629-20-114 Inaccessible Fire Damper Scope and Locations 71620.pdf

PDF 289 KB Posted

Attached to
Z2DA--Design/Build Project: 629-29-114 Correct Inaccessible Fire Dampers Federal contract opportunity
Solicitation number
629-29-114
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This document outlines the scope of work for a two-phase design-build acquisition to correct inaccessible fire dampers. The contractor will be required to make all inaccessible fire, smoke, and fire/smoke dampers accessible for inspection and maintenance at the Southeast Louisiana Veterans Health Care System main campus in New Orleans, Louisiana. This will include relocating dampers, constructing access structures, and modifying spaces as needed. The contractor will also inspect, test, and repair all dampers that are currently inaccessible or were previously inaccessible but can now be accessed after repairs. Upon completion, all dampers must be accessible for the VA staff to conduct routine maintenance and inspections according to NFPA standards. The contractor must investigate any rated walls to determine if new fire dampers are required and provide associated design and installation. The design phase will clearly outline the means, methods, coordination and phasing of work. All execution must adhere to applicable building codes, NFPA, ASME, UL standards as well as VA requirements. This is a two-phase design-build acquisition conducted by the Department of Veterans Affairs Veterans Health Administration VISN 16.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Design/Build Project: 629-29-114 Correct Inaccessible Fire Dampers, newest first.
File Type Posted
36C25621R0033_1.pdf PDF
RESEARCH 3rd Mech Plan Drawing.pdf PDF
INP L01 Drawing.pdf PDF
Specs.pdf PDF
36C25621R0033_1.pdf PDF
RESEARCH 2nd Mech Plan Drawing.pdf PDF
629-20-114 Overall Campus Damper Location Drawings.pdf PDF
EXHIBIT A CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY.pdf PDF
General Decision LA 20200041 10-09-2020.pdf PDF
RESEARCH 4th Mech Plan Drawing.pdf PDF
INP L04 Drawing.pdf PDF
Concourse L1.pdf PDF
VA Master Specs Table of Contents.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inaccessible Damper Scope

Damper No. Building Floor PDF Sheet Damper Location Type Status Recommendation 1-FD-002 07 N 1st 8 Above the double doors outside of the elevators Fire NON-ACCESSIBLE Need duct access door.

1-FD-005 07 N 1st 8 In utility access 1N109 Fire NON-ACCESSIBLE Need ladder or scaffolding.

7.1-FD-001,002 04 K 8th 39 In the staff parking garage penthouse inside elevator equipment room Fire NON-ACCESSIBLE Need duct access door.

2-FD-020 06 M3 2nd 48 On the right wall of the gym second floor Fire NON-ACCESSIBLE Need duct access door.

2-FD-021 06 M3 2nd 48 On the right wall of the gym second floor Fire NON-ACCESSIBLE Need duct access door.

2-FD-023 06 M3 2nd 48 On the right wall of the gym second floor Fire NON-ACCESSIBLE Need duct access door.

2-FD-024 06 M3 2nd 48 On the right wall of the gym second floor Fire NON-ACCESSIBLE Need duct access door.

3-FD-003 06 M2 3rd 49 Above the double doors in the hallway outside the elevator Fire NON-ACCESSIBLE Immovable object blocking work area

2-FD-001A 08 P 2nd Research 2 In the hallway across from 2P137 Fire NON-ACCESSIBLE Need duct access door.

2-FD-001B 08 P 2nd Research 2 In the hallway across from 2P137 Fire NON-ACCESSIBLE Move 16 x 6 duct to clear existing panel.

2-FD-003A 08 P 2nd Research 2 In the hatch across from 2P137 Fire NON-ACCESSIBLE Move 16 x 6 duct to clear existing panel.

2-FD-003B 08 P 2nd Research 2 In the hatch across from 2P137 Fire NON-ACCESSIBLE Move 16 x 6 duct to clear existing panel.

2-FD-003C 08 P 2nd Research 2 In the hatch across from 2P137 Fire NON-ACCESSIBLE Move 16 x 6 duct to clear existing panel.

2-FD-003D 08 P 2nd Research 2 In the hatch across from 2P137 Fire NON-ACCESSIBLE Move 16 x 6 duct to clear existing panel.

2-FD-004A 08 P 2nd Research 2 In the hatch across from the men and women's restrooms Fire NON-ACCESSIBLE Move ceiling speaker assembly and install new tile.

2-FD-004B 08 P 2nd Research 2 In the hatch across from the men and women's restrooms Fire NON-ACCESSIBLE Move ceiling speaker assembly and install new tile.

2-FD-004C 08 P 2nd Research 2 In the hatch across from the men and women's restrooms Fire NON-ACCESSIBLE Move ceiling speaker assembly and install new tile.

2-FD-004D 08 P 2nd Research 2 In the hatch across from the men and women's restrooms Fire NON-ACCESSIBLE Move ceiling speaker assembly and install new tile.

3-FD-003 08 P 3rd Research 3 In the hallway outside of 3P131 Fire NON-ACCESSIBLE Move 16 x 6 duct to clear existing panel.

4-FD-001 08 P 4th Research 4 Outside of house keeping room 4P121 Fire NON-ACCESSIBLE Move 12 x 8 duct and add duct access door.

B-FD-A001 09 Q Basement 51 Inside the ceiling in the center of room #BQ105 Fire NON-ACCESSIBLE Need duct access door at Level 1 chase.

B-FD-A002 09 Q Basement 51 Inside the ceiling in the center of room #BQ105 Fire NON-ACCESSIBLE Need duct access door at Level 1 chase.

B-FD-A003 09 Q Basement 51 Inside the ceiling in the back left corner of room #BQ105 by the pump room return Fire NON-ACCESSIBLE Need duct access door at Level 1 chase.

B-FD-A004 09 Q Basement 51 Inside the ceiling in the back left corner of room #BQ105 by the pump room supply Fire NON-ACCESSIBLE Need duct access door at Level 1 chase.

1-FD-009 01 B1 1st 2 Chapel NON-ACCESSIBLE Access in existing drop ceiling is to small. Needs to cut new 24x24 access panel.

4-FD-001, 002 01 B1 4th 5 4B In front entrance to 4B Ward next to elevator (4B111) NON-ACCESSIBLE Move heating water piping closer to D building and then relocate the 10" duct next to the heating water piping from VAV. This will allow access to already installed access panel

1-FD-001, 002 00 A1 1st Concourse L1 1D Vestibule Canal Street entrance NON-ACCESSIBLE Need a platform / cat walk inside chase.

5-FD-008, 009,

010, 011, 012 02 D1.1 5th 17 5D Mental Health in Corridor NON-ACCESSIBLE Need a method to reach access panels up high.

2-FD-A009 07 N 1st Above the door inside the IT closet #2N121A Fire NON-ACCESSIBLE Investigate if fire damper required.

2-FD-A010 07 N 1st Above the door inside the IT closet #2N121A Fire NON-ACCESSIBLE Investigate if fire damper required.

2-FD-A011 07 N 2nd Inside the IT closet #2N121A Fire NON-ACCESSIBLE Investigate if fire damper required.

2-FD-A012 07 N 2nd Inside the IT closet #2N121A Fire NON-ACCESSIBLE Investigate if fire damper required.

4-FD-A001 07 N 4th Inside the IT closet #4N109A Fire NON-ACCESSIBLE Investigate if fire damper required.

4-FD-A004 07 N 4th Inside the IT room #4N109A Fire NON-ACCESSIBLE Investigate if fire damper required.

1-FD-003 1st 1st On the back wall of electrical closet 1N102 Fire NON-ACCESSIBLE Investigate if fire damper required.

1-FD-004 1st 1st On the back wall of electrical closet 1N102 Fire NON-ACCESSIBLE Investigate if fire damper required.