657-19-117JB - TES_Limited ACM Re-Inspection Report - Part 5.pdf
PDF 9 MB Posted
- Attached to
- Implement Sterile Processing Service Ventilation Requirements PN:657-19-117JB Federal contract opportunity
- Solicitation number
- 36C25520R0082
About this file
This solicitation is for implementing sterile processing service ventilation requirements at the Jefferson Barracks Division of the Saint Louis Health Care System. The contractor must provide all labor, materials, tools, equipment, supervision and site preparation to perform the work outlined in project 657-19-117JB drawings and specifications. The project cost range is between $500,000 to $1,000,000, has a NAICS code of 238220 with a small business size standard of $16.5 million, and duration of 365 calendar days after notice to proceed. The project is a competitive total set-aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation will be posted on June 5, 2020 to the System for Award Management and only one pre-solicitation site visit will be scheduled. The government will award utilizing the Best Value Lowest Price Technically Acceptable Source Selection Process and the successful prime contractor must perform no less than 25% of general construction labor.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2018 Asbestos/Lead Inspection Report St. Louis Jefferson Barracks VAMC – Bldg. 1
SECTION 17.0
PREVIOUS INSPECTION REPORTS
This section includes copies of all known previous inspection reports considered and referenced during this 2018 re-inspection effort, including the 2008 Altec report and the 1994 report. It should be noted that information from these reports was used, when deemed reliably accurate, in the development of the 2018 re-inspection report, and has been provided for reference herein.
ASBESTOS ASSESSMENT
ASBESTOS REINSPECTION REPORT
Jefferson Barracks Division 1 Jefferson Barracks Drive
St. Louis, Missouri
Building 1
Prepared for:
St. Louis V. A. Medical Center 1 Jefferson Barracks Drive
St. Louis, Missouri
Prepared by:
1421 Clarkview Road, Suite 100 P. O. Box 17867 Baltimore, MD 21209 Shreveport, Louisiana 71138-0867
(888) 776-0670 (318) 687-3771
INTRODUCTION
2008 ASBESTOS REINSPECTION REPORT
ST. LOUIS V. A. MEDICAL CENTER
JOHN COCHRAN AND JEFFERSON BARRACKS DIVISIONS
SCOPE OF WORK
1. The Inspector and Management Planner reviewed prior inspections and Management Plan information on file and compared this information with existing conditions for each facility.
2. This asbestos reinspection complies with the requirements of Asbestos Hazard Emergency Response Act (AHERA).
3. Each facility inspection was performed by an accredited inspector.
4. For each facility, the inspector performed the following tasks:
a. Visually reinspected and reassessed the condition of all friable known or assumed
ACBM.
b. Visually inspected material that was previously considered non-friable Asbestos- Containing Building Material (ACBM) and touched the material to determine whether it has become friable since the last inspection.
c. Identified any homogeneous areas with material that has become friable since the last inspection or reinspection.
d. The inspector collected bulk samples for analysis of newly friable material that is already assumed (not sampled) to be ACBM or collected additional bulk samples to fully assess the suspect materials.
e. Visually inspected, sampled, analyzed, and assessed the conditions of building materials that have been added to the facility since the last inspection or reinspection.
f. Assessed the condition of the newly friable material in areas where samples were collected and of newly friable material in areas assumed to be ACBM.
g. Reassessed the condition of friable known or assumed ACBM previously identified.
h. Recorded above information on field inspection forms for each facility.
5. A Management Planner reviewed the above information and performed the following required functions:
a. Reviewed each Management Plan for compliance with AHERA and verified that the plan reflects current conditions.
b. Reviewed the results of each reinspection and assessment.
c. Recommended in writing, the appropriate response actions.
d. Signed and dated the review documents, included the accreditation number of inspectors and planners, and submitted a copy to the Designated Person.
6. The following information was submitted to the Designated Person under AHERA, for inclusion in the Management Plan for each facility and, optionally, at a central office location.
a. The date of the inspection, the name and signature of the person making the inspection, state of accreditation, his or her accreditation number, and any changes in the condition of known or assumed ACBM.
b. If samples were collected, the exact locations where samples are collected during the inspection, a description of the manner used to choose sampling locations, the name and signature of each accredited inspector who collected the samples, state of accreditation, and his or her accreditation number.
c. Any assessments or reassessments made of friable material, the name and signature of the accredited inspector making the assessments, state of accreditation, and his or her accreditation number.
MANAGEMENT PLAN RECOMMENDATIONS
The following general notes are for all facilities inspected during the Asbestos Reinspection.
These notes reference any deficiencies found in prior inspections, reinspections, and the current Management Plan.
1. Removal Priorities were developed for each homogeneous area. The Removal Priorities are an indicator of priorities for future repair work or abatement work to be scheduled as financial budgets allow. Please see the 2008 Reinspection Condition and Removal Priority Table for further detail.
2. The current condition of material was listed for each homogeneous area. The condition, location, and potential for disturbance factors are used for the hazard ranking. Please see the 2008 Reinspection Condition and Removal Priority Table for the condition summaries.
3. Records for custodial, janitorial, and maintenance staff who have received two-hour awareness training should be filed in the Management Plan.
4. Any new custodial, janitorial, or maintenance staff that have the potential to come in contact with asbestos-containing materials (ACM) are required to attend a two-hour awareness training class. Records of training for new employees should be filed in the Management Plan.
5. The Designated Person is required to inform workers and building occupants at least once a year about the Management Plan. This includes information about inspections, response actions, and post-response action activities that are planned or in progress.
Provide a copy of the notification to each facility and include a copy in the Management Plan.
6. Maintenance areas (boiler rooms, janitor closets, etc.) are required to have warning labels where ACM are located. Install warning labels in these areas as needed. Some older labels may have come loose and are no longer visible. Post the labels in a prominent location.
7. Review the enclosed 2008 Reinspection Condition and Removal Priority Table for maintenance actions that may be required and to establish priorities and budgets for future repair and abatement work.
8. Periodic “Surveillance Inspections” are required every six (6) months. This inspection should indicate the condition of the material and provide recommendations for repair or potential removal. Consistency of inspections is desired and, therefore, should be performed by the same individual(s) for all facilities. An accredited inspector is not required, but is recommended. Records of Surveillance Inspections should be filed in both the administrative and facility Management Plans.
9. ”Reinspections” are required every three (3) years. Updated information should be added to the Management Plan.
10. The existing Management Plan (original) is updated by this Three-Year Reinspection.
All procedures and methods listed in the Plan are still in effect and should be followed unless specifically updated or omitted by this inspection. This includes maintenance procedures, repairs to damaged material, response actions, record keeping, surveillance inspections, and training.
11. An accredited “Supervisor” should be on staff or available on a contract basis per AHERA guidelines. Certification paperwork should be filed in the training section of the Management Plan.
12. ACBM should only be removed by licensed and accredited contractors in the State of Missouri. Response actions related to abatement activity should be filed in the Management Plan. Removal of limited amounts of asbestos is within the scope of the Management Plan by the accredited Supervisor and trained individuals.
13. Notification should be provided to “outside contractors” about ACM within the facility.
This should include such trades or services as telephone, electrical, plumbing, air conditioning, and other construction work. A form should be created for this purpose and placed in the Management Plan.
