660-20-102 ELEC DIST P1 DRAWINGS.pdf

PDF 11 MB Posted

Attached to
Z2DA--T2_Electrical Distribution Phase 1 (660-20-102)_(VA-22-00047012) Federal contract opportunity
Solicitation number
36C25922R0084
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs. The solicitation number is 36C25922R0084 and seeks proposals for the Electrical Distribution Phase 1 project (660-20-102) through the Veterans Integrated Service Network 19. Offerors should provide their responses by the date listed in the Attachments document. The opportunity is for electrical distribution design drawings to support upgrades at a VA medical center. Proposals should include pricing and schedules to complete the required drawings by the stated deadline. Veterans preference and SDVOSB/VOSB set-aside provisions may apply to any resulting award.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--T2_Electrical Distribution Phase 1 (660-20-102)_(VA-22-00047012), newest first.
File Type Posted
Site Visit Meeting Doc.docx DOCX document
Site Visit Attendance.pdf PDF
36C25922R0084 0001.docx DOCX document
36C25922R0084_1.docx DOCX document
660-20-102 ELEC DIST P1 SPECS.pdf PDF
Wage Determination UT20220085.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CU

K is te rs

S tr ee t

Kisters Street

W ah le n

W ay

Baker Street

Hall Street

Bennion Blvd.

DRAIN DRAIN

VENT

Va ld ez D riv e

E

D

C

B

A

H

En try

Sec on d L ev el

Entry

First Level

Hos pit al Main

E ntr y

Em er ge nc y E ntr an ce

PARKING

STRUCTURE

T2 T1

A

PH

G

E

FH

D

RI

VE

RENDERED IMAGEAREA OF WORK SHEET INDEX

GEORGE E WAHLEN VA MEDICAL CENTER

SALT LAKE CITY, UT

VAMC PROJECT #: 660-20-102

ELECTRICAL DISTRIBUTION PHASE 1

TRUE

NORTH

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

09/01/2021 RA GH

GI001

N/A

COVER SHEET

B. 27 PROJECT LOCATION

B. 14 PROJECT LOCATION

PROJECT

NORTH

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

09/01/2021 RA GH

GI002

N/A

APPLICABLE CODE CHECKLISTS

Attachment C - Construction Safety Risk Assessment Checklist

Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System

Hazard Likelihood: High: 76% - 100%

Medium: 51% - 75%

Low: 0% - 50%Project Manager: Ryan Ung

Identify Hazards

**Hazardous Waste/Storage

**Chemical Use/ PPE

Evaluator

RU

Is Hazard Likely?

H-M-L

L

Severity H-M-L

L

Mitigation Needed?

Y/N

N

RU L M Y

Users/operators must read the SDS' associated with their products and use PPE accordingly.

• Review Safety Data Sheets prior to starting work and whenever new products are introduced into the area.

Hazard Communication

Respiratory Protection

RU M M Y • Maintain copies on site.

• Ensure all containers are properly labeled with approved GHS labels.

RU L L N

• Minimum requirement are safety glasses and safety boots.

• Hard hat when exposed to any Overhead Hazards

Personal Protective Equipment RU M M Y • Other PPE shall be required based on the Job Hazard Analysis (JSA).

• Wear proper footwear and keep them clean to reduce the potential slipping hazards such as dirt, saw dust, oil, and grease.

• Establish fire extinguisher locations within job site for easy access.

Fire Protection RU M M Y

• Review location with area walk through.

• Maintain housekeeping to prevent accumulation of combustible material.

• Maintain fire and smoke barriers.

• All personnel shall wear VA badges.

• Install and maintain controlled access as appropriate. (i.e. fencing, doors, gates)

Traffic Control & Site Security RU M M Y

• Motorized equipment should have a ground guide while traversing parking lots and roads on campus.

• Ground guides shall have high visibility clothing on.

• Worksite access to remain locked when there is no activity.

• Restrict access to construction crew only.

Wire Rope and Rigging Equipment

RU L L N

• Proper ARC Flash rated PPE to worn when conducting electrical work.

• All PPE to be inspected prior to commencing work.

• See Hazard Communication below for chemical use requirements.

• See Personal Protective Equipment below for general requirements.

• Provide list of chemicals to Safety/GEMS and upload current SDSs via 3EProtect (formerly 3EOnline) ten days in advance for approval.

• Notify when uploaded.

Mitigation Strategies Mitigation Strategies

Implemented?

Comments

Project Name: Electrical Distribution Phase 1

Project Number: 660-20-102

Date: 7/8/2021

660-20-102 Electrical Distribution Phase 1 CSRA 1 of 6

Attachment C - Construction Safety Risk Assessment Checklist

Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System

Hazard Likelihood: High: 76% - 100%

Medium: 51% - 75%

Low: 0% - 50%Project Manager: Ryan Ung

Identify Hazards Evaluator Is Hazard Likely?

H-M-L

Severity H-M-L

Mitigation Needed?

Y/N Mitigation Strategies

• Dust control during all interior demolition.

Demolition/ **Recycling

RU M M Y

• Use PPE at all times.

• Stay clear of falling objects.

• Remove debris as generated.

• Document amount of materials recycled.

• Inspect tools prior to use.

Hand and Power Tools

RU M M Y

• Only double insulated or neutrally grounded tools can be used.

• Properly store tools when not in use.

• All guards to be in place and in good condition.

• Develop, communicate, and follow a written plan before performing electrical work to maximize safety.

• Persons conducting electrical work should have the knowledge, skills and abilities necessary to perform the task.

• Ensure all electrical circuits and circuit breakers are identified properly before troubleshooting or performing electrical work.

Electrical RU H H Y • Identify hazards and establish safety limits of approach.

• All work shall comply with NFPA 70 most recent edition.

• Verify code compliance prior to energizing.

• Inspect electrical cords before use.

• Do not use cords with damaged insulation or daisy chain them. Use GFCI's.

• Open circuit breaker that supplies power.

• Open visual disconnects.

Lockout / Tagout Electrical

RU H H Y

• Lock-out and tag-out visual disconnect yourself and NEVER rely on someone to do this for you.

• VA first lock on/last lock off.

• Follow Engineering LO/TO SOP.

• Include Operations & Maintenance Electricians in LO/TO plans.

Lockout / Tagout Med Gas or Oxygen

Lockout / Tagout Other Systems (Specify)

RU L L N

RU H H Y

• VA first lock on/last lock off.

• Follow Engineering LO/TO SOP.

• Include Operations & Maintenance in LO/TO plans.

660-20-102 Electrical Distribution Phase 1 CSRA

Please refer to SLC VAMC Engineering Services SOP #91 for approved lockout tagout procedures

Please refer to SLC VAMC Engineering Services SOP #91 for approved lockout tagout procedures

• Wear properly rated and well maintained PPE.

• Adhere to all ARC Flash requirements and NO ENGERGIZED work is authorized without approved permit.

Any debris contaminated with asbestos must be disposed of as regulated waste and can NOT be recycled.

Mitigation Strategies

Implemented?

Comments

Project Name: Electrical Distribution Phase 1

Project Number: 660-20-102

Date: 7/8/2021

Attachment C - Construction Safety Risk Assessment Checklist

Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System

Hazard Likelihood: High: 76% - 100%

Medium: 51% - 75%

Low: 0% - 50%Project Manager: Ryan Ung

Identify Hazards Evaluator Is Hazard Likely?

H-M-L

Severity H-M-L

Mitigation Needed?

Y/N Mitigation Strategies

• Hot Work Permits required daily for any work to include cutting, welding, brazing, soldering, thawing pipe, grinding, or other spark or flame producing operations.

Welding and Cutting RU M M Y • Any process that involves an open flames used temporarily for repair or temporary heating is considered a hot work operation.

• The use of a portable engine for temporary power is also considered a hot work operation.

Confined Spaces

Tunnels and Shafts Process Safety Management

RU

RU

N/A

H

L

N/A

H

L

N/A

Y

N

N/A N/A

• Submit lift plan to Safety for approval 14 days prior to performing the lift.

Cranes and Hoists RU H H Y • Isolate the area.

• Personnel in the vicinity shall wear high visibility vests, safety glasses and hard hats as a minimum.

Steel Erection Fall Protection Scaffolds

RU

RU

RU

L L L

L L L

N N N

• Inspect before use.

• Do not use the top two steps on a ladder.

• Cracked frames, missing feet or bent rungs will not be allowed on any ladders.

• Use ladder only on stable and level surfaces.

Ladders RU M M Y • Keep ladders free of any slippery materials on the steps.

• Always face the ladder and maintain three points of contact when climbing or descending.

• Do not carry items or supplies when climbing or descending a ladder.

• Use a cord or rope to life or lower supplies or tools.

N/A N/A

Evaluate spaces before entry for permit requirements.

Please refer to SLC VAMC Engineering Services SOP #90 for approved hot work procedures.

Mitigation Strategies

Implemented?

Comments

Project Name: Electrical Distribution Phase 1

Project Number: 660-20-102

Date: 7/8/2021

660-20-102 Electrical Distribution Phase 1 CSRA 3 of 6

Attachment C - Construction Safety Risk Assessment Checklist

Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System

Hazard Likelihood: High: 76% - 100%

Medium: 51% - 75%

Low: 0% - 50%Project Manager: Ryan Ung

Identify Hazards Evaluator Is Hazard Likely?

H-M-L

Severity H-M-L

Mitigation Needed?

Y/N Mitigation Strategies

• Obtain permit prior to excavating deeper than 15 inches.

• Protect openings near travel ways by installing railings, barriers, or covers.

• Ensure covers or railings protecting temporary access openings are secured in place at all times when an opening is not being used.

Trenching and Excavation/

** SWPPP

RU H H Y

• Provide readily visible warnings signs that clearly display the nature of the hazard and any protective action required.

• Train all persons to recognize adverse conditions and environmental factors that can decrease stability.

• Examine walls and spoils piles from as many perspectives as possible (bottom, sides, and top/crest).

• Look for cracking, displacement, or other signs of distress.

• Operate all mobile equipment at speeds that are consistent with the type of equipment, roadway conditions, grades, clearances, visibility, and other traffic.

Motor Vehicles, Earthmoving, and Mechanized Equip

RU M M Y

• Travel at safe speeds so that mobile equipment can be stopped within the limits of visibility.

• Vehicles shall be inspected daily before each use.

• Ensure that all persons are clear before moving equipment.

• High visibility vests required when working around motorized vehicles.

• Handheld power saws with any blade diameter must be equipped with an integrated water delivery system that continuously feeds water to the blade.

• Jackhammers and handheld powered chipping tools must be operated using either a water delivery system or a tool equipped with a shroud and vacuum dust collection system.

Concrete and Masonry RU M M Y

• Respiratory protection required with a minimum assigned protection factor (APF) of ten.

• Handheld grinders must be equipped with a shroud and dust collection system in compliance with OSHA's Respirable Crystalline Silica standard for Construction.

• Use Eco Pans for collection of concrete washout materials.

• Ensure the use of PPE.

Mitigation Strategies

Implemented?

Comments

Project Name: Electrical Distribution Phase 1

Project Number: 660-20-102

Date: 7/8/2021

660-20-102 Electrical Distribution Phase 1 CSRA 4 of 6

Attachment C - Construction Safety Risk Assessment Checklist

Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System

Hazard Likelihood: High: 76% - 100%

Medium: 51% - 75%

Low: 0% - 50%Project Manager: Ryan Ung

Identify Hazards Evaluator Is Hazard Likely?

H-M-L

Severity H-M-L

Mitigation Needed?

Y/N Mitigation Strategies

• A pre-construction survey for Asbestos is required that tests all building materials that will be disturbed during project work.

Lead, Asbestos, and Silica RU L L N

• If Asbestos is identified appropriate work practices and plans are to be coordinated with the Asbestos Program Coordinator in advance.

• Concrete dust to be kept to a minimum.

• Prevent dust from becoming airborne.

• Utilize wet methods and approved HEPA vacuums as safely practical.

• Full coordination with COR and • Full coordination with COR and Operations & Maintenance required.

Utility Interruptions RU H H Y

• Notify and coordinate shutdown with all affected services to include VA Police.

• Maintain barriers to control dust.

Dust RU M M Y

• Use particulate filter masks when generating dust.

• Control dusts as needed for excavation work.

Moisture/Water Leaks

Vapors/Fumes/ **Air Emissions

Noise

Vibration

Open Outside Walls

Impact to Levels Above and Below

Proximity of Air Intakes

Tuberculosis Transmission

RU

RU

L

L

L

L

N

N

• Notify tenants in the area before demolition or drilling.

RU M M Y

• Hearing protection required when identified by job hazard analysis.

RU

RU

RU

RU

M

L

M

L

M

L

M

L

Y

N

Y

N

RU L L N N/A

Until such time that the hospital is no longer low-risk for TB transmission per annual TB risk assessment, this will remain unchanged for all projects.

Pest Control within Construction Area

RU M M Y

• Keep area clear of any substances that could attract rodents or other animals.

• Remove debris at the end of each work shift.

** These construction activities have been identified as significant based on potential environmental impacts.

Approval Signatures:

No eating in work areas

Coordinate all activities having an adverse impact on floors above or below project work with COR and affected occupants.

Notify COR and tenants in the area before demolition or drilling.

Mitigation Strategies

Implemented?

Comments

Project Name: Electrical Distribution Phase 1

Project Number: 660-20-102

Date: 7/8/2021

Contact Asbestos Coordinator with any questions or concerns.

660-20-102 Electrical Distribution Phase 1 CSRA 5 of 6

Attachment C - Construction Safety Risk Assessment Checklist

Construction Safety Risk Assessment Checklist, VA Salt Lake City Healthcare System

Hazard Likelihood: High: 76% - 100%

Medium: 51% - 75%

Low: 0% - 50%Project Manager: Ryan Ung

Identify Hazards

Project Manager:

Evaluator Is Hazard Likely?

H-M-L

Severity H-M-L

Mitigation Needed?

Y/N Mitigation Strategies

Mitigation Strategies

Implemented?

Date:

Comments

Project Name: Electrical Distribution Phase 1

Project Number: 660-20-102

Date: 7/8/2021

Contractor: Date:

Safety Manager: Date:

Service / Section / Program Director: Date:

660-20-102 Electrical Distribution Phase 1 CSRA 6 of 6

Attachment A: Interim Life Safety Measures Assessment for Scheduled Construction Activities Directions: 1) Check 'Yes' or 'No' for Construction Life Safety Hazard Items #1 through #4 2) Check Appropriate ILSM for each column Marked as 'Yes'

Project Name and Number:

# 1.

NO

Fire Alarm System impaired.

Construction Life Safety Hazard (#1 thru #4):

NO

Fire Alarm System out of service more than 4 hours in 24 hour period.

ILSMs:

Temporary Fire Alarm and Detection Systems - Provide temporary but equivalent fire alarm and detection systems for use when a fire system is impaired. The organization determines when these systems are needed.

Provide Additional Firefighting Equipment - Provide additional firefighting equipment. The organization determines when to provide this equipment.

Post Signage - Post signage identifying the location of alternative exits to everyone affected.

NO

Sprinkler System out of service more than 10 hours in 24 hour period.

# 2.

NO

Sprinkler System impaired.

# 3.

NO

Egress / Exits Impaired.

# 4.

NO

Separation between construction and non-construction space has been degraded / altered.

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Inspect Exits - Inspects exits in affected areas on a daily basis.

The organization determines when these inspections are needed.

Temporary Construction Partition Construction - Use temporary construction partitions that are smoke-tight, or made of noncombustible or limited-combustible material that will not contribute to the development or spread of fire.

The organization determines when to use these partitions.

Fire Watch - Increases surveillance of buildings, grounds, and equipment, giving special attention to construction areas and storage, excavation, and field offices. The organization determines when to increase surveillance.

Reduction Combustible Loads - Enforces storage, housekeeping, and debris-removal practices that reduce the building’s flammable and combustible fire load to the lowest feasible level. The organization determines when these practices are needed.

N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A

Firefighting Equipment Training - Provide additional training to those who work in the organization on the use of firefighting equipment. The organization determines when to provide additional training.

Education - The organization conducts education to promote awareness of building deficiencies, construction hazards, and temporary measures implemented to maintain fire safety. The organization determines when this education is needed.

Situational Awareness Training - The organization trains those who work in the organization to compensate for impaired structural or compartmental fire safety features. The organization determines when this training is needed.

Additional Fire Drill per Quarter - The organization does the following: Conducts one additional fire drill per quarter.

The organization determines when these additional fire drills are needed.

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

N/A N/A N/A N/A

Monthly inspection Temporary Systems - Inspects and tests temporary systems monthly. The completion date of the tests is documented. The organization determines when these inspections and tests are needed.

Fire Department Notification - Notify fire department of system impairment.

Additional Assessment Notes:

Implementation: Which ILSM is being implemented and how? Be descriptive on procedures put in place and departments notified.

Assessment Performed By: Date:

Safety Officer Review:

Chief of Engineering:

Date:

Date:

N/A N/A N/A N/A

N/A N/A N/A N/A

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

09/01/2021 RA GH

GI003

N/A

APPLICABLE CODE CHECKLISTS

CONTINUED

MOTOR, SINGLE-PHASE

MOTOR, THREE-PHASE

DELTA CONNECTION

TRANSFORMER

WYE CONNECTION

PULL BOX

MANHOLE

ELECTRICAL SYMBOLS - DIAGRAM

TRANSFORMER, PLAN

EARTH GROUND

RIGID CONDUIT LINE = RC

SUBSTATION

BUSWAY

DISTRIBUTION PANEL

LIGHTING PANEL

PANELBOARD CABINET, FLUSH MOUNTED

PANELBOARD CABINET, SURFACE MOUNTED

DIRECT BURIAL CABLE = DB

POWER DUCT = P

FUSE WITH RATING

NORMALLY CLOSED RELAY CONTACT

NORMALLY OPEN RELAY CONTACT

MOLDED CASE CIRCUIT BREAKER

LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

MEDIUM-VOLTAGE OIL CIRCUIT BREAKER

MEDIUM-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER

SWITCH AND FUSE UNIT

FUSED DRAWOUT POTENTIAL TRANSFORMER

VARIABLE FREQUENCY DRIVE

GENERATOR, POWER

BATTERY

CAPACITOR

RELAY; LETTER INDICATES RELAY TYPE

50 = INSTANTANEOUS OVERCURRENT OR RATE-OF-RISE

51 = AC-TIME OVERCURRENT

67 = AC-DIRECTIONAL OVERCURRENT

86 = LOCK OUT

DISCONNECT SWITCH, FUSED

DISCONNECT SWITCH, UNFUSED, VAV

ELECTRICAL SYMBOLS - POWER PLAN

RC

DB

P

VFD

T

S

DP#__

LP

B B

PB

P

GROUNDING BAR

SELECTOR SWITCH

NEUT OR N

NC

NEUTRAL

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

P POLE

PA PUBLIC ADDRESS

PB PULL BOX OR PANEL BOARD

PBPU PREFABRICATED BEDSIDE PATIENT UNIT

PCB POLYCHLORINATED BIPHENYL

PEC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

PT POTENTIAL TRANSFORMER

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

REQ REQUIRED

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

SCC SHORT CIRCUIT CAPACITY

SES SERVICE ENTRANCE SECTION

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SURF SURFACE

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VA VOLT·AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMCP EMERGENCY MONITORING CONTROL PANEL

EMER EMERGENCY

EMI ELECTROMAGNETIC INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

EPRF EXPLOSION PROOF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXST EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FABL FIRE ALARM BELL

FABX FIRE ALARM BOX

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FIXT FIXTURE

FLA FULL LOAD AMPS

FLEX FLEXIBLE METALLIC CONDUIT

FLT FLOODLIGHT

FLUOR FLUORESCENT

FLUOR

FIX

FLUORESCENT FIXTURE

FOUTT TELEPHONE FLOOR OUTLET

FP FIRE PROTECTION

FT FEET OR FOOT

FU SW FUSED SWITCH

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

G OR GND ELECTRICAL GROUND

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GTB GROUND TERMINAL BOX

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HZ HERTZ

IESNA ILLUMINATION ENGINEERING SOCIETY OF

NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

KV KILOVOLT

KVA KILOVOLT AMPERE

KVAH KILOVOLT AMPERE PER HOUR

KVAR KILOVOLT AMPERE REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

KWHM KILOWATT HOUR METER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LM LUMEN

LP LIGHT POLE

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LT LIGHT

LTG LIGHTING

LTG PNL LIGHTING PANEL

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MLO MAIN LUGS ONLY

MOCP MAXIMUM OVERCURRENT PROTECTION

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT·AMPERE

MW MEGAWATT

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

SINGLE POLE

SINGLE PHASE

TWO-CONDUCTOR

THREE-CONDUCTOR

THREE PHASE

FOUR-CONDUCTOR

FOUR WIRE

A/C UNIT AIR CONDITIONING UNIT

ARCHITECT / ENGINEER

AAP ALARM ANNUNCIATOR PANEL

ALTERNATING CURRENT OR ARMORED

CABLE

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJACENT OR ADJOINING

ADO AUTOMATIC DOOR OPENER

AMPERE FRAME OR AMP FUSE

AFC ABOVE FINISHED COUNTER, AUTOMATIC

FREQUENCY CONTROL, OR AVAILABLE

FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AMPERE·HOUR

AUTHORITY HAVING JURISDICTION

AMPERE INTERRUPTING CAPACITY

ALTERNATE

AMB OR A AMBIENT

AMP AMPERE

ARCH ARCHITECT

ASC AMPS SHORT CIRCUIT

AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUDIO VISUAL

BAT BATTERY

BARE COPPER

BOARD

BELOW FINISHED FLOOR

BASIC INSULATION LEVEL

BLDG BUILDING

BPIP BOILER PLANT INSTRUMENTATION PANEL

BRKR BREAKER

BYP BYPASS

CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA TELEVISION

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

CANDELA OR CONSTRUCTION DOCUMENTS

CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED / CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED / OWNER

INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CKT

BRKR

CIRCUIT BREAKER

CURRENT LIMITING FUSE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

COMPT COMPARTMENT

COR CONTRACTING OFFICER REPRESENTATIVE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER TRANSFORMER

COLOR RENDERING INDEX

CURRENT TRANSFORMER

CTV CABLE TELEVISION

COPPER

CU FT CUBIC FEET

CUR CURRENT

DECIBEL

DIRECT CURRENT

DCP DIMMER CONTROL PANEL

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DISTR

PNL

DISTRIBUTION PANEL

DMR SW DIMMER SWITCH

DOWN

DPDT DOUBLE POLE, DOUBLE THROW

NORMALLY CLOSED

ELECTRICAL ABBREVIATIONS ELECTRICAL ABBREVIATIONS ELECTRICAL ABBREVIATIONS

A. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES,

CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP

CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE

WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE DEVICE AND

REMOVE WIRING COMPLETELY FROM THE ABANDONED CONDUITS.

B. DISCONNECT AND REMOVE ALL WIRES AND CONDUIT BACK TO THE OVERCURRENT

DEVICE AND RELABEL AS A SPARE. REUSE EXISTING CONDUIT IN COMPLIANCE WITH

NEC.

C. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS

PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.

