INDEX TO SHEETS
PROJECT MANAGER
NATIONAL
PARK
SERVICE
Department of the Interior
9 10
KENAI
FJORDS
N.P.
LAKE CLARK
NAT'L PARK
WRANGELL-
ST. ELIAS
NAT'L PARK
DENALI
NATIONAL
PARK
ALASKA KEY MAP
SOUTH CENTRAL
C A
N A
D A
U N I T
E D
S T
A T
E S
Junction
Delta
FAIRBANKS
Tok
Glennallen
Valdez
Cordova
Whittier
ANCHORAGE
Palmer
Kenai
Homer
Seward
Hot Springs
Manley Hot Springs
Circle
N
B. CHON
G.4-7
G.3
G.2
G.1
F.8
F.7
F.6
F.5
F.4
F.3
F.2
F.1
E.4-6
E.3
E.2
E.1
D.2
D.1
C.1
B.1
A.3
A.2
A.1
G. TEMPORARY TRAFFIC CONTROL
F. DRAINAGE
E. EROSION CONTROL
D. PLAN-PROFILE
C. TYPICAL SECTION
B. SUMMARIES
A. GENERAL INFORMATION
STANDARD DRAWINGS
TRAFFIC DIVERSION MP 63
TEMPORARY TRAFFIC CONTROL
TRAFFIC DIVERSION MP 62.7
TEMPORARY TRAFFIC CONTROL
TABULATION OF TEMP. TRAFFIC CONTROL QUANTITIES
BOX CULVERT RIPRAP DETAILS
BOX CULVERT STRUCTURAL DETAILS
SIMULATED STREAM CULVERT INTERIOR TREATMENT
LITTLE STONY CREEK - MP 63 AOP CULVERT ELEVATIONS
PLAN & PROFILE
LITTLE STONY CREEK - MP 63 AOP CULVERT
KRIER'S CREEK - MP 62.7 AOP CULVERT ELEVATIONS
KRIER'S CREEK - MP 62.7 AOP CULVERT PLAN & PROFILE
TABULATION OF DRAINAGE QUANTITIES
STANDARD DRAWINGS
CHANNEL AND DETOUR ROAD MP 63
EROSION CONTROL PLAN TEMPORARY DIVERSION
CHANNEL AND DETOUR ROAD MP 62.7
EROSION CONTROL PLAN TEMPORARY DIVERSION
TABULATION OF EROSION CONTROL QUANTITIES
PLAN & PROFILE MP 63 CULVERT
PLAN & PROFILE MP 62.7 CULVERT
TYPICAL SECTION
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
TITLE SHEET
A.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft c m y fi le s p w p r o d u c ti o n d d e n a a a .d g n
AK NPS DENA 10(46)
A
M
J u n e
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
Project Location
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
PLANS FOR PROPOSED PROJECT
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
on Federal Highway Projects, FP-14
Construction of Roads and Bridges
Standard Specifications for
ALASKA
DENALI BOROUGH
DANALI NATIONAL PARK AND PRESERVE
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
SCALE IN MILES
25 50 7525 100
HIGHWAY
DENALI
HIGHWAY
RICHARDSON
HIG
HWAYGLENN
HIGHWAY
ALASKA
Anchorage
Fairbanks
Richardson
Big Delta
Hot Springs
Manley
Kokrines
Ruby
Telida
Nikolai
Farewell
Lime Village
Tyonek
Susitna
Skwentna
Montana
Palmer
Chickaloon
Glennallen Gulkana
Chistochina
Paxson
Healy
PRESERVE
AND
DENALI N.P.
McGrath
Poorman Minchumina
Lake
Lake
Tazlina
PROJECT LOCATION
MP 62.7 AND MP 63
WEST DISTRICT CULVERT REPLACEMENT,
0.060
35 MPH
< 100
< 100 e (max) =
V
ADT (2040)
ADT (2020)
NPS PMIS NO. 148115A
AK NPS DENA 10(46)
LENGTH 0.248 MILES
AK NPS DENA 10(46)
and drainage
Grading, earthwork, AOP culverts, APPROVED:
DATE
DATE
DATE
National Park Service
Regional Director, Alaska Region, Denali National Park and Preserve
Superintendent, Western Federal Lands Highway Division
Chief of Engineering, NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
PRELIMINARY
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
F e b r u a r y
U
S C m y fi le s p w p r o d u c ti o n d d e n a a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 NPS DENA 10(46) AK
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
NPS Drwg. No. 184/80,299
T
S
T
S
33 34 35 3632
23456
7 8 9 10 11 12
131415161718
31 33 34 3532
56 3
7 8 9 10
151617181314151617
8 9 10 11 12
45 3 2 1
33 34 35 36 31
21 22 23
19 20 21 22
27282930252627 2829302526272829
19 20
28 27 26 25 30 29 28
21 22 23 24 19 20 21
161718131415 16 15 14 13 18 17 16 15
22 23 24
252627
19 20 21 22
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
63 miles
To Healy
VICINITY MAP
N
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a a c .d g n
AK NPS DENA 10(46)
A u g u s t
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
L ittle
S to n y
C re e k
Bergh Lake
Pass
Highway
Overlook
Stony Hill
H I L L
S T O N Y
SCALE IN MILES
1 21
D E N A L I N A T I O N A L P A R K
Mt. Galen
Mtn.
Divine
Toklat
Pass
Thorofate era foro hT
Copper Mtn. Bar
WILDERNESS
DENALI
T o k la t
R iv e r
Staging Water Source
Toklat Pit Material/
MP 53.88
Visitors Center
Eielson D
E N A
L I
P A
R K
R O A D
S to n y
Creek kro F e s o oM k e er C k e er
C egroG keerC esoo M rev iR
MP 62.7
BEGIN PROJECT
MP 63
END PROJECT
NPS Drwg. No. 184/80,299
TYPICAL SECTION
le a r in g l im it
100+00 to 108+00
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a c a .d g n
AK NPS DENA 10(46)
P u g u s t
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
418+10 to 423+20
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
[1]3% [1]3%
Profile grade point
[2
1V:
2H
[2]
1V:2H
Unclassified borrow [3]method 2, 6" compacted depth
Roadway aggregate, Existing ground
Existing ground
TYPICAL SECTION
LC
C le a r in g l im it
FOOTNOTE:
Varies
V ar ie s
Aggregatesurface
Existing p r o fi le
M a tc h
0' to 5.5' 0' to 5.5'
9' to 12' 9' to 12'
Traveled way varies
Varies Shoulder
Varies Shoulder Traveled way variesEstablishment
Turf
Establishment
Turf
Varies
Construction limit varies
Construction limit varies, see plan sheets.[3]
Construct slopes as shown in the Staking Report.[2] on the cross sections.
Superelevate roadway at the rate 'e' as indicated [1]
NPS Drwg. No. 184/80,299
CP
17629
3635 3635
MP
X C
M P O
U T
L E
T F
U L L
X C
MP
,6
.2
,6
.2
+1.0564%
+3.7492%
140' VC
K = 52
,6
.9
340' VC
K = 51
SSD = 332'
,6
.3
-2.9
160' VC
K = 56
,6
.2
-0.0384%
N
CUYD
EXC.
CUYD
EMB.
D.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fa .d g n
AK NPS DENA 10(46)
M a y
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
107+00 104+00 101+00
102+00103+00105+00106+00108+00 100+00
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Limits of construction
Edge of proposed shoullder
Remove and replace signLine to be constructed Install Aquatic Organism
Passage Culvert
See Sheet F.2
Remove existing culvert
Limits of construction
Edge of proposed shooulder Remove and replace sign
BEGIN PROJECT
100+00.00
AK NPS DENA 10(46)
SUSPEND PROJECT
108+00.00
AK NPS DENA 10(46)
Profile grade
Existing ground
See Sheet F.2 for details
14' x 11'
Aquatic Organism Passage Culvert
104+10
CULVERT
MP 62.7
PLAN & PROFILE
Detour centerline (see sheet G.2)
CP
17631
,6
.9
,6
.1
,6
.4
-2.5
200' VC
K = 514
,6
.6
+1.3676%
100' VC
K = 65
SSD = 756'
,6
.4
-0.1600%
+3.4600%
190' VC
K = 52
,6
.8
N
36153615
CUYD
EXC.
CUYD
D.2
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a fb .d g n
AK NPS DENA 10(46)
A u g u s t
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
420+00421+00422+00423+00424+00 419+00 418+00
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Profile grade
Remove culvert
See Sheet F.4
Passage Culvert
Install Aquatic Organism
Existing ground
Limits of construction
Limits of construction
Edge of proposed shoulder
Edge of proposed shoulderEND PROJECT
423+20.00
AK NPS DENA 10(46)
See Sheet F.4
14' x 11'
Passage Culvert
Aquatic Organism
420+78.5
RESUME PROJECT
418+10.00
AK NPS DENA 10(46)
Line to be constructed
(see sheet G.3 for details) Detour centerline
CULVERT
MP 63
PLAN & PROFILE
CHANNEL DETAIL
TEMPORARY DIVERSION
TEMPORARY DETOUR DETAIL
FOOTNOTE:
30 36
3635 3635
Shdr_Wedge_Layer2_RPvmt_ETW_LayerTop_R
Slope_Stake_Fill_R
Pvmt_ETW_Layer2_R
Pvmt_CL_LayerTop
Pvmt_ETW_Layer3_R
Pvmt_CL_Layer2
Pvmt_CL_Layer3
Exterior Boundary
-3% -3%
A
B
1.5
1.5
SECTION B - B
SECTION A -A
N
B
A
& DETOUR ROAD MP 62.7
DIVERSION CHANNEL
TEMPORARY
EROSION CONTROL PLAN
[1] Cut vegetation flush to ground and cover with geotextile filter.
