536-26_Score_Sheet.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Competitive Selection OH|DOT53626-1
Contract number
DOT53626-1
Issued by
Ohio

About this file

The document is a score sheet for a state or local government contract evaluation, comparing technical proposals from six vendors: Applied Research Associates, Inc., Environmental Solutions, Polygon Solutions, RetroTekUSA Inc, SEADS Technology, and Spy Pond Partners, LLC. The scoring sheet appears to be for a competitive solicitation with a minimum technical score threshold of 1000 points, evaluating vendors across five key work requirement criteria related to data analysis and pavement marking.

The contract appears to involve technical services focused on data analysis, statistical modeling, and machine learning for producing degradation curves, with an emphasis on pavement marking analysis. Vendors were evaluated on their ability to clean and analyze data, demonstrate statistical and machine learning expertise, and effectively communicate findings. Pricing varied significantly, with submitted prices ranging from $46,155.27 to $145,000.00. The evaluation method calculated a "Cost Per Quality Point" to determine the most advantageous proposal, with Spy Pond Partners, LLC offering the lowest cost per quality point at $45.32 and achieving the highest technical score of 1,450 points. Only vendors meeting or exceeding 1,000 technical points were eligible to have their cost proposals considered.

View the file

Other files

File Type Posted
P25412_ODOT_Degradation_Analysis.pdf PDF
Affirmation_and_Disclosure_Form_ESI.pdf PDF
536-26.pdf PDF
Cost_Proposal_ESI.xlsx XLSX spreadsheet
Signature.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

VendorApplied Research Associates, Inc.
Item #Evaluation CriteriaWeightingDoesn't Meet
0Partially Meets
2Meets 5Exceeds 7
WORK REQUIREMENTS
1Provide examples of conducting at least 3 projects that demonstrate experience in cleaning and analyzing data for change over time, and producing results and recommendations from that analysis75525
2Provide examples of previous experience working on at least 2 projects that directly involve pavement marking analysis50350
3Demonstrate expertise in at least 2 different statistical modeling methods relevant to producing degradation curves50350
4Demonstrate expertise in at least 2 different machine learning modeling methods relevant to producing degradation curves50250
5Provided 2 examples of reports or visualizations conveying findings to stakeholders25125

GRAND TOTAL SCORE: 1600

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 1000 points?

YESXNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price$103,500.00/Grand Total Techincal Score1600
Cost Per Quality Point:$64.69
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

Sheet2

VendorENVIRONMENTAL SOLUTIONS &
Item #Evaluation CriteriaWeightingDoesn't Meet
0Partially Meets
2Meets 5Exceeds 7
WORK REQUIREMENTS
1Provide examples of conducting at least 3 projects that demonstrate experience in cleaning and analyzing data for change over time, and producing results and recommendations from that analysis75375
2Provide examples of previous experience working on at least 2 projects that directly involve pavement marking analysis500
3Demonstrate expertise in at least 2 different statistical modeling methods relevant to producing degradation curves50350
4Demonstrate expertise in at least 2 different machine learning modeling methods relevant to producing degradation curves50250
5Provided 2 examples of reports or visualizations conveying findings to stakeholders25175

GRAND TOTAL SCORE: 1150

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 1000 points?

YESXNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price$46,155.27/Grand Total Techincal Score1150
Cost Per Quality Point:$40.14
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

Sheet3

VendorPolygon Solutions
Item #Evaluation CriteriaWeightingDoesn't Meet
0Partially Meets
2Meets 5Exceeds 7
WORK REQUIREMENTS
1Provide examples of conducting at least 3 projects that demonstrate experience in cleaning and analyzing data for change over time, and producing results and recommendations from that analysis75375
2Provide examples of previous experience working on at least 2 projects that directly involve pavement marking analysis50100
3Demonstrate expertise in at least 2 different statistical modeling methods relevant to producing degradation curves50100
4Demonstrate expertise in at least 2 different machine learning modeling methods relevant to producing degradation curves50100
5Provided 2 examples of reports or visualizations conveying findings to stakeholders2550

GRAND TOTAL SCORE: 725

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 1000 points?

YESNoX
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price/Grand Total Techincal Score725
Cost Per Quality Point:$0.00
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

Sheet4

VendorRetroTekUSA Inc
Item #Evaluation CriteriaWeightingDoesn't Meet
0Partially Meets
2Meets 5Exceeds 7
WORK REQUIREMENTS
1Provide examples of conducting at least 3 projects that demonstrate experience in cleaning and analyzing data for change over time, and producing results and recommendations from that analysis75375
2Provide examples of previous experience working on at least 2 projects that directly involve pavement marking analysis50350
3Demonstrate expertise in at least 2 different statistical modeling methods relevant to producing degradation curves500
4Demonstrate expertise in at least 2 different machine learning modeling methods relevant to producing degradation curves50250
5Provided 2 examples of reports or visualizations conveying findings to stakeholders25175

GRAND TOTAL SCORE: 1150

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 1000 points?

YESXNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price$145,000.00/Grand Total Techincal Score1150
Cost Per Quality Point:$126.09
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

Sheet5

VendorSEADS Technology
Item #Evaluation CriteriaWeightingDoesn't Meet
0Partially Meets
2Meets 5Exceeds 7
WORK REQUIREMENTS
1Provide examples of conducting at least 3 projects that demonstrate experience in cleaning and analyzing data for change over time, and producing results and recommendations from that analysis750
2Provide examples of previous experience working on at least 2 projects that directly involve pavement marking analysis500
3Demonstrate expertise in at least 2 different statistical modeling methods relevant to producing degradation curves500
4Demonstrate expertise in at least 2 different machine learning modeling methods relevant to producing degradation curves500
5Provided 2 examples of reports or visualizations conveying findings to stakeholders250

GRAND TOTAL SCORE: 0

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 1000 points?

YESNoX
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price/Grand Total Techincal Score0
Cost Per Quality Point:ERROR:#DIV/0!
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

Sheet6

VendorSpy Pond Partners, LLC
Item #Evaluation CriteriaWeightingDoesn't Meet
0Partially Meets
2Meets 5Exceeds 7
WORK REQUIREMENTS
1Provide examples of conducting at least 3 projects that demonstrate experience in cleaning and analyzing data for change over time, and producing results and recommendations from that analysis75525
2Provide examples of previous experience working on at least 2 projects that directly involve pavement marking analysis50250
3Demonstrate expertise in at least 2 different statistical modeling methods relevant to producing degradation curves50250
4Demonstrate expertise in at least 2 different machine learning modeling methods relevant to producing degradation curves50250
5Provided 2 examples of reports or visualizations conveying findings to stakeholders25175

GRAND TOTAL SCORE: 1450

Based upon the Grand Total Technical Score earned, does the vendor’s proposal meet or exceed the minimum Technical score of 1000 points?

YESXNo
(If No, Vendor's Cost Propsal will NOT be opened.)
Cost Per Quality Point
Vendors Total Submitted Price$65,720.00/Grand Total Techincal Score1450
Cost Per Quality Point:$45.32
The Technical Proposal with the lowest Cost per Quality point will be recommended for award of the contract.

File details come from the government source that posted it. Updated .