D. REMOVE ALL ACCESSIBLE ABANDONED WIRING OF ALL TYPES, OR CAP AND LABEL IN

JUNCTION BOX FOR RE-USE, IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE.

KEY NOTE.1

NEW LINE TYPE.

EXISTING LINE TYPE.

DEMO LINE TYPE.

ELECTRICAL GENERAL NOTES:

ELECTRICAL GENERAL NOTES - DEMOLITION:

KEY NOTES:

NEW - EXISTING & DEMO LINE TYPES:

A. CONTRACTOR TO FIELD VERIFY DIMENSIONS OF TRANSFORMER ENCLOSURES AND

PADS PRIOR TO START OF WORK. CLEARANCES AND PAD SIZE MUST BE CONSIDERED

WHEN ORDERING NEW EQUIPMENT FOR INSTALLATION. ANY CONFLICTS MUST BE

BROUGHT TO THE ATTENTION OF THE VHA COR PRIOR TO WORK STARTING.

B. ALL WIRING SHALL BE (3)#12 THWN/THHN COPPER 3/4C" UNLESS OTHERWISE NOTED.

C. MINIMUM SIZE CONDUIT SHALL BE 3/4" IN DIAMETER.

D. CORE DRILL AND SAW CUT, AS REQUIRED, FOR FLOOR AND WALL PENETRATIONS. SEAL

REMAINING ANULUS WITH FIRE CAULK.

E. FURNISH ACCESS DOORS FOR INSTALLATION BY GENERAL CONTRACTOR IN WALLS

AND CEILINGS WHERE ACCESS IS REQUIRED TO CONCEALED ELECTRICAL BOXES AND

DEVICES.

F. PROVIDE ALL ELECTRICAL WORK IN ACCORDANCE WITH THE CURRENT NATIONAL

ELECTRICAL CODE AND THE REQUIREMENTS OF THE LOCAL AUTHORITY HAVING

JURISDICTION AS OUTLINED IN SPEC SECTION 26 05 11.

G. COORDINATE ALL OUTAGES WITH VHA COR PER SPECS PRIOR TO WORK BEING DONE.

DEMO HATCH.

REFERENCE SPECIFICATION: SECTION 13 05 41

SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS

SEISMIC DESIGN DATA FOR ANALYSIS AND DESIGN:

H-18-8 SEISMICITY = HIGH

SEISMIC RISK CATEGORY BASED UPON CRITICAL OCCUPANCY = IV

COMPONENT IMPORTANCE FACTORS:

IP=1.0 FOR NON-ESSENTIAL COMPONENTS NOT REQUIRED FOR CONTINUED OPERATION OR IF ITS

FAILURE WILL NOT IMPAIR THE CONTINUED OPERATION OF THE FACILITY

IP=1.5 FOR LIFE SAFETY AND DESIGNATED SEISMIC SYSTEMS (DSS) AND PERMANENT

EQUIPMENT AND COMPONENTS REQUIRING SPECIAL SEISMIC CERTIFICATION PER H-18-8

FOR MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS AND DESIGN SPECTRAL

RESPONSE ACCELERATION PARAMETERS: SEE GENERAL STRUCTURAL NOTES AND DESIGN

CRITERIA AS SPECIFIED ON DRAWING NUMBER S-000.

SITE CLASS = C (PER GEOTECHNICAL REPORT)

SEISMIC DESIGN CATEGORY (SDC) = D

NONSTRUCTURAL SEISMIC EXCEPTIONS AND EXEMPTIONS SHALL BE DETERMINED IN ACCORDANCE

WITH H-18-8 AND CHAPTER 13 OF ASCE 7 FOR SDC = D

H-18-8 EQUIPMENT AND COMPONENTS SPECIAL SEISMIC CERTIFICATION (SSC) REQUIREMENT:

IN STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORY C, D, E, OR F, PERMANENT EQUIPMENT

AND COMPONENTS ARE TO HAVE SPECIAL SEISMIC CERTIFICATION IN ACCORDANCE WITH

REQUIREMENTS OF SECTION 13.2.2 OF ASCE 7 EXCEPT FOR EQUIPMENT AND COMPONENTS THAT ARE CONSIDERED RUGGED AS LISTED IN SECTION 2.2 OF OSHPD CODE APPLICATION NOTICE CAN

NO. 2-1708A.5, AND SHALL COMPLY WITH SECTION 13.2.6 OF ASCE 7.

CLARIFICATION OF ASCE 7 "12 INCH RULE" SUSPENDED SEISMIC BRACING CODE EXCEPTION FOR

PIPING AND HVAC DUCTWORK:

ALL PIPING OR DUCTWORK SUSPENDED BY INDIVIDUAL HANGER RODS 12" OR LESS AS MEASURED

FROM THE TOP OF THE PIPING OR DUCTWORK TO THE BOTTOM OF THE SUPPORT WHERE THE

HANGER IS ATTACHED. IF THE 12" LIMIT IS EXCEEDED BY ANY HANGER IN THE RUN, SEISMIC

BRACING IS REQUIRED FOR THE RUN. A SINGLE SUPPORT LOCATION THAT MEETS THE

REQUIREMENT OF THIS EXCEPTION DOES NOT CONSTITUTE A SEISMIC SWAY BRACE LOCATION.

IN ADDITION, TO MEET THE CODE REQUIREMENTS, ALL OF THE FOLLOWING CONDITIONS MUST ALSO

BE SATISFIED:

1. LATERAL MOTION OF PIPING OR DUCTWORK WILL NOT CAUSE DAMAGING IMPACT WITH

SURROUNDING SYSTEMS (E.G. OTHER CONDUIT, TRAY, PIPE, DUCT, EQUIPMENT, SPRINKLER

HEADS ETC.) OR CAUSE LOSS OF SYSTEM VERTICAL SUPPORT.

2. PIPING OR DUCTWORK MUST BE MADE OF DUCTILE MATERIAL WITH DUCTILE CONNECTIONS.

3. VERTICAL SUPPORT CONNECTIONS CANNOT DEVELOP MOMENTS (E.G. SWIVEL JOINTS, EYE

BOLTS, VIBRATION ISOLATION HANGERS, ETC.)

ELECTRICAL EQUIPMENT AND DISTRIBUTION SYSTEM

(RACEWAYS) 2015 IBC AND ASCE 7-10 NONSTRUCTURAL

SEISMIC RESTRAINT, BRACING AND ANCHORAGE NOTES:

VHA VETERANS HEALTH ADMINISTRATION

TX TRANSFORMER

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

EC ELECTRICAL CONTRACTOR / ELECTRICAL CONDUIT

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

09/01/2021 RA GH

E-001

ELECTRICAL NOTES, SYMBOLS &

ABBREVIATIONS

A. REFER TO SHEET E-001 FOR ABBREVIATIONS, SYMBOLS, AND NOTES.

B. CONTRACTOR SHALL RECONNECT TRANSFORMER GROUNDING

ELECTRODE AND INTERSYSTEM GROUNDING.

C. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND

CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING

CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE

ATTENTION OF THE VHA COR.

D. PROJECT INTENT IS TO REMOVE EXISTING PRIMARY CONDUCTORS,

SECONDARY CONDUCTORS, AND TRANSFORMERS. NEW TRANSFORMERS

WILL BE SUBSTATION TYPE 7.2/12.47KV - 480/277V 1000/1150FA KVA . NEW

PAD/SKIDS AND GROUNDING WILL BE INSTALLED. NEW REMOVABLE-TYPE

BOLLARDS WILL BE PROVIDED FOR TRANSFORMER PROTECTION. TWO

PRIMARY FEEDS WILL BE FROM EXISTING C AND D SWITCHES WITH NEW

DUCTBANK INSTALLED TO NEW TRANSFORMER LOCATION. C AND D FEED

WILL BE PROVIDED TO EACH TRANSFORMER WITH A LOAD-BREAK SWITCH

TO ALLOW EACH TRANSFORMER TO BE FED FROM EITHER C OR D FEED.