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a e b .d g n
AK NPS DENA 10(46)
A u g u s t
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Temporary flow barrier
Temporary diversion channel
Install 50' - 4' dia. pipe culvert
Temporary diversion channel
Line to be constructed
LEGEND:
LC
Unclassified borrow
LC
method 2, 6" compacted depth
Roadway aggregate, 9'
Limits of construction
Fiber Roll
Silt Fence
Water flow arrow
Riprap
Culvert
3'
Edge of detour road shoulder
Line to be constructed
Temporary flow barrier
No Scale
Temporary detour centerline (see sheet G.2)
20'
Geotextile filter, class 1, type A (non woven) [1]
Proposed culvert and roadway
TEMPORARY DETOUR DETAIL
CHANNEL DETAIL
TEMPORARY DIVERSION
SECTION B-B
SECTION A-A
1.5
1.5
FOOTNOTE:
Slope_Stake_Fill_R
Slope_Stake_Fill_L
N
& DETOUR ROAD MP 63
DIVERSION CHANNEL
TEMPORARY
EROSION CONTROL PLAN
A
A
B B
E.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a e c .d g n
AK NPS DENA 10(46)
A u g u s t
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
[1] Flush cut vegetation and place geotextile filter over vegetation.
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Line to be constructed
Temporary flow barrier
Temporary flow barrier
LEGEND:
Install temporary 44' - 48" pipe culvert
Edge of temporay detour shoulder
3'
9'
Construct diversion channel
Construct concrete box culvert
NO SCALE
Limits of construction
Fiber Roll
Silt Fence
Water flow arrow
Riprap
Culvert Unclassified borrow
Temporary flow barrier method 2, 6" compacted depth
Roadway aggregate, Temporary detour centerline (see sheet G.3)
20'
LC
Geotextile filter, class 1, type A, (non woven) [1]
Construct diversion channel
Concrete box culvert
11' D x 14' W partial width construction PRELIMINARY
NO SCALE
REVISED: 10/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c m y fi le s p w p r o d u c ti o n d d e n a e d .d g n
F e b r u a r y
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
DIVERSION CHANNELS
TEMPORARY
STATE PROJECT
NUMBER
SHEET
E.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c m y fi le s p w p r o d u c ti o n d d e n a e e .d g n
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
Roadway embankment
Roadway embankment
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
1.
2.
3.
4.
5.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
When specified replace the portion of the diversion channel through the roadway embankment with temporary culvert. Compact temporary culvert backfill using one of the methods listed in Subsection 204.11(a).
See Erosion Control Section for temporary culvert diameter, riprap class, channel dimensions and quantities.
Use plastic liner or riprap along the entire length and width of the temporary diversion channel.
Construct channel at a minimum grade of 0.5 percent.
Do not construct with longitudinal joints if using a plastic liner. Bury the upstream edge of the liner a minimum of
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
NOTE:
with plastic liner or riprap
Temporary diversion channel
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c m y fi le s p w p r o d u c ti o n d d e n a e g .d g n
A p r il
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
0 10 20 30 40 50 60 7060 50 40 30 20 1070
8090100110120130140150 80 90 100 110 120 130 140 150
3630 3630
N
PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 8 feet
LENGTH: 36 feet
INFILL TYPE: SBM
SPAN: 14'-0"
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 1.0 feet
HW : 2.3 feetQ : 221 cfs
PIPE SLOPE: 0.0 ft/ft
RISE: 11'-0"TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
BEVEL: None BEVEL: None
LOWER BEVEL HEIGHT: None LOWER BEVEL HEIGHT: None
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 4.5 feet BURIAL DEPTH: 3.1 feet
FLOWLINE SLOPE: 0.011 ft/ftINSTREAM WORK WINDOW: 7/15- 9/14
FISH SPECIES: Arctic grayling
INV N/E/EL: 3630.5 INV N/E/EL: 3630.5Q : 53 cfs
Fil l26 .04
Fil l24 .17
Fil l13 .94
Fil l14 .28
Fil l14 .50
Fil l21 .61
Flow
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d v
M p
K r ie r 's
C r e e k
A O
P
L O
S u r ft
D .d g n
AK NPS DENA 10(46)
a y
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y
PLAN & PROFILE
AOP CULVERT
KRIER'S CREEK - MP 62.7
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
SCALE IN FEET
0 1010 20 25
0.030 Ft/Ft
New precast wingwall (L-16') New precast wingwall (L-16')
Elev 3635.5'
Elev 3643.5'
Elev 3626.5'
Elev 3626.5'
Elev 3635.5'
Elev 3643.5'
Proposed road grade
Proposed roadLC
Flowline
(L=36') concrete box culvert
New 14' x 11' precast materialConserved streambed
Match existing stream bottom
100-yr WS profile
Existing stream bottom locate as needed
Temporary flow barrier,
0.030 Ft/Ft
0.030 Ft/Ft
New precast wingwall (L-16')
Placed riprap, class 3
New precast wingwall (L-16')
Placed riprap, class 3
'-0
'-0
Existing channel edge
LC New culvert
Station 104+09.6
Existing channel edge
New channel bank top
Proposed road LC
LCExisting road locate as needed
Temporary flow barrier, Remove existing 45x70" CMP arches
18'-0"
Remove existing gabion wingwall
.5
30 degree, 24 feet wall alternative
Temporary flow barrier, locate as needed
(L36') concrete box culvert
New 14' x 11' precast concrete box culvert (L36')
New 14' x 11' precast barrier, locate as needed
Temporary flow
F.3
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d v
M p
K r ie r 's
C r e e k
A O
P
L O
S u r ft
D .d g n
AK NPS DENA 10(46)
a y
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y
ELEVATIONS
AOP CULVERT
KRIER'S CREEK - MP 62.7
CULVERT INLET
CULVERT OUTLET
TYPICAL CULVERT CHANNEL
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Placed riprap, class 3 concrete box culvert
New 14' x 11' precast
Existing grade, upstream
2-yr WS
100-yr WS
Raise existing road surface 2.0' transition to existing stream channel shape and locate for smooth
New stream channel surface, New precast wingwall (L-16')
Precast cutoff wall
Channel bank top
Flowline
TOW, elev 3643.5'
Elev 3642.5'
Floor elev 3630.5' Elev 3626.5'
Elev 3635.5'
Remove existing 45x70" CMP arch culvert
Placed riprap, class 3 concrete box culvert
New 14' x 11' precast materialConserved streambed
2-yr WS
100-yr WS
Raise existing road surface 2.0' transition to existing stream channel shape and locate for smooth
New stream channel surface, New precast wingwall (L-16')
Precast cutoff wall
Channel bank top
Flowline
TOW, elev 3643.5'
Elev 3642.5'
Floor elev 3630.5' Elev 3626.5'
Elev 3635.5'
Remove existing 45x70" CMP arch culvert
Existing grade, downstream
5'
4'
8' 3'3'
5'
Conserved streambed material
Not to scale.
0 10 20 30 40 50 60 7060 50 40 30 20 1070
8090100110120130140150 80 90 100 110 120 130 140 150
N
PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 8 feet
LENGTH: 36 feet
INFILL TYPE: SBM
SPAN: 14'-0"
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 2.0 feet
HW : 4.5 feetQ : 378 cfs
PIPE SLOPE: 0.0 ft/ft
RISE: 11'-0"TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
BEVEL: None BEVEL: None
LOWER BEVEL HEIGHT: None LOWER BEVEL HEIGHT: None
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 5.4 feet BURIAL DEPTH: 4.9 feet
FLOWLINE SLOPE: 0.011 ft/ftINSTREAM WORK WINDOW: 7/15- 9/14
FISH SPECIES: Arctic grayling
INV N/E/EL: 3612.9 INV N/E/EL: 3612.9Q : 98 cfs
Fil l26 .04
Fil l24 .17
Fil l13 .94
Fil l14 .28
Fil l14 .50
Fil l21 .61
Flow
PLAN & PROFILE
AOP CULVERT
LITTLE STONY CREEK - MP 63
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d v
M p
L it tl e S to n y
C r e e k
A O
P
L O
S u r ft
D .d g n
AK NPS DENA 10(46)
a y
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y
0.011 Ft/Ft
New precast wingwall (L-16')
New precast wingwall (L-16')
Elev 3617.9'
Elev 3625.9'
Elev 3608.9'
Elev 3608.9'
Elev 3617.9'
Elev 3625.9'
New precast wingwall (L-16')
Placed riprap, class 3
New precast wingwall (L-16')
Placed riprap, class 3
18'-0"
'-0
'-0
Existing channel edge
LC New culvert
Station 420+78.5
Existing channel edge
New channel bank top
Proposed road LC
LCExisting road locate as needed
Temporary flow barrier, Remove existing 72" CMP
.2
Proposed road grade Proposed roadLC
Flowline
(L=36') concrete box culvert
New 14' x 11' precast materialConserved streambed
Match existing stream bottom
100-yr WS profile
Existing stream bottom locate as needed
Temporary flow barrier,
0.011 Ft/Ft
0.011 Ft/Ft
°2
30 degree, 24 feet wall alternative barrier, locate as needed
Temporary flow concrete box culvert (L36')
New 14' x 11' precast
Temporary flow barrier, locate as needed
SCALE IN FEET
0 1010 20 25
NPS Drwg. No. 184/80,299
ELEVATIONS
AOP CULVERT
LITTLE STONY CREEK - MP 63
F.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d v
M p
L it tl e S to n y
C r e e k
A O
P
L O
S u r ft
D .d g n
AK NPS DENA 10(46)
a y
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y
CULVERT INLET
CULVERT OUTLET
TYPICAL CULVERT CHANNEL
Placed riprap, class 3 concrete box culvert
New 14' x 11' precast materialConserved streambed
Existing grade, upstream
2-yr WS
100-yr WS
Raise existing road surface 2.0' transition to existing stream channel shape and locate for smooth
New stream channel surface, New precast wingwall (L-16')
Precast cutoff wall
Channel bank top
Flowline
TOW, elev 3625.9'
Elev 3624.9'
Floor elev 3612.9' Elev 3608.9'
Remove existing 72" CMP culvert
Elev 3617.9'
Placed riprap, class 3 concrete box culvert
New 14' x 11' precast materialConserved streambed
2-yr WS
100-yr WS
Raise existing road surface 2.0' transition to existing stream channel shape and locate for smooth
New stream channel surface, New precast wingwall (L-16')
Precast cutoff wall
Channel bank top
Flowline
TOW, elev 3625.9'
Elev 3624.9'
Floor elev 3612.9' Elev 3608.9'
Remove existing 72" CMP culvert
Elev 3617.9'
Existing grade, downstream
5'
3' 8'
4'
3'
5'
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Not to scale.
PLAN
F lo w A A
B
B
NOTE:
FOOTNOTE:
3.
2.
1.
Stagger in-channel fish passage boulder within the culvert span.
streambed cobble, and bank stone gradations.
See special contract requirements for streambed sediment, Mix streambed cobbles evenly throughout streambed sediment.
Material.
Quantities included in Item 64704-1000 Mitigation, Streambed[5]
18-inches or as specified on plan sheet.[4] dimension.
smallest4 3 Embed fish passage boulders within active channel [3] streambed sediment.
Construct well defined banks with bank stone and[2] parabolic shape.
Slope streambed aggregate towards flowline to ensure[1]
[1]
[5]
LOCATION
(ft)
D
(ft)
W
(in)
GRADATION
COBBLE
STREAMBED
INFILL INFORMATIONAL QUANTITIES
(cuyd)
COBBLE
STREAMBED
(cuyd)
SEDIMENT
STREAMBED
8 Class D 15 25
(cuyd)
STONE
BANK
14 30
(in +/- 4)
BOULDER DIAMETER
FISH PASSAGE
ITEM DESCRIPTION UNIT
each
64703-6000
64704-1000
QUANTITY
MITIGATION QUANTITIES
Fish passage boulder
Streambed material cuyd
145 30 50
(each)
BOULDER
FP
70MP 62.7
14 8 Class D 30 75 30 15 25MP 63
INTERIOR TREATMENT
STREAM CULVERT
SIMULATED
F.6
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c m y fi le s p w p r o d u c ti o n d
W e s t_
S id e
A O
P S tr e a m
C u lv
I n te r io r
T r e a t_
B a n k S to n e s .d g n
AK NPS DENA 10(46)
a y
C h e c k e d b y
D e s ig n e d b y
SECTION A-A
Flow sediment
Streambed
D2
SECTION B-B
LC
Culvert wall
Channel flowline
Streambed cobble
D
D ty p
D ty p
(typ.)
(typ.)
Streambed sediment
36" min.
or Length on plan sheet
Culvert outlet
Culvert inlet
W
Streambed sediment
Streambed cobble
Channel flowline
Pipe arch culvert wall
Box culvert wall boulder
Fish passage boulder
Fish passage
[3]Fish passage boulder
[2]Bank stone
[2]Bank stone d e p th b u r ia l b u r ia l d e p th
Round pipe culvert wall top
Streambed
NPS Drwg. No. 184/80,299
" (min.)2 12'-6
1'-3" (min.)
ty p
STRUCTURAL DETAILS
BOX CULVERT
SECTION PROFILE
F.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d
W e s t_
S id e
A O
P B o x
C u lv e r t_
T y p ic a l_
S tr u c tu r a l_
D e ta il s v .d g n
AK NPS DENA 10(46)
a y
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y plate assembly
Welded connection
Headed Stud
GENERAL NOTES:
15°
Precast footing
O Ring if required over pipe joint
Do not install fastener m a x
" (max.)2 12'-9
(ref.)
"8 11 "2 on top and sides
(outside joint) mastic joint wrap
Grout and 9" wide box culvert
Inside of "2
Non-shrink grout
V a ri e s
" Gap2
1¼" Mastic rope foam gasket
Closed cell
1'-5" (max.)
WATERTIGHT BOX JOINT SECTION
CONNECTION PLATE DETAIL
SUPPLEMENTAL CONCRETE PIPE TIE
WINGWALL DETAIL
Non-shrink grout 1¼" Mastic rope foam gasket
Closed cell for 1"Ø joint tie
"Ø Hole4
Install tie rods or connector plates per manufacturer between precast sections (typ.)
along both sides (typ.)
" Bevel2 1" x 22
Weep holes per manufacturer
BOX CULVERT BEDDING DETAIL
Bedding material
R is e
Span Thickness in 6" lifts
Soil compacted
R is e
DETAIL
HEADWALL AND CUTOFF WALL
Headwall (per precast culvert manufacturer)
Span + 4' plates (typ.)
connection
Embedded
Cutoff wall (per precast culvert manufacturer) spaced 2'-6" max.
No. 8 dowels
3" dia. holes with
R is e
Span
P e r p la n
P e r p la n
10" spaced 2'-6" max.
No. 8 dowels
3" dia. holes with
10" culvert manufacturer)
Headwall (per precast culvert manufacturer)
Cutoff wall (per precast
Friction angle: 36 degrees.
Factored bearing resistance: 6 kips per square foot.
Unit weight: 125 lb per cubic foot.
SOIL:
Provide 2-inch minimum concrete cover to the face of any bar.
ASTM A1064.
(ASTM, A615) grade 60, or welded wire reinforcing conforming to
Furnish reinforcing steel bars conforming to AASHTO M31, deformed
REINFORCING STEEL:
Chamfer all exposed edges 3/4-inch.
compressive strength f'c=5000 psi.
Furnish structural concrete, class A(AE) with minimum 28-day design
CONCRETE:
HL-93.
LIVE LOAD:
Soil: 125 lb per cubic foot.
Concrete: 150 lb per cubic foot.
DEAD LOAD:
latest edition.
accordance with AASHTO LRFD Bridge Design Specifications, Design cut -off walls, headwalls, wingwalls, and footings in
Design precast culverts in accordance with Section 602.
DESIGN:
precast sections.
Install tie rods or connector plates per manufacturer between
104.
plans and provide shop drawings for review by the CO. See section walls conforming ASTM-C1577 and to the and grades shown in the
Provide precast concrete culverts, headwalls, wingwalls, and cut-off
FP-14 (U.S. Customary).
Construction of Roads and Bridges on Federal Highway Projects, Federal Highway Administration Standard Specifications for
Detail is for general information only.
CONSTRUCTION:
(per manufacturer) wire mesh (typ.)
" 24 16" x 6" x W
" (ref.)8 material, 12" depth
Bedding permitted when precast
Tapered holes
Outside of box culvert
Bedding material, 12" depth
NPS Drwg. No. 184/80,299
DETAILS
BOX CULVERT RIPRAP
ITEM NO. DESCRIPTION UNIT QUANTITY
25101-0300
20701-0200
Placed riprap, method A, class 3
Separation- stabilization geotextile, class 1, type C
CY
SQYD
RIPRAP QUANTITIES
1.
