66-25066SB Process and Asset Management System Consultant.pdf
PDF 434 KB Posted
- Attached to
- Process and Asset Management System Consulting
- Solicitation number
- 66-25066SB
- Issued by
- Mecklenburg County, Cleveland Town, North Carolina
About this file
This is a Request for Proposals (RFP) issued by the University of North Carolina at Charlotte (UNC Charlotte) for Process and Asset Management System Consulting services. The RFP seeks a consultant to develop and implement an ISO 55000 compliant asset management system across campus and assist in analyzing requirements for a new Enterprise Asset Management Information System (EAMIS) to replace their current Integrated Workplace Management System (Archibus). The project has two primary deliverables: first, implementing an ISO 55000 compliant asset management system by late 2026, and second, developing requirements for a separate RFP to secure a new asset management and work management software platform by January 2026. Proposals are due on Thursday, May 15, 2025, at 2:00 PM ET, with an anticipated contract award on Monday, June 9, 2025.
The RFP indicates the project is funded internally by UNC Charlotte and will involve a comprehensive evaluation of the university's current asset management practices, with a focus on optimizing facilities management processes. The evaluation will include analyzing reliability management, asset management, maintenance management, and potential integrations with other university systems such as Health, Safety and Environment (HSE), Information Technology Asset Management (ITAM), and space management. The university seeks a vendor with experience in ISO 55000 implementation, preferably with experience in higher education or similar complex organizational environments. The financial proposal will be evaluated with a 15% weight, considering project costs compared to other respondents, while technical approach, vendor experience, and deliverables will constitute the majority of the evaluation criteria.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 66-25066 SB Addendum #1.pdf | ||
| 66-25066 SB Addendum #3.pdf | ||
| 66-25066 SB Addendum #2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF NORTH CAROLINA
University of North Carolina at Charlotte
Request for Proposals # 66-25066 SB
Process and Asset Management System Consulting
Date of Issue: Friday, April 25, 2025
Proposal Due Date: Thursday, May 15, 2025
At 2:00 PM ET
Direct all inquiries concerning this RFP to:
Scott Brechtel
Director of Materials Management
Email: sjbrecht@charlotte.edu
Request for Proposals #
66-25066 SB
For internal State agency processing, including tabulation of proposals, provide your company’s eVP (Electronic
Vendor Portal) Number. Pursuant to G.S. 132-1.10(b) this identification number shall not be released to the public.
This page will be removed and shredded, or otherwise kept confidential, before the procurement file is made available for public inspection.
This page shall be filled out and returned with your proposal.
Failure to do so may subject your proposal to rejection.
Vendor Name
Vendor eVP#
Note: For a contract to be awarded to you, your company (you) must be a North Carolina registered vendor in good standing. You must enter the vendor number assigned through eVP (Electronic Vendor
Portal). If you do not have a vendor number, register at https://vendor.ncgov.com/vendor/login
Electronic responses ONLY will be accepted for this solicitation.
Proposal Number: 66-25066 SB Vendor: __________________________________________
Ver: 03/2025 2
Refer ALL Inquiries regarding this RFP to:
Scott Brechtel sjbrecht@charlotte.edu
Request for Proposal #66-25066 SB
Proposals will be received until:
Thursday, May 15, 2025 @ 2:00 PM ET
EXECUTION
In compliance with this Request for Proposals (RFP), and subject to all the conditions herein, the undersigned Vendor offers and agrees to furnish and deliver any or all items upon which prices are bid, at the prices set opposite each item within the time specified herein.
By executing this proposal, the undersigned Vendor understands that false certification is a Class I felony and certifies that:
▪ this proposal is submitted competitively and without collusion (G.S. 143-54),
▪ none of its officers, directors, or owners of an unincorporated business entity has been convicted of any violations of Chapter 78A of the General Statutes, the Securities Act of 1933, or the Securities Exchange Act of 1934 (G.S. 143-59.2), and
▪ it is not an ineligible Vendor as set forth in G.S. 143-59.1.
Furthermore, by executing this proposal, the undersigned certifies to the best of Vendor’s knowledge and belief, that:
▪ it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal or State department or agency.
As required by G.S. 143-48.5, the undersigned Vendor certifies that it, and each of its sub-Contractors for any Contract awarded as a result of this RFP, complies with the requirements of Article 2 of Chapter 64 of the NC General Statutes, including the requirement for each employer with more than 25 employees in North Carolina to verify the work authorization of its employees through the federal E-Verify system.
As required by Executive Order 24 (2017), the undersigned vendor certifies will comply with all Federal and State requirements concerning fair employment and that it does not and will not discriminate, harass, or retaliate against any employee in connection with performance of any
Contract arising from this solicitation.
G.S. 133-32 and Executive Order 24 (2009) prohibit the offer to, or acceptance by, any State Employee associated with the preparing plans, specifications, estimates for public contracts; or awarding or administering public contracts; or inspecting or supervising delivery of the public contract of any gift from anyone with a contract with the State, or from any person seeking to do business with the State. By execution of this response to the RFP, the undersigned certifies, for Vendor’s entire organization and its employees or agents, that Vendor is not aware that any such gift has been offered, accepted, or promised by any employees of your organization.
By executing this proposal, Vendor certifies that it has read and agreed to the INSTRUCTION TO VENDORS and the NORTH CAROLINA GENERAL
TERMS AND CONDITIONS incorporated herein. These documents can be accessed from the ATTACHMENTS page within this document.
Failure to execute/sign proposal prior to submittal may render proposal invalid and it MAY BE REJECTED.
Late proposals CANNOT and will NOT be accepted.
COMPLETE/FORMAL NAME OF VENDOR:
STREET ADDRESS: P.O. BOX:
CITY, STATE & ZIP: TELEPHONE NUMBER:
PRINCIPAL PLACE OF BUSINESS ADDRESS IF DIFFERENT FROM ABOVE (SEE INSTRUCTIONS TO VENDORS ITEM #21):
NAME OF PERSON SIGNING ON BEHALF OF VENDOR: TITLE:
VENDOR’S AUTHORIZED SIGNATURE: DATE: EMAIL:
Ver: 03/2025 3
VALIDITY PERIOD
Offer shall be valid for at least sixty 60 days from date of bid opening, unless otherwise stated here: ______ days, or if extended by mutual agreement of the parties in writing. Any withdrawal of this offer shall be made in writing, effective upon receipt by the agency issuing this RFP.
ACCEPTANCE OF PROPOSAL
If your proposal is accepted, all provisions of this RFP, along with the written results of any negotiations, shall constitute the written agreement between the parties (“Contract”). The NORTH CAROLINA GENERAL TERMS AND CONDITIONS are incorporated herein and shall apply. Depending upon the Goods or Services being offered, other terms and conditions may apply, as mutually agreed.
FOR STATE USE ONLY: Offer accepted and Contract awarded this________ day of __________, 2025, as indicated on
The attached certification, by ____________________________________________________________________.
(Authorized Representative of UNC Charlotte)
Ver: 03/2025 4
1.0 PURPOSE AND BACKGROUND
The University of North Carolina at Charlotte was established in 1965 by the North Carolina General Assembly which transformed Charlotte College, with beginnings in 1946, into a campus of The University of North Carolina. It is organized into the following eight colleges: College of Arts & Architecture; College of Science; College of Humanities & Earth and Social Science; College of Business; College of Education; College of Engineering; College of Health and Human Services; and the College of Computing and Informatics. It offers a broad array of degree programs at the undergraduate, graduate, and doctoral levels and also in graduate certificate programs.
Enrollment is approximately 31,000 with 19 percent of the students pursuing graduate degrees. The University is expected to experience continued growth in the foreseeable future.
The intent of this solicitation is to secure a consultant to assist with two key deliverables. First, the development and implementation of an ISO 55000 compliant asset management system for use across campus. The second task will encompass assistance with the development of the requirements to be included in a separate RFP that will be issued to secure a new asset management and work management software platform.
1.1 CONTRACT TERM
The Contract shall have an initial term that begins with the award of this solicitation (the “Effective Date”) and is expected to be completed by late 2026.
Proposals shall be submitted in accordance with the terms and conditions of this RFP and any addenda issued hereto.
2.0 GENERAL INFORMATION
2.1 REQUEST FOR PROPOSAL DOCUMENT
This RFP is comprised of the base RFP document, any attachments, and any addenda released before Contract award, which are incorporated herein by reference.
2.2 E-PROCUREMENT
ATTENTION: NC E-Procurement does NOT apply to this solicitation and the paragraph entitled ELECTRONIC
PROCUREMENT of the North Carolina General Terms and Conditions does NOT apply.
2.3 NOTICE TO VENDORS REGARDING RFP TERMS AND CONDITIONS
It shall be the Vendor’s responsibility to read the Instructions to Vendors, the North Carolina General Terms and
Conditions, all relevant exhibits and attachments, and any other components made a part of this RFP and comply with all requirements and specifications herein. Vendors are also responsible for obtaining and complying with all Addenda and other changes that may be issued in connection with this RFP.
If Vendors have questions or issues regarding any component of this RFP, those must be submitted as questions in accordance with the instructions in the PROPOSAL QUESTIONS Section. If the State determines that any changes will be made as a result of the questions asked, then such decisions will be communicated in the form of an RFP addendum.
The State may also elect to leave open the possibility for later negotiation of specific provisions of the Contract that have been addressed during the question-and-answer period, prior to contract award.
Other than through the process of negotiation under 01 NCAC 05B.0503, the State rejects and will not be required to evaluate or consider any additional or modified terms and conditions submitted with Vendor’s proposal or otherwise.
This applies to any language appearing in or attached to the document as part of the Vendor’s proposal that purports to vary any terms and conditions or Vendors’ instructions herein or to render the proposal non-binding or subject to
Ver: 03/2025 5 further negotiation. Vendor’s proposal shall constitute a firm offer that shall be held open for the period required herein (“Validity Period” above).
The State may exercise its discretion to consider Vendor proposed modifications. By execution and delivery of this
RFP Response, the Vendor agrees that any additional or modified terms and conditions, whether submitted purposely or inadvertently, shall have no force or effect, and will be disregarded unless expressly agreed upon through negotiation and incorporated by way of a Best and Final Offer (BAFO). Noncompliance with, or any attempt to alter or delete, this paragraph shall constitute sufficient grounds to reject Vendor’s proposal as nonresponsive.
2.4 RFP SCHEDULE
The table below shows the intended schedule for this RFP. The State will make every effort to adhere to this schedule.
Event Responsibility Date and Time
Issue RFP State Friday, April 25, 2025
Submit Written Questions Vendor Monday, May 5, 2025 by 2:00 PM ET
Provide Response to Questions State Thursday, May 8, 2025
Submit Proposals Vendor Thursday, May 15, 2025 at 2:00 PM ET
Contract Award State Monday, June 9, 2025
2.5 RESERVED
2.6 PROPOSAL QUESTIONS
Upon review of the RFP documents, Vendors may have questions to clarify or interpret the RFP in order to submit the best proposal possible. To accommodate the Proposal Questions process, Vendors shall submit any such questions by the “Submit Written Questions” date and time provided in the RFP SCHEDULE Section above, unless modified by
Addendum.
Written questions shall be emailed to sjbrecht@charlotte.edu by the date and time specified above. Vendors should enter “RFP # 66-25066 SB: Questions” as the subject for the email. Question submittals should include a reference to the applicable RFP section.
Questions received prior to the submission deadline date, the State’s response, and any additional terms deemed necessary by the State will be posted in the form of an addendum to the electronic Vendor Portal (eVP), https://evp.nc.gov, and shall become an Addendum to this RFP. No information, instruction or advice provided orally or informally by any State personnel, whether made in response to a question or otherwise in connection with this
RFP, shall be considered authoritative or binding. Vendors shall rely only on written material contained in the RFP and an addendum to this RFP.
2.7 PROPOSAL SUBMITTAL
IMPORTANT NOTE: This is an absolute requirement. Vendor shall bear the risk of late submission due to unintended or unanticipated delay, or technical issue. It is the Vendor’s sole responsibility to ensure its proposal has been received via the eVP as described in this RFP by the specified time and date of opening. The date and time of receipt will be electronically time stamped by the system when received. Any proposal or portion thereof received or attempted to be submitted after the proposal submission deadline will be rejected.
All proposal responses shall be submitted electronically via the electronic Vendor Portal (eVP). Additional information can be found at the eVP updates for Vendors link: https://eprocurement.nc.gov/news-events/evp-updates-vendors.
Ver: 03/2025 6
Attempts to submit a proposal via mail, courier, facsimile (FAX) machine, telephone or email in response to this RFP shall NOT be accepted.
This will be a One-Step proposal process:
Vendor’s proposal may contain both the Technical and Financial Proposal (ATTACHMENT A) submitted for evaluation in a single file.
If confidential and proprietary information is included in the proposal, also submit one (1) signed, REDACTED copy of the proposal. Such information may include trade secrets defined by N.C. Gen. Stat. § 66-152 and other information exempted from the Public Records Act pursuant to N.C. Gen. Stat. §132- 1.2. Vendor may designate information, Products, Services or appropriate portions of its response as confidential, consistent with and to the extent permitted under the statutes and rules set forth above. By so redacting any page, or portion of a page, the Vendor warrants that it has formed a good faith opinion, having received such necessary or proper review by counsel and other knowledgeable advisors, that the portions determined to be confidential and proprietary and redacted as such, meet the requirements of the Rules and Statutes set forth above. However, under no circumstances shall price information be designated as confidential.
If the Vendor does not provide a redacted version of the proposal with its proposal submission, the University may release an unredacted version if an open records request is received.
Failure to submit a proposal in strict accordance with these instructions shall constitute sufficient cause to reject a
Vendor’s proposal(s). Vendors are strongly encouraged to allow sufficient time to upload proposals.
Critical updated information may be included in Addenda to this RFP. It is important that all Vendors responding to this
RFP periodically check the State’s eVP website for any Addenda that may be issued prior to the bid opening date. All
Vendors shall be deemed to have read and understood all information in this RFP and all Addenda thereto.
2.8 PROPOSAL CONTENTS
Vendors shall populate all attachments of this RFP that require the Vendor to provide information and include an authorized signature where requested. Failure to provide all required items, or Vendor’s submission of incomplete items, may result in the State rejecting Vendor’s proposal, in the State’s sole discretion.
Vendor RFP responses shall include the following items and attachments:
a) Cover Letter, which must contain the following: (i) a statement that confirms that the proposer has read the RFP in its entirety, including all links, and all Addenda released in conjunction with the RFP, (ii) a statement that the
Vendor agrees to perform in accordance with the scope of work, requirements, and specifications contained herein; (iii) Vendor’s agreement to comply with all instructions, terms and conditions, and attachments; and (iv) contact information for Vendor’s representative responsible for this RFP.
b) Completed and signed version of all EXECUTION PAGES, and any pages requiring vendor input.
c) Signed receipt pages of any addenda released in conjunction with this RFP, if required to be returned.
d) Vendor’s Proposal addressing all requirements of this RFP, to include, but not be limited to:
Plan to implement an ISO 55000 compliant asset management system.
Plan to perform an analysis of requirements and recommend suitable vendors and implementers for the follow-up RFP that will be issued for a new software platform.
Sample ISO 55000 deliverables from recent projects including an asset management plan (not a SAMP or asset management policy) and an asset management system procedure manual.
Sample EAMIS analysis products from recent projects including comparison matrices vs client requirements.
Ver: 03/2025 7
List of EAM vendors and implementers the consultant has partnered with, used or recommended in projects in the last 5 years.
List of any University staff that should be dedicated to the consultant’s efforts for information gathering, analysis, and implementation processes.
List of University information systems the consultant needs access to.
Company background information.
Recent project descriptions.
e) Completed version of ATTACHMENT A: FINANCIAL PROPOSAL
f) Completed version of ATTACHMENT D: HUB SUPPLEMENTAL VENDOR INFORMATION
g) Completed version of ATTACHMENT E: CUSTOMER REFERENCE FORM
h) Completed version of ATTACHMENT F: LOCATION OF WORKERS UTILIZED BY VENDOR
i) Completed and signed version of ATTACHMENT G: CERTIFICATION OF FINANCIAL CONDITION
2.9 ALTERNATE PROPOSALS
Unless provided otherwise in this RFP, Vendor may submit alternate proposals for comparable Goods, various methods or levels of Service(s), or that propose different options. Alternate proposals must specifically identify the RFP requirements and advantage(s) addressed by the alternate proposal. Any alternate proposal, in addition to the marking described above, must be clearly marked with the legend: “Alternate Proposal #66-25066 SB [for ‘name of Vendor’]”.
Each proposal must be for a specific set of Goods and Services and must include specific pricing. If a Vendor chooses to respond with various offerings, each must be offered with a separate price and be contained in a separate proposal document. Each proposal must be complete and independent of other proposals offered.
2.10 DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
Relevant definitions for this RFP are provided in 01 NCAC 05A .0112 and in the Instructions to Vendors found below which are incorporated herein by this reference.
3.0 METHOD OF AWARD AND PROPOSAL EVALUATION PROCESS
3.1 METHOD OF AWARD
North Carolina G.S. 143-52 provides a general list of criteria the State shall use to award contracts, as supplemented by the additional criteria herein. The Goods or Services being procured shall dictate the application and order of criteria; however, all award decisions shall be in the State’s best interest. All qualified proposals will be evaluated, and awards will be made to the Vendor(s) meeting the specific RFP Specifications and achieving the highest and best final evaluation, based on the criteria described below.
While the intent of this RFP is to award a Contract to a single Vendor, the State reserves the right to make separate awards to different Vendors for one or more portions, to not award one or more portions or to cancel this RFP in its entirety without awarding a Contract, if it is considered to be most advantageous to the State to do so.
The State reserves the right to waive any minor informality or technicality in proposals received.
3.2 CONFIDENTIALITY AND PROHIBITED COMMUNICATIONS DURING EVALUATION
While this RFP is under evaluation, the responding Vendor, including any subcontractors and suppliers, is prohibited from engaging in conversations intended to influence the outcome of the evaluation. See the Paragraph of the
Instructions to Vendors entitled COMMUNICTIONS BY VENDORS.
Ver: 03/2025 8
Each Vendor submitting a proposal to this RFP, including its employees, agents, subcontractors, suppliers, subsidiaries and affiliates, is prohibited from having any communications with any person inside or outside the using agency; issuing agency; other government agency office or body (including the purchaser named above, any department secretary, agency head, members of the General Assembly and Governor’s office); or private entity, if the communication refers to the content of Vendor’s proposal or qualifications, the content of another Vendor’s proposal, another Vendor’s qualifications or ability to perform a resulting contract, and/or the transmittal of any other communication of information that could be reasonably considered to have the effect of directly or indirectly influencing the evaluation of proposals, the award of a contract, or both.
Any Vendor not in compliance with this provision shall be disqualified from evaluation and award. A Vendor’s proposal may be disqualified if its subcontractor and/or supplier engage in any of the foregoing communications during the time that the procurement is active (i.e., the issuance date of the procurement until the date of contract award or cancellation of the procurement). Only those discussions, communications or transmittals of information authorized or initiated by the issuing agency for this RFP or inquiries directed to the purchaser named in this RFP regarding requirements of the RFP (prior to proposal submission) or the status of the award (after submission) are excepted from this provision.
3.3 PROPOSAL EVALUATION PROCESS
Only responsive submissions will be evaluated.
The State will conduct a One-Step evaluation of Proposals:
Proposals will be received according to the method stated in the Proposal Submittal Section above.
All proposals must be received by the issuing agency not later than the date and time specified in the RFP SCHEDULE
Section above, unless modified by Addendum. Vendors are cautioned that this is a request for offers, not an offer or request to contract, and the State reserves the unqualified right to reject any and all offers at any time if such rejection is deemed to be in the best interest of the State.
At the date and time provided in the RFP SCHEDULE Section above, unless modified by Addendum, the proposal from each responding Vendor will be accessed via the eVP and all offers (except those that have been previously withdrawn, or voided bids) will be noted. Since negotiations after receipt of bids is authorized pursuant to G.S.
143-49 and 01 NCAC 05B.0503, only the names of offerors and the Goods and Services offered shall be noted at the time of opening. Interested parties are cautioned that proposals and their components are subject to further evaluation for completeness and correctness and therefore may not be an exact indicator of a Vendor’s final position.
At their option, the evaluators may request oral presentations or discussions with any or all Vendors for clarification or to amplify the materials presented in any part of the proposal. Vendors are cautioned, however, that the evaluators are not required to request presentations or other clarification—and often do not. Therefore, all proposals should be complete and reflect the most favorable terms available from the Vendor.
Upon completion of the evaluation process, the State will make award(s) based on the evaluation and post the award(s) to the eVP website under the RFP number for this solicitation. Award of a Contract to one Vendor does not mean that the other proposals lacked merit, but that, all factors considered, the selected proposal was deemed most advantageous and represented the best value to the State.
Ver: 03/2025 9
The State reserves the right to negotiate with one or more vendors, or to reject all original offers and negotiate with one or more sources of supply that may be capable of satisfying the requirement, and in either case to require
Vendor to submit a Best and Final Offer (BAFO) based on discussions and negotiations with the State.
3.4 EVALUATION CRITERIA
In addition to the general criteria in G.S. 143-52 which may or may not be relevant to this RFP, all qualified proposals will be evaluated, and award made based on considering the following criteria, to result in an award most advantageous to the State:
Vendor Background & Experience 25%
● Demonstrated stable vendor who can successfully complete the project
● Experience with ISO 55000 implementation/certification for clients similar in size, asset portfolio, and business purpose
● Experience with EAMIS evaluation for an ISO 55000 environment
● Project example and detailed information provided
● Responses provided from references provided
Deliverables 35%
● ISO compliant asset management system implementation proposed
● Sample ISO 55000 deliverables from recent projects including an asset management plan (not a SAMP or asset management policy) and an asset management system procedure manual.
● Description of method for EAMIS evaluation and recommendation
● List of EAM vendors and implementers the consultant has partnered with, hired, or recommended in projects within the last five (5) years
● Sample EAMIS analysis products from recent projects including comparison matrices versus client requirements
Technical Approach 25%
● Thoroughness of proposed project plan
● Timeline proposed for project completion
● Proposed vendor project team, qualifications, and work process (virtual versus on-site)
● University asset and staffing requirements
Financial Proposal 15%
● Project costs as compared to other RFP respondents
The State will determine low cost by normalizing the scores as follows:
The proposal with the lowest cost will receive a score of XX. All other competing proposals will be assigned a portion of the maximum score using the formula:
Financial Proposal Points Available
(20) x the cost of the lowest cost proposal the cost of the cost proposal being evaluated
Ver: 03/2025 10
3.5 PERFORMANCE OUTSIDE THE UNITED STATES
Vendor shall complete ATTACHMENT F: LOCATION OF WORKERS UTILIZED BY VENDOR. In addition to any other evaluation criteria identified in this RFP, the State may also consider, for purposes of evaluating proposed or actual contract performance outside of the United States, how that performance may affect the following factors to ensure that any award will be in the best interest of the State:
a) Total cost to the State
b) Level of quality provided by the Vendor
c) Process and performance capability across multiple jurisdictions
d) Protection of the State’s information and intellectual property
e) Availability of pertinent skills
f) Ability to understand the State’s business requirements and internal operational culture
g) Particular risk factors such as the security of the State’s information technology
h) Relations with citizens and employees
i) Contract enforcement jurisdictional issues
3.6 INTERPRETATION OF TERMS AND PHRASES
This RFP serves two functions: (1) to advise potential Vendors of the parameters of the solution being sought by the
State; and (2) to provide (together with other specified documents) the terms of the Contract resulting from this procurement. The use of phrases such as “shall,” “must,” and “requirements” are intended to create enforceable contract conditions. In determining whether proposals should be evaluated or rejected, the State will take into consideration the degree to which Vendors have proposed or failed to propose solutions that will satisfy the State’s needs as described in the RFP. Except as specifically stated in the RFP, no one requirement shall automatically disqualify a Vendor from consideration. However, failure to comply with any single requirement may result in the State exercising its discretion to reject a proposal in its entirety.
4.0 REQUIREMENTS
This Section lists the requirements related to this RFP. By submitting a proposal, the Vendor agrees to meet all stated requirements in this Section as well as any other specifications, requirements, and terms and conditions stated in this
RFP. If a Vendor is unclear about a requirement or specification, or believes a change to a requirement would allow for the State to receive a better proposal, the Vendor is urged to submit these items in the form of a question during the question and answer period in accordance with the Proposal Questions Section above.
4.1 FINANCIAL PROPOSAL
Proposal price shall constitute the total cost to the State for complete performance in accordance with the requirements and specifications herein, including all applicable charges for handling, transportation, administrative and other similar fees. Provide a complete pricing proposal for completion of all requirements of this RFP, clearly label as ATTACHMENT A: FINANCIAL PROPOSAL, and include in Vendor’s proposal. Financial proposal must be separated to clearly show the individual costs for each of the two separate tasks/deliverables detailed in this RFP.
The pricing provided in ATTACHMENT A, or resulting from any negotiations, is incorporated herein and shall become part of any resulting Contract.
4.2 INVOICES
The standard format for invoices shall include detailed information to allow University to verify pricing at point of receipt matches the correct price from the proposal submitted.
Ver: 03/2025 11
The following fields shall be included on all invoices, as relevant:
Vendor’s Billing Address, Customer Account Number, NC Contract Number, Order Date, Buyer’s Purchase Order Number, Manufacturer Part Numbers, Vendor Part Numbers, Item Descriptions, Price, Quantity, and Unit of Measure.
INVOICES MAY NOT BE PAID UNTIL AN INSPECTION HAS OCCURRED AND THE SERVICES ACCEPTED.
4.3 FINANCIAL STABILITY
As a condition of contract award, the Vendor must certify that it has the financial capacity to perform and to continue to perform its obligations under the Contract; that Vendor has no constructive or actual knowledge of an actual or potential legal proceeding being brought against Vendor that could materially adversely affect performance of this Contract; and that entering into this Contract is not prohibited by any contract, or order by any court of competent jurisdiction.
Each Vendor shall certify it is financially stable by completing ATTACHMENT G: CERTIFICATION OF FINANCIAL CONDITION. The State is requiring this certification to minimize potential issues from contracting with a Vendor that is financially unstable. From the date of the Certification to the expiration of the Contract, the Vendor shall notify the State within thirty (30) days of any occurrence or condition that materially alters the truth of any statement made in this Certification. The Contract Manager may require annual recertification of the Vendor’s financial stability.
4.4 HUB PARTICIPATION
Pursuant to North Carolina General Statute G.S. 143-48, it is State policy to encourage and promote the use of small, minority, physically handicapped, and women contractors in purchasing Goods and Services. As such, this RFP will serve to identify those Vendors that are minority owned or have a strategic plan to support the State’s Historically
Underutilized Business program by meeting or exceeding the goal of 10% utilization of diverse firms as 1st or 2nd tier subcontractors. Vendor shall complete ATTACHMENT D: HUB SUPPLEMENTAL VENDOR INFORMATION.
4.5 VENDOR EXPERIENCE
In its Proposal, Vendor shall demonstrate experience with public and/or private sector clients with similar or greater size and complexity to the State. Vendor shall provide information as to the qualifications and experience of all executive, managerial, legal, and professional personnel to be assigned to this project, including resumes citing experience with similar projects and the responsibilities to be assigned to each person. Vendor’s proposal shall contain a description of a project of similar size and scope that was completed within the last two (2) years to demonstrate applicable experience. Include representative deliverables from ISO 55000 implementation such as an asset management plan (not a SAMP or asset management policy), an asset management system procedure manual, and sample deliberative products for EAMIS selection such as comparison matrices and how the recommended solution aligned with the client’s requirements.
4.6 REFERENCES
Vendor shall provide three (3) references, using ATTACHMENT E: CUSTOMER REFERENCE FORM, for which it has provided Services of similar size and scope to those proposed herein. The State may contact these users to determine whether the Services provided are substantially similar in scope to those proposed herein and whether Vendor’s performance has been satisfactory. The information obtained may be considered in the evaluation of the Proposal.
Separate references may be provided for each of the two phases of this project, if necessary.
4.7 BACKGROUND CHECKS
Any personnel or agent of Vendor performing Services under any Contract arising from this RFP may be required to undergo a background check at the expense of the Vendor, if so requested by the State.
Ver: 03/2025 12
4.8 PERSONNEL
Vendor warrants that qualified personnel shall provide Services under this Contract in a professional manner.
“Professional manner” means that the personnel performing the Services will possess the skill and competence consistent with the prevailing business standards in the industry. Vendor will serve as the prime contractor under this
Contract and shall be responsible for the performance and payment of all subcontractor(s) that may be approved by the State. Names of any third-party Vendors or subcontractors of Vendor may appear for purposes of convenience in
Contract documents; and shall not limit Vendor’s obligations hereunder. Vendor will retain executive representation for functional and technical expertise as needed in order to incorporate any work by third party subcontractor(s).
Should the Vendor’s proposal result in an award, the Vendor shall be required to agree that it will not substitute key personnel assigned to the performance of the Contract without prior written approval by the Contract Lead. Vendor shall further agree that it will notify the Contract Lead of any desired substitution, including the name(s) and references of Vendor’s recommended substitute personnel. The State will approve or disapprove the requested substitution in a timely manner. The State may, in its sole discretion, terminate the Services of any person providing Services under this
Contract. Upon such termination, the State may request acceptable substitute personnel or terminate the contract
Services provided by such personnel.
4.9 VENDOR’S REPRESENTATIONS
If Vendor’s Proposal results in an award, Vendor agrees that it will not enter any agreement with a third party that may abridge any rights of the State under the Contract. If any Services, deliverables, functions, or responsibilities not specifically described in this solicitation are required for Vendor’s proper performance, provision and delivery of the
Service and deliverables under a resulting Contract, or are an inherent part of or necessary sub-task included within such Service, they will be deemed to be implied by and included within the scope of the Contract to the same extent and in the same manner as if specifically described in the Contract. Unless otherwise expressly provided herein, Vendor will furnish all of its own necessary management, supervision, labor, facilities, furniture, computer and telecommunications equipment, software, supplies and materials necessary for the Vendor to provide and deliver the
Services and/or other Deliverables.
4.10 AGENCY INSURANCE REQUIREMENTS
A. Default Insurance Coverage from the General Terms and Conditions applicable to this Solicitation:
☐ Small Purchases
☒ Contract value in excess of the Small Purchase threshold, but up to $1,000,000.00
☐ Contract value in excess of $1,000,000.00
5.0 SPECIFICATIONS AND SCOPE OF WORK
5.1 GENERAL BACKGROUND
The Facilities Management (FM) department established a policy for asset management in 2022 to replace its campus buildout strategy which was focused on doubling the campus size from 2000 to 2022. This included the construction of more than one hundred (100) buildings and facilities culminating with the delivery of Klein Hall. Also, in 2019-2020, FM reorganized itself based on a consultant’s recommendations for efficiency and effectiveness which
Ver: 03/2025 13 also identified the significant inadequacies of Archibus, our current Integrated Workplace Management System (IWMS). The consultant determined the system could not meet the requirements of a modern Facilities Management department and graded it with Cs and Fs against several other available systems. Since 2021, FM has worked to develop an asset management strategy and now requires assistance to complete its implementation of a rigorous ISO 55000 compliant system. FM also needs assistance with selecting a new Enterprise Asset Management Information System (EAMIS) to replace Archibus’ work and asset management functions, support our ISO compliant asset management processes, and optimize FM core competencies (asset management, reliability management, work and procurement management, project management and space management).
5.2 SCOPE OF WORK
Develop a comprehensive Asset Management System (AMS) compliant with ISO 55000 standards, implement the system across all relevant departments and facilities, train staff on the use and maintenance of the system, and ensure continuous improvement and compliance with ISO 55000. The awarded Vendor will also be tasked with analyzing the University’s requirements for an Enterprise Asset Management Information System (EAMIS) and assisting with the development of the requirements to be included in a separate RFP to be issued for implementation of a new platform.
5.3 TASKS & DELIVERABLES
The specific services the University is seeking are listed below. Proposal by the Vendor must meet or exceed the listed requirements to be considered for award.
1. Develop and implement an ISO 55000 compliant asset management system.
a. Conduct a thorough assessment of current asset management practices.
b. Design an ISO 55000 compliant asset management framework.
c. Develop necessary documentation and procedures.
d. Implement the asset management system.
e. Provide training and support to university staff.
f. Ensure the system is scalable and adaptable to future needs.
2. Analyze requirements and identify potential RFP respondents for an EAMIS to support our ISO 55000 compliant asset management system and replace the existing IWMS.
a. Analyze the university's reliability management, asset management, and maintenance management needs and current system capabilities.
i. Identify opportunities for additional consolidation, integration, and streamlining of processes beyond these core areas including Health, Safety and Environment (HSE), Information Technology Asset Management (ITAM), automotive fleet management, general service request tracking, space management and project management.
b. Create a list of University requirements for review ensuring they include at a minimum:
i. Consideration of a software solution and consideration for 3rd party implementation
ii. Support ISO 55000 asset management compliance
iii. Optimization of reliability management and maintenance processes
iv. The ability to integrate facilities management processes that are not core competencies of the ISO asset management system, e.g. space management, project management, custodial services, landscaping services, etc.
v. Manage data IAW ISO 14224, COBIE, SAE JA1011/1012, ISO 19650 and ISO 55000
vi. Can integrate Operating Technology (OT) such as SCADA, BAS or IoT plus BIM and GIS
vii. A current or future AI component for analysis of asset reliability, lifecycle, and operational efficiency
Ver: 03/2025 14
viii. A current or future capability of providing a live sandbox for faculty research and curriculum
ix. Training requirements for implementation and annual skill sustainment
c. Complete a comparative analysis of potential EAMIS solutions versus university requirements.
d. Recommend three EAMIS vendors and three implementers that would meet the requirements developed in this analysis.
e. Develop a notional roadmap for the potential new system’s implementation including major steps, milestones and timeline.
5.4 PROJECT ORGANIZATION
Vendor shall describe the organizational and operational structure it proposes to utilize for the work described in this RFP and identify the responsibilities to be assigned to each person Vendor proposes to staff the work.
1. Organize the project for the simultaneous start of both task/deliverable items but with separate delivery of milestones in order to fast track the EAMIS deliverable to meet the university’s January 2026 deadline while including the major processes the ISO compliant AMS will implement.
2. Ensure project plan includes milestones, deliverables, phasing and key meetings, including the appropriate audiences for each scope item.
3. Timeline: Vendor shall provide a detailed timeline for all phases of project completion.
a. Project Kickoff: Immediately after contract award, expected to be no later than June 1, 2025
b. Completion of the development and implementation of an ISO 55000 compliant asset management system expected by late 2026
c. Completion of assistance in development of the requirements for a separate RFP to be issued to support the asset management system and replace the existing Integrated Work Management System, expected by January 2026 (to meet project submission deadline to University IT department)
5.5 TECHNICAL APPROACH
Vendor’s proposal shall include, in narrative, outline, and/or graph form, the Vendor's approach to accomplishing the tasks outlined in this RFP. A description of each deliverable and the schedule for accomplishing each shall be included.
1. Identify a dedicated project manager with a dedicated project team for each scope item. Describe the project team composition, experience and intended work location of each member. Describe how the project team will interact with university counterparts on a daily basis, to include the plan for virtual versus on-site activities.
2. The AMS must be capable of implementing essential elements using the current IWMS and full implementation using the new EAMIS.
3. The EAMIS evaluation should identify considerations for SaaS versus on-premise solutions, data management, integral AI capabilities, university staffing needed to support implementation and sustained operations, initial and sustainment training, and use of the system and data by faculty for research and curriculum teaching purposes.
a. Provide EAMIS evaluation and selection criteria to be used for this project.
b. Provide a list of EAM vendors and implementers the consultant has partnered with, used, or recommended in projects in the last five (5) years.
4. Identify any university staff that should be dedicated, have significant involvement, and have casual involvement with the implementation and evaluation processes.
5. Identify university information systems access requirements and purpose.
Ver: 03/2025 15
6.0 CONTRACT ADMINISTRATION
All Contract Administration requirements are conditioned on an award resulting from this solicitation.
6.1 CONTRACT MANAGER AND CUSTOMER SERVICE
The Vendor shall be required to designate and make available to the State a contract manager. The contract manager shall be the State’s point of contact for Contract related issues and issues concerning performance, progress review, scheduling, and service.
Contract Manager Point of Contact
Name:
Office Phone #:
Mobile Phone #:
Email:
The Vendor shall be required to designate and make available to the State a contact for customer service for all customer service-related issues.
Customer Service Point of Contact
Name:
Office Phone #:
Mobile Phone #:
Email:
6.2 POST AWARD PROJECT REVIEW MEETINGS
The Vendor, at the request of the State, shall be required to meet periodically with the State for Project Review meetings. The purpose of these meetings will be to review project progress reports, discuss Vendor and State performance, address outstanding issues, review problem resolution, provide direction, evaluate continuous improvement and cost saving ideas, and discuss any other pertinent topics.
6.3 CONTINUOUS IMPROVEMENT
The State encourages the Vendor to identify opportunities to reduce the total cost the State. A continuous improvement effort consists of various ways to enhance business efficiencies as performance progresses.
Ver: 03/2025 16
6.4 WEEKLY STATUS REPORTS
The Vendor shall be required to provide a weekly Management Report to the designated Contract Lead. This report shall include, at a minimum, information concerning the work accomplished during the reporting period; work to be accomplished during the subsequent reporting period; problems, real or anticipated, and notification of any significant deviation from previously agreed upon work plans and schedules. These reports shall be well organized and easy to read. The Vendor shall submit these reports electronically using the format required by the Purchasing Agency. The
Vendor shall submit the reports in a timely manner and on a regular schedule as agreed by the parties.
6.5 ACCEPTANCE OF WORK
Performance of the work and/or delivery of services shall be conducted and completed at least in accordance with the
Contract requirements and recognized and customarily accepted industry practices. Performance shall be considered complete when the Services are approved as acceptable by the Contract Administrator.
The State shall have the obligation to notify Vendor, in writing ten (10) calendar days following completion of such work or delivery of a deliverable described in the Contract that it is not acceptable. The notice shall specify in reasonable detail the reason(s) it is unacceptable. Acceptance by the State shall not be unreasonably withheld; but may be conditioned or delayed as required for reasonable review, evaluation, installation, or testing, as applicable to the work or deliverable. Final acceptance is expressly conditioned upon completion of all applicable assessment procedures. Should the work or deliverables fail to meet any specifications, acceptance criteria or otherwise fail to conform to the Contract, the State may exercise any and all rights hereunder, including, for Goods deliverables, such rights provided by the Uniform Commercial Code, as adopted in North Carolina.
6.6 FAITHFUL PERFORMANCE
Any Contract may include terms ensuring a Vendor's performance such as: (1) a bond, or similar assurance; (2) liquidated damages; (3) a percentage of the Contract value held as a retainage; (4) withholding final payment contingent on acceptance of the final deliverable; and (5) any other provision that assures performance of the Vendor.
6.7 DISPUTE RESOLUTION
During the performance of the Contract, the parties agree that it is in their mutual interest to resolve disputes informally. Any claims by the Vendor shall be submitted in writing to the State’s Contract Manager for resolution. Any claims by the State shall be submitted in writing to the Vendor’s Project Manager for resolution. The Parties shall agree to negotiate in good faith and use all reasonable efforts to resolve such dispute(s).
During the time the Parties are attempting to resolve any dispute, each shall proceed diligently to perform their respective duties and responsibilities under this Contract. The Parties will agree on a reasonable amount of time to resolve a dispute. If a dispute cannot be resolved between the Parties within the agreed upon period, either Party may
Ver: 03/2025 17 elect to exercise any other remedies available under the Contract, or at law. This provision, when agreed in the
Contract, shall not constitute an agreement by either party to mediate or arbitrate any dispute.
6.8 CONTRACT CHANGES
Contract changes, if any, over the life of the Contract shall be implemented by contract amendments agreed to in writing by the State and Vendor. Amendments to the contract can only be through the contract administrator.
6.9 PIGGYBACKING OPTION
All public agencies or public higher education institutions may utilize this solicitation and subsequent award to satisfy mandated competition requirements. The other public agencies and other public higher education institutions shall be individually responsible for their obligations with the awarded Vendor. Likewise, Vendor shall be responsible to the public agencies or public higher education institutions in any ensuing contract. University of North Carolina at Charlotte makes no representations, guarantees, or warranties regarding any contract made between awarded Vendor and other public agencies or public higher education institutions.
THE REMAINDER OF THIS PAGE IS INTENTIONALLY LEFT BLANK
Ver: 03/2025 18
7.0 ATTACHMENTS
**IMPORTANT NOTICE**
RETURN THE REQUIRED ATTACHMENTS WITH YOUR RESPONSE
EACH ATTACHMENT CAN BE ACCESSED FROM THIS LINK:
https://www.doa.nc.gov/divisions/purchase-contract/vendor-forms
ATTACHMENT A: FINANCIAL PROPOSAL
Develop, complete, clearly label as ATTACHMENT A, and return the Pricing associated with this RFP.
ATTACHMENT B: INSTRUCTIONS TO VENDORS
The Instructions to Vendors are incorporated herein by this reference.
ATTACHMENT C: NORTH CAROLINA GENERAL TERMS & CONDITIONS
The North Carolina General Terms and Conditions are incorporated herein by this reference.
ATTACHMENT D: HUB SUPPLEMENTAL VENDOR INFORMATION
Complete and return the Historically Underutilized Businesses (HUB) Vendor Information form.
ATTACHMENT E: CUSTOMER REFERENCE FORM
Complete and return the Customer Reference form.
ATTACHMENT F: LOCATION OF WORKERS UTILIZED BY VENDOR
Complete and return the Location of Workers Utilized by Vendor form.
ATTACHMENT G: CERTIFICATION OF FINANCIAL CONDITION
Complete, sign, and return the Certification of Financial Condition form.
*** Failure to Return the Required Attachments May Eliminate
Your Response from Further Consideration ***
File details come from the government source that posted it. Updated .