Q&A_06-12-19.pdf

PDF 68 KB Posted

Attached to
OR DOT 16(1), US20 Santiam Junction - Jack Lake Rd
Solicitation number
69056719B000012
Issued by

View the file

Other files

File Type Posted
Bid_Opening_Summary_Jack_Lake_Rd.pdf PDF
Amendment_A001.pdf PDF
Q&A_06-10-19.pdf PDF
BR19184_BIR_05252018.pdf PDF
OR_DOT_16_1_Plans_Signed.pdf PDF
IFB_Santiam.pdf PDF
BN19184_as-built_plans.pdf PDF
Plan_Request_form.pdf PDF
PROJECT_DESCRIPTION_Jack_Lake_Rd.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR DOT 16(1)

US20 Santiam Junction ‐ Jack Lake Rd

# General Technical Question Answer Date

1 X

I don’t think the Type B‐HA, Preformed, Fused Thermoplastic Film material is correct for Pay Item Nos. 63401‐1700 and 63401‐1800. Please advise.

This will be addressed under a forthcoming amendment.

6/7/19

2 X Is it the Department’s intention to spec Type H, hot liquid applied thermoplastic for the long‐line striping items?

This will be addressed under a forthcoming amendment.

6/10/19

3 X Will the agency be performing surveying on this project? There are no survey bid items.

The Agency will not be performing survey work for this project. Work for which direct payment is not provided is a subsidiary obligation of the Contractor.

6/10/19

4 X Will the agency allow a start date earlier than July 15th?

This will be addressed under a forthcoming amendment.

6/10/19

5 X

It the long line thermoplastic (Items A1660 and A1680) supposed to be Surface or Inlaid/Grooved? I worry about the temps, at night, in Sept. Would it be possible to stripe during the day?

Please bid according to the plans and specifications.

6/12/2019

X

So, It’s not inlaid/grooved?

The contract does not indicate that it is inlaid/grooved.