This is Addendum No. 2 to a Request for Contractor Services issued by Orleans Parish Schools for mechanical replacement work at Edward Hynes Elementary School in Metairie, Louisiana. The project is identified as ITB26-FAC-0072 with MCA Project Number OPS 23031.801 and was issued on July 29, 2026. The addendum addresses modifications to the original contract documents and serves as part of the overall Contract Documents for the mechanical replacement project. The addendum confirms that no changes have been made to general information, specifications, or plans as part of this addendum, and no prior approvals have been submitted to date.

The addendum responds to a request for information regarding bonding purposes by providing the Available Funds for Construction (AFC) amount, which is established at between $150,000 and $160,000. This funding information is critical for contractors preparing bid bonds and performance bonds as part of their proposal submissions. The document is prepared by Marrero, Couvillon and Associates, LLC, a professional services firm located in Baton Rouge, Louisiana, on behalf of Orleans Parish Schools, with administrative coordination through their Metairie office.

View the file

Other files

File Type Posted
654321-26-FAC-0072-1.pdf PDF
654321-26-FAC-0072.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3445 N. Causeway Blvd., Suite 701 Metairie, LA 70002 Ph: (504) 834-3448 Fax: (504) 834-5770

MARRERO, COUVILLON AND ASSOCIATES, LLC

2644 S. Sherwood Forest Blvd., Suite 200, Baton Rouge, Louisiana 70816 Ph: (225) 408-8249 Fax: (225) 408-8244

Edward Hynes Elementary School Mechanical Replacement Orleans Parish Schools Project # ITB26-FAC-0072

MCA Project Number OPS 23031.801 July 29, 2026

Addendum No. 2

This Addendum, applicable to work designated herein below shall be understood to be an Addendum and as such shall be included in the "Contract Documents".

Following are the changes, amendments, deletions or additions to components of the "Request for Contractor Services" as now written or drawn. All provisions of General Conditions of the Contract for Construction, Supplementary Conditions, and other pertinent portions of the Specifications and Drawings shall apply to this Addendum.

GENERAL:

1. No general information as part of this addendum.

SPECIFICATIONS:

1. No changes as part of this addendum.

PLANS:

1. No changes as part of this addendum

PRIOR APPROVALS:

1. No prior approvals have been submitted to date.

REQUESTS FOR INFORMATION:

1. Question: Can you please provide the AFC or estimate for bonding purposes?

Answer: The available funds for construction (AFC) are between $150,000 and $160,000.

END OF ADDENDUM