F.8
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d
W e s t_
S id e
A O
P B o x
C u lv e r tR ip r a p .d g n
AK NPS DENA 10(46)
a y
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y
SECTION A-A
TYPICAL CULVERT & STREAM CHANNEL PROFILE
CULVERT INLET/OUTLET ELEVATION
Flow
TYPICAL CULVERT PLAN
Per plan
1 V a r ie s
ELEVATION
TYPICAL INSIDE WINGWALL FACE
Varies
Varies
Varies
Per plan
Per plan
Per plan
Varies
Per plan
Per plan
Geotextile, class 1-C
Geotextile, class 1-C
Geotextile, class 1-C
Geotextile, class 1-C
Geotextile, class 1-C
Geotextile, class 1-CGeotextile, class 1-C
Placed riprap, class 3 class 3 Placed riprap, class 3 Placed riprap, Placed riprap, class 3
Placed riprap, class 3
CL culvert & stream
CL culvert & stream
Existing stream bottom
Existing stream bottom bank top Stream bank top Stream bank top Stream bank top Stream
Proposed road grade
Proposed road grade bank top Stream
Box culvert headwall Box culvert headwall headwall Box culvert headwall Box culvert
Wingwall footing
Wingwall footing
Wingwall footing
Wingwall footing footing Headwall
Wingwall
Wingwall
Wingwall
Wingwall top
Placed riprap, class 3
A
A outside face Wingwall
Wingwall inside faceWingwall inside face
Stream bank toe
Stream bank toe wall Box culvert
NOTE:
Grade break
Grade break
NO SCALE
LC Culvert & stream Placed riprap, class 3 riprap, class 3 Placed
ELEVATION
TYPICAL OUTSIDE WINGWALL FACE
' 5
5'
5'
5'
5'
5'
5'
5' transition to existing bank top and toe.
Place conserved streambed material over riprap as needed for
NPS Drwg. No. 184/80,299
R= 60.00'
Curve= DET4
D
T= 14.01'
L= 27.53'
L= 33.39'
Curve= DET3
D
R= 60.00'
T= 17.14'
T= 13.21'
Curve= DET2
D
R= 60.00'
L= 26.00'
L= 32.37'
Curve= DET1
D
R= 60.00'
T= 16.59'
,6
.4
,6
.0
+1.4836%
100' VC
,6
.4
-3.
100' VC
,6
.0
+0.3867%
80' VC
,6
.6
+2.8832%
60' VC
-0.2176%
YIELD
TO
ONCOMING
TRAFFIC
YIELD
TO
ONCOMING
TRAFFIC
ROAD
CLOSED
ROAD
CLOSED
ONE LANE
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
N
MP 62.7
TRAFFIC DIVERSION
CONTROL
TEMPORARY TRAFFIC
CUYD
EXC.
CUYD
EMB.
101+00102+50104+00105+50107+00
3621 3621
3624 3624
3627 3627
3630 3630
3633 3633
3636 3636
3639 3639
3642 3642
3645 3645
G.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a n b .d g n
AK NPS DENA 10(46)
A u g u s t
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A high intensity flashing warning light
Type III barricade with type B
W20-4
R12aP
R1-2
R11-2
R1-2
R12aP W20-4
R1-6L
R1-6R
Temporary 20' wide min. detour road high intensity flashing waring light
Type III barricade with a type B
0+07.29
AK NPS DENA 10(46)
8+56.87
AK NPS DENA 10(46)
Proposed diversion centerline
R11-2
NOTE:
2. See sheet E.2 for culvert location.
in accordence with See SCR 650.
1. Design traffic diversion
BEGIN TRAFFIC
DIVERSION DET1DIVERSION DET1
END TRAFFIC
T= 10.65'
Curve= RDET2
D
R= 60.00'
L= 21.09' L= 24.47'
Curve= RDET1
D
R= 60.00'
T= 12.41'
,6
.2
,6
.2
+0.7639% -1.1461
150' VC
,6
.8
N
YIELD
TO
ONCOMING
TRAFFIC
YIELD
TO
ONCOMING
TRAFFIC
ROAD
CLOSED
ROAD
CLOSED
ONE LANE
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
CUYD
EXC.
CUYD
417+00419+00421+00422+00423+00
3615 3615
3620 3620
3625 3625
3630 3630
418+00420+00424+00
MP 63
TRAFFIC DIVERSION
CONTROL
TEMPORARY TRAFFIC
G.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d d e n a n c .d g n
AK NPS DENA 10(46)
A u g u s t
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
R12aP
R1-2
R1-6L
R11-2 R11-2
R1-2
R12aP
R1-6R
W20-4
W20-4
NOTE:
2. See sheet E.3 for culvert location.
in accordence with See SCR 650.
1. Design traffic diversion
DIVERSION RDET
END TRAFFIC
DIVERSION RDET
BEGIN TRAFFIC
centerline diversion
Proposed
604+46.10
422+43.77 =
AK NPS DENA 10(46)
601+27.59
419+37.19 =
AK NPS DENA 10(46)
flashing warning light type B high intensity
Type III barricade with detour road wide min.
Temporary 20'
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c m y fi le s p w p r o d u c ti o n d d e n a n d .d g n
A p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
B as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
NOTE:
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx xx
MPH
ROAD WORK
END
NO SCALE
635-4
FOR DIVERSION
TEMPORARY TRAFFIC CONTROL
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2015
REVISED:
STATE PROJECT
NUMBER
SHEET
G.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DEN 10(46) AK
U S
C c m y fi le s p w p r o d u c ti o n d d e n a n e .d g n
A p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
LENGTH AND SPACING TABLE
APPROACH
SPEED* TAPER
AREA
BUFFER
SPACE
WORK
SPACE
CHANNELIZING DEVICE
* Approach speed based on the regulatory posted speed, not the advisory speed.
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
BUFFER SPACE
LENGTH
Expressway / Freeway
SIGNS IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and lessSPACING IN FEET
FEETMPH
20-70
20-65
20-60
20-55
20-50
20-45
20-40
20-35
20-30
20-25
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
W1-6 Rt. or Lt.
Traffic flow
Traffic flow
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
If the area approaching diversion is not already signed and marked as a no passing zone, add signing and/or marking as appropriate. Remove conflicting pavement markings.
W20-1
See Note 4
W20-1
See Note 4
G20-2
See Note 4
W13-1P
1.
2.
3.
4.
5.
6.
W24-1
See Note 3
NOTE:
use an appropriate "Reverse Curve" sign (W1-4) instead of the "Double
Reverse Curve" sign (W24-1). Install a second, appropriate "Reverse
Curve" sign (W1-4) in advance of the second reverse curve back to the original alignment. Use "Reverse Turn" signs (W1-3) instead when the diversion has sharp curves with recommended speeds of 30 mph or less.
If the diversion is completely within the project limits, eliminate the
"ROAD WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
Place channelizing devices outside temporary roadway.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
ABC
ADVANCE WARNING AREA (See Sign Spacing Table)
TAPER AREA BUFFER SPACE
See Length and Spacing Table
A
TAPER AREABUFFER SPACE
for all diversion curves radius for the signed speed
Use at least the minimum
Mounted on
Type 3 barricades
Show markings as no passing unless otherwise directed by the CO)
Channelizing devices (drums, directed by the CO along diversion as channelizing devices
Delineators or
If the tangent distance along the temporary diversion is more than 600', LENGTH AND SPACING TABLE
APPROACH
SPEED*
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
* Approach speed based on the regulatory posted speed, not the advisory speed.
BUFFER SPACE
LENGTH
Expressway / Freeway
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
635-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c m y fi le s p w p r o d u c ti o n d d e n a n f.
d g n
A p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the Contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
(See Length and
Spacing Table)
1.
2.
3.
4.
5.
6.
(See Length and
Spacing Table)
WORK SPACE
G20-2
See Note 4
W20-1
See Note 4
W3-4
W16-2P
(optional)
W20-7
BUFFER SPACE
NOTE:
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
A
Flagger location
Flagger location
NPS Drwg. No. 184/80,299
WIDTH
"X"
AREA
NUMBER
OF POSTS
POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
NO SCALE
635-14
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED:
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
1.5
1.5
1.5
1.5
STATE PROJECT
NUMBER
SHEET
G.7
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c m y fi le s p w p r o d u c ti o n d d e n a n g .d g n
A p r il
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
SINGLE POST SIGN TWO POST SIGN
SIGN INSTALLATION ANGLE
POST DETAIL
S e e N o te
S e e N o te
See Note 4 E d g e o f tr a v e le d w a y
E d g e o f p a v e d s h o u ld e r
CL Post
Local tangent
Bottom of sign panel
X
H
H
D
H
0.75X
X
X
H
Y D
H
0.2X
0.6X
0.2X
D
See post detail (typ.)
Break-away holes.
Long side of post
D
90°
93°
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, 200' m in m in
6' - 12'
" dia. bolts 4 1Attach sign panels with a minimum of 2 - 1.
2.
3.
4.
5.
6.
7. State standards may be used as an alternative if approved by the CO.
per post.
H1 and H2 = Overall post length.
Select post lengths to fit field conditions.
D = Post embedment depth for average soil conditions.
In areas where lateral distance is limited, a minimum the curb may be used.
In pedestrian locations, or in areas with obstructed views, NOTE:
See table for hole size parallel to sign face.
Field drill holes through post
File details come from the government source that posted it.