THE SECONDARY OF EACH TRANSFORMER WILL BE CONNECTED TO A NEW

1600 AMP EXTERIOR BUS THAT WILL RUN ALONG THE PERIMETER

RETAINING WALL ALONG THE TOP OF THE WALL AND THEN DOWN TO THE

EXISTING TRANSFORMER LOCATION. AT THIS POINT THE BUS WILL BE

CONNECTED TO NEW WIRE AND FED INTO THE BUILDING USING EXISTING

CONDUIT. NEW SERVICE DISCONNECTS AND NEW SWITCHBOARDS WILL BE

INSTALLED INSIDE REPLACING EXISTING.

1. INSTALL NEW 2/0 SHIELDED XLPE WITH 4/0 GROUND FROM C AND D

SWITCHES TO NEW TRANSFORMER. EACH TRANSFORMER WILL HAVE A C

AND D FEED.

2. NEW 7.2/12.47KV-480/277V1000/1150FA KVA TRANSFORMER WITH FORCED

AIR TO INCLUDE GROUNDING AND A DUAL PRIMARY FEED WITH

SWITCHING CAPABILITY. PROVIDE MINIMUM CLEARANCES FROM WALL AT

3 FEET AND ALSO 3 FEET BETWEEN TRANSFORMERS. ENTRY TO

COMPARTMENTS WILL REQUIRE 4 FEET.

3. RELOCATE EXTERIOR LIGHT AND CONDUIT, AS NECESSARY FOR

INSTALLATION OF NEW TRANSFORMER PRIMARY FEED.

4. PROVIDE ONE 1600A BUSWAY TO NEW JBOX FROM EACH TRANSFORMER,

TOTAL OF TWO. ROUTE BUSWAY AS SHOWN, TAKING CARE TO AVOID

INTERRUPTING EXISTING SERVICES. REFERENCE E-502 FOR ADDITIONAL

INFORMATION. TRANSITION SHALL BE LOCATED AT NEW JUNCTION

LOCATED AT PREVIOUS TRANSFORMER PADS. 1600A BUSWAY WILL

TRANSITION INTO BUILDING VIA 4(4#350MCM & 3/0G) IN EXISTING 4"

CONDUITS.

5. EXISTING 15 KV SWITCHES TO REMAIN; LABEL AS SPARE. REMOVE

INDICATIONS OF 14-N AND 14-S FEED.

AND INTERIOR DRAWING

North Plan

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

ELECTRICAL SITE PLAN

BUILDINGS 14 & 42

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

00KEYNOTES

GENERAL NOTES

09/01/2021 RA GH

ES101

14 & 42

ELECTRICAL SITE PLAN -

BUILDINGS 14 & 42

4" CONDUIT TO BE CUT AND

CAPPED AT GROUND LEVEL

OF EXTERIOR OF BUILDING.

REMOVE ALL CONDUCTORS

AND CONDUIT FROM

EXISTING SWITCHES.

RETAIN EXTERIOR JUNCTION

BOX.

EXISTING

SWITCHGEAR FOR

14-NORTH AND

14-SOUTH

EXISTING SWITCH C11

NEW REMOVABLE

BOLLARDS (TYP)

54" ON CENTER

NEW SUBSTATION TYPE 1000/1150FA KVA TRANSFORMERS

WITH SIDE ENTRY AND EXIT PRIMARY AND SECONDARY.

PROVIDE GROUNDING PER CODE

NEW 1600 AMP BUSDUCT SECONDARY

FROM EACH TRANSFORMERREPLACE (4) 4#350kCMIL, #3/0 G, RE-USE EXISTING 4" CONDUIT

INSTALL NEW JUNCTION BOX . TRANSITION 1600A BUS DUCT TO

NEW (4) 4#500kCMIL, #4/0 G, 4" EXISTING CONDUIT

SEE DETAIL

NEW DUCTBANK

SAWCUT ROAD AND SIDEWALK, EXCAVATE FOR NEW

DUCBANK, CONCRETE ENCASE, AND REPAIR PER

DETAIL.

C AND D FEED FOR EACH TRANSFORMER

(3#2/0 XLPE & 1#2G)4"C PER LOOP FEED.

TWO PRIMARY FEEDS

(C AND D) TO NEW

TRANSFORMERS

PRIMARY CONNECTIONS.

EXISTING SWITCH D11NEW TRANSFORMER

14-NORTH

NEW TRANSFORMER

14-SOUTH

Baker Street

SCALE: 1/16" = 1'-0"

4' 8' 16' 32' 64'0

ELECTRICAL SITE PLAN

BUILDINGS 27 & 40

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

00KEYNOTES

GENERAL NOTES

09/01/2021 RA GH

ES102

27 & 40

ELECTRICAL SITE PLAN -

BUILDINGS 27 & 40

1. REPLACE EXISTING 2500 KVA TRANSFORMER WITH NEW 2500 KVA

TRANSFORMER. EXTEND 15'X7' CONCRETE PAD AS NEEDED TO

ACCOMMODATE NEW EQUIPMENT. REPLACE EXISTING SECONDARY 12"X6"

BUS DUCT FEEDING B27 EQUIPMENT WITH NEW. NOTE THAT NEW

TRANSFORMER TO HAVE A SWITCH TO SELECT C OR D FEEDER AND CROSS

CONNECTED TO 500 KVA TRANSFORMER. ALSO, NOTE COMPARTMENTS

FOR BUS DUCT, SWITCHES, ETC. NOTE SIDE EXIT FOR BUS AND BOTTOM

FEED FOR PRIMARY INTO COMPARTMENT.

2. REPLACE EXISTING 500 KVA TRANSFORMER WITH NEW. EXTEND PAD AS

REQUIRED BY TRANSFORMER MANUFACTURER. REPLACE EXISTING

SECONDARY 2(4#350MCM & #2/0G) IN EXISTING CONDUIT. NOTE PAD

MOUNTED WITH INTERNAL C AND D SWITCH WITH CROSS CONNECT TO

ALLOW EITHER C OR D CONNECTION.

3. REPLACE EXISTING MCCS IN BUILDING 27. REFER TO EP103 FOR

ADDITIONAL INFORMATION.

4. PROVIDE NEW CONCRETE-ENCASED DUCTBANK FROM SWITCH TO

MANHOLE TO ACCOMMODATE NEW C/D LOOP FEED. REFER TO SHEET E-501

TO FOR DETAILS.

5. PROVIDE NEW (2/0 SHIELDED XLPE & #2G) CROSS CONNECTION IN NEW

CONDUIT OR WIREWAY BETWEEN TRANSFORMERS. TAP "D FEED" FROM

2500KVA TX AND FEED SWITCHED ALTERNATE OF 500KVA TX. PROVIDE

SIMILAR "C FEED" FROM 500KVATX TO 2500KVA TX. USER SHALL BE ABE TO

SWITCH PRIMARY SOURCE OF TRANSFORMER AT UNIT. REFER TO SHEET

E-501 TO FOR DETAILS.

6. PROVIDE NEW CONDUCTORS FROM SWITCHES 'C08' AND 'D08' IN NEW

DUCTBANK. FROM MANHOLE #10, C AN D CONDUCTORS SHALL USE

EXISTING ROUTING TO RE-FEED EXISTING 15KV SWITCHES PREVIOUSLY

SERVED BY 'A' AND 'B' CONDUCTORS. A AND B CONDUCTORS TO BE

REMOVED PRIOR TO INSTALLING NEW C AND D CONDUCTORS.

7. TERMINATE AND LOOP 'A' AND 'B' SERVICE CONDUCTORS IN MANHOLE. NO

LONGER IN SERVICE FOR BUILDING 27 TRANSFORMERS.

8. RE-USE EXISTING DUCTBANK FEED TO 15KV SWITCHES WITH NEW C/D LOOP

FROM SWITCHES C08 AND D08.

9. USE EXISTING DUCTBANK TO PROVIDE NEW PRIMARY TRANSFORMER

CONDUCTORS FROM EXISTING 15KV SWITCHES.

10. PROVIDE MANHOLE INFLOW PROTECTION COVER FOR EXISTING MANHOLE

TO PROTECT AGAINST FLOODING.

3 NEW (2/0 XLPE & #2G) IN EXISTING CONDUIT

A. REFER TO SHEETS E-001 FOR ABBREVIATIONS, SYMBOLS, AND NOTES.

B. CONTRACTOR SHALL RECONNECT TRANSFORMER GROUNDING

ELECTRODE AND INTERSYSTEM GROUNDING.

C. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND

CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING

CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE

ATTENTION OF THE VHA COR.

D. PROJECT INTENT IS TO REFEED EXISTING 15 KV SWITCHES FROM EXISTING

A/B LOOP TO C/D LOOP UTILIZING EXISTING EXTERIOR SWITCHES (C08 &

D08) AND ROUTING (AS MUCH AS POSSIBLE). NEW DUCT BANK FROM

SWITCHES TO NEARBY MANHOLE 10 WILL BE REQUIRED TO INTERCEPT

EXISTING CONDUIT ROUTE. CONTRACTOR SHALL REPLACE ALL MCCS,

TRANSFORMERS, CONDUCTOR, AND BUS DUCT AS SHOWN FOR BUILDING

27.

CONTRACTOR SHALL PROVIDE A SINGLE FEED FROM EXTERIOR SWITCHES,

THROUGH INTERIOR 15KV SWITCHES, TO TRANSFORMER. ALTERNATE

FEED WILL SOURCE FROM TRANSFORMER PRIMARY AND CROSS FEED

INTO INTEGRAL TRANSFORMER SWITCH THAT ALLOWS FOR LOAD-BREAK

SWITCHING. THIS DIFFERS FROM BUILDING 14 WORK, WHICH PROVIDES

TWO PRIMARY FEEDS FROM SWITCHES TO EXTERNAL TRANSFORMER

LOAD-BREAK SWITCH.

TX 27

2500KVA

7.2/12.47KV - 480/277V

TX 27

500KVA

7.2/12.47KV - 480/277V

3000A BUSDUCT FEED

FROM TX TO SWBD

"D LOOP" SWITCH D08

"C LOOP" SWITCH C08

MANHOLE #10

MANHOLE #11

68 8

'C' LOOP CONDUCTORS

(2/0XLPE & #2G) IN EXISTING CONDUIT

'D' LOOP CONDUCTORS

(2/0XLPE & #2G) IN EXISTING CONDUIT

EXISTING 15KV SWITCHES

TO BE RE-USED

North Plan

MCC-27

MCC-B1

MCC-B2

MCC-B2EM

NEW 2(350MCM & 2/0G) IN EXISTING 4"C

TX 14-NORTH

1000 kVA 12.47kV - 480V 5.75%

(3#2/0XLPE & #2G)4"C

14-NORTH

SERVICE

DISCONNECT

4(4#350MCM & #3/0G)4"C

1600A

M1A

1600A SWBD

1000A

M1B

1600A SWBD

100A

1600A

14-B-C-E-ATS1/

EATS-14

150A

TVSS

125A

14-2-B-N-P1/

2AA

150A

BAH

100A

14-1-B-N-P3/

IWW

100A

14-1-B-N-P4/

IYY

150A

14-B-D-N-P1

100A

14-B-A-N-P1/

BMH

225A

IAA

100A

14-B-A-N-P3/

BMHA

1600A

TO 14-SOUTH

SERVICE DISCONNECT

TIE BREAK

1600A BUS

1600A BUS

4(4#350MCM & 3/0G)4"C

TO FIRE PUMPS

(3#4 & #3G)EXISTING"C

TX 14-SOUTH

1000 kVA 12.47kV - 480V 5.75%

14-SOUTH

SERVICE

DISCONNECT

1600A

M2C

1600A SWBD

1200A/ 1000A

M2A

1600A SWBD

M2B

1600A SWBD

(3#2/0XLPE & #2G)4"C

100A

4(4#350MCM & #3/0G)4"C

150A/ 100A

SPARE

150A/ 125A

SPARE

225A

GZZ

SPARE

14-3-B-N-P1/

3ZZ

225A

SPARE

150A

SPARE

400A/ 350A

2ZZ

150A

MCC-1

150A

MCC-4

150A

MCC-2

150A

MCC-5

150A

MCC-3

150A/ 100A

MCC-6

150A

SPARE

125A

SPARE

150A

SPARE

125A

14-B-C-L-ATS1

225A

SPARE

600A

14-B-C-C-ATS1

14-B-C-C-ATS2/

CATS-14

CAPACITOR BANK

1600A

TIE BREAK

TO 14-NORTH

SERVICE DISCONNECT

1200A/ 1000A

1200A/ 1000A

1200A/ 1000A

1600A BUS

1600A BUS

3(4#350MCM & #3/0G)4"C

3(4#350MCM & #3/0G)4"C

150A/ 20A

150A/ 125A

3(4#350MCM & #3/0G)

2(3#500MCM & #3/0G)

TX 14-SOUTH

1000/1150FA kVA 12.47kV - 480V 5.75%

14-SOUTH SERVICE

DISCONNECT

65 kAIC

1600A

M2C

1600A SWBD

35 kAIC 1200A/ 1000A

M2A

1600A SWBD

35 kAIC

M2B

1600A SWBD

35 kAIC

1600 AMP BUS DUCT FROM NEW TRANSFORMER TO LOCATION OF OLD TRANSFORMER, THEN 4(4#500MCM & #4/0G)4"C INTO BUILDING

APPROX. 180' DUCT, TRANSITION TO APPROX. 20' CONDUIT

150A/ 100A

SPARE

150A/ 125A

SPARE

250A

GZZ

150A/ 20A

SPARE

150A/ 125A

14-3-B-N-P1/

3ZZ

225A

SPARE

150A

SPARE

400A/ 350A

2ZZ

150A/ 100A

MCC-1

150A/ 150A

MCC-4

150A/ 100A

MCC-2

150A/ 150A

MCC-5

150A/ 150A

MCC-3

150A/ 100A

MCC-6

150A/ 150A

SPARE

125A/ 125A

SPARE

150A/ 150A

SPARE

225A/ 225A

14-B-C-L-ATS1

225A

SPARE

800A/ 600A

14-B-C-C-ATS1

1600A

TIE BREAK

TO 14-NORTH

SERVICE DISCONNECT

(3#2/0XLPE & #2G)4"C

PRIMARY "D" LOOP FROM SWITCH D11

APPROX. 120'

(3#2/0XLPE & #2G)4"C

ALTERNATE "C" LOOP

FROM SWITCH C11

APPROX. 120'

EXTERNAL SWITCH MOUNTED

TO/ADJACENT TO TRANSFORMER

1200A/ 1000A

1200A/ 1000A

1200A/ 1000A

1600A BUS

1600A BUS

3(4#350MCM & #3/0G)4"C

3(4#350MCM & #3/0G)4"C

100A

14-B-C-C-ATS2/

CATS-14

CAPACITOR BANK

3(4#350MCM & #3/0G)

2(3#500MCM & #3/0G)

19,167A ISC 19,220A ISC

19,664A ISC

TX 14-NORTH

1000/1150FA kVA 12.47kV - 480V 5.75%

(3#2/0XLPE & #2G)4"C

PRIMARY "C" LOOP

FROM SWITCH C11

APPRROX. 120'

