660-20-102 ELEC DIST P1 DRAWINGS.pdf
PDF 11 MB Posted
- Attached to
- Z2DA--T2_Electrical Distribution Phase 1 (660-20-102)_(VA-22-00047012) Federal contract opportunity
- Solicitation number
- 36C25922R0084
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs. The solicitation number is 36C25922R0084 and seeks proposals for the Electrical Distribution Phase 1 project (660-20-102) through the Veterans Integrated Service Network 19. Offerors should provide their responses by the date listed in the Attachments document. The opportunity is for electrical distribution design drawings to support upgrades at a VA medical center. Proposals should include pricing and schedules to complete the required drawings by the stated deadline. Veterans preference and SDVOSB/VOSB set-aside provisions may apply to any resulting award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Meeting Doc.docx | DOCX document | |
| Site Visit Attendance.pdf | ||
| 36C25922R0084 0001.docx | DOCX document | |
| 36C25922R0084_1.docx | DOCX document | |
| 660-20-102 ELEC DIST P1 SPECS.pdf | ||
| Wage Determination UT20220085.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CU
K is te rs
S tr ee t
Kisters Street
W ah le n
W ay
Baker Street
Hall Street
Bennion Blvd.
DRAIN DRAIN
VENT
Va ld ez D riv e
E
D
C
B
A
H
En try
Sec on d L ev el
Entry
First Level
Hos pit al Main
E ntr y
Em er ge nc y E ntr an ce
PARKING
STRUCTURE
T2 T1
A
PH
G
E
FH
D
RI
VE
RENDERED IMAGEAREA OF WORK SHEET INDEX
GEORGE E WAHLEN VA MEDICAL CENTER
SALT LAKE CITY, UT
VAMC PROJECT #: 660-20-102
ELECTRICAL DISTRIBUTION PHASE 1
TRUE
NORTH
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
09/01/2021 RA GH
GI001
N/A
COVER SHEET
B. 27 PROJECT LOCATION
B. 14 PROJECT LOCATION
PROJECT
NORTH
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
09/01/2021 RA GH
GI002
N/A
APPLICABLE CODE CHECKLISTS
Attachment C - Construction Safety Risk Assessment Checklist
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%Project Manager: Ryan Ung
Identify Hazards
**Hazardous Waste/Storage
**Chemical Use/ PPE
Evaluator
RU
Is Hazard Likely?
H-M-L
L
Severity H-M-L
L
Mitigation Needed?
Y/N
N
RU L M Y
Users/operators must read the SDS' associated with their products and use PPE accordingly.
• Review Safety Data Sheets prior to starting work and whenever new products are introduced into the area.
Hazard Communication
Respiratory Protection
RU M M Y • Maintain copies on site.
• Ensure all containers are properly labeled with approved GHS labels.
RU L L N
• Minimum requirement are safety glasses and safety boots.
• Hard hat when exposed to any Overhead Hazards
Personal Protective Equipment RU M M Y • Other PPE shall be required based on the Job Hazard Analysis (JSA).
• Wear proper footwear and keep them clean to reduce the potential slipping hazards such as dirt, saw dust, oil, and grease.
• Establish fire extinguisher locations within job site for easy access.
Fire Protection RU M M Y
• Review location with area walk through.
• Maintain housekeeping to prevent accumulation of combustible material.
• Maintain fire and smoke barriers.
• All personnel shall wear VA badges.
• Install and maintain controlled access as appropriate. (i.e. fencing, doors, gates)
Traffic Control & Site Security RU M M Y
• Motorized equipment should have a ground guide while traversing parking lots and roads on campus.
• Ground guides shall have high visibility clothing on.
• Worksite access to remain locked when there is no activity.
• Restrict access to construction crew only.
Wire Rope and Rigging Equipment
RU L L N
• Proper ARC Flash rated PPE to worn when conducting electrical work.
• All PPE to be inspected prior to commencing work.
• See Hazard Communication below for chemical use requirements.
• See Personal Protective Equipment below for general requirements.
• Provide list of chemicals to Safety/GEMS and upload current SDSs via 3EProtect (formerly 3EOnline) ten days in advance for approval.
• Notify when uploaded.
Mitigation Strategies Mitigation Strategies
Implemented?
Comments
Project Name: Electrical Distribution Phase 1
Project Number: 660-20-102
Date: 7/8/2021
660-20-102 Electrical Distribution Phase 1 CSRA 1 of 6
Attachment C - Construction Safety Risk Assessment Checklist
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%Project Manager: Ryan Ung
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
• Dust control during all interior demolition.
Demolition/ **Recycling
RU M M Y
• Use PPE at all times.
• Stay clear of falling objects.
• Remove debris as generated.
• Document amount of materials recycled.
• Inspect tools prior to use.
Hand and Power Tools
RU M M Y
• Only double insulated or neutrally grounded tools can be used.
• Properly store tools when not in use.
• All guards to be in place and in good condition.
• Develop, communicate, and follow a written plan before performing electrical work to maximize safety.
• Persons conducting electrical work should have the knowledge, skills and abilities necessary to perform the task.
• Ensure all electrical circuits and circuit breakers are identified properly before troubleshooting or performing electrical work.
Electrical RU H H Y • Identify hazards and establish safety limits of approach.
• All work shall comply with NFPA 70 most recent edition.
• Verify code compliance prior to energizing.
• Inspect electrical cords before use.
• Do not use cords with damaged insulation or daisy chain them. Use GFCI's.
• Open circuit breaker that supplies power.
• Open visual disconnects.
Lockout / Tagout Electrical
RU H H Y
• Lock-out and tag-out visual disconnect yourself and NEVER rely on someone to do this for you.
• VA first lock on/last lock off.
• Follow Engineering LO/TO SOP.
• Include Operations & Maintenance Electricians in LO/TO plans.
Lockout / Tagout Med Gas or Oxygen
Lockout / Tagout Other Systems (Specify)
RU L L N
RU H H Y
• VA first lock on/last lock off.
• Follow Engineering LO/TO SOP.
• Include Operations & Maintenance in LO/TO plans.
660-20-102 Electrical Distribution Phase 1 CSRA
Please refer to SLC VAMC Engineering Services SOP #91 for approved lockout tagout procedures
Please refer to SLC VAMC Engineering Services SOP #91 for approved lockout tagout procedures
• Wear properly rated and well maintained PPE.
• Adhere to all ARC Flash requirements and NO ENGERGIZED work is authorized without approved permit.
Any debris contaminated with asbestos must be disposed of as regulated waste and can NOT be recycled.
Mitigation Strategies
Implemented?
Comments
Project Name: Electrical Distribution Phase 1
Project Number: 660-20-102
Date: 7/8/2021
Attachment C - Construction Safety Risk Assessment Checklist
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%Project Manager: Ryan Ung
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
• Hot Work Permits required daily for any work to include cutting, welding, brazing, soldering, thawing pipe, grinding, or other spark or flame producing operations.
Welding and Cutting RU M M Y • Any process that involves an open flames used temporarily for repair or temporary heating is considered a hot work operation.
• The use of a portable engine for temporary power is also considered a hot work operation.
Confined Spaces
Tunnels and Shafts Process Safety Management
RU
RU
N/A
H
L
N/A
H
L
N/A
Y
N
N/A N/A
• Submit lift plan to Safety for approval 14 days prior to performing the lift.
Cranes and Hoists RU H H Y • Isolate the area.
• Personnel in the vicinity shall wear high visibility vests, safety glasses and hard hats as a minimum.
Steel Erection Fall Protection Scaffolds
RU
RU
RU
L L L
L L L
N N N
• Inspect before use.
• Do not use the top two steps on a ladder.
• Cracked frames, missing feet or bent rungs will not be allowed on any ladders.
• Use ladder only on stable and level surfaces.
Ladders RU M M Y • Keep ladders free of any slippery materials on the steps.
• Always face the ladder and maintain three points of contact when climbing or descending.
• Do not carry items or supplies when climbing or descending a ladder.
• Use a cord or rope to life or lower supplies or tools.
N/A N/A
Evaluate spaces before entry for permit requirements.
Please refer to SLC VAMC Engineering Services SOP #90 for approved hot work procedures.
Mitigation Strategies
Implemented?
Comments
Project Name: Electrical Distribution Phase 1
Project Number: 660-20-102
Date: 7/8/2021
660-20-102 Electrical Distribution Phase 1 CSRA 3 of 6
Attachment C - Construction Safety Risk Assessment Checklist
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%Project Manager: Ryan Ung
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
• Obtain permit prior to excavating deeper than 15 inches.
• Protect openings near travel ways by installing railings, barriers, or covers.
• Ensure covers or railings protecting temporary access openings are secured in place at all times when an opening is not being used.
Trenching and Excavation/
** SWPPP
RU H H Y
• Provide readily visible warnings signs that clearly display the nature of the hazard and any protective action required.
• Train all persons to recognize adverse conditions and environmental factors that can decrease stability.
• Examine walls and spoils piles from as many perspectives as possible (bottom, sides, and top/crest).
• Look for cracking, displacement, or other signs of distress.
• Operate all mobile equipment at speeds that are consistent with the type of equipment, roadway conditions, grades, clearances, visibility, and other traffic.
Motor Vehicles, Earthmoving, and Mechanized Equip
RU M M Y
• Travel at safe speeds so that mobile equipment can be stopped within the limits of visibility.
• Vehicles shall be inspected daily before each use.
• Ensure that all persons are clear before moving equipment.
• High visibility vests required when working around motorized vehicles.
• Handheld power saws with any blade diameter must be equipped with an integrated water delivery system that continuously feeds water to the blade.
• Jackhammers and handheld powered chipping tools must be operated using either a water delivery system or a tool equipped with a shroud and vacuum dust collection system.
Concrete and Masonry RU M M Y
• Respiratory protection required with a minimum assigned protection factor (APF) of ten.
• Handheld grinders must be equipped with a shroud and dust collection system in compliance with OSHA's Respirable Crystalline Silica standard for Construction.
• Use Eco Pans for collection of concrete washout materials.
• Ensure the use of PPE.
Mitigation Strategies
Implemented?
Comments
Project Name: Electrical Distribution Phase 1
Project Number: 660-20-102
Date: 7/8/2021
660-20-102 Electrical Distribution Phase 1 CSRA 4 of 6
Attachment C - Construction Safety Risk Assessment Checklist
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%Project Manager: Ryan Ung
Identify Hazards Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
• A pre-construction survey for Asbestos is required that tests all building materials that will be disturbed during project work.
Lead, Asbestos, and Silica RU L L N
• If Asbestos is identified appropriate work practices and plans are to be coordinated with the Asbestos Program Coordinator in advance.
• Concrete dust to be kept to a minimum.
• Prevent dust from becoming airborne.
• Utilize wet methods and approved HEPA vacuums as safely practical.
• Full coordination with COR and • Full coordination with COR and Operations & Maintenance required.
Utility Interruptions RU H H Y
• Notify and coordinate shutdown with all affected services to include VA Police.
• Maintain barriers to control dust.
Dust RU M M Y
• Use particulate filter masks when generating dust.
• Control dusts as needed for excavation work.
Moisture/Water Leaks
Vapors/Fumes/ **Air Emissions
Noise
Vibration
Open Outside Walls
Impact to Levels Above and Below
Proximity of Air Intakes
Tuberculosis Transmission
RU
RU
L
L
L
L
N
N
• Notify tenants in the area before demolition or drilling.
RU M M Y
• Hearing protection required when identified by job hazard analysis.
RU
RU
RU
RU
M
L
M
L
M
L
M
L
Y
N
Y
N
RU L L N N/A
Until such time that the hospital is no longer low-risk for TB transmission per annual TB risk assessment, this will remain unchanged for all projects.
Pest Control within Construction Area
RU M M Y
• Keep area clear of any substances that could attract rodents or other animals.
• Remove debris at the end of each work shift.
** These construction activities have been identified as significant based on potential environmental impacts.
Approval Signatures:
No eating in work areas
Coordinate all activities having an adverse impact on floors above or below project work with COR and affected occupants.
Notify COR and tenants in the area before demolition or drilling.
Mitigation Strategies
Implemented?
Comments
Project Name: Electrical Distribution Phase 1
Project Number: 660-20-102
Date: 7/8/2021
Contact Asbestos Coordinator with any questions or concerns.
660-20-102 Electrical Distribution Phase 1 CSRA 5 of 6
Attachment C - Construction Safety Risk Assessment Checklist
Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System
Hazard Likelihood: High: 76% - 100%
Medium: 51% - 75%
Low: 0% - 50%Project Manager: Ryan Ung
Identify Hazards
Project Manager:
Evaluator Is Hazard Likely?
H-M-L
Severity H-M-L
Mitigation Needed?
Y/N Mitigation Strategies
Mitigation Strategies
Implemented?
Date:
Comments
Project Name: Electrical Distribution Phase 1
Project Number: 660-20-102
Date: 7/8/2021
Contractor: Date:
Safety Manager: Date:
Service / Section / Program Director: Date:
660-20-102 Electrical Distribution Phase 1 CSRA 6 of 6
Attachment A: Interim Life Safety Measures Assessment for Scheduled Construction Activities Directions: 1) Check 'Yes' or 'No' for Construction Life Safety Hazard Items #1 through #4 2) Check Appropriate ILSM for each column Marked as 'Yes'
Project Name and Number:
# 1.
NO
Fire Alarm System impaired.
Construction Life Safety Hazard (#1 thru #4):
NO
Fire Alarm System out of service more than 4 hours in 24 hour period.
ILSMs:
Temporary Fire Alarm and Detection Systems - Provide temporary but equivalent fire alarm and detection systems for use when a fire system is impaired. The organization determines when these systems are needed.
Provide Additional Firefighting Equipment - Provide additional firefighting equipment. The organization determines when to provide this equipment.
Post Signage - Post signage identifying the location of alternative exits to everyone affected.
NO
Sprinkler System out of service more than 10 hours in 24 hour period.
# 2.
NO
Sprinkler System impaired.
# 3.
NO
Egress / Exits Impaired.
# 4.
NO
Separation between construction and non-construction space has been degraded / altered.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Inspect Exits - Inspects exits in affected areas on a daily basis.
The organization determines when these inspections are needed.
Temporary Construction Partition Construction - Use temporary construction partitions that are smoke-tight, or made of noncombustible or limited-combustible material that will not contribute to the development or spread of fire.
The organization determines when to use these partitions.
Fire Watch - Increases surveillance of buildings, grounds, and equipment, giving special attention to construction areas and storage, excavation, and field offices. The organization determines when to increase surveillance.
Reduction Combustible Loads - Enforces storage, housekeeping, and debris-removal practices that reduce the building’s flammable and combustible fire load to the lowest feasible level. The organization determines when these practices are needed.
N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A
Firefighting Equipment Training - Provide additional training to those who work in the organization on the use of firefighting equipment. The organization determines when to provide additional training.
Education - The organization conducts education to promote awareness of building deficiencies, construction hazards, and temporary measures implemented to maintain fire safety. The organization determines when this education is needed.
Situational Awareness Training - The organization trains those who work in the organization to compensate for impaired structural or compartmental fire safety features. The organization determines when this training is needed.
Additional Fire Drill per Quarter - The organization does the following: Conducts one additional fire drill per quarter.
The organization determines when these additional fire drills are needed.
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
N/A N/A N/A N/A
Monthly inspection Temporary Systems - Inspects and tests temporary systems monthly. The completion date of the tests is documented. The organization determines when these inspections and tests are needed.
Fire Department Notification - Notify fire department of system impairment.
Additional Assessment Notes:
Implementation: Which ILSM is being implemented and how? Be descriptive on procedures put in place and departments notified.
Assessment Performed By: Date:
Safety Officer Review:
Chief of Engineering:
Date:
Date:
N/A N/A N/A N/A
N/A N/A N/A N/A
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
09/01/2021 RA GH
GI003
N/A
APPLICABLE CODE CHECKLISTS
CONTINUED
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
DELTA CONNECTION
TRANSFORMER
WYE CONNECTION
PULL BOX
MANHOLE
ELECTRICAL SYMBOLS - DIAGRAM
TRANSFORMER, PLAN
EARTH GROUND
RIGID CONDUIT LINE = RC
SUBSTATION
BUSWAY
DISTRIBUTION PANEL
LIGHTING PANEL
PANELBOARD CABINET, FLUSH MOUNTED
PANELBOARD CABINET, SURFACE MOUNTED
DIRECT BURIAL CABLE = DB
POWER DUCT = P
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
MOLDED CASE CIRCUIT BREAKER
LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
MEDIUM-VOLTAGE OIL CIRCUIT BREAKER
MEDIUM-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
SWITCH AND FUSE UNIT
FUSED DRAWOUT POTENTIAL TRANSFORMER
VARIABLE FREQUENCY DRIVE
GENERATOR, POWER
BATTERY
CAPACITOR
RELAY; LETTER INDICATES RELAY TYPE
50 = INSTANTANEOUS OVERCURRENT OR RATE-OF-RISE
51 = AC-TIME OVERCURRENT
67 = AC-DIRECTIONAL OVERCURRENT
86 = LOCK OUT
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED, VAV
ELECTRICAL SYMBOLS - POWER PLAN
RC
DB
P
VFD
T
S
DP#__
LP
B B
PB
P
GROUNDING BAR
SELECTOR SWITCH
NEUT OR N
NC
NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
P POLE
PA PUBLIC ADDRESS
PB PULL BOX OR PANEL BOARD
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PCB POLYCHLORINATED BIPHENYL
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
REQ REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
SCC SHORT CIRCUIT CAPACITY
SES SERVICE ENTRANCE SECTION
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VA VOLT·AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMCP EMERGENCY MONITORING CONTROL PANEL
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
EPRF EXPLOSION PROOF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXST EXISTING
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FABL FIRE ALARM BELL
FABX FIRE ALARM BOX
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FIXT FIXTURE
FLA FULL LOAD AMPS
FLEX FLEXIBLE METALLIC CONDUIT
FLT FLOODLIGHT
FLUOR FLUORESCENT
FLUOR
FIX
FLUORESCENT FIXTURE
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
G OR GND ELECTRICAL GROUND
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF
NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT AMPERE
KVAH KILOVOLT AMPERE PER HOUR
KVAR KILOVOLT AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KWHM KILOWATT HOUR METER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MG MOTOR GENERATOR
MH MANHOLE
MIN MINIMUM
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT·AMPERE
MW MEGAWATT
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
SINGLE POLE
SINGLE PHASE
TWO-CONDUCTOR
THREE-CONDUCTOR
THREE PHASE
FOUR-CONDUCTOR
FOUR WIRE
A/C UNIT AIR CONDITIONING UNIT
ARCHITECT / ENGINEER
AAP ALARM ANNUNCIATOR PANEL
ALTERNATING CURRENT OR ARMORED
CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJACENT OR ADJOINING
ADO AUTOMATIC DOOR OPENER
AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR AVAILABLE
FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AMPERE·HOUR
AUTHORITY HAVING JURISDICTION
AMPERE INTERRUPTING CAPACITY
ALTERNATE
AMB OR A AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUDIO VISUAL
BAT BATTERY
BARE COPPER
BOARD
BELOW FINISHED FLOOR
BASIC INSULATION LEVEL
BLDG BUILDING
BPIP BOILER PLANT INSTRUMENTATION PANEL
BRKR BREAKER
BYP BYPASS
CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CANDELA OR CONSTRUCTION DOCUMENTS
CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED / CONTRACTOR
INSTALLED
CF/OI CONTRACTOR FURNISHED / OWNER
INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CKT
BRKR
CIRCUIT BREAKER
CURRENT LIMITING FUSE
CLG CEILING
CMU CONCRETE MASONRY UNIT
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
COR CONTRACTING OFFICER REPRESENTATIVE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
COLOR RENDERING INDEX
CURRENT TRANSFORMER
CTV CABLE TELEVISION
COPPER
CU FT CUBIC FEET
CUR CURRENT
DECIBEL
DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR
PNL
DISTRIBUTION PANEL
DMR SW DIMMER SWITCH
DOWN
DPDT DOUBLE POLE, DOUBLE THROW
NORMALLY CLOSED
ELECTRICAL ABBREVIATIONS ELECTRICAL ABBREVIATIONS ELECTRICAL ABBREVIATIONS
A. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES,
CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP
CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE
WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE DEVICE AND
REMOVE WIRING COMPLETELY FROM THE ABANDONED CONDUITS.
B. DISCONNECT AND REMOVE ALL WIRES AND CONDUIT BACK TO THE OVERCURRENT
DEVICE AND RELABEL AS A SPARE. REUSE EXISTING CONDUIT IN COMPLIANCE WITH
NEC.
C. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS
PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
D. REMOVE ALL ACCESSIBLE ABANDONED WIRING OF ALL TYPES, OR CAP AND LABEL IN
JUNCTION BOX FOR RE-USE, IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE.
KEY NOTE.1
NEW LINE TYPE.
EXISTING LINE TYPE.
DEMO LINE TYPE.
ELECTRICAL GENERAL NOTES:
ELECTRICAL GENERAL NOTES - DEMOLITION:
KEY NOTES:
NEW - EXISTING & DEMO LINE TYPES:
A. CONTRACTOR TO FIELD VERIFY DIMENSIONS OF TRANSFORMER ENCLOSURES AND
PADS PRIOR TO START OF WORK. CLEARANCES AND PAD SIZE MUST BE CONSIDERED
WHEN ORDERING NEW EQUIPMENT FOR INSTALLATION. ANY CONFLICTS MUST BE
BROUGHT TO THE ATTENTION OF THE VHA COR PRIOR TO WORK STARTING.
B. ALL WIRING SHALL BE (3)#12 THWN/THHN COPPER 3/4C" UNLESS OTHERWISE NOTED.
C. MINIMUM SIZE CONDUIT SHALL BE 3/4" IN DIAMETER.
D. CORE DRILL AND SAW CUT, AS REQUIRED, FOR FLOOR AND WALL PENETRATIONS. SEAL
REMAINING ANULUS WITH FIRE CAULK.
E. FURNISH ACCESS DOORS FOR INSTALLATION BY GENERAL CONTRACTOR IN WALLS
AND CEILINGS WHERE ACCESS IS REQUIRED TO CONCEALED ELECTRICAL BOXES AND
DEVICES.
F. PROVIDE ALL ELECTRICAL WORK IN ACCORDANCE WITH THE CURRENT NATIONAL
ELECTRICAL CODE AND THE REQUIREMENTS OF THE LOCAL AUTHORITY HAVING
JURISDICTION AS OUTLINED IN SPEC SECTION 26 05 11.
G. COORDINATE ALL OUTAGES WITH VHA COR PER SPECS PRIOR TO WORK BEING DONE.
DEMO HATCH.
REFERENCE SPECIFICATION: SECTION 13 05 41
SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS
SEISMIC DESIGN DATA FOR ANALYSIS AND DESIGN:
H-18-8 SEISMICITY = HIGH
SEISMIC RISK CATEGORY BASED UPON CRITICAL OCCUPANCY = IV
COMPONENT IMPORTANCE FACTORS:
IP=1.0 FOR NON-ESSENTIAL COMPONENTS NOT REQUIRED FOR CONTINUED OPERATION OR IF ITS
FAILURE WILL NOT IMPAIR THE CONTINUED OPERATION OF THE FACILITY
IP=1.5 FOR LIFE SAFETY AND DESIGNATED SEISMIC SYSTEMS (DSS) AND PERMANENT
EQUIPMENT AND COMPONENTS REQUIRING SPECIAL SEISMIC CERTIFICATION PER H-18-8
FOR MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS AND DESIGN SPECTRAL
RESPONSE ACCELERATION PARAMETERS: SEE GENERAL STRUCTURAL NOTES AND DESIGN
CRITERIA AS SPECIFIED ON DRAWING NUMBER S-000.
SITE CLASS = C (PER GEOTECHNICAL REPORT)
SEISMIC DESIGN CATEGORY (SDC) = D
NONSTRUCTURAL SEISMIC EXCEPTIONS AND EXEMPTIONS SHALL BE DETERMINED IN ACCORDANCE
WITH H-18-8 AND CHAPTER 13 OF ASCE 7 FOR SDC = D
H-18-8 EQUIPMENT AND COMPONENTS SPECIAL SEISMIC CERTIFICATION (SSC) REQUIREMENT:
IN STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORY C, D, E, OR F, PERMANENT EQUIPMENT
AND COMPONENTS ARE TO HAVE SPECIAL SEISMIC CERTIFICATION IN ACCORDANCE WITH
REQUIREMENTS OF SECTION 13.2.2 OF ASCE 7 EXCEPT FOR EQUIPMENT AND COMPONENTS THAT ARE CONSIDERED RUGGED AS LISTED IN SECTION 2.2 OF OSHPD CODE APPLICATION NOTICE CAN
NO. 2-1708A.5, AND SHALL COMPLY WITH SECTION 13.2.6 OF ASCE 7.
CLARIFICATION OF ASCE 7 "12 INCH RULE" SUSPENDED SEISMIC BRACING CODE EXCEPTION FOR
PIPING AND HVAC DUCTWORK:
ALL PIPING OR DUCTWORK SUSPENDED BY INDIVIDUAL HANGER RODS 12" OR LESS AS MEASURED
FROM THE TOP OF THE PIPING OR DUCTWORK TO THE BOTTOM OF THE SUPPORT WHERE THE
HANGER IS ATTACHED. IF THE 12" LIMIT IS EXCEEDED BY ANY HANGER IN THE RUN, SEISMIC
BRACING IS REQUIRED FOR THE RUN. A SINGLE SUPPORT LOCATION THAT MEETS THE
REQUIREMENT OF THIS EXCEPTION DOES NOT CONSTITUTE A SEISMIC SWAY BRACE LOCATION.
IN ADDITION, TO MEET THE CODE REQUIREMENTS, ALL OF THE FOLLOWING CONDITIONS MUST ALSO
BE SATISFIED:
1. LATERAL MOTION OF PIPING OR DUCTWORK WILL NOT CAUSE DAMAGING IMPACT WITH
SURROUNDING SYSTEMS (E.G. OTHER CONDUIT, TRAY, PIPE, DUCT, EQUIPMENT, SPRINKLER
HEADS ETC.) OR CAUSE LOSS OF SYSTEM VERTICAL SUPPORT.
2. PIPING OR DUCTWORK MUST BE MADE OF DUCTILE MATERIAL WITH DUCTILE CONNECTIONS.
3. VERTICAL SUPPORT CONNECTIONS CANNOT DEVELOP MOMENTS (E.G. SWIVEL JOINTS, EYE
BOLTS, VIBRATION ISOLATION HANGERS, ETC.)
ELECTRICAL EQUIPMENT AND DISTRIBUTION SYSTEM
(RACEWAYS) 2015 IBC AND ASCE 7-10 NONSTRUCTURAL
SEISMIC RESTRAINT, BRACING AND ANCHORAGE NOTES:
VHA VETERANS HEALTH ADMINISTRATION
TX TRANSFORMER
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
EC ELECTRICAL CONTRACTOR / ELECTRICAL CONDUIT
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
09/01/2021 RA GH
E-001
ELECTRICAL NOTES, SYMBOLS &
ABBREVIATIONS
A. REFER TO SHEET E-001 FOR ABBREVIATIONS, SYMBOLS, AND NOTES.
B. CONTRACTOR SHALL RECONNECT TRANSFORMER GROUNDING
ELECTRODE AND INTERSYSTEM GROUNDING.
C. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND
CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING
CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE VHA COR.
D. PROJECT INTENT IS TO REMOVE EXISTING PRIMARY CONDUCTORS,
SECONDARY CONDUCTORS, AND TRANSFORMERS. NEW TRANSFORMERS
WILL BE SUBSTATION TYPE 7.2/12.47KV - 480/277V 1000/1150FA KVA . NEW
PAD/SKIDS AND GROUNDING WILL BE INSTALLED. NEW REMOVABLE-TYPE
BOLLARDS WILL BE PROVIDED FOR TRANSFORMER PROTECTION. TWO
PRIMARY FEEDS WILL BE FROM EXISTING C AND D SWITCHES WITH NEW
DUCTBANK INSTALLED TO NEW TRANSFORMER LOCATION. C AND D FEED
WILL BE PROVIDED TO EACH TRANSFORMER WITH A LOAD-BREAK SWITCH
TO ALLOW EACH TRANSFORMER TO BE FED FROM EITHER C OR D FEED.
THE SECONDARY OF EACH TRANSFORMER WILL BE CONNECTED TO A NEW
1600 AMP EXTERIOR BUS THAT WILL RUN ALONG THE PERIMETER
RETAINING WALL ALONG THE TOP OF THE WALL AND THEN DOWN TO THE
EXISTING TRANSFORMER LOCATION. AT THIS POINT THE BUS WILL BE
CONNECTED TO NEW WIRE AND FED INTO THE BUILDING USING EXISTING
CONDUIT. NEW SERVICE DISCONNECTS AND NEW SWITCHBOARDS WILL BE
INSTALLED INSIDE REPLACING EXISTING.
1. INSTALL NEW 2/0 SHIELDED XLPE WITH 4/0 GROUND FROM C AND D
SWITCHES TO NEW TRANSFORMER. EACH TRANSFORMER WILL HAVE A C
AND D FEED.