14. New building construction and portable buildings added to a facility are required to be inspected and sampled for ACM. In lieu of this, a letter from the architect, engineer, or manufacturer can be obtained that states “no ACM were specified or used in the facility”.
A copy of this letter is to be filed with the Management Plan at the facility. This letter will cancel the requirement for sampling.
15. Abatement Costs were developed for each homogeneous area and per facility. The estimated abatement cost is for budget purposes only. The cost is based on the area of material and estimated abatement costs for this material. The cost is for abatement only and does not include abatement design, air monitoring, or project observation costs.
REPORT SECTION
This report includes the following sections:
ACM Homogeneous Areas Summary Table and Drawings
This section provides a quick table reference to all asbestos-containing homogeneous areas found during the reinspection and drawings with the asbestos-containing homogeneous areas found during the 2008 asbestos reinspection.
Condition and Removal Priority Table
This section provides a table with the current condition, potential for disturbance, and removal priority for each homogeneous area.
Master Summary Table – Asbestos Bulk Samples
This table provides a listing of all asbestos bulk samples taken to date.
Asbestos-Containing Bulk Samples
This table provides a listing of all asbestos-containing bulk samples.
2008 Reinspection – Inspection Logs
This section provides the field inspection logs for samples taken during the 2008 asbestos reinspection.
Bulk Sample Location Drawings
This section provides drawings with sample locations for all asbestos bulk samples.
2008 Reinspection – Photographs
This section provides photographs of all asbestos bulk samples taken during the 2008 asbestos reinspection.
2008 Reinspection – Laboratory Reports
This section provides all laboratory analytical results.
Certifications
This section provides certifications for all Inspectors, the Management Planner who reviewed this Management Plan, and the laboratory that performed the bulk sample analysis.
Periodic Surveillance Forms
This section includes the forms completed during the periodic surveillance inspections required every six (6) months.
Management Plan Updates
This section includes the records of any asbestos abatement activities that are completed at the subject site. Notifications, daily notes, drawings, etc., should be placed in this section. This would also include air-monitoring data from asbestos abatement projects.
Response Actions
This section includes the records of any internal asbestos abatement or operation and maintenance activities that may be completed by V. A. employees. This would include any drawings, field notes, and air monitoring that was completed.
Training Documents
This section includes the records of training for the Designated Person and accredited Supervisor, as well as the two-hour awareness training for the custodial, janitorial, and maintenance staff.
Annual Notification Letters
This section includes copies of the annual Notification Letters provided to employees to inform them of the availability of the Management Plan.
Initial Inspection
This section contains the original asbestos inspection that was completed in 1994. This information was used to develop the 2008 Asbestos Reinspection.
CONTRACTORS
This 2008 Asbestos Reinspection was provided by:
Contractor: Subcontractor:
FINBACK 670, Inc. ALTEC Environmental Consultants, Inc.
1421 Clarkview Road, Suite 100 10100 Woolworth Road Baltimore, MD 21209 Keithville, LA 71047
(888) 776-0670 (Office) (318) 687-3771 (Office)
(877) 776-0670 (Fax) (318) 687-9923 (Fax)
INSPECTORS:
Brandon Odom Donald R. Joiner LA Certificate No. 9I01392 LA Certificate No. 8I01348 LA Certificate No. 9I01348
Eric Clipps Joshua Anders LA Certificate No. 9I01588 LA Certificate No. 9I01589
Justin L. Holcomb LA Certificate No. 9I00306
MANAGEMENT PLANNER:
Roy W. Dowling LA Certificate No. 9I00213 – Inspector LA Certificate No. 9P00072 – Management Planner
Accreditation Agency: Louisiana Department of Environmental Quality
ACM Homogeneous Areas Summary Table and Drawings
JEFFERSON BARRACKS DIVISION
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Basement HMA-01 9"x9" Floor Tile
HMA-02 Flooring Adhesive HMA-03 12"x12" Floor Tile & Adhesive
HMA-08 Transite Panels HMA-09 Tan Exterior Coating
HMA-10 Pipe Insulation & Fittings HMA-13 Duct Insulation
HMA-12 White Duct Connector (Vibration Isolator)
HMA-15 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Basement
HMA-01 9"x9" Floor Tile HMA-02 Flooring Adhesive
HMA-03 12"x12" Floor Tile & Adhesive HMA-04 9"x9" Floor Tile & Adhesive
HMA-08 Transite Panels HMA-09 Tan Exterior Coating
HMA-10 Pipe Insulation & Fittings HMA-13 Duct Insulation HMA-21 Tank Insulation
HMA-15 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Basement HMA-01 9"x9" Floor Tile
HMA-02 Flooring Adhesive HMA-05 Linoleum
HMA-09 Tan Exterior Coating HMA-10 Pipe Insulation & Fittings
HMA-11 Pipe Hangers
HMA-12 White Duct Connector (Vibration Isolator)
HMA-15 Fire Doors (Assumed) HMA-16 Felt Roofing Tar
HMA-17 Gray Reflective Paper
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 9"x9" Floor Tile HMA-03 12"x12" Floor Tile & Adhesive HMA-04 9"x9" Floor Tile & Adhesive
HMA-06 12"x12" Floor Tile
HMA-09 Tan Exterior Coating HMA-10 Pipe Insulation & Fittings HMA-12 White Duct Connector
(Vibration Isolator)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-02 Flooring Adhesive
HMA-03 12"x12" Floor Tile & Adhesive HMA-09 Tan Exterior Coating HMA-10 Pipe Insulation & Fittings No ACM
Building 1 - Basement - West Wing
Building 1 - Basement - Center Section
Building 1 - Basement - East Wing
Building 1 - 1st Floor - West Wing
Building 1 - 1st Floor - Center Section
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 9"x9" Floor Tile HMA-03 12"x12" Floor Tile & Adhesive HMA-04 9"x9" Floor Tile & Adhesive
HMA-06 12"x12" Floor Tile
HMA-09 Tan Exterior Coating HMA-10 Pipe Insulation & Fittings HMA-12 White Duct Connector
(Vibration Isolator) HMA-15 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-02 Flooring Adhesive
HMA-05 Linoleum HMA-09 Tan Exterior Coating HMA-10 Pipe Insulation & Fittings HMA-15 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 9"x9" Floor Tile HMA-02 Flooring Adhesive
HMA-03 12"x12" Floor Tile & Adhesive HMA-04 9"x9" Floor Tile & Adhesive
HMA-06 12"x12" Floor Tile
HMA-08 Transite Panels HMA-09 Tan Exterior Coating
HMA-10 Pipe Insulation & Fittings
HMA-12 White Duct Connector (Vibration Isolator)
HMA-15 Fire Doors (Assumed) HMA-18 Lab Counter Tops
HMA-19 Transite Vent Hood
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-02 Flooring Adhesive
HMA-04 9"x9" Floor Tile & Adhesive HMA-07 Linoleum & Adhesive
HMA-08 Transite Panels HMA-09 Tan Exterior Coating
HMA-10 Pipe Insulation & Fittings HMA-12 White Duct Connector
(Vibration Isolator) HMA-15 Fire Doors (Assumed)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-03 12"x12" Floor Tile & Adhesive HMA-04 9"x9" Floor Tile & Adhesive
HMA-05 Linoleum HMA-06 12"x12" Floor Tile
HMA-09 Tan Exterior Coating No ACM HMA-15 Fire Doors (Assumed)
Building 1 - 1st Floor - East Wing
Building 1 - 2nd Floor - West Wing
Building 1 - 2nd Floor - Center Section
Building 1 - 2nd Floor - East Wing
Building 1 - 3rd Floor - West Wing
2008 THREE-YEAR ASBESTOS REINSPECTION
ACM HOMOGENEOUS AREAS SUMMARY TABLE
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 9"x9" Floor Tile
HMA-02 Flooring Adhesive HMA-03 12"x12" Floor Tile & Adhesive
HMA-09 Tan Exterior Coating HMA-10 Pipe Insulation & Fittings HMA-18 Lab Counter Tops
HMA-19 Transite Vent Hood
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
HMA-01 9"x9" Floor Tile
HMA-02 Flooring Adhesive HMA-06 12"x12" Floor Tile
HMA-09 Tan Exterior Coating HMA-10 Pipe Insulation & Fittings
HMA-13 Duct Insulation
HMA-12 White Duct Connector (Vibration Isolator)
HMA-18 Lab Counter Tops HMA-19 Transite Vent Hood
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Penthouse HMA-01 9"x9" Floor Tile
HMA-02 Flooring Adhesive HMA-09 Tan Exterior Coating
HMA-10 Pipe Insulation & Fittings HMA-13 Duct Insulation
HMA-12 White Duct Connector (Vibration Isolator)
Floor Flooring Materials Surfacing Materials TSI Materials Miscellaneous Materials
Penthouse No ACM HMA-09 Tan Exterior Coating HMA-14 Thermal Insulation Debris HMA-20-Roofing Mastic
Building 1 - Penthouse - East Wing
Building 1 - Penthouse - Center Section
Building 1 - 3rd Floor - Center Section
Building 1 - 3rd Floor - East Wing
BASEMENT – WEST WING
ST. LOUIS V.A. MEDICAL CENTER
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GW01-01-JB unknown acm non-assessable above plaster ceiling GW02-01-JB unknown acm non-assessable above plaster ceiling
GW04-01-JB magnesia pipe lag 500 lf 0 4.00 GW04-01-JB mudded joint ftg on cardboard 0 ea 50 4.00 GW04-01-JB mudded joint ftg on fiberglas piping 0 ea 20 4.00 GW04-01-JB mudded joint ftg on fiberglas piping 0 ea 30 10.00 GW04-01-JB mudded joint ftg on mag pipe lag 0 ea 150 4.00 GW04-01-JB white canvas duct insulation 150 sf 0 0.00
GW05-01-JB magnesia pipe lag 300 lf 0 4.00 GW05-01-JB mudded joint ftg on cardboard 0 ea 3 4.00 GW05-01-JB mudded joint ftg on fiberglas piping 0 ea 10 4.00 GW05-01-JB mudded joint ftg on fiberglas piping 0 ea 5 10.00 GW05-01-JB mudded joint ftg on mag pipe lag 0 ea 75 4.00
GW05A-01-JB magnesia pipe lag 110 lf 6 4.00 GW05A-01-JB mudded joint ftg on cardboard 0 ea 2 4.00 GW05A-01-JB mudded joint ftg on mag pipe lag 0 ea 20 4.00
GW08-01-JB magnesia pipe lag 40 lf 0 4.00 GW08-01-JB magnesia pipe lag 14 lf 0 6.00 GW08-01-JB mudded joint ftg on cardboard 0 ea 6 4.00 GW08-01-JB mudded joint ftg on mag pipe lag 0 ea 20 4.00 GW08-01-JB mudded joint ftg on mag pipe lag 0 ea 2 6.00
GW09-01-JB magnesia pipe lag 40 lf 0 4.00 GW09-01-JB magnesia pipe lag 30 lf 0 6.00 GW09-01-JB mudded joint ftg on cardboard 0 ea 3 4.00 GW09-01-JB mudded joint ftg on mag pipe lag 0 ea 32 4.00 GW09-01-JB mudded joint ftg on mag pipe lag 0 ea 5 6.00
GW10-01-JB magnesia pipe lag 175 lf 0 4.00 GW10-01-JB magnesia pipe lag 32 lf 0 12.00 GW10-01-JB mudded joint ftg on cardboard 0 ea 15 4.00 GW10-01-JB mudded joint ftg on mag pipe lag 0 ea 44 4.00 GW10-01-JB mudded joint ftg on mag pipe lag 0 ea 2 12.00
GW10A-01-JB mudded joint ftg on fiberglas piping 0 ea 4 4.00
GW11-01-JB magnesia pipe lag 8 lf 0 12.00 GW11-01-JB mudded joint ftg on mag pipe lag 0 ea 1 12.00
Building 1 - Basement - West
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
GW12-01-JB magnesia pipe lag 64 lf 0 4.00 GW12-01-JB mudded joint ftg on fiberglas piping 0 ea 2 4.00 GW12-01-JB mudded joint ftg on mag pipe lag 0 ea 32 4.00
GW13-01-JB magnesia pipe lag 415 lf 0 4.00 GW13-01-JB mudded joint ftg on cardboard 0 ea 6 4.00 GW13-01-JB mudded joint ftg on fiberglas piping 0 ea 6 4.00 GW13-01-JB mudded joint ftg on fiberglas piping 0 ea 6 8.00 GW13-01-JB mudded joint ftg on mag pipe lag 0 ea 147 4.00
GW15-01-JB magnesia pipe lag 70 lf 0 4.00 GW15-01-JB mudded joint ftg on mag pipe lag 0 ea 32 4.00
GW16-01-JB magnesia pipe lag 70 lf 0 4.00 GW16-01-JB mudded joint ftg on mag pipe lag 0 ea 32 4.00
GW17-01-JB magnesia pipe lag 130 lf 0 4.00 GW17-01-JB mudded joint ftg on mag pipe lag 0 ea 53 4.00
GW18-01-JB magnesia pipe lag 45 lf 0 4.00 GW18-01-JB mudded joint ftg on cardboard 0 ea 21 4.00 GW18-01-JB mudded joint ftg on mag pipe lag 0 ea 13 4.00
H009-01-JB magnesia pipe lag 80 lf 0 6.00 H009-01-JB mudded joint ftg on cardboard 0 ea 10 4.00 H009-01-JB mudded joint ftg on fiberglas piping 0 ea 10 4.00 H009-01-JB mudded joint ftg on mag pipe lag 0 ea 4 6.00
H010-01-JB magnesia pipe lag 155 lf 0 4.00 H010-01-JB magnesia pipe lag 25 lf 0 8.00 H010-01-JB magnesia pipe lag 32 lf 0 12.00 H010-01-JB mudded joint ftg on cardboard 0 ea 10 2.00 H010-01-JB mudded joint ftg on cardboard 0 ea 10 4.00 H010-01-JB mudded joint ftg on cardboard 0 ea 10 6.00 H010-01-JB mudded joint ftg on fiberglas piping 0 ea 10 4.00 H010-01-JB mudded joint ftg on fiberglas piping 0 ea 10 6.00 H010-01-JB mudded joint ftg on mag pipe lag 0 ea 4 4.00 H010-01-JB mudded joint ftg on mag pipe lag 0 ea 4 8.00 H010-01-JB mudded joint ftg on mag pipe lag 0 ea 4 12.00
H011-01-JB magnesia pipe lag 32 lf 0 6.00 H011-01-JB mudded joint ftg on cardboard 0 ea 10 2.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI H011-01-JB mudded joint ftg on fiberglas piping 0 ea 7 6.00
2517 958TOTALS
BASEMENT – CENTER SECTION
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GC01-01-JB aircell pipe lagging 70 lf 0 4.00 GC01-01-JB magnesia pipe lag 74 lf 0 4.00 GC01-01-JB magnesia pipe lag 15 lf 0 8.00 GC01-01-JB mudded joint ftg on aircell lag 0 ea 12 4.00 GC01-01-JB mudded joint ftg on fiberglas piping 0 ea 45 4.00 GC01-01-JB mudded joint ftg on fiberglas piping 0 ea 26 6.00 GC01-01-JB mudded joint ftg on mag pipe lag 0 ea 17 4.00 GC01-01-JB white canvas duct insulation 150 sf 0 0.00
GC02-01-JB aircell pipe lagging 53 lf 0 4.00 GC02-01-JB magnesia pipe lag 65 lf 0 4.00 GC02-01-JB magnesia pipe lag 10 lf 0 8.00 GC02-01-JB mudded joint ftg on aircell lag 0 ea 2 4.00 GC02-01-JB mudded joint ftg on mag pipe lag 0 ea 23 4.00
GC03-01-JB aircell pipe lagging 105 lf 0 4.00 GC03-01-JB magnesia pipe lag 130 lf 0 4.00 GC03-01-JB magnesia pipe lag 42 lf 0 8.00 GC03-01-JB mudded joint ftg on aircell lag 0 ea 35 4.00 GC03-01-JB mudded joint ftg on mag pipe lag 0 ea 52 4.00
GC07-01-JB magnesia pipe lag 35 lf 0 4.00 GC07-01-JB magnesia pipe lag 8 lf 0 6.00 GC07-01-JB mudded joint ftg on cardboard 0 ea 14 4.00 GC07-01-JB mudded joint ftg on mag pipe lag 0 ea 16 4.00
GC07A-01-JB magnesia pipe lag 10 lf 0 4.00 GC07A-01-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00
GC08-01-JB magnesia pipe lag 85 lf 0 4.00 GC08-01-JB magnesia pipe lag 25 lf 0 6.00 GC08-01-JB mudded joint ftg on cardboard 0 ea 8 4.00 GC08-01-JB mudded joint ftg on mag pipe lag 0 ea 41 4.00 GC08-01-JB mudded joint ftg on mag pipe lag 0 ea 1 6.00
GC10-01-JB aircell pipe lagging 50 lf 0 4.00 GC10-01-JB magnesia pipe lag 112 lf 0 4.00 GC10-01-JB magnesia pipe lag 13 lf 0 6.00 GC10-01-JB mudded joint ftg on aircell lag 0 ea 3 4.00 GC10-01-JB mudded joint ftg on mag pipe lag 0 ea 31 4.00
GC10B-01-JB aircell pipe lagging 15 lf 0 4.00
Building 1 - Basement - Center
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GC10B-01-JB magnesia pipe lag 70 lf 0 4.00 GC10B-01-JB magnesia pipe lag 10 lf 0 6.00 GC10B-01-JB mudded joint ftg on aircell lag 0 ea 4 4.00 GC10B-01-JB mudded joint ftg on mag pipe lag 0 ea 14 4.00
GC11-01-JB magnesia pipe lag 250 lf 0 4.00 GC11-01-JB magnesia pipe lag 90 lf 0 6.00 GC11-01-JB mudded joint ftg on cardboard 0 ea 25 4.00 GC11-01-JB mudded joint ftg on fiberglas piping 0 ea 2 2.00 GC11-01-JB mudded joint ftg on fiberglas piping 0 ea 4 6.00 GC11-01-JB mudded joint ftg on mag pipe lag 0 ea 50 4.00 GC11-01-JB mudded joint ftg on mag pipe lag 0 ea 4 6.00
GC12-01-JB magnesia pipe lag 140 lf 0 4.00 GC12-01-JB magnesia pipe lag 48 lf 0 6.00 GC12-01-JB mudded joint ftg on cardboard 0 ea 8 4.00 GC12-01-JB mudded joint ftg on fiberglas piping 0 ea 2 8.00 GC12-01-JB mudded joint ftg on mag pipe lag 0 ea 27 4.00
GC14-01-JB magnesia pipe lag 155 lf 0 4.00 GC14-01-JB mudded joint ftg on cardboard 0 ea 18 4.00 GC14-01-JB mudded joint ftg on fiberglas piping 0 ea 18 4.00 GC14-01-JB mudded joint ftg on fiberglas piping 0 ea 6 8.00 GC14-01-JB mudded joint ftg on fiberglas piping 0 ea 3 10.00 GC14-01-JB mudded joint ftg on fiberglas piping 0 ea 25 14.00 GC14-01-JB mudded joint ftg on mag pipe lag 0 ea 25 4.00
GC15-01-JB magnesia pipe lag 38 lf 0 4.00 GC15-01-JB mudded joint ftg on mag pipe lag 0 ea 12 4.00
GC15A-01-JB magnesia pipe lag 52 lf 0 4.00 GC15A-01-JB magnesia pipe lag 20 lf 0 6.00 GC15A-01-JB mudded joint ftg on mag pipe lag 0 ea 8 4.00
GC16-01-JB unknown non-assessable above ceiling plaster
GC16A-01-JB magnesia pipe lag 65 lf 0 6.00 GC16A-01-JB mudded joint ftg on mag pipe lag 0 ea 24 4.00
GC17-01-JB magnesia pipe lag 220 lf 0 4.00 GC17-01-JB magnesia pipe lag 25 lf 0 6.00 GC17-01-JB magnesia pipe lag 15 lf 0 12.00 GC17-01-JB mudded joint ftg on cardboard 0 ea 6 4.00 GC17-01-JB mudded joint ftg on mag pipe lag 0 ea 12 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GC17-01-JB mudded joint ftg on mag pipe lag 0 ea 1 6.00 GC17-01-JB mudded joint ftg on mag pipe lag 0 ea 60 6.00 GC17-01-JB mudded joint ftg on mag pipe lag 0 ea 2 6.00 GC17-01-JB mudded joint ftg on mag pipe lag 0 ea 2 8.00 GC17-01-JB mudded joint ftg on mag pipe lag 0 ea 1 12.00
GC17A-01-JB magnesia pipe lag 255 lf 0 4.00 GC17A-01-JB magnesia pipe lag 40 lf 0 6.00 GC17A-01-JB mudded joint ftg on cardboard 0 ea 21 4.00 GC17A-01-JB mudded joint ftg on fiberglas piping 0 ea 16 6.00 GC17A-01-JB mudded joint ftg on mag pipe lag 0 ea 43 4.00
GC17B-01-JB aircell pipe lagging 55 lf 0 4.00 GC17B-01-JB magnesia pipe lag 60 lf 0 4.00 GC17B-01-JB mudded joint ftg on aircell lag 0 ea 5 4.00 GC17B-01-JB mudded joint ftg on fiberglas piping 0 ea 2 8.00 GC17B-01-JB mudded joint ftg on mag pipe lag 0 ea 10 4.00
GC17C-01-JB magnesia pipe lag 220 lf 0 4.00 GC17C-01-JB magnesia pipe lag 95 lf 0 8.00 GC17C-01-JB magnesia pipe lag 18 lf 0 12.00 GC17C-01-JB mudded joint ftg on fiberglas piping 0 ea 3 4.00 GC17C-01-JB mudded joint ftg on fiberglas piping 0 ea 3 6.00 GC17C-01-JB mudded joint ftg on fiberglas piping 0 ea 6 10.00 GC17C-01-JB mudded joint ftg on mag pipe lag 0 ea 73 4.00 GC17C-01-JB mudded joint ftg on mag pipe lag 0 ea 16 8.00 GC17C-01-JB mudded joint ftg on mag pipe lag 0 ea 1 12.00
GC17D-01-JB aircell pipe lagging 35 lf 0 4.00 GC17D-01-JB magnesia pipe lag 50 lf 0 4.00 GC17D-01-JB mudded joint ftg on aircell lag 0 ea 3 4.00 GC17D-01-JB mudded joint ftg on fiberglas piping 0 ea 1 10.00 GC17D-01-JB mudded joint ftg on mag pipe lag 0 ea 12 4.00
GC18-01-JB aircell pipe lagging 12 lf 0 4.00 GC18-01-JB magnesia pipe lag 180 lf 0 4.00 GC18-01-JB magnesia pipe lag 14 lf 0 6.00 GC18-01-JB mudded joint ftg on aircell lag 0 ea 4 4.00 GC18-01-JB mudded joint ftg on fiberglas piping 0 ea 20 4.00 GC18-01-JB mudded joint ftg on fiberglas piping 0 ea 7 8.00 GC18-01-JB mudded joint ftg on mag pipe lag 0 ea 59 4.00
GC19-01-JB aircell pipe lagging 1 lf 0 4.00 GC19-01-JB magnesia pipe lag 95 lf 0 4.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GC19-01-JB magnesia pipe lag 26 lf 0 6.00 GC19-01-JB mudded joint ftg on mag pipe lag 0 ea 47 4.00 GC19-01-JB mudded joint ftg on mag pipe lag 0 ea 1 6.00
GC20-01-JB magnesia pipe lag 85 lf 0 4.00 GC20-01-JB magnesia pipe lag 25 lf 0 6.00 GC20-01-JB mudded joint ftg on fiberglas piping 0 ea 4 4.00 GC20-01-JB mudded joint ftg on mag pipe lag 0 ea 26 4.00 GC20-01-JB mudded joint ftg on mag pipe lag 0 ea 2 6.00
GC21-01-JB aircell pipe lagging 32 lf 0 4.00 GC21-01-JB magnesia pipe lag 60 lf 0 4.00 GC21-01-JB magnesia pipe lag 30 lf 0 8.00 GC21-01-JB mudded joint ftg on aircell lag 0 ea 4 4.00 GC21-01-JB mudded joint ftg on mag pipe lag 0 ea 29 4.00 GC21-01-JB mudded joint ftg on mag pipe lag 0 ea 2 8.00
GC22-01-JB mudded joint ftg on cardboard 0 ea 21 4.00 GC22-01-JB mudded joint ftg on cardboard 0 ea 21 4.00 GC22-01-JB mudded joint ftg on fiberglas piping 0 ea 4 4.00 GC22-01-JB tank#1 insulation (rm GC22) 225 sf 0 4.00 GC22-01-JB tank#2 insulation (rm GC22) 225 sf 0 4.00
H006-01-JB magnesia pipe lag 210 lf 0 4.00 H006-01-JB magnesia pipe lag 25 lf 0 6.00 H006-01-JB mudded joint ftg on cardboard 0 ea 43 2.00 H006-01-JB mudded joint ftg on fiberglas piping 0 ea 5 2.00 H006-01-JB mudded joint ftg on fiberglas piping 0 ea 7 4.00 H006-01-JB mudded joint ftg on fiberglas piping 0 ea 12 6.00 H006-01-JB mudded joint ftg on fiberglas piping 0 ea 20 8.00 H006-01-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00 H006-01-JB mudded joint ftg on mag pipe lag 0 ea 1 6.00
H007-01-JB magnesia pipe lag 55 lf 0 4.00 H007-01-JB magnesia pipe lag 12 lf 0 6.00 H007-01-JB mudded joint ftg on cardboard 0 ea 7 4.00 H007-01-JB mudded joint ftg on fiberglas piping 0 ea 6 4.00 H007-01-JB mudded joint ftg on fiberglas piping 0 ea 3 8.00 H007-01-JB mudded joint ftg on fiberglas piping 0 ea 3 12.00 H007-01-JB mudded joint ftg on mag pipe lag 0 ea 4 4.00
H008-01-JB magnesia pipe lag 200 lf 0 4.00 H008-01-JB magnesia pipe lag 32 lf 0 8.00 H008-01-JB magnesia pipe lag 80 lf 0 12.00
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI H008-01-JB mudded joint ftg on cardboard 0 ea 23 2.00 H008-01-JB mudded joint ftg on cardboard 0 ea 15 4.00 H008-01-JB mudded joint ftg on cardboard 0 ea 4 8.00 H008-01-JB mudded joint ftg on fiberglas piping 0 ea 24 4.00 H008-01-JB mudded joint ftg on fiberglas piping 0 ea 10 8.00 H008-01-JB mudded joint ftg on mag pipe lag 0 ea 4 4.00 H008-01-JB mudded joint ftg on mag pipe lag 0 ea 1 8.00 H008-01-JB mudded joint ftg on mag pipe lag 0 ea 1 12.00
4717 1359TOTALS
BASEMENT – EAST WING
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI GE15-01-JB aircell pipe lagging 15 lf 0 4.00 GE15-01-JB magnesia pipe lag 54 lf 0 4.00 GE15-01-JB magnesia pipe lag 10 lf 0 6.00 GE15-01-JB mudded joint ftg on aircell lag 0 ea 6 4.00 GE15-01-JB mudded joint ftg on mag pipe lag 0 ea 32 4.00
GE16-01-JB magnesia pipe lag 8 lf 0 4.00 GE16-01-JB magnesia pipe lag 20 lf 0 6.00 GE16-01-JB mudded joint ftg on mag pipe lag 0 ea 6 4.00 GE16-01-JB mudded joint ftg on mag pipe lag 0 ea 8 6.00
GE17-01-JB aircell pipe lagging 25 lf 0 4.00 GE17-01-JB magnesia pipe lag 46 lf 0 4.00 GE17-01-JB mudded joint ftg on mag pipe lag 0 ea 14 4.00
GE20-01-JB aircell pipe lagging 120 lf 0 4.00 GE20-01-JB magnesia pipe lag 376 lf 0 4.00 GE20-01-JB mudded joint ftg on mag pipe lag 0 ea 87 4.00
GE21-01-JB aircell pipe lagging 18 lf 0 4.00 GE21-01-JB magnesia pipe lag 30 lf 0 4.00 GE21-01-JB mudded joint ftg on aircell lag 0 ea 17 4.00
GE24-01-JB aircell pipe lagging 39 lf 0 4.00 GE24-01-JB mudded joint ftg on aircell lag 0 ea 5 4.00
GE29-01-JB magnesia pipe lag 85 lf 0 4.00 GE29-01-JB mudded joint ftg on mag pipe lag 0 ea 25 4.00
GE31-01-JB aircell pipe lagging 35 lf 0 4.00 GE31-01-JB mudded joint ftg on aircell lag 0 ea 3 4.00
GE32-01-JB magnesia pipe lag 220 lf 0 4.00 GE32-01-JB mudded joint ftg on mag pipe lag 0 ea 53 4.00
GE34-01-JB magnesia pipe lag 5 lf 0 6.00
GE35-01-JB magnesia pipe lag 2 lf 0 4.00 GE35-01-JB magnesia pipe lag 4 lf 0 6.00 GE35-01-JB mudded joint ftg on mag pipe lag 0 ea 5 4.00 GE35-01-JB mudded joint ftg on mag pipe lag 0 ea 2 6.00
Building 1 - Basement - East
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI H003-01-JB aircell pipe lagging 170 lf 0 4.00 H003-01-JB aircell pipe lagging 22 lf 0 6.00 H003-01-JB magnesia pipe lag 155 lf 0 4.00 H003-01-JB magnesia pipe lag 60 lf 0 6.00 H003-01-JB mudded joint ftg on aircell lag 0 ea 10 4.00 H003-01-JB mudded joint ftg on aircell lag 0 ea 2 6.00 H003-01-JB mudded joint ftg on fiberglas piping 0 ea 17 6.00 H003-01-JB mudded joint ftg on fiberglas piping 0 ea 8 8.00 H003-01-JB mudded joint ftg on mag pipe lag 0 ea 37 4.00 H003-01-JB mudded joint ftg on mag pipe lag 0 ea 3 6.00
H003A-01-JB aircell pipe lagging 10 lf 0 2.00 H003A-01-JB magnesia pipe lag 33 lf 0 4.00 H003A-01-JB magnesia pipe lag 12 lf 0 6.00 H003A-01-JB mudded joint ftg on aircell lag 0 ea 2 2.00 H003A-01-JB mudded joint ftg on fiberglas piping 0 ea 4 6.00 H003A-01-JB mudded joint ftg on fiberglas piping 0 ea 5 10.00 H003A-01-JB mudded joint ftg on mag pipe lag 0 ea 30 4.00 H003A-01-JB mudded joint ftg on mag pipe lag 0 ea 11 6.00
H004-01-JB magnesia pipe lag 595 lf 0 4.00 H004-01-JB mudded joint ftg on mag pipe lag 0 ea 138 4.00
H005-01-JB aircell pipe lagging 85 lf 0 4.00 H005-01-JB magnesia pipe lag 10 lf 0 4.00 H005-01-JB mudded joint ftg on aircell lag 0 ea 5 4.00
S001-01-JB magnesia pipe lag 8 lf 0 6.00 S001-01-JB mudded joint ftg on mag pipe lag 0 ea 3 6.00
2272 538TOTALS
1ST FLOOR – WEST WING
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 1W02-01-JB mudded joint ftg on fiberglas piping 0 ea 47 4.00 1W02-01-JB white canvas duct connector 8 sf 0 0.00
1W08A-01-JB mudded joint ftg on fiberglas piping 0 ea 8 8.00
1W17-01-JB cardboard wrap pipe lagging 63 lf 0 4.00 1W17-01-JB cardboard wrap pipe lagging 63 lf 0 4.00 1W17-01-JB magnesia pipe lag 40 lf 0 4.00 1W17-01-JB magnesia pipe lagging 40 lf 0 4.00 1W17-01-JB mudded joint fitting on mag pipe la 0 sf 21 4.00 1W17-01-JB mudded joint ftg on cardboard lag 0 ea 9 4.00
1W18-01-JB magnesia pipe lagging 60 lf 0 4.00 1W18-01-JB mudded joint fitting on mag pipe la 0 sf 10 4.00
1W20-01-JB magnesia pipe lagging 70 lf 0 4.00 1W20-01-JB mudded joint fitting on mag pipe la 0 sf 20 4.00
H117-01-JB tar mudded joint fitting on fbglass 0 ea 12 4.00 H117-01-JB tar mudded joint fitting on fbglass 0 ea 9 8.00
H119-01-JB tar mudded joint fitting on fbglass 0 ea 28 4.00
344 164
Building 1 - West - 1st Floor
TOTALS
1ST FLOOR – CENTER SECTION
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 1C102F-01-JB magnesia pipe lag 10 lf 0 4.00
1C102G-01-JB magnesia pipe lag 20 lf 0 4.00
1C105A-01-JB tar mudded joint fitting on fbglass 0 lf 3 8.00
H106-01-JB tar mudded joint fitting on fbglass 0 ea 8 8.00
H107-01-JB tar mudded joint fitting on fbglass 0 ea 4 4.00 H107-01-JB tar mudded joint fitting on fbglass 0 ea 7 8.00
30 22
Building 1 - Center - 1st Floor
1ST FLOOR – EAST WING
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 1E01-01-JB magnesia pipe lag 70 lf 0 4.00
1E01A-01-JB magnesia pipe lag 25 lf 0 4.00
1E02-01-JB magnesia pipe lag 20 lf 0 4.00 1E02-01-JB mudded joint ftg on fiberglas piping 0 ea 6 4.00
1E04-01-JB magnesia pipe lag 40 lf 0 4.00
1E05-01-JB magnesia pipe lag 6 lf 0 4.00 1E05-01-JB white canvas duct insulation 8 sf 0 0.00
1E07-01-JB magnesia pipe lag 20 lf 0 4.00
1E08-01-JB magnesia pipe lag 20 lf 0 4.00
1E09-01-JB magnesia pipe lag 40 lf 0 4.00
1E11-01-JB magnesia pipe lag 40 lf 0 4.00
1E11A-01-JB magnesia pipe lag 55 lf 0 4.00
1E12-01-JB magnesia pipe lag 45 lf 0 4.00
1E14-01-JB magnesia pipe lag 20 lf 0 4.00
1E15-01-JB magnesia pipe lag 20 lf 0 4.00
1E16-01-JB magnesia pipe lag 15 lf 0 4.00
1E17-01-JB magnesia pipe lag 30 lf 0 4.00
1E17A-01-JB magnesia pipe lag 40 lf 0 4.00
1E18-01-JB magnesia pipe lag 95 lf 0 4.00
1E19-01-JB magnesia pipe lag 85 lf 0 4.00
1E35-01-JB magnesia pipe lag 45 lf 0 4.00
1E39-01-JB magnesia pipe lag 75 lf 0 4.00
Building 1 - East - 1st Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI H101-01-JB tar mudded joint fitting on fbglass 0 lf 24 4.00
H102-01-JB tar mudded joint fitting on fbglass 0 ea 5 4.00
H105-01-JB tar mudded joint fitting on fbglass 0 ea 20 4.00 H105-01-JB tar mudded joint fitting on fbglass 0 ea 21 8.00
814 76TOTALS
2ND FLOOR – WEST WING
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 2W01-01-JB tar mudded joint fitting on fibglass 0 lf 10 4.00
2W04-01-JB magnesia pipe lag 35 lf 0 4.00 2W04-01-JB mudded joint fitting on magnesia la 0 lf 5 4.00
2W05-01-JB tar mudded joint fitting on fibglass 0 lf 2 4.00
2W06-01-JB magnesia pipe lag 10 lf 0 4.00 2W06-01-JB mudded joint fitting on magnesia la 0 lf 6 4.00
2W18-01-JB magnesia pipe lag 60 lf 0 4.00 2W18-01-JB mudded joint fitting on magnesia la 0 lf 12 4.00
2W19-01-JB magnesia pipe lag 25 lf 0 4.00 2W19-01-JB mudded joint fitting on magnesia la 0 lf 8 4.00
2W21-01-JB cardboard wrap pipe lagging 30 lf 0 4.00 2W21-01-JB magnesia pipe lag 20 lf 0 4.00 2W21-01-JB mudded joint fitting on magnesia la 0 lf 6 4.00
2W22C-01-JB cardboard wrap pipe lagging 20 lf 0 4.00 2W22C-01-JB magnesia pipe lagging 26 lf 0 4.00 2W22C-01-JB mudded joint fitting on magnesia la 0 lf 10 4.00
2W25-01-JB mudded joint fitting on fbglass pip 0 sf 60 4.00 2W25-01-JB mudded joint fitting on fbglass pip 0 sf 10 6.00
2W27-01-JB magnesia pipe lagging 40 lf 0 4.00 2W27-01-JB mudded joint fitting on magnesia la 0 lf 12 4.00
2W28-01-JB magnesia pipe lagging 18 lf 0 4.00 2W28-01-JB mudded joint fitting on magnesia la 0 lf 8 4.00
2W29-01-JB magnesia pipe lagging 135 lf 0 4.00 2W29-01-JB mudded joint fitting on magnesia la 0 lf 42 4.00 2W29-01-JB tar mudded joint fitting on fibglass 0 sf 8 6.00
2W29A-01-JB magnesia pipe lagging 65 lf 0 4.00 2W29A-01-JB mudded joint fitting on magnesia la 0 lf 18 4.00
2W29B-01-JB magnesia pipe lagging 65 lf 0 4.00 2W29B-01-JB mudded joint fitting on magnesia la 0 lf 20 4.00
Building 1 - West - 2nd Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
2W29D-01-JB magnesia pipe lagging 30 lf 0 4.00 2W29D-01-JB mudded joint fitting on magnesia la 0 lf 16 4.00
2W32-01-JB magnesia pipe lagging 15 lf 0 4.00 2W32-01-JB mudded joint fitting on magnesia la 0 lf 6 4.00
2W33-01-JB magnesia pipe lagging 18 lf 0 4.00 2W33-01-JB mudded joint fitting on magnesia la 0 lf 5 4.00
2W35-01-JB magnesia pipe lagging 40 lf 0 4.00 2W35-01-JB mudded joint fitting on magnesia la 0 lf 17 4.00
H208-01-JB mudded joint fitting on fbglass pip 0 sf 2 4.00 H208-01-JB tar mudded joint fitting on fibglass 0 sf 8 6.00
H209-01-JB tar mudded joint fitting on fibglass 0 sf 42 6.00
H210-01-JB mudded joint fitting on fbglass pip 0 sf 18 4.00 H210-01-JB tar mudded joint fitting on fibglass 0 sf 44 6.00
652 395TOTALS
2ND FLOOR – CENTER SECTION
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 2C01-01-JB magnesia pipe lag 30 lf 0 4.00 2C01-01-JB mudded joint fitting on mag lag 0 lf 12 4.00
2C02-01-JB magnesia pipe lag 60 lf 0 4.00 2C02-01-JB mudded joint fitting on mag lag 0 lf 28 4.00
2C03-01-JB cardboard wrap pipe lagging 25 lf 0 2.00 2C03-01-JB magnesia pipe lag 60 lf 0 4.00 2C03-01-JB mudded joint fitting on mag lag 0 ea 20 4.00
2C05-01-JB cardboard wrap pipe lagging b.wall 11 lf 0 2.00 2C05-01-JB cardboard wrap pipe lagging b.wall 11 lf 0 4.00
2C07-01-JB cardboard wrap pipe lagging b.wall 11 lf 0 2.00
2C08-01-JB cardboard wrap pipe lagging b.wall 33 lf 0 2.00 2C08-01-JB cardboard wrap pipe lagging b.wall 11 lf 0 4.00
2C09-01-JB cardboard wrap pipe lagging b.wall 22 lf 0 2.00 2C09-01-JB cardboard wrap pipe lagging s.wall 33 lf 0 2.00
2C10-01-JB pipe lag on backwall 22 lf 0 2.00 2C10-01-JB pipe lag on backwall 22 lf 0 4.00 2C10-01-JB pipe lag on ceiling 12 lf 0 2.00 2C10-01-JB pipe lag on sidewall 6 lf 0 2.00 2C10-01-JB pipe lag on sidewall 4 lf 0 4.00
2C11-01-JB cardboard wrap pipe lagging 40 lf 0 4.00 2C11-01-JB magnesia pipe lag 15 lf 0 4.00 2C11-01-JB mudded joint fitting on mag lag 0 lf 12 4.00
2C12-01-JB cardboard wrap pipe lagging 28 lf 0 4.00 2C12-01-JB magnesia pipe lag 20 lf 0 4.00 2C12-01-JB mudded joint fitting on mag lag 0 lf 10 4.00
2C13-01-JB cardboard wrap pipe lagging 45 lf 0 4.00 2C13-01-JB magnesia pipe lag 30 lf 0 4.00 2C13-01-JB mudded joint fitting on mag lag 0 lf 15 4.00
2C14-01-JB cardboard wrap pipe lagging 25 lf 0 2.00 2C14-01-JB magnesia pipe lag 25 lf 0 4.00 2C14-01-JB mudded joint fitting on mag lag 0 lf 12 4.00
Building 1 - Center - 2nd Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI
2C15-01-JB cardboard wrap pipe lagging 75 lf 0 2.00 2C15-01-JB magnesia pipe lag 20 lf 0 4.00 2C15-01-JB mudded joint fitting on mag lag 0 lf 8 4.00
2C16-01-JB cardboard wrap pipe lagging 50 lf 0 2.00
2C18-01-JB cardboard wrap pipe lagging 25 lf 0 2.00 2C18-01-JB magnesia pipe lag 20 lf 0 4.00 2C18-01-JB mudded joint fitting on fbglass pip 0 lf 28 4.00 2C18-01-JB mudded joint fitting on fbglass pip 0 lf 10 6.00 2C18-01-JB mudded joint fitting on mag lag 0 lf 8 4.00
2C19-01-JB cardboard wrap pipe lagging 70 lf 0 2.00 2C19-01-JB magnesia pipe lag 100 lf 0 4.00 2C19-01-JB mudded joint fitting on magnesia la 0 lf 35 4.00
2C29-01-JB cardboard wrap pipe lagging 8 lf 0 2.00 2C29-01-JB magnesia pipe lag 20 lf 0 4.00 2C29-01-JB mudded joint fitting on magnesia la 0 lf 8 4.00
H204-01-JB tar mudded joint fitting on fibglass 0 sf 20 6.00
H205-01-JB tar mudded joint fitting on fibglass 0 sf 20 6.00
989 246TOTALS
2ND FLOOR – EAST WING
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 2E04-01-JB mudded joint fitting on fbglass pip 0 lf 38 4.00 2E04-01-JB mudded joint fitting on fbglass pip 0 lf 11 6.00
2E05-01-JB magnesia pipe lag 25 lf 0 4.00 2E05-01-JB mudded joint fitting on magnesia la 0 lf 10 4.00
2E06-01-JB magnesia pipe lag 60 lf 0 4.00 2E06-01-JB mudded joint fitting on magnesia la 0 lf 16 4.00
2E09-01-JB magnesia pipe lag 40 lf 0 4.00 2E09-01-JB mudded joint fitting on magnesia la 0 lf 16 4.00
2E11-01-JB magnesia pipe lag 45 lf 0 4.00 2E11-01-JB mudded joint fitting on magnesia la 0 lf 6 4.00
2E12-01-JB magnesia pipe lag 10 lf 0 4.00 2E12-01-JB mudded joint fitting on magnesia la 0 lf 6 4.00
2E13-01-JB cardboard wrap pipe lagging 30 lf 0 4.00 2E13-01-JB magnesia pipe lag 20 lf 0 4.00 2E13-01-JB mudded joint fitting on magnesia la 0 lf 6 4.00
2E15-01-JB cardboard wrap pipe lagging 30 lf 0 4.00
2E17-01-JB cardboard wrap pipe lagging 15 lf 0 2.00 2E17-01-JB magnesia pipe lag 5 lf 0 4.00 2E17-01-JB mudded joint fitting on magnesia la 0 lf 3 4.00
2E18-01-JB magnesia pipe lag 20 lf 0 4.00
2E19-01-JB cardboard wrap pipe lagging 45 lf 0 2.00
2E20-01-JB magnesia pipe lag 30 lf 0 4.00
2E21-01-JB cardboard wrap pipe lagging 36 lf 0 2.00 2E21-01-JB magnesia pipe lag 40 lf 0 4.00 2E21-01-JB mudded joint fitting on magnesia la 0 lf 12 4.00
2E22-01-JB magnesia pipe lag 80 lf 0 4.00 2E22-01-JB mudded joint fitting on magnesia la 0 lf 32 4.00
2E23-01-JB cardboard wrap pipe lagging 65 lf 0 4.00
Building 1 - East - 2nd Floor
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 2E23-01-JB magnesia pipe lag 45 lf 0 4.00 2E23-01-JB mudded joint fitting on magnesia la 0 lf 10 4.00 2E23-01-JB tar mudded joint fitting on fibglass 0 lf 3 8.00
2E25A-01-JB magnesia pipe lag 50 lf 0 4.00 2E25A-01-JB mudded joint fitting on magnesia la 0 lf 30 4.00
2E26-01-JB cardboard wrap pipe lagging 50 lf 0 4.00 2E26-01-JB magnesia pipe lag 40 lf 0 4.00 2E26-01-JB mudded joint fitting on magnesia la 0 lf 18 4.00
2E27-01-JB magnesia pipe lag 45 lf 0 4.00 2E27-01-JB mudded joint fitting on magnesia la 0 lf 18 4.00
2E29-01-JB cardboard wrap pipe lagging 20 lf 0 4.00 2E29-01-JB magnesia pipe lag 35 lf 0 4.00 2E29-01-JB mudded joint fitting on magnesia la 0 lf 16 4.00
H201-01-JB tar mudded joint fitting on fibglass 0 sf 20 6.00
H202-01-JB cardboard wrap pipe lagging 40 lf 0 4.00
H203-01-JB tar mudded joint fitting on fibglass 0 sf 20 6.00
S201-01-JB magnesia pipe lagging 10 lf 0 4.00 S201-01-JB mudded joint fitting on magnesia la 0 lf 1 4.00 S201-01-JB tar wrap pipe lagging 10 lf 0 4.00
941 292TOTALS
3RD FLOOR – WEST WING
3RD FLOOR – CENTER SECTION
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 3C01-01-JB magnesia pipe lagging 10 lf 0 2.00
3C04-01-JB magnesia pipe lagging 15 lf 0 2.00
3C12-01-JB magnesia pipe lagging 11 lf 0 2.00 3C12-01-JB magnesia pipe lagging 11 lf 0 4.00
3C13-01-JB magnesia pipe lagging 22 lf 0 2.00
3C14-01-JB cardboard wrap pipe lagging 27 lf 0 2.00 3C14-01-JB mudded joint fitting on cardboard l 0 sf 5 2.00
3C15-01-JB magnesia pipe lagging 22 lf 0 2.00
3C17-01-JB magnesia pipe lagging 33 lf 0 2.00
3C18-01-JB magnesia pipe lagging 22 lf 0 2.00
H303-01-JB tar mudded joint fitting on fbglass 0 sf 16 6.00
H304-01-JB tar mudded joint fitting on fbglass 0 sf 25 6.00
H305-01-JB tar mudded joint fitting on fbglass 0 sf 10 6.00
173 56
Building 1 - Center - 3rd Floor
3RD FLOOR – EAST WING
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 3E06-01-JB tar mudded joint fitting on fbglass 0 lf 10 6.00
3E11-01-JB mudded joint fitting on fbglass 0 sf 42 4.00 3E11-01-JB mudded joint fitting on fbglass 0 sf 12 6.00
H301-01-JB mudded joint fitting on fbglass 0 sf 25 6.00
H302-01-JB mud patch on fibglass duct insula 25 sf 0 0.00 H302-01-JB tar mudded joint fitting on fbglass 0 sf 6 6.00
25 95
Building 1 - East - 3rd Floor
PENTHOUSE – CENTER SECTION
2008 THREE-YEAR REINSPECTION
THERMAL SYSTEM INSULATION (TSI) SUMMARY TABLE
Room # Description Qty S/LF Ftgs TH/DI 4C02-01-JB magnesia pipe lag 10 lf 0 4.00 4C02-01-JB mudded joint ftg on cardboard 0 ea 25 4.00 4C02-01-JB duct insulation 50 sf 0
4C03-01-JB magnesia pipe lag 2 lf 0 4.00 4C03-01-JB mudded joint ftg on cardboard 0 ea 5 4.00
4C03A-01-JB magnesia pipe lag 3 lf 0 4.00 4C03A-01-JB mudded joint ftg on cardboard 0 ea 5 4.00
65 35
Building 1 - Center - Penthouse
PENTHOUSE – EAST WING
| 6 - JB-1-Report.pdf (p.14-712) |
| JB-Draft-1-Report |
| CoverLetter1 |
| Final-missingCostTbl |
File details come from the government source that posted it. Updated .