14-NORTH SERVICE

DISCONNECT

65 kAIC

1600 AMP BUS DUCT FROM NEW TRANSFORMER TO LOCATION OF OLD TRANSFORMER, THEN 4(4#500MCM & #4/0G)4"C INTO BUILDING

APPROX. 180' DUCT, TRANSITION TO APPROX. 20' CONDUIT

1600A

M1A

1600A SWBD

1000A

M1B

1600A SWBD

1600A

14-B-C-E-ATS1/

EATS-14

150A

TVSS

125A

14-2-B-N-P1/

2AA

150A

BAH

100A

14-1-B-N-P3/

IWW

100A

14-1-B-N-P4/

IYY

150A

14-B-D-N-P1

100A

14-B-A-N-P1/

BMH

225A

IAA

100A

14-B-A-N-P3/

BMHA

1600A

TIE BREAK

TO 14-SOUTH

SERVICE DISCONNECT

(3#2/0XLPE & #2G)4"C

ALTERNATE "D" LOOP

FROM SWITCH D11

APPROX. 120'

1600A BUS

1600A BUS

4(4#350MCM & 3/0G)4"C

100A

TO FIRE PUMPS

(3#4 & #3G)EXISTING"C

19,972A ISC 19,760A ISC

17,324A ISC

20,149A ISC

EXTERNAL SWITCH MOUNTED

TO/ADJACENT TO TRANSFORMER

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

00KEYNOTES

GENERAL NOTES

09/01/2021 RA GH

E-601

14 & 42

ONE-LINE DIAGRAMS - BUILDING 14

1. REPLACE EXISTING 1000 KVA TRANSFORMER WITH 1000/1150FA FORCED AIR

TRANSFORMER TO INCLUDE PRIMARY FEED CONDUCTOR AND GROUNDING,

SECONDARY FEED CONDUCTORS AND GROUND.

2. REPLACE EXISTING SWITCHBOARD AND BREAKERS SERVING EXISTING

LOADS TO REMAIN.

3. EXISTING SWITCHBOARDS M1A AND M1B TO REMAIN. REPLACE BUS FEED AS

SHOWN.

A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.

B. WORK SHALL INCLUDE REPLACEMENT AND RELOCATION OF

TRANSFORMERS, PRIMARY CONDUCTORS AND GROUNDING, SECONDARY

CONDUCTORS AND GROUNDING, EXTENSION OF PADS (AS NEEDED), AND

REPLACEMENT OF SWITCHBOARDS IN B14.

C. CONTRACTOR TO PROVIDE METERING FOR EACH INCOMING SECONDARY

TRANSFORMER FEED. METER MAY BE INTEGRAL COMPONENT TO

SWITCHBOARD OR MCC. CONNECT TO NEAREST JOHNSON CONTROL

BUILDING MANAGEMENT SYSTEM CONTROL PANEL.

D. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND

CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING

CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE

ATTENTION OF THE VHA COR.

E. CONTRACTOR TO REPLACE ALL SWITCHBOARDS, CONDUCTOR, AND

BREAKER SHOWN EXCEPT M1 AND M1B. M1A MUST BE CONNECTED TO

NEW SERVICE DISCONNECT. FIELD VERIFY CONNECTION.

SCALE: NO SCALE

BUILDING 14 - DEMOLITION WORK

TRANSFORMER 14-NORTH

SCALE: NO SCALE

BUILDING 14 - DEMOLITION WORK

TRANSFORMER 14-SOUTH

SCALE: NO SCALE

BUILDING 14 - NEW WORK

TRANSFORMER 14-SOUTH

SCALE: NO SCALE

BUILDING 14 - NEW WORK

TRANSFORMER 14-NORTH

TX 27

2500 kVA 12.47kV - 480V 6.09%

BUILDING 27

SWITCHBOARD

MCC-B1

3000A BUS

125A/ 30A

125A/ 30A

(3#2/0XLPE & #2/0G)4"C

3000A BUSDUCT

125A/ 80A

COOL

TOWER 1

125A/ 80A

COOL

TOWER 2

PUMP2

PUMP1

1200A/ 1200A

CHILLER

125A/ 25A

CP1

125A/ 100A

CHWP-1

125A/ 80A

CHWP-2

MCC-B2

3000A BUS

1200A 1200A

CWP-1

CWP-2

1200A 600A

CHILLER-2

CAPACITOR BUS

TO ATS-MCC-B2

B40 EMERGENCY FEED

400A

2(4#3/0 & #3G)4"C

FROM BUILDING 40

15KV MAIN SWITCH

3000A

3000A BUSDUCT

3000A BUSDUCT

30A

FILTRATION

SKID

TX 27

500 kVA 12.47kV - 480V 5.3%

27 MAIN

SWITCHBOARD

(3#2/0XLPE & #2/0G)4"C

2(4#350MCM & #2/0G)4"C

150A/ 100A

PANEL 1-A

600A

CHILLER3

100A/ 20A

COOLING TOWER

HEATER

600A 150A/ 100A

SPARE

MCC-27

600A BUS

150A/ 20A

150A

COOL TOWER

COOLING TOWER

150A 150A

CHWP-3

HXCWP-1

150A 150A

HXCWP-1

CWP-3

2(4#350MCM & #1/0G)4"C

FROM BUILDING 40

15KV MAIN SWITCH

800A

TX 27

2500 kVA 12.47kV - 480V 6.09%

BUILDING 27

SWITCHBOARD

3000A

MCC-B1

3000A BUS

100 kAIC 125A/ 30A

125A/ 30A

3000A BUSDUCT

125A/ 80A

COOL

TOWER 1

125A/ 80A

COOL

TOWER 2

PUMP2

PUMP1

1200A/ 1200A

CHILLER

125A/ 25A

CP1

125A/ 100A

CHWP-1

125A/ 80A

CHWP-2

MCC-B2

3000A BUS

65 kAIC 1200A 1200A

CWP-1

CWP-2

1200A 600A

CHILLER-2

CAPACITOR BUS

TO ATS-MCC-B2

B40 EMERGENCY FEED

400A

2(4#3/0 & #3G)4"C

(3#2/0XLPE & #2G)4"C

PRIMARY "D" LOOP

FROM BUILDING 40 SWITCH

APPROX. 20' NEW DUCTBANK

APPROX. 180' EXISTING ROUTE

(3#2/0XLPE & #2G)4"C

ALTERNATE "C" LOOP

FROM TX 27(500KVA)

APPROX. 20' NEW DUCTBANK

APPROX. 180' EXISTING ROUTE

BUILT-IN HIGH VOLTAGE

TRANSFORMER SELECTOR SWITCH

3000A BUSDUCT

3000A BUSDUCT

350A

30A

FILTRATION

SKID

35,979A ISC

35,154A ISC

34,353A ISC

TX 27

500 kVA 12.47kV - 480V 5.3%

27 MAIN

SWITCHBOARD

800A 35 kAIC

800A

2(4#500MCM & #2/0G)4"C

150A/ 100A

PANEL 1-A

600A

CHILLER3

100A/ 20A

COOLING TOWER

HEATER

600A 150A/ 100A

SPARE

MCC-27

600A BUS

25 kAIC 150A/ 20A

150A

COOL TOWER

COOLING TOWER

150A 150A

CHWP-3

HXCWP-1

150A 150A

HXCHWP-1

CHWP-3

2(4#500MCM & #1/0G)4"C

(3#2/0XLPE & #2G)4"C

PRIMARY "C" LOOP

FROM BUILDING 40 SWITCH

APPROX. 20' NEW DUCTBANK

APPROX. 180' EXISTING ROUTE

(3#2/0XLPE & #2G)4"C

ALTERNATE "D" LOOP

FROM TX 27(2500KVA)

APPROX. 20' NEW DUCTBANK

APPROX. 180' EXISTING ROUTE

BUILT-IN HIGH VOLTAGE

TRANSFORMER SELECTOR SWITCH70A

11,048A ISC

10,687A ISC

SCALE: NO SCALE

BUILDING 27 - DEMOLITION

2500KVA TRANSFORMER FEED

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

00KEYNOTES

GENERAL NOTES

09/01/2021 RA GH

E-602

27 & 40

ONE-LINE DIAGRAMS - BUILDINGS

27 & 40

A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.

