July 2025 Asphalt Price Adjustment - July 2025
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | July 1, 2025 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2025 base index of | | | | $598.000 | per ton. | | Year: | 2025 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | July | Posted Price | 2025 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64-22 BINDER ADJUSTMENT: | | The July 2025 Average is | | | $646.000 | per ton | Asphalt Price Adjustment | | January | |
| | (F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent) | | | | | | | Base Average = | $598.000 | February | |
| | The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was | | | | $598.000 | per ton. | | New Average = | $646.000 | March | |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 621 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 626 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | 632 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | 646 |
| | the price adjustments listed below: | | | | | | | | | August | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | November | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | December | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.205 | ERROR:#VALUE! | | | Month | 2026 |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.116 | ERROR:#VALUE! | | | | $/ton |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.116 | $0.000 | | | January | |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.134 | $0.000 | | | February | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.134 | $0.000 | | | March | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.150 | $0.000 | | | April | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.150 | $0.000 | | | May | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.138 | ERROR:#REF! | | | June | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.150 | ERROR:#REF! | | | July | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.117 | ERROR:#REF! | | | August | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.133 | ERROR:#REF! | | | | September | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.117 | ERROR:#REF! | | | October | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.133 | ERROR:#REF! | | | | November | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.134 | ERROR:#REF! | | | December | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.134 | ERROR:#REF! | | | | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.150 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.128 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.128 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.138 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.154 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.154 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.117 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.133 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.117 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.133 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.127 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.128 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.138 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.127 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.016 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $11.479 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $8.211 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $3.600 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $3.600 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $4.440 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $3.696 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $3.456 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $3.120 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $2.832 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.082 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.113 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.103 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.204663829787234) = | $3.205 | |
| Total Material Price After Adjustment: | | $3.205 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($11.4791489361702) = | $1,511.479 | |
| Total Material Price After Adjustment: | | $1,511.479 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($4.44) = | $204.440 | |
| Total Material Price After Adjustment: | | $204.440 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot June 2025 Asphalt Price Adjustment - June 2025
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | June 1, 2025 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2025 base index of | | | | $598.000 | per ton. | | Year: | 2025 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | June | Posted Price | 2025 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64-22 BINDER ADJUSTMENT: | | The June 2025 Average is | | | $632.000 | per ton | Asphalt Price Adjustment | | January | |
| | (F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent) | | | | | | | Base Average = | $598.000 | February | |
| | The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was | | | | $598.000 | per ton. | | New Average = | $632.000 | March | |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 621 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 626 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | 632 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | |
| | the price adjustments listed below: | | | | | | | | | August | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | November | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | December | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.145 | ERROR:#VALUE! | | | Month | 2026 |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.082 | ERROR:#VALUE! | | | | $/ton |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.082 | $0.000 | | | January | |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.095 | $0.000 | | | February | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.095 | $0.000 | | | March | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.106 | $0.000 | | | April | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.106 | $0.000 | | | May | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.098 | ERROR:#REF! | | | June | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.106 | ERROR:#REF! | | | July | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.083 | ERROR:#REF! | | | August | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.094 | ERROR:#REF! | | | | September | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.083 | ERROR:#REF! | | | October | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.094 | ERROR:#REF! | | | | November | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.095 | ERROR:#REF! | | | December | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.095 | ERROR:#REF! | | | | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.106 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.091 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.091 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.098 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.109 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.109 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.083 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.094 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.083 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.094 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.090 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.091 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.098 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.090 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.011 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $8.131 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $5.816 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $2.550 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $2.550 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $3.145 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $2.618 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $2.448 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $2.210 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $2.006 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.058 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.080 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.073 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.144970212765957) = | $3.145 | |
| Total Material Price After Adjustment: | | $3.145 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($8.13106382978723) = | $1,508.131 | |
| Total Material Price After Adjustment: | | $1,508.131 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($3.145) = | $203.145 | |
| Total Material Price After Adjustment: | | $203.145 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot May 2025 Asphalt Price Adjustment - May 2025
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | May 1, 2025 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2025 base index of | | | | $598.000 | per ton. | | Year: | 2025 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | May | Posted Price | 2025 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64-22 BINDER ADJUSTMENT: | | The May 2025 Average is | | | $626.000 | per ton | Asphalt Price Adjustment | | January | |
| | (F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent) | | | | | | | Base Average = | $598.000 | February | |
| | The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was | | | | $598.000 | per ton. | | New Average = | $626.000 | March | |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 621 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 626 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | |
| | the price adjustments listed below: | | | | | | | | | August | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | November | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | December | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.119 | ERROR:#VALUE! | | | Month | 2026 |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.068 | ERROR:#VALUE! | | | | $/ton |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.068 | $0.000 | | | January | |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.078 | $0.000 | | | February | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.078 | $0.000 | | | March | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.087 | $0.000 | | | April | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.087 | $0.000 | | | May | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.081 | ERROR:#REF! | | | June | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.087 | ERROR:#REF! | | | July | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.068 | ERROR:#REF! | | | August | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.078 | ERROR:#REF! | | | | September | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.068 | ERROR:#REF! | | | October | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.078 | ERROR:#REF! | | | | November | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.078 | ERROR:#REF! | | | December | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.078 | ERROR:#REF! | | | | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.087 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.075 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.075 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.081 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.090 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.090 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.068 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.078 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.068 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.078 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.074 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.075 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.081 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.074 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.009 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $6.696 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $4.790 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $2.100 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $2.100 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $2.590 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $2.156 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $2.016 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $1.820 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $1.652 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.048 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.066 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.060 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.119387234042553) = | $3.119 | |
| Total Material Price After Adjustment: | | $3.119 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($6.69617021276596) = | $1,506.696 | |
| Total Material Price After Adjustment: | | $1,506.696 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($2.59) = | $202.590 | |
| Total Material Price After Adjustment: | | $202.590 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot April 2025 Asphalt Price Adjustment - April 2025
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | April 1, 2025 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2025 base index of | | | | $598.000 | per ton. | | Year: | 2025 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | April | Posted Price | 2025 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64-22 BINDER ADJUSTMENT: | | The April 2025 Average is | | | $621.000 | per ton | Asphalt Price Adjustment | | January | |
| | (F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent) | | | | | | | Base Average = | $598.000 | February | |
| | The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was | | | | $598.000 | per ton. | | New Average = | $621.000 | March | |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 621 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | |
| | the price adjustments listed below: | | | | | | | | | August | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | November | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | December | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.098 | ERROR:#VALUE! | | | Month | 2026 |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.055 | ERROR:#VALUE! | | | | $/ton |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.055 | $0.000 | | | January | |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.064 | $0.000 | | | February | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.064 | $0.000 | | | March | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.072 | $0.000 | | | April | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.072 | $0.000 | | | May | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.066 | ERROR:#REF! | | | June | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.072 | ERROR:#REF! | | | July | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.056 | ERROR:#REF! | | | August | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.064 | ERROR:#REF! | | | | September | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.056 | ERROR:#REF! | | | October | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.064 | ERROR:#REF! | | | | November | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.064 | ERROR:#REF! | | | December | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.064 | ERROR:#REF! | | | | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.072 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.061 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.061 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.066 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.074 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.074 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.056 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.064 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.056 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.064 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.061 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.061 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.066 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.061 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.008 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $5.500 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $3.934 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $1.725 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $1.725 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $2.128 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $1.771 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $1.656 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $1.495 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $1.357 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.039 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.054 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.049 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.098068085106383) = | $3.098 | |
| Total Material Price After Adjustment: | | $3.098 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($5.50042553191489) = | $1,505.500 | |
| Total Material Price After Adjustment: | | $1,505.500 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($2.1275) = | $202.128 | |
| Total Material Price After Adjustment: | | $202.128 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot