the CWA, MDEQ 401 certification, and the NOI for the SWPPP. Does FHWA anticipate that the contractor will need to obtain any further permits to complete the permanent and temporary features associated with the box culvert installation as detailed in the plans/specs? Montana Streambank Protection Act (SPA 124 Permit)? MDEQ 318 authorization?

Section H contains all the permits that have been acquired by the Government for this project. Other permits required by the Contractor’s methods of operations are to be acquired by the Contractor. See Subsection 107.01.

2/25/2021

7 X

SCR 108.01 (c) states that written approval must be obtained prior to starting work on each box culvert, including the ordering of material. What conditions must be met for approval to begin work. Are there anticipated allowable start dates?

This will be addressed under Amendment A002

2/25/2021

8 X

SCR 302.03 (c) references “designated sites” to dispose of waste. Have these sites been designated already or will they be identified by the CO in the field? With they be within the project limits? Can culvert and RCB excavation be disposed at these sites as well?

This will be addressed under Amendment A002

2/25/2021

9 X

SCR 157.10(d) and (e) appear to indicate that the temporary culverts can be sized for EITHER the 2‐year OR 10‐year peak discharge rates based on the EXPECTED timeframe the work will occur, but the diversion channel and berm MUST be sized for the 10‐year peak flow. Please clarify.

The flow diversion and barrier system requirements are different from the temporary culvert requirements for this project. Please bid accordingly.

2/25/2021

10 X

SCR 157.10 (e) states “Do not span the stream channel and floodplain completely. Isolate one bank first for completing riprap installation at that bank. Finish riprap installation and final grading before removing flow diversion at that bank and starting second bank. Isolate second bank for completing riprap installation of that bank. Maintain at least half‐width channel flow always.” Please clarify this statement as the plans clearly indicate the intent is to divert the entire stream flow for the installation of each RCB and associated stream restoration.

This will be addressed under Amendment A002

2/25/2021

11 X

An electronic centerline alignment is provided in the survey data. When compared to the existing survey at the culvert areas, it appears that the design centerline may deviate up to 1.5’ from the center of the surveyed road. Will the design centerline control? Or will the contractor need to develop a field‐fit centerline to match the existing road crown and grade outside the areas listed in SCR 152.04 (b)?

In accordance with SCR 152.04(b), the design centerline controls within the limits specified under this Subsection. For the areas outside the limits specified under SCR 152.04(b), see FP‐14 Subsection 152.05(b).

12 X

SCR 152.04 says to ‘Preserve initial reference points’, but the plan sheets (D.6 and D.8) seem to show these control points to be within the traveled way. Will government‐set control points be provided outside the roadway prism?

See Subsection 152.04(a) and bid accordingly.

2/25/2021

13 X

Notes 1 and 3 on Plan Sheet D.14 states, “…PLACE CONCRETE IN THE PIPE UP TO 10”

BELOW THE TOP OF THE PIPE(DO NOT FILL

COMPLETELY)” and “..FILL THE REMAINING 10”

OF THE 4” DIA. PIPE WITH CONCRETE, SET AND

MARK THE BRASS..” Can the pouring of the concrete bases and the setting of the brass cap under the direction of a surveyor occur in the same pour? Or must the concrete base be allowed a specified cure time before the brass cap is set? Would non‐shrink grout be an acceptable alternative to Class General Concrete in the top 10” to set the brass/bronze cap?

In accordance with Note 3 on Plan Sheet D.14, filling the remaining 10” of the 4” diameter pipe with concrete and setting of the monument is to occur after construction. Non‐shrink grout is not an acceptable alternative in this application.

2/25/2021

14 X

Is there a detail drawing for the construction of Item A0740 62102‐0000 MARKER? Plan sheet D.1 only identifies them as “Rebar & Cap”. Given that they are at centerline, will they need a monument box around them or to be cored/grouted back into the asphalt?

We do not intent to provide a detail for constructing Item A0740 62102‐0000 MARKER. Perform work according to the Plan Sheet D.1, FP‐14 Subsection 152.05(k), and the second paragraph of FP‐14 Subsection 107.02.

File details come from the government source that posted it. Updated .