B. WORK SHALL INCLUDE REPLACEMENT OF TRANSFORMERS, PRIMARY

CONDUCTORS AND GROUNDING, SECONDARY CONDUCTORS AND

GROUNDING, EXTENSION OF PADS, AND REPLACEMENT OF

SWITCHBOARDS AND MOTOR CONTROL CENTERS IN B27.

C. CONTRACTOR TO PROVIDE METERING FOR EACH INCOMING SECONDARY

TRANSFORMER FEED. METER MAY BE INTEGRAL COMPONENT TO

SWITCHBOARD OR MCC.

D. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND

CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING

CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE

ATTENTION OF THE VHA COR.

E. CONTRACTOR TO REPLACE ALL MCCS, CONDUCTOR, AND BREAKERS

SHOWN.

F. PROVIDE METERING AT TRANSFORMERS AND CONNECT TO NEAREST

JOHNSON CONTROL PANEL.

1. REPLACE 500 KVA TRANSFORMER.

2. REPLACE 2500 KVA TRANSFORMER.

3. REFEED 15KV SWITCH FROM EXTERIOR MV SWITCHES C08 AND D08.

REFER TO ES102 FOR MORE DETAIL.

4. REPLACE ALL MCCs, BREAKERS, AND WIRE/BUS TO MCCs. RE-CONNECT

ALL LOADS AT MCCs.

SCALE: NO SCALE

BUILDING 27 - DEMOLITION

500KVA TRANSFORMER FEED

SCALE: NO SCALE

BUILDING 27 - NEW WORK

500KVA TRANSFORMER FEED

SCALE: NO SCALE

BUILDING 27 - NEW WORK

2500KVA TRANSFORMER FEED

4 4

4 4

4 4

MCC B2-EM

(4#3/0 & #3G)4"C

4(4#3/0 & #3G)4"C

125A/ 50A

COMP1

125A /50A

COMP2

250A/ 225A

PNL EM/A

250A/ 225A

250A/ 225A

SCHWP2

FROM BUILDING 27

MCC-B1

FROM EM PANEL

BUILDING 40

2(4#3/0 & #3G)4"C

ATS-MCC B2

250A/ 175A

SCHWP1 COOLING

TOWER 4

MCC B2-EM

2(4#3/0 & #3G)4"C

2(4#3/0 & #3G)4"C

125A/ 50A

COMP1

125A /50A

COMP2

250A/ 225A

PNL EM/A

250A/ 225A

250A/ 225A

SCHWP2

FROM BUILDING 27

MCC-B1

FROM EM PANEL

BUILDING 40

2(4#3/0 & #3G)4"C

ATS-MCC B2

250A/ 175A

SCHWP1 COOLING

TOWER 4

22,792A ISC

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

00KEYNOTES

GENERAL NOTES

09/01/2021 RA GH

E-603

27 & 40

ONE-LINE DIAGRAMS - BUILDING 27

EMERGENCY

A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.

B. WORK SHALL INCLUDE REPLACEMENT OF TRANSFORMERS, PRIMARY

CONDUCTORS AND GROUNDING, SECONDARY CONDUCTORS AND

GROUNDING, EXTENSION OF PADS, A ND REPLACEMENT OF

SWITCHBOARDS AND MOTOR CONTROL CENTERS IN B27.

C. CONTRACTOR TO PROVIDE METERING FOR EACH INCOMING SECONDARY

TRANSFORMER FEED. METER MAY BE INTEGRAL COMPONENT TO

SWITCHBOARD OR MCC. CONNECT METER TO NEAREST JOHNSON

CONTROL PANEL.

D. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND

CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING

CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE

ATTENTION OF THE VHA COR.

E. CONTRACTOR TO REPLACE ALL MCCS, CONDUCTOR, AND BREAKERS

SHOWN. CONDUCTOR FROM EM PANEL TO ATS TO REMAIN. ATS TO

REMAIN.

1. REPLACE MCC, FEEDER WIRE, BREAKERS, AND RE-CONNECT ALL

EXISTING LOADS TO NEW MCC BREAKERS.

SCALE: NO SCALE

BUILDING 27 - DEMOLITION

EMERGENCY FEED

SCALE: NO SCALE

BUILDING 27 - NEW WORK

EMERGENCY FEED

M1B M1A

M2B M2AM2C14-NORTH

DISCONNECT

14-SOUTH

DISCONNECT

TIE BREAK

SCALE: NO SCALE

BUILDING 14

SWITCHBOARD ELEVATIONS

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

00KEYNOTES

GENERAL NOTES

09/01/2021 RA GH

E-604

BUILDING 14 - SWITCHBOARD

ELEVATIONS

1. PROVIDE NEW METER ON NEW SWITCH BOARD TO REPLACE EXISTING.

METER SHALL COMMUNICATE WITH EXISTING ADVANCED METER READING

SYSTEM FOR CAMPUS. CONNECT METER TO NEAREST JOHNSON CONTROL

PANEL.

2. FIRE PUMPS POWERED FROM 14-NORTH DISCONNECT BUS.

A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.

B. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND

CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING

CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE

ATTENTION OF THE VHA COR.

C. SWITCHBOARDS M1A AND M1B TO REMAIN. CONNECT EXISTING M1A AND

M1B TO NEWLY INSTALLED SERVICE DISCONNECTS. REFER TO ONE-LINE

FOR ADDITIONAL INFORMATION.

D. METERS SHALL BE CONNECTED TO JOHNSON CONTROL SYSTEM. RUN

CONDUIT AND CAT6 TO NEAREST JOHNSON CONTROL PANEL.

A

B C D

I H G F

E

J

K

L

M

N

O

P

Q

R

S

T

U V W X Y Z

AA

BB

CC

DD

EE

FF

MCC-B1 SWITCHBOARD MCC-B2 MCC27MCC-B2EM B27 MAIN SWBD

SCALE: 3/8" = 1'-0"

9" 1'-6" 3' 6' 12'0

BUILDING 27

MCC ELEVATIONS

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

Project Director

Issued: Date:

750 W HAMPDEN AVE

SUITE #300

ENGLEWOOD CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

660-20-102

VA SALT LAKE CITY, SALT LAKE CITY, UT

CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION

DOCUMENTS

ELECTRICAL DISTRIBUTION PHASE 1

00KEYNOTES

GENERAL NOTES

09/01/2021 RA GH

E-605

BUILDING 27 - MCC ELEVATIONS

1. PROVIDE NEW METER ON NEW SWITCH BOARD. METER SHALL COMMUNICATE

WITH EXISTING ADVANCED METER READING SYSTEM FOR CAMPUS.

CONNECT METER TO NEAREST JOHNSON CONTROL PANEL.

A. REFER TO SHEET E-001 FOR SYMBOLS, ABBREVIATIONS, AND NOTES.

B. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS, EXISTING CONDUIT, AND

CONDUCTOR PRIOR TO PLACING ORDERS. ANY DEVIATIONS OF EXISTING

CONDITIONS FROM DESIGNED DRAWINGS SHALL BE BROUGHT TO THE

ATTENTION OF THE VHA COR.

A

B

C

D

E

F

G

H

I

J

K

L

M

W

X

YV

U

T P

Q

R

S

N

O

Z

AA

BB

CC

DD

EE

FF

GG

HH

II

JJ

KK

LL

MM

NN

PANEL

M2A

PANEL

M2B

PANEL

M2C

SWITCH

GEAR

14 NORTH

SWITCH

GEAR

14 SOUTH

SWITCH

GEAR

TIE BREAKER

M1B

(NOT IN

SCOPE)

M1A

(NOT IN

SCOPE)

TX 14-N

7.2KV/12.47KV-480V

1,000 KVA

TX 14-S

7.2KV/12.47KV-480V

1,000 KVA

SCALE: 1/4" = 1'-0"

1' 2' 4' 8' 16'0

BUILDING 14 DEMOLITION PLAN

VEG 21.06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .