Q&A_02-07-2020.pdf

PDF 100 KB Posted

Attached to
MT Phillips 364(1), Short Oil Road
Solicitation number
69056720B000007
Issued by

About this file

This document contains questions and answers related to federal solicitation number 69056720B000007 for the MT Phillips 364(1), Short Oil Road project. The solicitation is for road construction requiring asphalt paving using a PG 58-34 binder. Questions ask about submitting a non-approved job mix formula, availability of a specified traffic paint, recycling existing asphalt and base, using an alternative binder grade, stripping and replacing topsoil, seeding requirements, needing a material transfer machine, and concerns around meeting rut testing requirements with the specified softer binder. Bidders are instructed to bid according to the solicitation documents, with responses to outstanding questions forthcoming by February 7, 2020. The project is solicited by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Bid Opening Summary_Short Oil.pdf PDF
Amendment A004_R1.pdf PDF
Q&A_02-18-2020.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
Q&A_01-30-2020.pdf PDF
Q&A_01-29-2020.pdf PDF
IFB_Short Oil Road.pdf PDF
Plan Request form.pdf PDF
Plans_mt-a2015013_StampedandSigned.pdf PDF
mt-a2015013_PavementReport.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MT Phillips 364(1) (RESOL) Short Oil Road

# General Technical Question Answer Date

1 X

Under the Special contract requirements (403.02) it states: Submit a Montana Department of Transportation JMF approved within the past 12 months…….., Is it possible to submit a (new) JMF that has NOT been approved by MDOT but meets all of the their specifications. Since this is not one of their projects, they will not use resources to approve a JMF. Our closest mix design that MDOT has approved in the last 12 months would come from East of Lewistown MT. (145.0 miles away)

This will be addressed under a forthcoming amendment.

1/29/2020

2 X

It appears that they are calling for 634.04 Solventborne Traffic Paint (Type A). We haven't been able to procure this material for years. I think it’s been phased out of other federal projects and they have been using 634.05 Waterborne Traffic Paint Type B. Please verify.

Bid according to the solicitation documents. 1/29/2020

Check General or Technical

3 X

Pay item # 20303‐1600 – Removal of Pavement, Asphalt. Would the owner entertain recycling the existing asphalt and base? I’ve read the pavement report, but utilization of all the existing material that’s in place would help decrease the subgrades exposure pumping of clay soil due to wheel traffic.

Bid according to the solicitation documents. 1/29/2020

4 X

Per special contract requirement 403.01, the asphalt binder designated for this project is PG 58‐34. Would the owner entertain using a different grade of asphalt binder? The designated binder appears to be limited in regional availability. Most of the past projects that we’ve encountered in this tri‐county area from the MDOT contain PG 64‐28 asphalt binder. If the owner entertained at least an alternative pricing bid item, it might give some perspective for cost comparing.

Bid according to the solicitation documents. 1/30/2020

5 X Will the contractor be required to strip the topsoil off the edges of the roadway and replace it?

We’ve received your question and a response is forthcoming.

2/7/2020

6 X Is seeding required along the roadway edges?

We’ve received your question and a response is forthcoming.

2/7/2020

7 X Is a material transfer machine required for paving the project?

No. 2/7/2020

8 X Did you receive my questions sent on Friday (1/31/20)? Please let me know if a reply is forthcoming or not.

Yes, a response is forthcoming. 2/7/2020

9 X

A big concern that I have is with the MDOT mix that is spec’d. I am not familiar with the MDOT ever using a PG 58‐34 in their mixes. A passing Hamburg rut test is required as part of their mix design acceptance. With this softer oil, will a passing Hamburg rut test be possible?

Harder/stiffer asphalts fail on a regular basis.

Please clarify.

We’ve received your question and a response is forthcoming.

2/7/2020