2. NEW 7.2/12.47KV-480/277V1000/1150FA KVA TRANSFORMER WITH FORCED
AIR TO INCLUDE GROUNDING AND A DUAL PRIMARY FEED WITH
SWITCHING CAPABILITY. PROVIDE MINIMUM CLEARANCES FROM WALL AT
3 FEET AND ALSO 3 FEET BETWEEN TRANSFORMERS. ENTRY TO
COMPARTMENTS WILL REQUIRE 4 FEET.
3. RELOCATE EXTERIOR LIGHT AND CONDUIT, AS NECESSARY FOR
INSTALLATION OF NEW TRANSFORMER PRIMARY FEED.
4. PROVIDE ONE 1600A BUSWAY TO NEW JBOX FROM EACH TRANSFORMER,
TOTAL OF TWO. ROUTE BUSWAY AS SHOWN, TAKING CARE TO AVOID
INTERRUPTING EXISTING SERVICES. REFERENCE E-502 FOR ADDITIONAL
INFORMATION. TRANSITION SHALL BE LOCATED AT NEW JUNCTION
LOCATED AT PREVIOUS TRANSFORMER PADS. 1600A BUSWAY WILL
TRANSITION INTO BUILDING VIA 4(4#350MCM & 3/0G) IN EXISTING 4"
CONDUITS.
5. EXISTING 15 KV SWITCHES TO REMAIN; LABEL AS SPARE. REMOVE
INDICATIONS OF 14-N AND 14-S FEED.
AND INTERIOR DRAWING
North Plan
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
ELECTRICAL SITE PLAN
BUILDINGS 14 & 42
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
00KEYNOTES
GENERAL NOTES
09/01/2021 RA GH
ES101
14 & 42
ELECTRICAL SITE PLAN -
BUILDINGS 14 & 42
4" CONDUIT TO BE CUT AND
CAPPED AT GROUND LEVEL
OF EXTERIOR OF BUILDING.
REMOVE ALL CONDUCTORS
AND CONDUIT FROM
EXISTING SWITCHES.
RETAIN EXTERIOR JUNCTION
BOX.
EXISTING
SWITCHGEAR FOR
14-NORTH AND
14-SOUTH
EXISTING SWITCH C11
NEW REMOVABLE
BOLLARDS (TYP)
54" ON CENTER
NEW SUBSTATION TYPE 1000/1150FA KVA TRANSFORMERS
WITH SIDE ENTRY AND EXIT PRIMARY AND SECONDARY.
PROVIDE GROUNDING PER CODE
NEW 1600 AMP BUSDUCT SECONDARY
FROM EACH TRANSFORMERREPLACE (4) 4#350kCMIL, #3/0 G, RE-USE EXISTING 4" CONDUIT
INSTALL NEW JUNCTION BOX . TRANSITION 1600A BUS DUCT TO
NEW (4) 4#500kCMIL, #4/0 G, 4" EXISTING CONDUIT
SEE DETAIL
NEW DUCTBANK
SAWCUT ROAD AND SIDEWALK, EXCAVATE FOR NEW
DUCBANK, CONCRETE ENCASE, AND REPAIR PER
DETAIL.
C AND D FEED FOR EACH TRANSFORMER
(3#2/0 XLPE & 1#2G)4"C PER LOOP FEED.
TWO PRIMARY FEEDS
(C AND D) TO NEW
TRANSFORMERS
PRIMARY CONNECTIONS.
EXISTING SWITCH D11NEW TRANSFORMER
14-NORTH
NEW TRANSFORMER
14-SOUTH
Baker Street
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
ELECTRICAL SITE PLAN
BUILDINGS 27 & 40
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
00KEYNOTES
GENERAL NOTES
09/01/2021 RA GH
ES102
27 & 40
ELECTRICAL SITE PLAN -
BUILDINGS 27 & 40
1. REPLACE EXISTING 2500 KVA TRANSFORMER WITH NEW 2500 KVA
TRANSFORMER. EXTEND 15'X7' CONCRETE PAD AS NEEDED TO
ACCOMMODATE NEW EQUIPMENT. REPLACE EXISTING SECONDARY 12"X6"
BUS DUCT FEEDING B27 EQUIPMENT WITH NEW. NOTE THAT NEW
TRANSFORMER TO HAVE A SWITCH TO SELECT C OR D FEEDER AND CROSS
CONNECTED TO 500 KVA TRANSFORMER. ALSO, NOTE COMPARTMENTS
FOR BUS DUCT, SWITCHES, ETC. NOTE SIDE EXIT FOR BUS AND BOTTOM
FEED FOR PRIMARY INTO COMPARTMENT.
2. REPLACE EXISTING 500 KVA TRANSFORMER WITH NEW. EXTEND PAD AS
REQUIRED BY TRANSFORMER MANUFACTURER. REPLACE EXISTING
SECONDARY 2(4#350MCM & #2/0G) IN EXISTING CONDUIT. NOTE PAD
MOUNTED WITH INTERNAL C AND D SWITCH WITH CROSS CONNECT TO
ALLOW EITHER C OR D CONNECTION.
3. REPLACE EXISTING MCCS IN BUILDING 27. REFER TO EP103 FOR
ADDITIONAL INFORMATION.
4. PROVIDE NEW CONCRETE-ENCASED DUCTBANK FROM SWITCH TO
MANHOLE TO ACCOMMODATE NEW C/D LOOP FEED. REFER TO SHEET E-501
TO FOR DETAILS.
5. PROVIDE NEW (2/0 SHIELDED XLPE & #2G) CROSS CONNECTION IN NEW
CONDUIT OR WIREWAY BETWEEN TRANSFORMERS. TAP "D FEED" FROM
2500KVA TX AND FEED SWITCHED ALTERNATE OF 500KVA TX. PROVIDE
SIMILAR "C FEED" FROM 500KVATX TO 2500KVA TX. USER SHALL BE ABE TO
SWITCH PRIMARY SOURCE OF TRANSFORMER AT UNIT. REFER TO SHEET
E-501 TO FOR DETAILS.
6. PROVIDE NEW CONDUCTORS FROM SWITCHES 'C08' AND 'D08' IN NEW
DUCTBANK. FROM MANHOLE #10, C AN D CONDUCTORS SHALL USE
EXISTING ROUTING TO RE-FEED EXISTING 15KV SWITCHES PREVIOUSLY
SERVED BY 'A' AND 'B' CONDUCTORS. A AND B CONDUCTORS TO BE
REMOVED PRIOR TO INSTALLING NEW C AND D CONDUCTORS.
7. TERMINATE AND LOOP 'A' AND 'B' SERVICE CONDUCTORS IN MANHOLE. NO
LONGER IN SERVICE FOR BUILDING 27 TRANSFORMERS.
8. RE-USE EXISTING DUCTBANK FEED TO 15KV SWITCHES WITH NEW C/D LOOP
FROM SWITCHES C08 AND D08.
9. USE EXISTING DUCTBANK TO PROVIDE NEW PRIMARY TRANSFORMER
CONDUCTORS FROM EXISTING 15KV SWITCHES.
10. PROVIDE MANHOLE INFLOW PROTECTION COVER FOR EXISTING MANHOLE
TO PROTECT AGAINST FLOODING.
3 NEW (2/0 XLPE & #2G) IN EXISTING CONDUIT
A. REFER TO SHEETS E-001 FOR ABBREVIATIONS, SYMBOLS, AND NOTES.
B. CONTRACTOR SHALL RECONNECT TRANSFORMER GROUNDING
ELECTRODE AND INTERSYSTEM GROUNDING.
C. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND
CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING
CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE VHA COR.
D. PROJECT INTENT IS TO REFEED EXISTING 15 KV SWITCHES FROM EXISTING
A/B LOOP TO C/D LOOP UTILIZING EXISTING EXTERIOR SWITCHES (C08 &
D08) AND ROUTING (AS MUCH AS POSSIBLE). NEW DUCT BANK FROM
SWITCHES TO NEARBY MANHOLE 10 WILL BE REQUIRED TO INTERCEPT
EXISTING CONDUIT ROUTE. CONTRACTOR SHALL REPLACE ALL MCCS,
TRANSFORMERS, CONDUCTOR, AND BUS DUCT AS SHOWN FOR BUILDING
27.
CONTRACTOR SHALL PROVIDE A SINGLE FEED FROM EXTERIOR SWITCHES,
THROUGH INTERIOR 15KV SWITCHES, TO TRANSFORMER. ALTERNATE
FEED WILL SOURCE FROM TRANSFORMER PRIMARY AND CROSS FEED
INTO INTEGRAL TRANSFORMER SWITCH THAT ALLOWS FOR LOAD-BREAK
SWITCHING. THIS DIFFERS FROM BUILDING 14 WORK, WHICH PROVIDES
TWO PRIMARY FEEDS FROM SWITCHES TO EXTERNAL TRANSFORMER
LOAD-BREAK SWITCH.
TX 27
2500KVA
7.2/12.47KV - 480/277V
TX 27
500KVA
7.2/12.47KV - 480/277V
3000A BUSDUCT FEED
FROM TX TO SWBD
"D LOOP" SWITCH D08
"C LOOP" SWITCH C08
MANHOLE #10
MANHOLE #11
68 8
'C' LOOP CONDUCTORS
(2/0XLPE & #2G) IN EXISTING CONDUIT
'D' LOOP CONDUCTORS
(2/0XLPE & #2G) IN EXISTING CONDUIT
EXISTING 15KV SWITCHES
TO BE RE-USED
North Plan
MCC-27
MCC-B1
MCC-B2
MCC-B2EM
NEW 2(350MCM & 2/0G) IN EXISTING 4"C
TX 14-NORTH
1000 kVA 12.47kV - 480V 5.75%
(3#2/0XLPE & #2G)4"C
14-NORTH
SERVICE
DISCONNECT
4(4#350MCM & #3/0G)4"C
1600A
M1A
1600A SWBD
1000A
M1B
1600A SWBD
100A
1600A
14-B-C-E-ATS1/
EATS-14
150A
TVSS
125A
14-2-B-N-P1/
2AA
150A
BAH
100A
14-1-B-N-P3/
IWW
100A
14-1-B-N-P4/
IYY
150A
14-B-D-N-P1
100A
14-B-A-N-P1/
BMH
225A
IAA
100A
14-B-A-N-P3/
BMHA
1600A
TO 14-SOUTH
SERVICE DISCONNECT
TIE BREAK
1600A BUS
1600A BUS
4(4#350MCM & 3/0G)4"C
TO FIRE PUMPS
(3#4 & #3G)EXISTING"C
TX 14-SOUTH
1000 kVA 12.47kV - 480V 5.75%
14-SOUTH
SERVICE
DISCONNECT
1600A
M2C
1600A SWBD
1200A/ 1000A
M2A
1600A SWBD
M2B
1600A SWBD
(3#2/0XLPE & #2G)4"C
100A
4(4#350MCM & #3/0G)4"C
150A/ 100A
SPARE
150A/ 125A
SPARE
225A
GZZ
SPARE
14-3-B-N-P1/
3ZZ
225A
SPARE
150A
SPARE
400A/ 350A
2ZZ
150A
MCC-1
150A
MCC-4
150A
MCC-2
150A
MCC-5
150A
MCC-3
150A/ 100A
MCC-6
150A
SPARE
125A
SPARE
150A
SPARE
125A
14-B-C-L-ATS1
225A
SPARE
600A
14-B-C-C-ATS1
14-B-C-C-ATS2/
CATS-14
CAPACITOR BANK
1600A
TIE BREAK
TO 14-NORTH
SERVICE DISCONNECT
1200A/ 1000A
1200A/ 1000A
1200A/ 1000A
1600A BUS
1600A BUS
3(4#350MCM & #3/0G)4"C
3(4#350MCM & #3/0G)4"C
150A/ 20A
150A/ 125A
3(4#350MCM & #3/0G)
2(3#500MCM & #3/0G)
TX 14-SOUTH
1000/1150FA kVA 12.47kV - 480V 5.75%
14-SOUTH SERVICE
DISCONNECT
65 kAIC
1600A
M2C
1600A SWBD
35 kAIC 1200A/ 1000A
M2A
1600A SWBD
35 kAIC
M2B
1600A SWBD
35 kAIC
1600 AMP BUS DUCT FROM NEW TRANSFORMER TO LOCATION OF OLD TRANSFORMER, THEN 4(4#500MCM & #4/0G)4"C INTO BUILDING
APPROX. 180' DUCT, TRANSITION TO APPROX. 20' CONDUIT
150A/ 100A
SPARE
150A/ 125A
SPARE
250A
GZZ
150A/ 20A
SPARE
150A/ 125A
14-3-B-N-P1/
3ZZ
225A
SPARE
150A
SPARE
400A/ 350A
2ZZ
150A/ 100A
MCC-1
150A/ 150A
MCC-4
150A/ 100A
MCC-2
150A/ 150A
MCC-5
150A/ 150A
MCC-3
150A/ 100A
MCC-6
150A/ 150A
SPARE
125A/ 125A
SPARE
150A/ 150A
SPARE
225A/ 225A
14-B-C-L-ATS1
225A
SPARE
800A/ 600A
14-B-C-C-ATS1
1600A
TIE BREAK
TO 14-NORTH
SERVICE DISCONNECT
(3#2/0XLPE & #2G)4"C
PRIMARY "D" LOOP FROM SWITCH D11
APPROX. 120'
(3#2/0XLPE & #2G)4"C
ALTERNATE "C" LOOP
FROM SWITCH C11
APPROX. 120'
EXTERNAL SWITCH MOUNTED
TO/ADJACENT TO TRANSFORMER
1200A/ 1000A
1200A/ 1000A
1200A/ 1000A
1600A BUS
1600A BUS
3(4#350MCM & #3/0G)4"C
3(4#350MCM & #3/0G)4"C
100A
14-B-C-C-ATS2/
CATS-14
CAPACITOR BANK
3(4#350MCM & #3/0G)
2(3#500MCM & #3/0G)
19,167A ISC 19,220A ISC
19,664A ISC
TX 14-NORTH
1000/1150FA kVA 12.47kV - 480V 5.75%
(3#2/0XLPE & #2G)4"C
PRIMARY "C" LOOP
FROM SWITCH C11
APPRROX. 120'
14-NORTH SERVICE
DISCONNECT
65 kAIC
1600 AMP BUS DUCT FROM NEW TRANSFORMER TO LOCATION OF OLD TRANSFORMER, THEN 4(4#500MCM & #4/0G)4"C INTO BUILDING
APPROX. 180' DUCT, TRANSITION TO APPROX. 20' CONDUIT
1600A
M1A
1600A SWBD
1000A
M1B
1600A SWBD
1600A
14-B-C-E-ATS1/
EATS-14
150A
TVSS
125A
14-2-B-N-P1/
2AA
150A
BAH
100A
14-1-B-N-P3/
IWW
100A
14-1-B-N-P4/
IYY
150A
14-B-D-N-P1
100A
14-B-A-N-P1/
BMH
225A
IAA
100A
14-B-A-N-P3/
BMHA
1600A
TIE BREAK
TO 14-SOUTH
SERVICE DISCONNECT
(3#2/0XLPE & #2G)4"C
ALTERNATE "D" LOOP
FROM SWITCH D11
APPROX. 120'
1600A BUS
1600A BUS
4(4#350MCM & 3/0G)4"C
100A
TO FIRE PUMPS
(3#4 & #3G)EXISTING"C
19,972A ISC 19,760A ISC
17,324A ISC
20,149A ISC
EXTERNAL SWITCH MOUNTED
TO/ADJACENT TO TRANSFORMER
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
00KEYNOTES
GENERAL NOTES
09/01/2021 RA GH
E-601
14 & 42
ONE-LINE DIAGRAMS - BUILDING 14
1. REPLACE EXISTING 1000 KVA TRANSFORMER WITH 1000/1150FA FORCED AIR
TRANSFORMER TO INCLUDE PRIMARY FEED CONDUCTOR AND GROUNDING,
SECONDARY FEED CONDUCTORS AND GROUND.
2. REPLACE EXISTING SWITCHBOARD AND BREAKERS SERVING EXISTING
LOADS TO REMAIN.
3. EXISTING SWITCHBOARDS M1A AND M1B TO REMAIN. REPLACE BUS FEED AS
SHOWN.
A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.
B. WORK SHALL INCLUDE REPLACEMENT AND RELOCATION OF
TRANSFORMERS, PRIMARY CONDUCTORS AND GROUNDING, SECONDARY
CONDUCTORS AND GROUNDING, EXTENSION OF PADS (AS NEEDED), AND
REPLACEMENT OF SWITCHBOARDS IN B14.
C. CONTRACTOR TO PROVIDE METERING FOR EACH INCOMING SECONDARY
TRANSFORMER FEED. METER MAY BE INTEGRAL COMPONENT TO
SWITCHBOARD OR MCC. CONNECT TO NEAREST JOHNSON CONTROL
BUILDING MANAGEMENT SYSTEM CONTROL PANEL.
D. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND
CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING
CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE VHA COR.
E. CONTRACTOR TO REPLACE ALL SWITCHBOARDS, CONDUCTOR, AND
BREAKER SHOWN EXCEPT M1 AND M1B. M1A MUST BE CONNECTED TO
NEW SERVICE DISCONNECT. FIELD VERIFY CONNECTION.
SCALE: NO SCALE
BUILDING 14 - DEMOLITION WORK
TRANSFORMER 14-NORTH
SCALE: NO SCALE
BUILDING 14 - DEMOLITION WORK
TRANSFORMER 14-SOUTH
SCALE: NO SCALE
BUILDING 14 - NEW WORK
TRANSFORMER 14-SOUTH
SCALE: NO SCALE
BUILDING 14 - NEW WORK
TRANSFORMER 14-NORTH
TX 27
2500 kVA 12.47kV - 480V 6.09%
BUILDING 27
SWITCHBOARD
MCC-B1
3000A BUS
125A/ 30A
125A/ 30A
(3#2/0XLPE & #2/0G)4"C
3000A BUSDUCT
125A/ 80A
COOL
TOWER 1
125A/ 80A
COOL
TOWER 2
PUMP2
PUMP1
1200A/ 1200A
CHILLER
125A/ 25A
CP1
125A/ 100A
CHWP-1
125A/ 80A
CHWP-2
MCC-B2
3000A BUS
1200A 1200A
CWP-1
CWP-2
1200A 600A
CHILLER-2
CAPACITOR BUS
TO ATS-MCC-B2
B40 EMERGENCY FEED
400A
2(4#3/0 & #3G)4"C
FROM BUILDING 40
15KV MAIN SWITCH
3000A
3000A BUSDUCT
3000A BUSDUCT
30A
FILTRATION
SKID
TX 27
500 kVA 12.47kV - 480V 5.3%
27 MAIN
SWITCHBOARD
(3#2/0XLPE & #2/0G)4"C
2(4#350MCM & #2/0G)4"C
150A/ 100A
PANEL 1-A
600A
CHILLER3
100A/ 20A
COOLING TOWER
HEATER
600A 150A/ 100A
SPARE
MCC-27
600A BUS
150A/ 20A
150A
COOL TOWER
COOLING TOWER
150A 150A
CHWP-3
HXCWP-1
150A 150A
HXCWP-1
CWP-3
2(4#350MCM & #1/0G)4"C
FROM BUILDING 40
15KV MAIN SWITCH
800A
TX 27
2500 kVA 12.47kV - 480V 6.09%
BUILDING 27
SWITCHBOARD
3000A
MCC-B1
3000A BUS
100 kAIC 125A/ 30A
125A/ 30A
3000A BUSDUCT
125A/ 80A
COOL
TOWER 1
125A/ 80A
COOL
TOWER 2
PUMP2
PUMP1
1200A/ 1200A
CHILLER
125A/ 25A
CP1
125A/ 100A
CHWP-1
125A/ 80A
CHWP-2
MCC-B2
3000A BUS
65 kAIC 1200A 1200A
CWP-1
CWP-2
1200A 600A
CHILLER-2
CAPACITOR BUS
TO ATS-MCC-B2
B40 EMERGENCY FEED
400A
2(4#3/0 & #3G)4"C
(3#2/0XLPE & #2G)4"C
PRIMARY "D" LOOP
FROM BUILDING 40 SWITCH
APPROX. 20' NEW DUCTBANK
APPROX. 180' EXISTING ROUTE
(3#2/0XLPE & #2G)4"C
ALTERNATE "C" LOOP
FROM TX 27(500KVA)
APPROX. 20' NEW DUCTBANK
APPROX. 180' EXISTING ROUTE
BUILT-IN HIGH VOLTAGE
TRANSFORMER SELECTOR SWITCH
3000A BUSDUCT
3000A BUSDUCT
350A
30A
FILTRATION
SKID
35,979A ISC
35,154A ISC
34,353A ISC
TX 27
500 kVA 12.47kV - 480V 5.3%
27 MAIN
SWITCHBOARD
800A 35 kAIC
800A
2(4#500MCM & #2/0G)4"C
150A/ 100A
PANEL 1-A
600A
CHILLER3
100A/ 20A
COOLING TOWER
HEATER
600A 150A/ 100A
SPARE
MCC-27
600A BUS
25 kAIC 150A/ 20A
150A
COOL TOWER
COOLING TOWER
150A 150A
CHWP-3
HXCWP-1
150A 150A
HXCHWP-1
CHWP-3
2(4#500MCM & #1/0G)4"C
(3#2/0XLPE & #2G)4"C
PRIMARY "C" LOOP
FROM BUILDING 40 SWITCH
APPROX. 20' NEW DUCTBANK
APPROX. 180' EXISTING ROUTE
(3#2/0XLPE & #2G)4"C
ALTERNATE "D" LOOP
FROM TX 27(2500KVA)
APPROX. 20' NEW DUCTBANK
APPROX. 180' EXISTING ROUTE
BUILT-IN HIGH VOLTAGE
TRANSFORMER SELECTOR SWITCH70A
11,048A ISC
10,687A ISC
SCALE: NO SCALE
BUILDING 27 - DEMOLITION
2500KVA TRANSFORMER FEED
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
00KEYNOTES
GENERAL NOTES
09/01/2021 RA GH
E-602
27 & 40
ONE-LINE DIAGRAMS - BUILDINGS
27 & 40
A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.
B. WORK SHALL INCLUDE REPLACEMENT OF TRANSFORMERS, PRIMARY
CONDUCTORS AND GROUNDING, SECONDARY CONDUCTORS AND
GROUNDING, EXTENSION OF PADS, AND REPLACEMENT OF
SWITCHBOARDS AND MOTOR CONTROL CENTERS IN B27.
C. CONTRACTOR TO PROVIDE METERING FOR EACH INCOMING SECONDARY
TRANSFORMER FEED. METER MAY BE INTEGRAL COMPONENT TO
SWITCHBOARD OR MCC.
D. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND
CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING
CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE VHA COR.
E. CONTRACTOR TO REPLACE ALL MCCS, CONDUCTOR, AND BREAKERS
SHOWN.
F. PROVIDE METERING AT TRANSFORMERS AND CONNECT TO NEAREST
JOHNSON CONTROL PANEL.
1. REPLACE 500 KVA TRANSFORMER.
2. REPLACE 2500 KVA TRANSFORMER.
3. REFEED 15KV SWITCH FROM EXTERIOR MV SWITCHES C08 AND D08.
REFER TO ES102 FOR MORE DETAIL.
4. REPLACE ALL MCCs, BREAKERS, AND WIRE/BUS TO MCCs. RE-CONNECT
ALL LOADS AT MCCs.
SCALE: NO SCALE
BUILDING 27 - DEMOLITION
500KVA TRANSFORMER FEED
SCALE: NO SCALE
BUILDING 27 - NEW WORK
500KVA TRANSFORMER FEED
SCALE: NO SCALE
BUILDING 27 - NEW WORK
2500KVA TRANSFORMER FEED
4 4
4 4
4 4
MCC B2-EM
(4#3/0 & #3G)4"C
4(4#3/0 & #3G)4"C
125A/ 50A
COMP1
125A /50A
COMP2
250A/ 225A
PNL EM/A
250A/ 225A
250A/ 225A
SCHWP2
FROM BUILDING 27
MCC-B1
FROM EM PANEL
BUILDING 40
2(4#3/0 & #3G)4"C
ATS-MCC B2
250A/ 175A
SCHWP1 COOLING
TOWER 4
MCC B2-EM
2(4#3/0 & #3G)4"C
2(4#3/0 & #3G)4"C
125A/ 50A
COMP1
125A /50A
COMP2
250A/ 225A
PNL EM/A
250A/ 225A
250A/ 225A
SCHWP2
FROM BUILDING 27
MCC-B1
FROM EM PANEL
BUILDING 40
2(4#3/0 & #3G)4"C
ATS-MCC B2
250A/ 175A
SCHWP1 COOLING
TOWER 4
22,792A ISC
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
00KEYNOTES
GENERAL NOTES
09/01/2021 RA GH
E-603
27 & 40
ONE-LINE DIAGRAMS - BUILDING 27
EMERGENCY
A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.
B. WORK SHALL INCLUDE REPLACEMENT OF TRANSFORMERS, PRIMARY
CONDUCTORS AND GROUNDING, SECONDARY CONDUCTORS AND
GROUNDING, EXTENSION OF PADS, A ND REPLACEMENT OF
SWITCHBOARDS AND MOTOR CONTROL CENTERS IN B27.
C. CONTRACTOR TO PROVIDE METERING FOR EACH INCOMING SECONDARY
TRANSFORMER FEED. METER MAY BE INTEGRAL COMPONENT TO
SWITCHBOARD OR MCC. CONNECT METER TO NEAREST JOHNSON
CONTROL PANEL.
D. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND
CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING
CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE VHA COR.
E. CONTRACTOR TO REPLACE ALL MCCS, CONDUCTOR, AND BREAKERS
SHOWN. CONDUCTOR FROM EM PANEL TO ATS TO REMAIN. ATS TO
REMAIN.
1. REPLACE MCC, FEEDER WIRE, BREAKERS, AND RE-CONNECT ALL
EXISTING LOADS TO NEW MCC BREAKERS.
SCALE: NO SCALE
BUILDING 27 - DEMOLITION
EMERGENCY FEED
SCALE: NO SCALE
BUILDING 27 - NEW WORK
EMERGENCY FEED
M1B M1A
M2B M2AM2C14-NORTH
DISCONNECT
14-SOUTH
DISCONNECT
TIE BREAK
SCALE: NO SCALE
BUILDING 14
SWITCHBOARD ELEVATIONS
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
00KEYNOTES
GENERAL NOTES
09/01/2021 RA GH
E-604
BUILDING 14 - SWITCHBOARD
ELEVATIONS
1. PROVIDE NEW METER ON NEW SWITCH BOARD TO REPLACE EXISTING.
METER SHALL COMMUNICATE WITH EXISTING ADVANCED METER READING
SYSTEM FOR CAMPUS. CONNECT METER TO NEAREST JOHNSON CONTROL
PANEL.
2. FIRE PUMPS POWERED FROM 14-NORTH DISCONNECT BUS.
A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.
B. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND
CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING
CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE VHA COR.
C. SWITCHBOARDS M1A AND M1B TO REMAIN. CONNECT EXISTING M1A AND
M1B TO NEWLY INSTALLED SERVICE DISCONNECTS. REFER TO ONE-LINE
FOR ADDITIONAL INFORMATION.
D. METERS SHALL BE CONNECTED TO JOHNSON CONTROL SYSTEM. RUN
CONDUIT AND CAT6 TO NEAREST JOHNSON CONTROL PANEL.
A
B C D
I H G F
E
J
K
L
M
N
O
P
Q
R
S
T
U V W X Y Z
AA
BB
CC
DD
EE
FF
MCC-B1 SWITCHBOARD MCC-B2 MCC27MCC-B2EM B27 MAIN SWBD
SCALE: 3/8" = 1'-0"
9" 1'-6" 3' 6' 12'0
BUILDING 27
MCC ELEVATIONS
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
660-20-102
VA SALT LAKE CITY, SALT LAKE CITY, UT
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
ELECTRICAL DISTRIBUTION PHASE 1
00KEYNOTES
GENERAL NOTES
09/01/2021 RA GH
E-605
BUILDING 27 - MCC ELEVATIONS
1. PROVIDE NEW METER ON NEW SWITCH BOARD. METER SHALL COMMUNICATE
WITH EXISTING ADVANCED METER READING SYSTEM FOR CAMPUS.
CONNECT METER TO NEAREST JOHNSON CONTROL PANEL.
A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.
B. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND
CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING
CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE
ATTENTION OF THE VHA COR.
A
B
C
D
E
F
G
H
I
J
K
L
M
W
X
YV
U
T P
Q
R
S
N
O
Z
AA
BB
CC
DD
EE
FF
GG
HH
II
JJ
KK
LL
MM
NN
PANEL
M2A
PANEL
M2B
PANEL
M2C
SWITCH
GEAR
14 NORTH
SWITCH
GEAR
14 SOUTH
SWITCH
GEAR
TIE BREAKER
M1B
(NOT IN
SCOPE)
M1A
(NOT IN
SCOPE)
TX 14-N
7.2KV/12.47KV-480V
1,000 KVA
TX 14-S
7.2KV/12.47KV-480V
1,000 KVA
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
BUILDING 14 DEMOLITION PLAN
VEG 21.06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .