Final_WDCR_MP627_and_MP63_Plans_r030719.pdf
PDF 11 MB Posted
- Solicitation number
- 69056718B000027
About this file
Plans
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CP GPS
JH
BH
TP
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS2
P
M
A u g u s t
U
S C c p w w o r k d d e n a a b .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.2 NPS DENA 10(46) AK
DI
T
NO SCALE
- no symbol -wall face
N
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
NOTE:
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
T
S
T
S
33 34 35 3632
23456
7 8 9
11 12
131415161718
31 33 34 3532
56 3
7 8 9 10
151617181314151617
8 9 10 11 12
45 3 2 1
33 34 35 36 31
21 22 23
19 20 21 22
27282930252627 2829302526272829
24 19
28 27 26 25 30 29 28
21 22 23 24 19 20 21
161718131415 16 15 14 13 18 17 16 15
22 23 24
252627
19 20 21 22
R
E
R
E
R
E
R
E
R
E
R
E
R
E
R
E
VICINITY MAP
N
A.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft
D p w w o r k d d e n a a c .d g n
AK NPS DENA 10(46)
A
F e b r u a r y
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
L ittle
S to n y
C re e k
Pass
Highway
Overlook
Stony Hill
H I L L
S T O N Y
SCALE IN MILES
1 21
D E N A L I N A T I O N A L P A R K
Mt. Galen
Mtn.
Divine
Pass
Thorofate era foro hT
Copper Mtn. Bar
WILDERNESS
DENALI
T o k la t
R iv e r
Visitors Center
Eielson D
E N A
L I
P A
R K
R O A D
S to n y
Creek kro F e s o oM k e er C k e er
C egroG keerC esoo M rev iR
To Healy
63 miles
END PROJECT
MP 63
BEGIN PROJECT
MP 62.7
Toklat Road Camp
Water Source
Staging/
Toklat Pit Material/
MP 53.88
Sheet and Description
SECTION C SECTION E SECTION F SECTION G -
Typical Section
Erosion Control
Drainage Quantities
Temporary Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND
ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY
DIVERSION CHANNEL LPSM All ALL
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 2,822 2,822
A0160 20101-0000 CLEARING AND GRUBBING ACRE 0.5 0.1 0.6
A0180 20301-1200 REMOVAL OF HEADWALL (GABION
BASKETS) EACH 2 2
A0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 3 3
A0220 20401-0000 ROADWAY EXCAVATION CUYD 112 18 130
A0240 20410-0000 SELECT BORROW (GOVERNMENT Contract Quantity
FURNISHED) CUYD 2,065 235 2,300
A0260 20702-0300 GEOTEXTILE FILTER, CLASS 1,
TYPE C SQYD 320 30 350
A0280 25101-0300 PLACED RIPRAP, METHOD A, CLASS
3 (GOVERNMENT FURNISHED) CUYD 128 12 140
A0300 30201-2000 ROADWAY AGGREGATE, METHOD 2 Contract Quantity
(GOVERNMENT FURNISHED) CUYD 590 60 650
A0320 31402-0000 STOCKPILED AGGREGATE (SELECT
BORROW) CUYD 8,000 8,000
A0340 31402-0000 STOCKPILED AGGREGATE (SURFACE
COURSE WITH BENTONITE) CUYD 12,000 12,000
A0360 31402-0000 STOCKPILED AGGREGATE (SURFACE
COURSE) CUYD 2,200 2,200
A0400 60103-0000 CONCRETE, HEADWALL (WITH
WINGWALLS) EACH 4 4
A0420 60221-4600 14 FEET SPAN, 11 FEET RISE
REINFORCED CONCRETE BOX
CULVERT, SINGLE BARREL LNFT 60 60
A0440 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 80 80
A0460 62201-1000 WHEEL LOADER, 4 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40 40
A0480 62201-2050 ROLLER HOUR 40 40
A0500 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM
BLADE HOUR 40 40
MileStone: Final Date Completed: In Progress Report Date: 03/01/19
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A 1-
M ar
-2
1:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
STATE PROJECT
B.1NPS DENA 10(46)AK
SHEET
NUMBER
Sheet and Description
SECTION C SECTION E SECTION F SECTION G -
Typical Section
Erosion Control
Drainage Quantities
Temporary Traffic Control
ALLOWANCE Bid Schedule
A0520 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 40 40
A0540 62301-0000 GENERAL LABOR HOUR 40 40
A0560 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.4 0.1 0.5
A0580 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A0600 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 8 8
A0620 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 130 150
A0640 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 8 8
A0660 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 160 160
A0680 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 186 14 200
A0700 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 90 10 100
A0720 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 600 60 660
A0740 63704-0000 VEHICLE EACH 2 2
A0760 63708-0000 CELLULAR PHONE SERVICE
(SATELLITE) MO 5 5
A0780 63713-0000 FIELD OFFICE SERVICES (INTERNET) MO 5 5
A0800 64703-6000 MITIGATION, FISH PASSAGE
BOULDER (26-INCH TO 34-INCH
DIA.) EACH 30 10 40
A0820 64704-1000 MITIGATION, STREAMBED MATERIAL
(CONSERVED FROM CHANNEL) CUYD 501 49 550
1- M ar -2
1:
P M
MileStone: Final Date Completed: In Progress Report Date: 03/01/19 c:
\p w -w or k\ d0 su m m ar y.
xl sm
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2NPS DENA 10(46)AK
SHEET
NUMBER
TYPICAL SECTION
100+00 to 108+00
418+10 to 423+20
C o n s tr u c ti o n l im it
C o n s tr u c ti o n l im it
C.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a c a .d g n
AK NPS DENA 10(46)
a r c h
B V in c e t e a d o w s
E
C h e c k e d b y
D e s ig n e d b y
[1]3% [1]3%
Profile grade point
[2
1V:
2H
[2]
1V:2H
Existing ground
Existing ground
DENALI PARK ROAD
LC
FOOTNOTE:
Varies surface
Existing p r o fi le
M a tc h
9' to 12' 9' to 12'
Traveled way varies
Varies Shoulder
Varies Shoulder Traveled way variesVaries
Construction limit varies
CONNECTION DETAIL
0' to 2' 0' to 2' topsoil, 4-inch depth
Placing conserved s ta k e l im it s
S lo p e
S lo p e s ta k e l im it s
NO SCALE
[4] 6" compacted depth method 2, (Government furnished)
Roadway aggregate, [2
V ar ie s method 2
Roadway aggregate, [5]Embankment
Use select borrow stockpile pile number 8. See Sheet C.2.[5]
Use surface aggregate stockpile pile number 5. See Sheet C.2.[4]
Construction limit varies, see Sheets D.1 and D.2.[3]
Construct slopes as shown in the Staking Report.[2] sections.
Superelevate roadway at the rate 'e' as indicated on the cross[1]
NOTE:
outside the specified limits will be performed by others.
1. Limit clearing according to Subsection 201.03. Clearing top soil, 4-inch depth
Placing conserved
OPERATION PLAN
TOKLAT PIT
N
Access
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a c b .d g n
AK NPS DENA 10(46)
a r c h
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
LEGEND:
NOTE:
SCALE IN FEET
50 100 150 200050
Existing jersey barrier
NPS
ac ce ss
Fenced enclosure
Raised leach fie ld
NPS Access
Approximate location of existing sheet pile wall
Stored materials see Stockpile Locations Table
Existing stockpile (typ.), Housing Area Contractor
Existing berm
8,000 CUYDS select borrow added remain clear corridors to
NPS access material processing area
Proposed contractor material is processed of existing piles as
Proposed expansion or structures
Existing materials material processing area
Proposed contractor for processing
26,000 CUYDS scrape mandatory source
Government provided
NPS access (30' R.O.W.)
Contractor
Staging Area
X
Shallow well pit
5.
4.
3.
2.
1.
(See Note 5)
See Subsection 107.13 Contractor housing.
Limit work according to Subsection 105.04.
Water source from the shallow well pit.
construction.
Large stockpiles for mixing fines will be available throughout and equipment staging will be determined by the CO.
The final location of all stockpiles, contractor housing, parking
CP
17629
5 1
8 1
92.70
103+50.00
24.46
102+07.95
23.16
100+00.00
100+00.00
25.73
3635 3635
MP
X C
M P O
U T
L E
T F
U L L
X C
MP
,6
.2
,6
.2
+1.0564%
126' VC
K = 52
,6
.0
+3.4589%
310' VC
K = 51
SSD = 333'
,6
.3
-2.5
-0.0384%
140' VC
K = 55
,6
.2
N
CUYD
EXC.
CUYD
EMB.
107+00 104+00 101+00
102+00103+00105+00106+00108+00 100+00
3625 3625
PLAN & PROFILE
MP 62.7 CULVERT
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
D.1
STATE PROJECT
NUMBER
SHEET
AK NPS DENA 10(46)
U
S S u r ft p w w o r k d d e n a fa .d g n a r c h
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Limits of construction
Edge of proposed shoulder
Line to be constructed Install Aquatic Organism
Passage Culvert
See Sheet F.2
BEGIN PROJECT
100+00.00
AK NPS DENA 10(46)SUSPEND PROJECT
108+00.00
AK NPS DENA 10(46)
Profile grade
See Sheet F.2 for details
14' x 11'
Aquatic Organism Passage Culvert
104+10
Detour centerline (see Sheet G.2)
Limits of construction
Existing ground
NOTE:
The ground may be frozen below 3-feet.1.
Remove and reset sign
Remove and reset sign
45 X 70 CMP culverts
Remove exisiting
Slope stake limits
El = 3634.22
E = 1600949.1324
N = 3454150.6425
El = 3638.29
E = 1600246.0047
N = 3453769.0518
20.64
108+03.83
22.56
108+02.33
23.92
106+00.00
97.21
104+50.00
86.76
104+87.82
97.17
103+50.00
30.52
103+49.99
29.02 LT
104+64.32
97.65
104+22.50 baskets) headwall (gabion
Removal of baskets) headwall (gabion
Removal of
Removal of pipe culverts
CP
17631
,6
.9
-2.5
,6
.1
,6
.4
+1.0004%
180' VC
K = 514
,6
.0
+0.5000%
40' VC
K = 80
SSD = 2176'
,6
.8
140' VC
K = 55
,6
.8
+3.0575%
+4.1285%
,6
.1
N
CUYD
EXC.
420+00421+00422+00423+00424+00 419+00 418+00
D.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a fb .d g n
AK NPS DENA 10(46)
a r c h
K
H a r r is o n
R
M e a d o w s
C h e c k e d b y
D e s ig n e d b y
MP 63 CULVERT
PLAN & PROFILE
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Profile grade
Existing ground
Limits of construction
Edge of proposed shoulder
423+20.00
AK NPS DENA 10(46)
Line to be constructed
(See Sheet G.3 for details) Detour centerline
END PROJECT
424+00
59.72
423+25.69
420+66.10
101.12
418+10.00
AK NPS DENA 10(46)
Limits of construction
Passage Culvert, see Sheet F.4
Install Aquatic Organism
420+37.87
72.92 83.08
420+90.50
424+00.23
17.75
19.42
423+74.81
60.34
423+58.40 turnaround Truck
NOTE:
The ground may be frozen below 3-feet.1.
Remove existing 72" cmp culvert
RESUME WORKEND WORK
Slope stake limits
El = 3626.99
E = 1600254.11
N = 3453773.84
El = 3629.86
E = 1599805.87
N = 3453530.58
See Sheet F.4
Passage Culvert, 14' x 11'
Aquatic Organism
420+78.5
21.07
422+25.00
30.80
421+36.40 16.96
422+75.00
22.16
423+12.53
14.16
424+00.74
64.56
420+36.43
18.41
419+50.00
26.20
420+35.51
21.23
418+09.45
16.19
418+05.99
Edge of proposed shoulder pipe culvert
Removal of
GPK FILE DATED 9/18/2017
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
17629 3454418.493 1601571.050 3641.150 63°27'11.766462"N 150°14'14.534733"W 3688.0195 0.99972591 5/8" IR w/FHWA Alum Cap 1.
17630 3454290.431 1601156.588 3639.066 63°27'10.490530"N 150°14'23.641520"W 3685.923 0.99972604 5/8" IR w/FHWA Alum Cap
17631 3453497.943 1599837.707 3628.175 63°27'02.639237"N 150°14'52.586411"W 3674.9986 0.99972668 5/8" IR w/FHWA Alum Cap
GRIZ 3455810.908 1602960.178 3893.339 63°27'25.524222"N 150°13'44.086164"W 3940.2318 0.99971377 5/8" IR w/FHWA Alum Cap
STONY 3455944.402 1603393.154 3934.745 63°27'26.853587"N 150°13'34.570648"W 3981.6509 0.99971176 5/8" IR w/FHWA Alum Cap
PROJECT : West District Culverts MP 62.7 & MP 63
DATE OF FIELD WORK :8/2017
DATE OF FINAL ADJUSTMENT : 9/2017
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 CORS96
EPOCH DATE :
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID_09
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Fi el d_ Fi le s\
A la sk a\ de na li\ C on tr ol
D
EN
A _W es t D is t
C ul ve rt s_ co nt ro ls he et .x ls x]
Sh ee t
-A ug
-2
3:
D av ie s
L.
G ob le
8/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.3
SHEET
NUMBER
NPS DENA 10(46)AK
West District Culverts MP62.7 & MP63
SURVEY CONTROL
QUANTITIES
EROSION CONTROL
TABULATION OF
E.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a d a .d g n
AK NPS DENA 10(46)
a r c h
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b
TEMPORARY DETOUR DETAIL
FOOTNOTE:
CHANNEL DETAIL
TEMPORARY DIVERSION
SECTION B-B
NOTE:
30 36
3635 3635
Shdr_Wedge_Layer2_R
Slope_Stake_Fill_R
Pvmt_CL_LayerTop
Pvmt_ETW_Layer3_R
Pvmt_CL_Layer2
Pvmt_CL_Layer3
Exterior Boundary
A
B
SECTION A -A
N
B
A
1.5 H
1 V
1.5 H
1 V
1 V
1 H
AND DETOUR ROAD MP 62.7
DIVERSION CHANNEL
TEMPORARY
EROSION CONTROL PLAN
E.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a d b .d g n
AK NPS DENA 10(46)
a r c h
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
[1] Cover vegetation with geotextile filter before placing embankment.
[2] See Sheet G.2 for Detour Road details.
[3] Use surface aggregate stockpile number 7. See Sheet C.2.
[4] Use select borrow stockpile number 8. See Sheet C.2.
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Temporary flow barrier
Temporary diversion channel
Temporary diversion channel
Line to be constructed
LC
LC
Edge of detour road shoulder
Line to be constructed
Temporary flow barrier
NO SCALE
[2]20'
LEGEND:
Limits of construction
Fiber Roll
Silt Fence
Water flow arrow
Riprap
Culvert
Temporary detour centerline (See Sheet G.2)
Install pipe culvert
See Sheet F.2
Construct concrete box culvert.
method 2, 6" compacted depth
Roadway aggregate, Geotextile filter, class 1, type A (non woven) [1]
Embankment
9'
3' section and place them along the riprap bank and the new channel.
the proposed culvert and channel, move fiber rolls from the detour
1. After the detour is removed, and before water is allowed to flow in
[3]
[4]
TEMPORARY DETOUR DETAIL
CHANNEL DETAIL
TEMPORARY DIVERSION
SECTION B-B
SECTION A-A
NOTE:
FOOTNOTE:
Slope_Stake_Fill_R
Slope_Stake_Fill_L
N
A
A
B B
1 V
1 H
1 V
1.5 H
1.5 H
1 V
AND DETOUR ROAD MP 63
DIVERSION CHANNEL
TEMPORARY
EROSION CONTROL PLAN
[1] Cover vegetation with geotextile filter before placing embankment.
[2] See Sheet G.3 for Detour Road details.
[3] Use surface aggregate stockpile number 7. See Sheet C.2.
[4] Use select borrow stockpile number 8. See Sheet C.2.
E.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a d c .d g n
AK NPS DENA 10(46)
a r c h
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Line to be constructed
Temporary flow barrier
Temporary flow barrier
LEGEND:
Temporary diversion channel
NO SCALE
Limits of construction
Fiber Roll
Silt Fence
Water flow arrow
Riprap
Culvert
Temporary detour centerline (See Sheet G.3)
LC
Construct diversion channel
Truck turnaround
Install temporary pipe culvert
Edge of temporary detour shoulder
Temporary flow barrier method 2, 6" compacted depth
Roadway aggregate, Geotextile filter, class 1, type A, (non woven) [1]
[2]20' See Sheet F.3
Construct concrete box culvert.
Embankment width construction
11' D x 14' W partial
Concrete box culvert
9'
3' section and place them along the riprap bank and the new channel.
the proposed culvert and channel, move fiber rolls from the detour
1. After the detour is removed, and before water is allowed to flow in
[3]
[4]
NO SCALE
REVISED: 10/2016
DETAIL APPROVED FOR USE --/----
WESTERN FEDERAL LANDS HIGHWAY DIVISION
SILT FENCE
W157-1
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c p w w o r k d d e n a d d .d g n e b r u a r y
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Fi ll slo pe
T o e o f s lo p e
PLAN
ELEVATION
4.
3.
2.
1.
T o e o f s lo p e
Fi ll sl op e
ELEVATION
PLAN
PLAN
PLAN
END DETAIL
END POSTS DETAIL
POSTS AT JOINTS
Varies
Varies
Geotextile
Steel or wood post
Backfilled and compacted soil fo r s p a c in g
S e e N o te
Limits of clearing
(undisturbed)
Existing ground
Silt fence reinforcement
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
NOTE:
Staple or tie
Section B
Geotextile fabric, Tie top of posts together driven tightly together.
Steel or wood posts
Steel or wood post
Staple or tie
Geotextile fabric
Fasten fabric to posts around each post one full turn.
Fold geotextile fabric See Note 3
End Posts Detail
End posts, see
End Posts Detail
End posts, see
See Note 3 fabric, Section A
Geotextile
Flow
Flow
Flow running around the ends.
Curve ends of silt fence upgrade to prevent water from as possible.
Install silt fence to follow the ground contours as closely does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed m in m in m in
6-foot (max.) spacing without silt fence reinforcement.
10-foot (max.) spacing with silt fence reinforcement.
4" min.
6" min. trench
157-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
DIVERSION CHANNELS
TEMPORARY
STATE PROJECT
NUMBER
SHEET
E.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c p w w o r k d d e n a d e .d g n
F e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
PLASTIC LINED DIVERSION CHANNEL
RIPRAP LINED DIVERSION CHANNEL
TEMPORARY CULVERT
DIVERSION CHANNEL
SECTION B-B
SECTION A-A
SECTION A-A SECTION B-B
SECTION B-B
PLAN
W
B
W
B
W
B B
W
T T
Ø when scheduled)
Silt fence (typ.
Roadway embankment
Roadway embankment
Temporary culvert backfill
Subgrade
Bedding
Sandbags
Riprap lining Riprap lining backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits when scheduled)
Silt fence (typ.
See Note 5
Permanent culvert
Roadway centerline temporary barrier
Use sandbags to construct
SandbagsPlastic liner
SSSS
SS SS
D
D D
D
SS
SS
SS SS
1.
2.
3.
4.
5.
FlowFlow
FlowFlow
Plastic liner when scheduled)
Silt fence (typ.
When specified replace the portion of the diversion channel through the roadway embankment with temporary culvert. Compact temporary culvert backfill using one of the methods listed in Subsection 204.11(a).
See Erosion Control Section for temporary culvert diameter, riprap class, channel dimensions and quantities.
Use plastic liner or riprap along the entire length and width of the temporary diversion channel.
Construct channel at a minimum grade of 0.5 percent.
Do not construct with longitudinal joints if using a plastic liner. Bury the upstream edge of the liner a minimum of
A
A
BB
GeotextileGeotextile
Flow
Natural ground and secure with sandbags (typ.)
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
6" deep and secure with riprap or sandbags.
2'2'
Bury plastic liner 6" deep
2'2'
NOTE:
with plastic liner or riprap
Temporary diversion channel
Spacing Slope
STAKES REQUIRED
1:1
1:2
1:3
1:4 or flatter for each roll
Stakes required
FIBER ROLL SPACING
Fiber roll length
DRAFT: 7/2016
REVISED:
DETAIL APPROVED FOR USE 10/2014
WESTERN FEDERAL LANDS HIGHWAY DIVISION
FIBER ROLL
(FT)
(FT)
W157-21
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
E.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c p w w o r k d d e n a d f.
d g n
A p r il
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
disturbed areas
Runoff from
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
FIBER ROLL STAKING DETAIL
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
Existing ground (typ.)
Fiber roll
Flow direction
Slope
Direction of runof f from distur bed area s sp ac in g ch ar t
S ee F ib er R ol l
Fiber roll ff o n ur f o n oi t c er i
D along contours
Install fiber rolls
Fiber roll
Slope
Fi ll slo pe
Direction of runoff ground
Existing soil to match ground level
Backfilled and compacted
Flow larger than fiber roll wood stakes. See Note 2.
Pay lim its
Pay lim its
SLOPE PROTECTION INSTALLATION
ALTERNATE FIBER ROLL JOINT DETAIL
FIBER ROLL LAPPING DETAIL
on uphill side of fiber roll
Place excavated material Stagger joints (typ.)
2.
1.
permanent installations. Do not crush fiber roll while staking.
roll is secure to slope. Live stakes may be used for and install fiber rolls
Step 1: Excavate trench Step 2: Backfill soil against fiber rolls
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
2" (min.) Excavate trench 2"
1" x 1" or 1" Ø ove rlap
12" (m in.)
t o m in m in
1" x 1" Wood stake as specified in plans
3' min. or
3' (min.)
Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.
6-inches from fiber roll end angles towards the adjacent
Overlap fiber rolls 12-inch minimum. Drive stakes at
NOTE:
10.4 x 16 20301 -1900
20702 -0300
25101 -0300
60103 -0000
60221 -4600
64703 -6000
64704 -1000
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
G
EO
TE
X
TI
LE
F
IL
TE
R
C
LA
S S
TY
PE
C
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
(G O
V
ER
N M
EN
T
FU
R N
IS
H
ED
C O
N C R
ET
E, H
EA
D
W A
LL
(W
IT
H
W
IN
G W
A
LL
S
F
EE
T
S
PA
N
F
EE
T
R
IS
E R
EI
N
FO
R C
ED
C
O N
C R
ET
E B O
X
U
LV
ER
T, S
IN
G
LE
B
A R R
EL
M
IT
IG
A
TI
O N
FI
S H
P A S S A G
E B O
U
LD
ER
(2
6-
IN
C H
T O
4-
IN
IA
M
IT
IG
A
TI
O N
S
TR
EA
M
ED
TE
R
IA
L( C O
N S
ER
V
ED
F R O
A N
N
EL
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH SQYD CUYD EACH LNFT EACH CUYD Lt Rt
MP 62.7 1 2184 2 160 64 2 30 15 231 C
MP 63 1 1409 1 160 64 2 30 15 270 C
PROJECT TOTAL 3593 3 320 128 4 60 30 501
Allowable Pipe Material A Aluminum AS Aluminized steel C Concrete
NOTE: GS Galvanized steel Pay Item 64704-1000 Mitigation Streambed Materal (Conserved from Channel) P Plastic includes 235 cuyds of culvert barrel infill material shown on sheet F.6 (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0
D ra in ag e.
xl sx ]S he et
4- M ar -2
:1
R
M ea do w s 3/
K H ar ri so n 3/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
F.1
SHEET
NUMBER
NPS DENA 10(46)AK
NPS PMIS No. 148115a NPS Drwg. No. 184/80,299
Note: The quantities shown hereon are approximate and are subject to field adjustments.
0 10 20 30 40 50 60 7060 50 40 30 20 1070
8090100110120130140 80 90 100 110 120 130 140
3630 3630
F.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a e b .d g n
AK NPS DENA 10(46)
a r c h e a d o
L e
C h e c k e d b y
D e s ig n e d b y
SCALE IN FEET
0 1010 20 30
N
PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 8 feet
LENGTH: 30 feet
INFILL TYPE: SBM
SPAN: 14'-0"
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 1.0 feet
HW : 2.3 feetQ : 221 cfs
PIPE SLOPE: 0.0 ft/ft
RISE: 11'-0"TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
BEVEL: None BEVEL: None
LOWER BEVEL HEIGHT: None LOWER BEVEL HEIGHT: None
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 4.0 feet BURIAL DEPTH: 3.1 feet
FLOWLINE SLOPE: 0.030 ft/ft
FISH SPECIES: Arctic grayling
INV N/E/EL: 3630.5 INV N/E/EL: 3630.5Q : 53 cfs
Fil l21 .61
Flow
PLAN & PROFILE
AOP CULVERT
KRIER'S CREEK - MP 62.7
INSTREAM WORK WINDOW:
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
New channel bank top
90.5°
0.030 Ft/Ft
New precast headwall (L-18') New precast headwall (L-18')
Proposed road grade
Proposed roadLC Flowline
(L=30') concrete box culvert
New 14' x 11' precast
Match existing stream bottom
Existing stream bottom locate as needed
Temporary flow barrier,
0.030 ft/ft
Existing channel edge
LC New culvert
Station 104+09.6
Existing channel edge
New channel bank top
Proposed roadLC
LCExisting road locate as needed
Temporary flow barrier, Mitigation streambed material barrier, locate as needed
Temporary flow concrete box culvert (L30')
New 14' x 11' precast barrier, locate as needed
Temporary flow
New precast headwall (L-18') (typ.)
New precast headwall (L-18') (typ.)
Top of wall, elev. 3643.0' Top of wall, elev. 3643.0'
Cutoff wall, elev 3626.5'Cutoff wall, elev 3626.5'
Floor elevation 3630.5'
V
H
0.030 ft/ft surface profile 100-yr water class 3 (Government furnished)
Placed riprap, method A, (Government furnished)
Placed riprap, method A, class 3
Removal of pipe culvert
Removal of headwall (gabion basket)
Flow
Placed riprap, method B, class 3
Geotextile filter, class 1, type C
ELEVATIONS
AOP CULVERT
KRIER'S CREEK - MP 62.7
F.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a e c .d g n
AK NPS DENA 10(46)
a r c h
H a r r is
L e
C h e c k e d b y
D e s ig n e d b and headwalls.
precast concrete culvert to wingwalls and
Match texture and color of outside face of [1]
[1]
[1]
FOOTNOTE:
CULVERT OUTLET
CULVERT INLET
TYPICAL CULVERT CHANNEL
TYPICAL RIPRAP PLAN
wingwall
Precast footing
Wingwall
& stream culvert wall culvert
Box
NO SCALE
class 1, type C
Geotextile filter, class 1, type C
Geotextile filter, class 1, type C
Geotextile filter, class 1, type C
Geotextile filter, 6'-0"
(See Sheet F.7 and F.8)
* Tilt riprap to match proosed side slopes.
(See Sheet F.7 to F.8)
LC
(Government furnished) method A, class 3*
Placed riprap, NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Channel bank top
Flowline
TOW, elev 3643.0'
Elev 3642.5'
Floor elev 3630.5'
8'-0"
4'-0"
3'-0" 3'-0"
Remove existing 45x70" CMP arch culvert
Precast concrete cutoff wall
18'-0"
Channel bank top
Flowline
TOW, elev 3643.0'
Elev 3642.5'
Floor elev 3630.5'
Remove existing 45x70" CMP arch culvert
24'-0"
5'-0"
Mitigation streambed material
Elev 3626.5'
24'-0"
5'-0" 18'-0"
Elev 3626.5'
1'-0"
Precast concrete cutoff wall
Mitigation streambed material
1'-0" transition to existing stream channel shape and locate for smooth
Overbank surface, concrete box culvert
14' x 11' precast
Proposed streambed grade
Wingwall footing (typ.)
transition to existing stream channel shape and locate for smooth
Overbank surface, concrete box culvert
14' x 11' precast
Proposed streambed grade
Wingwall footing (typ.)
upstream
Existing grade, downstream
Existing grade, 2-yr water surface
2-yr water surface
100-yr water surface
100-yr water surface
(Government furnished)
Placed riprap, method A, class 3*
(Government furnished)
Placed riprap, method A, class 3*
Profile grade
Profile grade class 7-form liner finish headwall with
Precast colored with class 7-form liner finish (typ.)
Precast colored wingwall with class 7-form liner finish
Precast colored headwall with class 7-form liner finish (typ.)
Precast colored wingwall
0 10 20 30 40 50 60 7060 50 40 30 20 1070
8090100110120130140 80 90 100 110 120 130 140
PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 8 feet
LENGTH: 30 feet
INFILL TYPE: SBM
SPAN: 14'-0"
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 2.0 feet
HW : 4.5 feetQ : 378 cfs
PIPE SLOPE: 0.0 ft/ft
RISE: 11'-0"TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
BEVEL: None BEVEL: None
LOWER BEVEL HEIGHT: None LOWER BEVEL HEIGHT: None
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 5.23 feet BURIAL DEPTH: 4.9 feet
FLOWLINE SLOPE: 0.011 ft/ft
FISH SPECIES: Arctic grayling
INV N/E/EL: 3612.9 INV N/E/EL: 3612.9Q : 98 cfs
PLAN & PROFILE
AOP CULVERT
LITTLE STONY CREEK - MP 63
INSTREAM WORK WINDOW:
N
PIPE INLET OUTLET
ACTIVE CHANNEL WIDTH: 8 feet INFILL TYPE: SBM
SPAN: 14'-0"
TYPE: Conserved
HYDRAULIC INFORMATION
100 100
OHW : 2.0 feet
HW : 4.5 feetQ : 378 cfs
PIPE SLOPE: 0.0 ft/ft
RISE: 11'-0"TYPE: Concrete Box Culvert
WALL THICKNESS: 12 in
BEVEL: None BEVEL: None
LOWER BEVEL HEIGHT: None LOWER BEVEL HEIGHT: None
HEADWALL: Precast Concrete HEADWALL: Precast Concrete
BURIAL DEPTH: 4.9 feet
FLOWLINE SLOPE: 0.011 ft/ft
FISH SPECIES: Arctic grayling
INV N/E/EL: 3612.9 INV N/E/EL: 3612.9Q : 98 cfs
SCALE IN FEET
0 1010 20 25
F.4
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a e d .d g n
AK NPS DENA 10(46)
a r c h
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
0.011 Ft/Ft
1V
1H
New precast headwall (L-18')
New precast headwall (L-18')
Existing channel edge
LC New culvert
Station 420+78.5
Existing channel edge
New channel bank top
Proposed roadLC
LCExisting road locate as needed
Temporary flow barrier, Removal of pipe culvert
Proposed road grade Proposed roadLC
Flowline
(L=30') concrete box culvert
New 14' x 11' precast
Match existing stream bottom Existing stream bottom locate as needed
Temporary flow barrier,
0.011 ft/ft
0.011 ft/ft
.8 materialMitigation streambed concrete box culvert (L30')
New 14' x 11' precast barrier, locate as needed
Temporary flow
New precast headwall (L-18') (typ.)
New precast headwall (L-18') (typ.)
bank top
New channel
Top of wall, elev. 3625.4'
Cutoff wall elev. 3608.9'Cutoff wall elev. 3608.9'
Top of wall, elev. 3625.4'
Floor elevation 3612.9' locate as needed barrier, Temporary flow surface profile 100-yr water class 3 (Government furnished)
Placed riprap, method A, class 3 (Government furnished)
Placed riprap, method A, Placed riprap, method B, class 3
Geotextile filter, class 1, type C
Flow
F.5
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a e e .d g n
AK NPS DENA 10(46)
a r c h
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b
ELEVATIONS
AOP CULVERT
LITTLE STONY CREEK - MP 63
and headwalls.
precast concrete culvert to wingwalls and
Match texture and color of outside face of [1]
[1]
[1]
FOOTNOTE:
CULVERT INLET
CULVERT OUTLET
TYPICAL CULVERT CHANNEL
NO SCALE
TYPICAL RIPRAP PLAN
wingwall
Precast footing
Wingwall wall culvert
Box class 1, type C
Geotextile filterclass 1, type C
Geotextile filter class 1, type C
Geotextile filter class 1, type C
Geotextile filter
6'-0"
* Tilt riprap to match proposed side slopes.
& stream culvert LC
(Government furnished) method A, class 3*
Placed riprap, NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
Existing grade, upstream
Channel bank top
Flowline
Remove existing 72" CMP culvert
Channel bank top
Flowline
Remove existing 72" CMP culvert
8'-0"
4'-0"
3'-0" 3'-0"
Existing grade, downstream
18'-0"
18'-0"
Mitigation streambed material
24'-0"
5'-0" 1'-0"
Mitigation streambed material
1'-0"
24'-0"
5'-0" to existing stream channel and locate for smooth transition
Overbank surface, shape concrete box culvert
14' x 11' precast to existing stream channel and locate for smooth transition
Overbank surface, shape
Proposed streambank grade concrete box culvert
14' x 11' precast
Wingwall footing (typ.)
Wingwall footing (typ.)
Profile grade
Profile grade
Precast concrete cutoff wall see Sheets F.7 and F.8
TOW elev.3625.4
Elev. 3624.9
Floor elev. 3612.9
Elev. 3608.9
Elev. 3624.9
TOW elev. 3625.4
Floor elev. 3612.9
Elev. 3608.9
Precast concrete cutoff wall see Sheets F.7 to F.8 surface
100-yr water surface
2-yr water
2-yr water surface surface100-yr water
(Government furnished)
Placed riprap, method A, class 3*
(Government furnished)
Placed riprap, method A, class 3* with class 7-form liner finish (typ.)
Precast colored wingwall with class 7-form liner finish (typ.)
Precast colored wingwall form liner finishclass 7-headwall with
Precast colored class 7-form liner finish headwall with
Precast colored
PLAN
F lo w A A
B
B
NOTE:
FOOTNOTE:
3.
2.
1.
[1]
[5]
Stagger in-channel fish passage boulder within the culvert span.
sediment, streambed cobble, and bank stone gradations.
See Special contract Requirements Section 647 for streambed
Mix streambed cobbles evenly throughout streambed sediment.
See Sheet F.1 for all quantities.
Quantities shown in table are Culvert Barrel Infill Quantities.[5]
18-inches (min.) or as specified on plan sheet.[4] of the smallest dimension.
3 Embed fish passage boulders within active channel at [3] streambed sediment.
Construct well defined banks with bank stone and[2] parabolic shape.
Slope streambed aggregate towards flowline to ensure[1]
LOCATION
(FT)
D
(FT)
(IN)
GRADATION
COBBLE
STREAMBED
(CUYD)
COBBLE
STREAMBED
(CUYD)
SEDIMENT
STREAMBED
8 Class D 15 20
(CUYD)
STONE
BANK
14 3020
120 30 40
(EACH)
BOULDER
FP
58MP 62.7
14 8 Class D 25 62 30 15 20MP 63
INTERIOR TREATMENT
STREAM CULVERT
SIMULATED
(IN +/- 4)
BOULDER DIAMETER
FISH PASSAGE (FP)
MITIGATION,
CULVERT BARREL INFILL INFORMATIONAL QUANTITIES F.6
STATE PROJECT
NUMBER
SHEET
U
S I n t2
D c p w w o r k d d e n a e f.
d g n
AK NPS DENA 10(46)
a r c h e a d o
L e
C h e c k e d b y
D e s ig n e d b y
SECTION A-A
Flow
D2
SECTION B-B
LC
Culvert wall
D
D ty p
D ty p
(typ.)
(typ.)
36" min.
or Length on plan sheet
Culvert outlet
Culvert inlet
W
Channel flowline
[2]Bank stone b u r ia l d e p th passage boulder
Mitigation, fish sediment Streambed
Channel flowline
Streambed cobble
Streambed sediment
Streambed cobble
Streambed sediment
[2]Bank stone
[3]Mitigation, fish passage (FP) boulder passage (FP) boulder
Mitigation, fish top Streambed
Interior culvert wall
Box invert
Bottom of Box
Top headwall
Box crown
SECTION A-A
SECTION B-B
SHEET 1 of 2
STRUCTURAL DETAILS
BOX CULVERT
Bottom of Cutoff Wall
F.7
STATE PROJECT
NUMBER
SHEET
I n t_ ft p w w o r k d d e n a e g .d g n
AK NPS DENA 10(46)
a r c h
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y
GENERAL NOTES:
BOX CULVERT BEDDING DETAIL
R is e
Span Thickness in 6" lifts
Soil compacted along both sides
" Bevel2 1" x 22
NO SCALE
Bedding materialSpan + 4'
B B
BOX CULVERT PLAN
plates per manufacturer and install connector and wingwall joint (typ.), mastic wrap along culvert
Water tight grout and
A
A
6'-0"6'-0" shop drawings.
provide dimensions per are nominal dimensions, Dimensions shown on plans
12" depth (min.)
Bedding material, Base slab
10" (min.)
sections (typ.)
manufacturer between precast
Install tie rods or connector plates per
1V 1V
1H 1H spacing per manufacturer
Watertight box joint
30'-0" ty p along both sides (typ.)
" Bevel2 1" x 22 precast sections (typ.)
manufacturer between connector plates per
Install tie rods or connection plates (typ.)
Embedded per manufacturer
Weep holes
(per manufacturer)
Wire mesh material, 12" depth
Bedding
12" (min.)
finish over entire panel
Provide Class 7 form liner form liner finish
Provide class 7 zone reinforcement
Concrete
2"
Clear
Friction angle: 36 degrees.
Factored bearing resistance: 6 kips per square foot.
Unit weight: 125 lb per cubic foot.
SOIL:
where class 7 finishes are not required.
Provide 2-inch minimum concrete cover to reinforcements
ASTM A1064.
(ASTM, A615) grade 60, or welded wire reinforcing conforming to
Furnish reinforcing steel bars conforming to AASHTO M31, deformed
REINFORCING STEEL:
and headwalls according to Section 601.
Provide class 7 form liner colored concrete wing walls
-inch.2 1Chamfer all exposed edges 2 compressive strength f'c=5000 psi.
Furnish minor concrete with minimum 28-day design
CONCRETE:
HL-93.
LIVE LOAD:
Soil: 125 lb per cubic foot.
Concrete: 150 lb per cubic foot.
DEAD LOAD:
latest edition.
accordance with AASHTO LRFD Bridge Design Specifications, Design cut -off walls, headwalls, wingwalls, and footings in
Design precast culverts in accordance with Section 602.
DESIGN:
plates per manufacturer between precast sections.
Contract Requirements Section 104. Install tie rods or connector plans and provide shop drawings for review by the CO. See Special walls conforming ASTM-C1577 and to the grades shown in the
Provide precast concrete culverts, headwalls, wingwalls, and cutoff
ASSHTO LRFD Bridge Design Specifications, latest edition.
FP-14 (U.S. Customary).
Construction of Roads and Bridges on Federal Highway Projects, Federal Highway Administration Standard Specifications for
Detail is for general information only.
CONSTRUCTION:
CONCRETE FINISH DETAIL
CLASS 7 FORM LINER
rough texture Provide abstract
1"
TEXTURE DETAIL
finish on culvert end Provide Class 7 form liner finish on culvert end Provide class 7 form liner
" (min.)2 12'-6
SECTION PROFILE
SHEET 2 of 2
STRUCTURAL DETAILS
BOX CULVERT
CONNECTION PLATE DETAIL (TYP.)
F.8
STATE PROJECT
NUMBER
SHEET
I n t_ ft p w w o r k d d e n a e h .d g n
AK NPS DENA 10(46)
a r c h
R
M e a d o w s
S
L e o n
C h e c k e d b y
D e s ig n e d b y
15°
O Ring if required
(ref.)
"8
"2 for 1"Ø joint tie
"Ø Hole4
R is e
DETAIL
HEADWALL AND CUTOFF WALL
Span
P e r p la n culvert manufacturer)
Cutoff wall (per precast
" (ref.)8 permitted when precast
Tapered holes
Bedding material, 12" depth culvert manufacturer)
Headwall (per precast
Cutoff wall (per precast culvert manufacturer)
" (max.)2 12'-9
"2 on top and sides
(outside joint) mastic joint wrap
Grout and 9" wide box culvert
Inside of Non-shrink grout
V a r ie s
" Gap2
1¼" Mastic rope foam gasket
Closed cell
R is e
Outside of box culvert and wingwall joint wrap along culvert
Grout and mastic plate assembly
Welded connection
Headed stud concrete culvert
Precast concrete wingwall
Precast
P e r p la n spaced 2'-6" (max.)
No. 8 dowels
3" dia. holes with spaced 2'-6" (max.)
No. 8 dowels
3" dia. holes with
1'-3" (min.)
1'-5" (max.)
over pipe joint fastener
Do not install ty p m a x
CONCRETE PIPE TIE (TYP.)
SECTION (TYP.)
WATERTIGHT BOX JOINT
1. See General Notes, Sheet F.7.
NOTE:
12"
12"
QUANTITIES
TEMPORARY TRAFFIC CONTROL
TABULATION OF
G.1
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a n a .d g n
AK NPS DENA 10(46)
e b r u a r y
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b
,6
.0
+1.4836%
60' VC
-0.6000%40' VC
+0.1333%
40' VC
+0.7692%
40' VC
-0.2176%
,6
.6
,6
.4
,6
.6
YIELD
TO
ONCOMING
TRAFFIC
YIELD
TO
ONCOMING
TRAFFIC
ROAD
CLOSED
ROAD
CLOSED
ONE LANE
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
N
P C
.3
P T
.6
P C
.9
P
T
.9
P C
.1
P T
.5
P C
.1
P T
.6
0+002+005+006+008+00 7+00 4+00 3+00 1+00
CUYD
EXC.
3620 3620
3625 3625
3630 3630
3635 3635
3640 3640
3645 3645
PLAN AND PROFILE
MP 62.7
TRAFFIC DIVERSION
5 (See Sheet E.1)
1271 (See Sheet E.1)
G.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a n b .d g n
AK NPS DENA 10(46)
a r c h
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
W20-4 R12aP
R1-2
R11-2
R1-2
R12aP
W20-4
R1-6L
R1-6R
Temporary 20' wide min. detour road high intensity flashing waring light
Type III barricade with a type B
R11-2
BEGIN TRAFFIC
DIVERSION DET1DIVERSION DET1
END TRAFFIC
Proposed diversion centerline
NOTE:
1.
Diversion profile
Existing ground
Section and Details.
See Sheet E.2 for Detour Road Typical
El. = 3634.40
E = 1601841.45
N = 3454643.33
El. = 3638.15
E = 1601140.00
N = 3454259.79
.1
.4 warning light type B high intensity flashing
Type III barricade with
108+00.00; Offset 4.55 RT
8+37.67; Offset 0 =
100+00.00; Offset 6.52 RT
0+07.19; Offset 0 =
,6
.2
150' VC
,6
.2
,6
.8
,6
.8
,6
.6
+3.34%
+5.17%
-1.15%
+0.76%
N
YIELD
TO
ONCOMING
TRAFFIC
YIELD
TO
ONCOMING
TRAFFIC
ROAD
CLOSED
ROAD
CLOSED
ONE LANE
ROAD
AHEAD
ONE LANE
ROAD
AHEAD
P C
.5
P T
.0
P C
.5
P T
.9
P C
.5
P T
.6
P C
.0
P T
.1
P O
T
.0
EXC.
CUYD
601+00603+00604+00605+00
3615 3615
3620 3620
3625 3625
3630 3630
600+00602+00606+00
PLAN AND PROFILE
MP 63
TRAFFIC DIVERSION
1 4
,6
.2
G.3
STATE PROJECT
NUMBER
SHEET
U
S S u r ft p w w o r k d d e n a n c .d g n
AK NPS DENA 10(46)
a r c h
H a r r is
M e a d o
C h e c k e d b y
D e s ig n e d b y
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
R12aP
R1-2
R1-6L
R11-2 R11-2
R1-2
R12aP
R1-6R
W20-4
W20-4
NOTE:
DIVERSION RDET
END TRAFFIC DIVERSION RDET
BEGIN TRAFFIC
flashing warning light type B high intensity
Type III barricade with
422+43.77
604+46.10 = 419+37.19
601+27.59 =
100'-0"
Truck turn around 1.
Diversion profile
Existing ground
Section and Details.
See Sheet E.3 for Detour Road Typical wide min. detour road
Temporary 20' diversion centerline
Proposed
0 (See Sheet E.1)
761 (See Sheet E.1)
El. = 3624.29
E = 1600142.33
N = 3453713.18
El. = 3625.63
E = 1599872.87
N = 3453566.94
MINIMUM DISTANCE TO SIGN
WOOD POST SELECTION TABLE
SIZE
POST NUMBER OF POSTS
1 2 3 4 D diameter and hole depth
Notch from curb
Offset (W)
Lateral
Height (V)
Mounting
Location
Rural Districts
Residence Districts
Business or exceeds the limit for the largest post, use steel post installation.
Values shown are the maximum permitted. If the product of XYZ
NO SCALE
W633-7
REVISED:
DETAIL APPROVED FOR USE 10/2009
WESTERN FEDERAL LANDS HIGHWAY DIVISION
(inch)
8 x 12
8 x 10
6 x 10
6 x 8
6 x 6
4 x 6
4 x 4
Product of X-Y-Z in CUFT
6'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
3'-0"
"4
"4
"2
6 ft 5 ft
7 ft 2 ft
V may be reduced by 1 foot in rural districts for
WOOD POSTS
INSTALLATION
PERMANENT SIGN
U.S. CUSTOMARY DETAIL
DETAIL
STATE PROJECT
NUMBER
SHEET
G.4
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c p w w o r k d d e n a n d .d g n
F e b r u a r y
SINGLE POST SIGNS
POST DETAIL
THREE POST SIGNS FOUR POST SIGNS
SIGN INSTALLATION ANGLE
SIGNS WITHOUT ANGLES
TYPICAL MOUNTING FOR
Direction of traffic flow
5.
4.
3.
2.
1.
TWO POST SIGNS
of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge of traveled way
Elevation at edge
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
E d g e o f tr a v e le d w a y
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
See table for hole size post, parallel to sign face.
Field drill holes through a secondary sign mounted below another sign.
E d g e o f tr a v e le d w a y
E d g e o f s h o u ld e r
Finish ground line rectangle enclosing all the signs.
- Multiple sign installations: X and Y are the dimensions of a dimensions of the signs.
- Single sign, or back to back signs: X and Y are the overall
For the purpose of post selection X and Y are as follows:
longest post.
Z is the height from ground line to mid-height of sign at the conditions. See Wood Post Selection Table below.
D is the minimum post embedment depth for average soil fit field conditions.
indicate overall post length. Select post lengths to 4 thru H1H is vulnerable to being struck when placed outside the clear zone.
Traffic barrier protection is required for all posts larger than
CL post
Backfill material
W
0.15X0.35X0.35X0.15X ty p
Z
.5
Y
H
H
H
V Y
Backfill material
W
0.125X0.25X0.25X0.25X0.125X
.5
Y Z
H
H
H
H ty p
D
V Y
V Y
H
Z ty p
D
Same post size
Same post size
Bottom of sign
Long side of post single post installations of post. Omit notch for
Saw cut notch full width
H
Same post size
Backfill material
(See Post Selection table)
Notch depth (where required)
W
Backfill material
.5
Y
Z ty p
D
V Y
H
.5
Y
0.2X0.6X0.2X
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
For all retroflectorized signs where W > 25'
22 ft (max.)
X=14 ft (min.) to maximum
X=5 ft to 12 ft (max.)
X=4 ft (min.)
18 ft (max.)
X=10 ft (min.) to
" outside dia.) 4 1(1 oversized washer
" nonmetallic16
" oversized washer16 5" lock nut16
" bolt16
" bolt thru the post8
6" x 8" when located within the clear zone or if the post
NOTE:
all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum all around (typ.)
3" minimum
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
W13-1P
(optional)
W13-1P
(optional) xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
635-1
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.5
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c p w w o r k d d e n a n e .d g n e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
G20-2
G20-2
G20-2
G20-1
See Note 11
G20-1
See Note 11
M in o r R o a d
M a jo r R o a d
W20-1
See Note 10
W20-1
See Note 10
W20-1 over
W16-8P
See Note 9
W20-1 over
W16-8P
See Note 9
W20-1
Ro ad N am e
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
W20-1
See Note 10
W20-1
See Note 10
G20-2
Erect all project advance warning signs before starting construction work.
Not all details shown on the temporary traffic control sheets may be applicable to this project. The Contractor may add or delete information and details in this traffic control plan as necessary to accommodate actual operations.
Where advance warning signs, placed as shown, interfere with permanent signs, locate the warning signs as determined by the CO for best results. Vary messages as required.
Additional or different message signs may be required to fit the actual construction conditions.
Install advisory speed plates under the W20 series warning signs as needed to indicate a maximum recommended speed through the construction area.
Ensure all sign supports exposed to impact by traffic meet the requirements of
NCHRP-350 or MASH for crashworthiness.
Maintain two-way traffic during all non-work hours except as approved by the CO.
Do not store traffic control devices along the roadway when not in use. Cover post-mounted signs when not applicable.
If W20-1 is placed on a roadway other than that on which the actual construction work occurs, include a supplementary plaque indicating the name of the road on which the construction does occur (applies to major roads only).
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify the distance to the work area in feet or in miles. Install an additional W20-1 each end of the project. Show the distance on the G20-1 sign to the nearest whole mile.
If signing on a roadway under a jurisdiction other than the client agency, verify that an encroachment permit has been obtained.
State standards may be used as an alternative if approved by the CO.
Refer to the Section 635 of the Special Contract Requirements for allowable retroreflective sheeting types.
A
B
C
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
as d et er m in ed b y th e
CO
W or k zo ne A re a of In flu en ce
Pr oj ec t L im its
A
A
(S ee S ig n
Sp ac in g
Ta bl e)
ADVANCE
W
ARNI
NG
AREA
A
A
NPS Drwg. No. 184/80,299
NPS PMIS No. 148115A
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1
NOTE:
LENGTH AND SPACING TABLE
APPROACH
SPEED*
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
* Approach speed based on the regulatory posted speed, not the advisory speed.
BUFFER SPACE
LENGTH
Expressway / Freeway
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
635-5
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
MPH
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.6
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c p w w o r k d d e n a n f.
d g n e b r u a r y
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
Traffic flow
Traffic flow
Signs are shown for one direction of travel only. Place devices similar to those depicted for the opposite direction of travel.
Final location and spacing of signs and devices may be changed to fit field conditions as approved by the CO.
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign at a conspicuous location on the rear of vehicle. Prominently display the name of the Contractor on the pilot car.
If closure is completely within the project limits, eliminate the "ROAD
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
For night time flagging operation, provide floodlighting at flagger stations.
Do not allow equipment, materials, or vehicles to be parked or stored in the buffer space.
(See Length and
Spacing Table)
1.
2.
3.
4.
5.
6.
(See Length and
Spacing Table)
WORK SPACE
G20-2
See Note 4
W20-1
See Note 4
W3-4
W16-2P
(optional)
W20-7
BUFFER SPACE
NOTE:
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
A
Flagger location
Flagger location
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2015
REVISED:
635-13
(WITH TEMPORARY BARRIER)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STATE PROJECT
NUMBER
SHEET
G.7
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
NPS DENA 10(46) AK
U S
C c p w w o r k d d…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.