31502PriceAdjust24.xlsx

XLSX spreadsheet 204 KB Posted

Attached to
Comprehensive Liquid Bituminous Materials (Statewide)
Contract number
23334
Issued by
New York

About this file

This document is a state contract vehicle for bituminous concrete (asphalt mix and cold patch) issued by the New York State Department of Transportation (NYSDOT), covering a statewide contract with multiple contract numbers (PC70617 - PC70673). The contract includes a comprehensive price adjustment mechanism for asphalt materials, utilizing the U.S. Bureau of Labor Statistics' Producer Price Index (PPI) for monthly and quarterly price modifications, with Award #23371 under Contract #31502.

The contract covers various asphalt mix items including bituminous stabilized course, miscellaneous patching materials, shim course, and top/binder course asphalts with different compaction series. The pricing is based on a base index of $593.000 per ton established on November 1, 2024, with monthly adjustments reflecting changes in asphalt cement prices. Price adjustments are calculated using a formula that considers both the binder adjustment (based on F.O.B. terminal prices) and a periodic PPI adjustment, with specific percentage allowances for asphalt content and fuel. The document also includes provisions for cold patch materials with similar adjustment mechanisms, and provides interactive calculators to help contractors determine precise price modifications across different asphalt and cold patch material types.

View the file

Other files

File Type Posted
3155523334ContractSpecifics.pdf PDF
3155523334ra.pdf PDF
3155523334PLQQ.pdf PDF
3155523334Insurance.pdf PDF
3155523334p.pdf PDF
31555PriceAdjust23.xlsx XLSX spreadsheet
315xxPriceAdjust24.xlsx XLSX spreadsheet
315xxPriceAdjust25.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 2025 Asphalt Price Adjustment - July 2025

GroupDescriptionAward #Contract No.
31502Comprehensive Bituminous Concrete

(Asphalt Mix and Cold Patch) (Statewide) 23371 PC70617 - PC70673

Bituminous materials price adjustment(s) EFFECTIVE on: July 1, 2025 ERROR:#REF! NYSDOT Average Posted Prices for Asphalt

(Performance Graded Binder)PPI - DATES FOR IMPLEMENTATION:
Award(s) using November 1, 2024 base index of$593.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification dated April 1, 2025Posted PriceInstructions PPI:
the following price adjustments have been calculated.Contract Manager InputPosted Price2025BLS Month
for CalculationPPI's Month
for CalculationEffective Date
for AdjustmentPPI & CPI
Base Montha) Go to: http://www.bls.gov/data/
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The July 2025 Average is$646.000per tonYear:2025Month$/tonApril-25485.560July 1, 2025December-24b) Choose "Price Producer" -> Industry Data -> Multi-Screen Data-Search.
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Month:JulyJanuary-August 1, 2025c) In the "Choose Industry" box, scroll down and highlight "21231 - Stone mining & quarrying" and click on "Next Form".
The November 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$593.000per ton.February-September 1, 2025d) Select "21231 - Stone mining & quarrying" again and click on "Next Form".
Until further notice, please revise the original contract per ton prices for materials in the referenced awards by using the price adjustments listed below:Asphalt Price AdjustmentMarch-July-25October 1, 2025e) At the next page click "Retrieve data". This brings you to the chart where you pull the numbers from and can calculate PPI as shown in the examples in the award document.
Old Average =$593.000April621November 1, 2025
Interactive Price Adjustment calculators (Asphalt Mix and Cold Patch)
can be found at the bottom of this page.New Average =$646.000May626December 1, 2025
Cold Patch Price Adjustments can be found after the Asphalt Mix Price Adjustments.June632October-25January 1, 2026
Table 1 - ASPHALT MIX ITEMS - MONTHLY PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 1 of 2:BLS Month for CalculationApril-25July646March 1, 2026
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TONNew PPI for that Month:485.560AugustJanuary-26April 1, 2026
302.01Bituminous Stabilized Course3.750.003.75$1.988ERROR:#VALUE!Base PPI MonthDecember 2024SeptemberMay 1, 2026
404.03810218Misc Patching F1, Asphalt Mix6.851.007.85$4.161ERROR:#REF!Base PPI Value459.404OctoberJune 1, 2026
404.03820218Misc Patching F2, Asphalt Mix6.851.007.85$4.161ERROR:#REF!Effective Date for Adjustment01-Jul-25NovemberApril-26July 1, 2026
404.03830218Misc Patching F3, Asphalt Mix6.851.007.85$4.161ERROR:#REF!DecemberAugust 1, 2026
404.03890218Misc Patching F9, Asphalt Mix6.851.007.85$4.161ERROR:#REF!2026September 1, 2026
404.058901Shim Course F9, Asphalt8.251.009.25$4.903ERROR:#REF!Month$/tonJuly-26October 1, 2026
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.70$4.081ERROR:#REF!JanuaryNovember 1, 2026
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.20$3.816ERROR:#REF!FebruaryDecember 1, 2026
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.50$3.445ERROR:#REF!MarchOctober-26January 1, 2027
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.90$3.127ERROR:#REF!AprilFebruary 1, 2027
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.50$2.915ERROR:#REF!MayMarch 1, 2027
JuneJanuary-27April 1, 2027
PERIODIC PPI PRICE ADJUSTMENT:JulyMay 1, 2027
Every three months the base prices shown in the initial CONTRACT AWARD NOTIFICATION may be adjusted in accordance with changes inAugustJune 1, 2027
the US Bureau of Labor Statistics (BLS). The PPI Price Adjustment does not apply to any optional items, only to materials items.SeptemberN/A Until July 1stN/A Until July 1stN/A Until July 1st
Price adjustments will NOT be recalculated if PPI changes due to change in (P) status.October
Producer Price Index (PPI) - Series ID: PCU 21231-21231 (Industry: Stone Mining & Quarrying; Product: Stone Mining & Quarrying)November
The PPI value forDecember 2024("Base" month for calculations) is459.404December
2027
The New Bureau of Labor of Statistics (BLS) PPI for the month ofApril-25used for Calculation is485.560Month$/ton
January
Table 2 - ASPHALT MIX ITEMS - PERIODIC PPI PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 2 of 2:February
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCE DIFFERENCE

(100% Material Minus Total % Asphalt Plus

Fuel Allowance)QUARTERLY PPI PRICE ADJUSTMENT PERCENTAGEMarch
302.01Bituminous Stabilized Course3.750.003.7596.25%5.00%April0.0569346371
404.03810218Misc Patching F1, Asphalt Mix6.851.007.8592.15%May5.00%
404.03820218Misc Patching F2, Asphalt Mix6.851.007.8592.15%June5.00%
404.03830218Misc Patching F3, Asphalt Mix6.851.007.8592.15%July5.00%
404.03890218Misc Patching F9, Asphalt Mix6.851.007.8592.15%August5.00%
404.058901Shim Course F9, Asphalt8.251.009.2590.75%September5.00%
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.7092.30%October5.00%
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.2092.80%November5.00%
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.5093.50%December5.00%
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.9094.10%5.00%
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.5094.50%5.00%
Table 3 - ONLY COLD PATCH ITEMS - MONTHLY PRICE ADJUSTMENTS
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TON
15402.2010Cold Patch - Regular Mix6.001.007.00$3.710ERROR:#REF!
15402.2030Cold Patch - Modified Mix6.001.007.00$3.710ERROR:#REF!
15402.2040Cold Patch - Fiber Reinforced6.001.007.00$3.710ERROR:#REF!

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: ASPHALT MIX ITEMS

Step 1 : Binder Adjustment:
Enter the Material's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 1 above = Note: Enter a negative number if the Price Adjustment in Table 1 shows a negative adjustment

Total Binder Adjustment for that Material = $0.000

Step 2 : PPI Adjustment:
Enter the Material's "Quarterly PPI Price Adjustment Percentage" as found

in Table 2 above = Note: Don't enter the percentage sign, just the number

Enter the Material's "Difference of 100% Material Minus Total % Asphalt + Fuel Allowance" as found in Table 2 above = Note: Don't enter the percentage sign, just the number

Total PPI Adjustment for that Material = $0.000

Step 3 : Final Total Price/Ton After Adjustment: (Binder Adjustment + PPI Adjustment)
Total Material Price/Ton After Adjustment (Binder Adjust. + PPI Adjust.) =$0.000/Ton

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: COLD PATCH ITEMS

Material Adjustment (Note: there is not PPI Adjustment for Cold Patch Items)
Enter the Cold Patch's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 3 above = Note: Enter a negative number if the Price Adjustment in Table 1 shows a negative adjustment

Final Total Cold Patch Material Adjustment = $0.000 /Ton

EXAMPLE OF HOW TO CALCULATE ASPHALT MIX MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Asphalt Mix items will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel

Allowance)

Note: To obtain the correct price adjustment for an Asphalt Mix material, both charts (part 1 and 2) above must be utilized

Example: 1 ton of 302.01 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($1.9875) =$46.988
PPI Adjustment:
$45.000 x 5.00% =$2.250
$2.25 x 96.25% (Difference of 100% Material Minus Total % Asphalt + Fuel Allowance) =$2.1662.165625
Total Material Price After Adjustment: (Binder Adjustment + PPI Adjustment)
$46.9875 + $2.165625 =$49.153

EXAMPLE OF HOW TO CALCULATE COLD PATCH MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Cold Patch will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel
Example: 1 ton of 15402.2010 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($3.71) =$48.710
Total Material Price After Adjustment:$48.710

http://www.bls.gov/data/ June 2025 Asphalt Price Adjustment - June 2025

GroupDescriptionAward #Contract No.
31502Comprehensive Bituminous Concrete

(Asphalt Mix and Cold Patch) (Statewide) 23371 PC70617 - PC70673

Bituminous materials price adjustment(s) EFFECTIVE on: June 1, 2025 ERROR:#REF! NYSDOT Average Posted Prices for Asphalt

(Performance Graded Binder)PPI - DATES FOR IMPLEMENTATION:
Award(s) using November 1, 2024 base index of$593.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification dated April 1, 2025Posted PriceInstructions PPI:
the following price adjustments have been calculated.Contract Manager InputPosted Price2025BLS Month
for CalculationPPI's Month
for CalculationEffective Date
for AdjustmentPPI & CPI
Base Montha) Go to: http://www.bls.gov/data/
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The June 2025 Average is$632.000per tonYear:2025Month$/tonApril-25July 1, 2025December-24b) Choose "Price Producer" -> Industry Data -> Multi-Screen Data-Search.
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Month:JuneJanuary-August 1, 2025c) In the "Choose Industry" box, scroll down and highlight "21231 - Stone mining & quarrying" and click on "Next Form".
The November 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$593.000per ton.February-September 1, 2025d) Select "21231 - Stone mining & quarrying" again and click on "Next Form".
Until further notice, please revise the original contract per ton prices for materials in the referenced awards by using the price adjustments listed below:Asphalt Price AdjustmentMarch-July-25October 1, 2025e) At the next page click "Retrieve data". This brings you to the chart where you pull the numbers from and can calculate PPI as shown in the examples in the award document.
Old Average =$593.000April621November 1, 2025
Interactive Price Adjustment calculators (Asphalt Mix and Cold Patch)
can be found at the bottom of this page.New Average =$632.000May626December 1, 2025
Cold Patch Price Adjustments can be found after the Asphalt Mix Price Adjustments.June632October-25January 1, 2026
Table 1 - ASPHALT MIX ITEMS - MONTHLY PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 1 of 2:BLS Month for CalculationN/A Until July 1stAugustMarch 1, 2026
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TONNew PPI for that Month:N/A Until July 1stSeptemberJanuary-26April 1, 2026
302.01Bituminous Stabilized Course3.750.003.75$1.463ERROR:#VALUE!Base PPI MonthDecember 2024OctoberMay 1, 2026
404.03810218Misc Patching F1, Asphalt Mix6.851.007.85$3.062ERROR:#REF!Base PPI Value459.404NovemberJune 1, 2026
404.03820218Misc Patching F2, Asphalt Mix6.851.007.85$3.062ERROR:#REF!Effective Date for AdjustmentN/A Until July 1stDecemberApril-26July 1, 2026
404.03830218Misc Patching F3, Asphalt Mix6.851.007.85$3.062ERROR:#REF!2026August 1, 2026
404.03890218Misc Patching F9, Asphalt Mix6.851.007.85$3.062ERROR:#REF!Month$/tonSeptember 1, 2026
404.058901Shim Course F9, Asphalt8.251.009.25$3.608ERROR:#REF!JanuaryJuly-26October 1, 2026
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.70$3.003ERROR:#REF!FebruaryNovember 1, 2026
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.20$2.808ERROR:#REF!MarchDecember 1, 2026
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.50$2.535ERROR:#REF!AprilOctober-26January 1, 2027
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.90$2.301ERROR:#REF!MayFebruary 1, 2027
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.50$2.145ERROR:#REF!JuneMarch 1, 2027
JulyJanuary-27April 1, 2027
PERIODIC PPI PRICE ADJUSTMENT:AugustMay 1, 2027
Every three months the base prices shown in the initial CONTRACT AWARD NOTIFICATION may be adjusted in accordance with changes inSeptemberJune 1, 2027
the US Bureau of Labor Statistics (BLS). The PPI Price Adjustment does not apply to any optional items, only to materials items.OctoberN/A Until July 1stN/A Until July 1stN/A Until July 1st
Price adjustments will NOT be recalculated if PPI changes due to change in (P) status.November
Producer Price Index (PPI) - Series ID: PCU 21231-21231 (Industry: Stone Mining & Quarrying; Product: Stone Mining & Quarrying)December
The PPI value forDecember 2024("Base" month for calculations) is459.4042027
Month$/ton
The New Bureau of Labor of Statistics (BLS) PPI for the month ofN/A Until July 1stused for Calculation isN/A Until July 1stJanuary
February
Table 2 - ASPHALT MIX ITEMS - PERIODIC PPI PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 2 of 2:March
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCE DIFFERENCE

(100% Material Minus Total % Asphalt Plus

Fuel Allowance)QUARTERLY PPI PRICE ADJUSTMENT PERCENTAGEApril
302.01Bituminous Stabilized Course3.750.003.7596.25%0%
(There will be no PPI adjustment until July 2025)MayERROR:#VALUE!
404.03810218Misc Patching F1, Asphalt Mix6.851.007.8592.15%JuneERROR:#VALUE!
404.03820218Misc Patching F2, Asphalt Mix6.851.007.8592.15%JulyERROR:#VALUE!
404.03830218Misc Patching F3, Asphalt Mix6.851.007.8592.15%AugustERROR:#VALUE!
404.03890218Misc Patching F9, Asphalt Mix6.851.007.8592.15%SeptemberERROR:#VALUE!
404.058901Shim Course F9, Asphalt8.251.009.2590.75%OctoberERROR:#VALUE!
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.7092.30%NovemberERROR:#VALUE!
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.2092.80%DecemberERROR:#VALUE!
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.5093.50%ERROR:#VALUE!
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.9094.10%ERROR:#VALUE!
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.5094.50%ERROR:#VALUE!
Table 3 - ONLY COLD PATCH ITEMS - MONTHLY PRICE ADJUSTMENTS
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TON
15402.2010Cold Patch - Regular Mix6.001.007.00$2.730ERROR:#REF!
15402.2030Cold Patch - Modified Mix6.001.007.00$2.730ERROR:#REF!
15402.2040Cold Patch - Fiber Reinforced6.001.007.00$2.730ERROR:#REF!

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: ASPHALT MIX ITEMS

Step 1 : Binder Adjustment:
Enter the Material's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 1 above = Note: Enter a negative number if the Price Adjustment in Table 1 shows a negative adjustment

Total Binder Adjustment for that Material = $0.000

Step 2 : PPI Adjustment:
Enter the Material's "Quarterly PPI Price Adjustment Percentage" as found

in Table 2 above = Note: Don't enter the percentage sign, just the number

Enter the Material's "Difference of 100% Material Minus Total % Asphalt + Fuel Allowance" as found in Table 2 above = Note: Don't enter the percentage sign, just the number

Total PPI Adjustment for that Material = $0.000

Step 3 : Final Total Price/Ton After Adjustment: (Binder Adjustment + PPI Adjustment)
Total Material Price/Ton After Adjustment (Binder Adjust. + PPI Adjust.) =$0.000/Ton

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: COLD PATCH ITEMS

Material Adjustment (Note: there is not PPI Adjustment for Cold Patch Items)
Enter the Cold Patch's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 3 above =

Final Total Cold Patch Material Adjustment = $0.000 /Ton

EXAMPLE OF HOW TO CALCULATE ASPHALT MIX MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Asphalt Mix items will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel

Note: To obtain the correct price adjustment for an Asphalt Mix material, both charts (part 1 and 2) above must be utilized

Example: 1 ton of 302.01 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($1.4625) =$46.463
PPI Adjustment:
$45.000 x 0%
(There will be no PPI adjustment until July 2025) =ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Total Material Price After Adjustment: (Binder Adjustment + PPI Adjustment)
ERROR:#VALUE!ERROR:#VALUE!

EXAMPLE OF HOW TO CALCULATE COLD PATCH MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Cold Patch will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel
Example: 1 ton of 15402.2010 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($2.73) =$47.730
Total Material Price After Adjustment:$47.730

May 2025 Asphalt Price Adjustment - May 2025

GroupDescriptionAward #Contract No.
31502Comprehensive Bituminous Concrete

(Asphalt Mix and Cold Patch) (Statewide) 23371 PC70617 - PC70673

Bituminous materials price adjustment(s) EFFECTIVE on: May 1, 2025 ERROR:#REF! NYSDOT Average Posted Prices for Asphalt

(Performance Graded Binder)PPI - DATES FOR IMPLEMENTATION:
Award(s) using November 1, 2024 base index of$593.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification dated April 1, 2025Posted PriceInstructions PPI:
the following price adjustments have been calculated.Contract Manager InputPosted Price2025BLS Month
for CalculationPPI's Month
for CalculationEffective Date
for AdjustmentPPI & CPI
Base Montha) Go to: http://www.bls.gov/data/
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The May 2025 Average is$626.000per tonYear:2025Month$/tonApril-25July 1, 2025December-24b) Choose "Price Producer" -> Industry Data -> Multi-Screen Data-Search.
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Month:MayJanuary-August 1, 2025c) In the "Choose Industry" box, scroll down and highlight "21231 - Stone mining & quarrying" and click on "Next Form".
The November 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$593.000per ton.February-September 1, 2025d) Select "21231 - Stone mining & quarrying" again and click on "Next Form".
Until further notice, please revise the original contract per ton prices for materials in the referenced awards by using the price adjustments listed below:Asphalt Price AdjustmentMarch-July-25October 1, 2025e) At the next page click "Retrieve data". This brings you to the chart where you pull the numbers from and can calculate PPI as shown in the examples in the award document.
Old Average =$593.000April621November 1, 2025
Interactive Price Adjustment calculators (Asphalt Mix and Cold Patch)
can be found at the bottom of this page.New Average =$626.000May626December 1, 2025
Cold Patch Price Adjustments can be found after the Asphalt Mix Price Adjustments.JuneOctober-25January 1, 2026
Table 1 - ASPHALT MIX ITEMS - MONTHLY PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 1 of 2:BLS Month for CalculationN/A Until July 1stAugustMarch 1, 2026
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TONNew PPI for that Month:N/A Until July 1stSeptemberJanuary-26April 1, 2026
302.01Bituminous Stabilized Course3.750.003.75$1.238ERROR:#VALUE!Base PPI MonthDecember 2024OctoberMay 1, 2026
404.03810218Misc Patching F1, Asphalt Mix6.851.007.85$2.591ERROR:#REF!Base PPI Value459.404NovemberJune 1, 2026
404.03820218Misc Patching F2, Asphalt Mix6.851.007.85$2.591ERROR:#REF!Effective Date for AdjustmentN/A Until July 1stDecemberApril-26July 1, 2026
404.03830218Misc Patching F3, Asphalt Mix6.851.007.85$2.591ERROR:#REF!2026August 1, 2026
404.03890218Misc Patching F9, Asphalt Mix6.851.007.85$2.591ERROR:#REF!Month$/tonSeptember 1, 2026
404.058901Shim Course F9, Asphalt8.251.009.25$3.053ERROR:#REF!JanuaryJuly-26October 1, 2026
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.70$2.541ERROR:#REF!FebruaryNovember 1, 2026
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.20$2.376ERROR:#REF!MarchDecember 1, 2026
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.50$2.145ERROR:#REF!AprilOctober-26January 1, 2027
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.90$1.947ERROR:#REF!MayFebruary 1, 2027
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.50$1.815ERROR:#REF!JuneMarch 1, 2027
JulyJanuary-27April 1, 2027
PERIODIC PPI PRICE ADJUSTMENT:AugustMay 1, 2027
Every three months the base prices shown in the initial CONTRACT AWARD NOTIFICATION may be adjusted in accordance with changes inSeptemberJune 1, 2027
the US Bureau of Labor Statistics (BLS). The PPI Price Adjustment does not apply to any optional items, only to materials items.OctoberN/A Until July 1stN/A Until July 1stN/A Until July 1st
Price adjustments will NOT be recalculated if PPI changes due to change in (P) status.November
Producer Price Index (PPI) - Series ID: PCU 21231-21231 (Industry: Stone Mining & Quarrying; Product: Stone Mining & Quarrying)December
The PPI value forDecember 2024("Base" month for calculations) is459.4042027
Month$/ton
The New Bureau of Labor of Statistics (BLS) PPI for the month ofN/A Until July 1stused for Calculation isN/A Until July 1stJanuary
February
Table 2 - ASPHALT MIX ITEMS - PERIODIC PPI PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 2 of 2:March
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCE DIFFERENCE

(100% Material Minus Total % Asphalt Plus

Fuel Allowance)QUARTERLY PPI PRICE ADJUSTMENT PERCENTAGEApril
302.01Bituminous Stabilized Course3.750.003.7596.25%0%
(There will be no PPI adjustment until July 2025)MayERROR:#VALUE!
404.03810218Misc Patching F1, Asphalt Mix6.851.007.8592.15%JuneERROR:#VALUE!
404.03820218Misc Patching F2, Asphalt Mix6.851.007.8592.15%JulyERROR:#VALUE!
404.03830218Misc Patching F3, Asphalt Mix6.851.007.8592.15%AugustERROR:#VALUE!
404.03890218Misc Patching F9, Asphalt Mix6.851.007.8592.15%SeptemberERROR:#VALUE!
404.058901Shim Course F9, Asphalt8.251.009.2590.75%OctoberERROR:#VALUE!
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.7092.30%NovemberERROR:#VALUE!
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.2092.80%DecemberERROR:#VALUE!
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.5093.50%ERROR:#VALUE!
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.9094.10%ERROR:#VALUE!
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.5094.50%ERROR:#VALUE!
Table 3 - ONLY COLD PATCH ITEMS - MONTHLY PRICE ADJUSTMENTS
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TON
15402.2010Cold Patch - Regular Mix6.001.007.00$2.310ERROR:#REF!
15402.2030Cold Patch - Modified Mix6.001.007.00$2.310ERROR:#REF!
15402.2040Cold Patch - Fiber Reinforced6.001.007.00$2.310ERROR:#REF!

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: ASPHALT MIX ITEMS

Step 1 : Binder Adjustment:
Enter the Material's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 1 above = Note: Enter a negative number if the Price Adjustment in Table 1 shows a negative adjustment

Total Binder Adjustment for that Material = $0.000

Step 2 : PPI Adjustment:
Enter the Material's "Quarterly PPI Price Adjustment Percentage" as found

in Table 2 above = Note: Don't enter the percentage sign, just the number

Enter the Material's "Difference of 100% Material Minus Total % Asphalt + Fuel Allowance" as found in Table 2 above = Note: Don't enter the percentage sign, just the number

Total PPI Adjustment for that Material = $0.000

Step 3 : Final Total Price/Ton After Adjustment: (Binder Adjustment + PPI Adjustment)
Total Material Price/Ton After Adjustment (Binder Adjust. + PPI Adjust.) =$0.000/Ton

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: COLD PATCH ITEMS

Material Adjustment (Note: there is not PPI Adjustment for Cold Patch Items)
Enter the Cold Patch's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 3 above =

Final Total Cold Patch Material Adjustment = $0.000 /Ton

EXAMPLE OF HOW TO CALCULATE ASPHALT MIX MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Asphalt Mix items will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel

Note: To obtain the correct price adjustment for an Asphalt Mix material, both charts (part 1 and 2) above must be utilized

Example: 1 ton of 302.01 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($1.2375) =$46.238
PPI Adjustment:
$45.000 x 0%
(There will be no PPI adjustment until July 2025) =ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Total Material Price After Adjustment: (Binder Adjustment + PPI Adjustment)
ERROR:#VALUE!ERROR:#VALUE!

EXAMPLE OF HOW TO CALCULATE COLD PATCH MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Cold Patch will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel
Example: 1 ton of 15402.2010 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($2.31) =$47.310
Total Material Price After Adjustment:$47.310

April 2025 Asphalt Price Adjustment - April 2025

GroupDescriptionAward #Contract No.
31502Comprehensive Bituminous Concrete

(Asphalt Mix and Cold Patch) (Statewide) 23371 PC70617 - PC70673

Bituminous materials price adjustment(s) EFFECTIVE on: April 1, 2025 ERROR:#REF! NYSDOT Average Posted Prices for Asphalt

(Performance Graded Binder)PPI - DATES FOR IMPLEMENTATION:
Award(s) using November 1, 2024 base index of$593.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification dated April 1, 2025Posted PriceInstructions PPI:
the following price adjustments have been calculated.Contract Manager InputPosted Price2025BLS Month
for CalculationPPI's Month
for CalculationEffective Date
for AdjustmentPPI & CPI
Base Montha) Go to: http://www.bls.gov/data/
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The April 2025 Average is$621.000per tonYear:2025Month$/tonApril-25July 1, 2025December-24b) Choose "Price Producer" -> Industry Data -> Multi-Screen Data-Search.
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Month:AprilJanuary-August 1, 2025c) In the "Choose Industry" box, scroll down and highlight "21231 - Stone mining & quarrying" and click on "Next Form".
The November 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$593.000per ton.February-September 1, 2025d) Select "21231 - Stone mining & quarrying" again and click on "Next Form".
Until further notice, please revise the original contract per ton prices for materials in the referenced awards by using the price adjustments listed below:Asphalt Price AdjustmentMarch-July-25October 1, 2025e) At the next page click "Retrieve data". This brings you to the chart where you pull the numbers from and can calculate PPI as shown in the examples in the award document.
Old Average =$593.000April621November 1, 2025
Interactive Price Adjustment calculators (Asphalt Mix and Cold Patch)
can be found at the bottom of this page.New Average =$621.000MayDecember 1, 2025
Cold Patch Price Adjustments can be found after the Asphalt Mix Price Adjustments.JuneOctober-25January 1, 2026
Table 1 - ASPHALT MIX ITEMS - MONTHLY PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 1 of 2:BLS Month for CalculationN/A Until July 1stAugustMarch 1, 2026
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TONNew PPI for that Month:N/A Until July 1stSeptemberJanuary-26April 1, 2026
302.01Bituminous Stabilized Course3.750.003.75$1.050ERROR:#VALUE!Base PPI MonthDecember 2024OctoberMay 1, 2026
404.03810218Misc Patching F1, Asphalt Mix6.851.007.85$2.198ERROR:#REF!Base PPI Value459.404NovemberJune 1, 2026
404.03820218Misc Patching F2, Asphalt Mix6.851.007.85$2.198ERROR:#REF!Effective Date for AdjustmentN/A Until July 1stDecemberApril-26July 1, 2026
404.03830218Misc Patching F3, Asphalt Mix6.851.007.85$2.198ERROR:#REF!2026August 1, 2026
404.03890218Misc Patching F9, Asphalt Mix6.851.007.85$2.198ERROR:#REF!Month$/tonSeptember 1, 2026
404.058901Shim Course F9, Asphalt8.251.009.25$2.590ERROR:#REF!JanuaryJuly-26October 1, 2026
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.70$2.156ERROR:#REF!FebruaryNovember 1, 2026
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.20$2.016ERROR:#REF!MarchDecember 1, 2026
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.50$1.820ERROR:#REF!AprilOctober-26January 1, 2027
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.90$1.652ERROR:#REF!MayFebruary 1, 2027
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.50$1.540ERROR:#REF!JuneMarch 1, 2027
JulyJanuary-27April 1, 2027
PERIODIC PPI PRICE ADJUSTMENT:AugustMay 1, 2027
Every three months the base prices shown in the initial CONTRACT AWARD NOTIFICATION may be adjusted in accordance with changes inSeptemberJune 1, 2027
the US Bureau of Labor Statistics (BLS). The PPI Price Adjustment does not apply to any optional items, only to materials items.OctoberN/A Until July 1stN/A Until July 1stN/A Until July 1st
Price adjustments will NOT be recalculated if PPI changes due to change in (P) status.November
Producer Price Index (PPI) - Series ID: PCU 21231-21231 (Industry: Stone Mining & Quarrying; Product: Stone Mining & Quarrying)December
The PPI value forDecember 2024("Base" month for calculations) is459.4042027
Month$/ton
The New Bureau of Labor of Statistics (BLS) PPI for the month ofN/A Until July 1stused for Calculation isN/A Until July 1stJanuary
February
Table 2 - ASPHALT MIX ITEMS - PERIODIC PPI PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 2 of 2:March
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCE DIFFERENCE

(100% Material Minus Total % Asphalt Plus

Fuel Allowance)QUARTERLY PPI PRICE ADJUSTMENT PERCENTAGEApril
302.01Bituminous Stabilized Course3.750.003.7596.25%0%
(There will be no PPI adjustment until July 2025)MayERROR:#VALUE!
404.03810218Misc Patching F1, Asphalt Mix6.851.007.8592.15%JuneERROR:#VALUE!
404.03820218Misc Patching F2, Asphalt Mix6.851.007.8592.15%JulyERROR:#VALUE!
404.03830218Misc Patching F3, Asphalt Mix6.851.007.8592.15%AugustERROR:#VALUE!
404.03890218Misc Patching F9, Asphalt Mix6.851.007.8592.15%SeptemberERROR:#VALUE!
404.058901Shim Course F9, Asphalt8.251.009.2590.75%OctoberERROR:#VALUE!
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.7092.30%NovemberERROR:#VALUE!
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.2092.80%DecemberERROR:#VALUE!
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.5093.50%ERROR:#VALUE!
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.9094.10%ERROR:#VALUE!
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.5094.50%ERROR:#VALUE!
Table 3 - ONLY COLD PATCH ITEMS - MONTHLY PRICE ADJUSTMENTS
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TON
15402.2010Cold Patch - Regular Mix6.001.007.00$1.960ERROR:#REF!
15402.2030Cold Patch - Modified Mix6.001.007.00$1.960ERROR:#REF!
15402.2040Cold Patch - Fiber Reinforced6.001.007.00$1.960ERROR:#REF!

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: ASPHALT MIX ITEMS

Step 1 : Binder Adjustment:
Enter the Material's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 1 above = Note: Enter a negative number if the Price Adjustment in Table 1 shows a negative adjustment

Total Binder Adjustment for that Material = $0.000

Step 2 : PPI Adjustment:
Enter the Material's "Quarterly PPI Price Adjustment Percentage" as found

in Table 2 above = Note: Don't enter the percentage sign, just the number

Enter the Material's "Difference of 100% Material Minus Total % Asphalt + Fuel Allowance" as found in Table 2 above = Note: Don't enter the percentage sign, just the number

Total PPI Adjustment for that Material = $0.000

Step 3 : Final Total Price/Ton After Adjustment: (Binder Adjustment + PPI Adjustment)
Total Material Price/Ton After Adjustment (Binder Adjust. + PPI Adjust.) =$0.000/Ton

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: COLD PATCH ITEMS

Material Adjustment (Note: there is not PPI Adjustment for Cold Patch Items)
Enter the Cold Patch's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 3 above =

Final Total Cold Patch Material Adjustment = $0.000 /Ton

EXAMPLE OF HOW TO CALCULATE ASPHALT MIX MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Asphalt Mix items will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel

Note: To obtain the correct price adjustment for an Asphalt Mix material, both charts (part 1 and 2) above must be utilized

Example: 1 ton of 302.01 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($1.05) =$46.050
PPI Adjustment:
$45.000 x 0%
(There will be no PPI adjustment until July 2025) =ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Total Material Price After Adjustment: (Binder Adjustment + PPI Adjustment)
ERROR:#VALUE!ERROR:#VALUE!

EXAMPLE OF HOW TO CALCULATE COLD PATCH MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Cold Patch will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel
Example: 1 ton of 15402.2010 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($1.96) =$46.960
Total Material Price After Adjustment:$46.960

TEMPLATE

Asphalt Price Adjustment - April 2025

GroupDescriptionAward #Contract No.
31502Comprehensive Bituminous Concrete

(Asphalt Mix and Cold Patch) (Statewide) 23371 PC70617 - PC70673

Bituminous materials price adjustment(s) EFFECTIVE on: April 1, 2025 ERROR:#REF! NYSDOT Average Posted Prices for Asphalt

(Performance Graded Binder)PPI - DATES FOR IMPLEMENTATION:
Award(s) using November 1, 2024 base index of$593.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification dated April 1, 2025Posted PriceInstructions PPI:
the following price adjustments have been calculated.Contract Manager InputPosted Price2025BLS Month
for CalculationPPI's Month
for CalculationEffective Date
for AdjustmentPPI & CPI
Base Montha) Go to: http://www.bls.gov/data/
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The April 2025 Average is$621.000per tonYear:2025Month$/tonApril-25July 1, 2025December-24b) Choose "Price Producer" -> Industry Data -> Multi-Screen Data-Search.
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Month:AprilJanuary-August 1, 2025c) In the "Choose Industry" box, scroll down and highlight "21231 - Stone mining & quarrying" and click on "Next Form".
The November 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$593.000per ton.February-September 1, 2025d) Select "21231 - Stone mining & quarrying" again and click on "Next Form".
Until further notice, please revise the original contract per ton prices for materials in the referenced awards by using the price adjustments listed below:Asphalt Price AdjustmentMarch-July-25October 1, 2025e) At the next page click "Retrieve data". This brings you to the chart where you pull the numbers from and can calculate PPI as shown in the examples in the award document.
Old Average =$593.000April621November 1, 2025
Interactive Price Adjustment calculators (Asphalt Mix and Cold Patch)
can be found at the bottom of this page.New Average =$621.000MayDecember 1, 2025
Cold Patch Price Adjustments can be found after the Asphalt Mix Price Adjustments.JuneOctober-25January 1, 2026
Table 1 - ASPHALT MIX ITEMS - MONTHLY PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 1 of 2:BLS Month for CalculationN/A Until July 1stAugustMarch 1, 2026
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TONNew PPI for that Month:N/A Until July 1stSeptemberJanuary-26April 1, 2026
302.01Bituminous Stabilized Course3.750.003.75$1.050ERROR:#VALUE!Base PPI MonthDecember 2024OctoberMay 1, 2026
404.03810218Misc Patching F1, Asphalt Mix6.851.007.85$2.198ERROR:#REF!Base PPI Value459.404NovemberJune 1, 2026
404.03820218Misc Patching F2, Asphalt Mix6.851.007.85$2.198ERROR:#REF!Effective Date for AdjustmentN/A Until July 1stDecemberApril-26July 1, 2026
404.03830218Misc Patching F3, Asphalt Mix6.851.007.85$2.198ERROR:#REF!2026August 1, 2026
404.03890218Misc Patching F9, Asphalt Mix6.851.007.85$2.198ERROR:#REF!Month$/tonSeptember 1, 2026
404.058901Shim Course F9, Asphalt8.251.009.25$2.590ERROR:#REF!JanuaryJuly-26October 1, 2026
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.70$2.156ERROR:#REF!FebruaryNovember 1, 2026
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.20$2.016ERROR:#REF!MarchDecember 1, 2026
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.50$1.820ERROR:#REF!AprilOctober-26January 1, 2027
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.90$1.652ERROR:#REF!MayFebruary 1, 2027
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.50$1.540ERROR:#REF!JuneMarch 1, 2027
JulyJanuary-27April 1, 2027
PERIODIC PPI PRICE ADJUSTMENT:AugustMay 1, 2027
Every three months the base prices shown in the initial CONTRACT AWARD NOTIFICATION may be adjusted in accordance with changes inSeptemberJune 1, 2027
the US Bureau of Labor Statistics (BLS). The PPI Price Adjustment does not apply to any optional items, only to materials items.OctoberN/A Until July 1stN/A Until July 1stN/A Until July 1st
Price adjustments will NOT be recalculated if PPI changes due to change in (P) status.November
Producer Price Index (PPI) - Series ID: PCU 21231-21231 (Industry: Stone Mining & Quarrying; Product: Stone Mining & Quarrying)December
The PPI value forDecember 2024("Base" month for calculations) is459.4042027
Month$/ton
The New Bureau of Labor of Statistics (BLS) PPI for the month ofN/A Until July 1stused for Calculation isN/A Until July 1stJanuary
February
Table 2 - ASPHALT MIX ITEMS - PERIODIC PPI PRICE ADJUSTMENTS - (STATEWIDE CONTRACT) - PART 2 of 2:March
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCE DIFFERENCE

(100% Material Minus Total % Asphalt Plus

Fuel Allowance)QUARTERLY PPI PRICE ADJUSTMENT PERCENTAGEApril
302.01Bituminous Stabilized Course3.750.003.7596.25%ERROR:#VALUE!MayERROR:#VALUE!
404.03810218Misc Patching F1, Asphalt Mix6.851.007.8592.15%JuneERROR:#VALUE!
404.03820218Misc Patching F2, Asphalt Mix6.851.007.8592.15%JulyERROR:#VALUE!
404.03830218Misc Patching F3, Asphalt Mix6.851.007.8592.15%AugustERROR:#VALUE!
404.03890218Misc Patching F9, Asphalt Mix6.851.007.8592.15%SeptemberERROR:#VALUE!
404.058901Shim Course F9, Asphalt8.251.009.2590.75%OctoberERROR:#VALUE!
404.068X016.3 F(X), Top Course Asphalt, 80 Series Compaction6.701.007.7092.30%NovemberERROR:#VALUE!
404.098X019.5 F(X,) Top Course Asphalt, 80 Series Compaction6.201.007.2092.80%DecemberERROR:#VALUE!
404.12XX0112.5 F(X), Top Course Asphalt, 80 Series Compaction5.501.006.5093.50%ERROR:#VALUE!
404.19XX0119.0 F9, Binder Course Asphalt, 80 Series Compaction4.901.005.9094.10%ERROR:#VALUE!
404.25XX0125.0 F9, Binder Course Asphalt, 80 Series Compaction4.501.005.5094.50%ERROR:#VALUE!
Table 3 - ONLY COLD PATCH ITEMS - MONTHLY PRICE ADJUSTMENTS
ITEMGRADE / DESCRIPTION% ASPHALTFUEL ALLOWANCETOTAL % ASPHALT

PLUS FUEL

ALLOWANCEPRICE ADJUST / TON
15402.2010Cold Patch - Regular Mix6.001.007.00$1.960ERROR:#REF!
15402.2030Cold Patch - Modified Mix6.001.007.00$1.960ERROR:#REF!
15402.2040Cold Patch - Fiber Reinforced6.001.007.00$1.960ERROR:#REF!

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: ASPHALT MIX ITEMS

Step 1 : Binder Adjustment:
Enter the Material's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 1 above = Note: Enter a negative number if the Price Adjustment in Table 1 shows a negative adjustment

Total Binder Adjustment for that Material = $0.000

Step 2 : PPI Adjustment:
Enter the Material's "Quarterly PPI Price Adjustment Percentage" as found

in Table 2 above = Note: Don't enter the percentage sign, just the number

Enter the Material's "Difference of 100% Material Minus Total % Asphalt + Fuel Allowance" as found in Table 2 above = Note: Don't enter the percentage sign, just the number

Total PPI Adjustment for that Material = $0.000

Step 3 : Final Total Price/Ton After Adjustment: (Binder Adjustment + PPI Adjustment)
Total Material Price/Ton After Adjustment (Binder Adjust. + PPI Adjust.) =$0.000/Ton

INTERACTIVE PRICE ADJUSTMENT CALCULATOR: COLD PATCH ITEMS

Material Adjustment (Note: there is not PPI Adjustment for Cold Patch Items)
Enter the Cold Patch's Unit Price/Ton shown in the Contractor's Quick Quote =

Enter the "Price Adjustment/Ton" for that Material as found in Table 3 above =

Final Total Cold Patch Material Adjustment = $0.000 /Ton

EXAMPLE OF HOW TO CALCULATE ASPHALT MIX MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Asphalt Mix items will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel

Note: To obtain the correct price adjustment for an Asphalt Mix material, both charts (part 1 and 2) above must be utilized

Example: 1 ton of 302.01 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($1.05) =$46.050
PPI Adjustment:
ERROR:#VALUE!ERROR:#VALUE!
ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
Total Material Price After Adjustment: (Binder Adjustment + PPI Adjustment)
ERROR:#VALUE!ERROR:#VALUE!

EXAMPLE OF HOW TO CALCULATE COLD PATCH MATERIAL'S PRICE ADJUSTMENT

Unit prices per ton of Cold Patch will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X (Total % Asphalt + Fuel
Example: 1 ton of 15402.2010 at $45.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 + ($1.96) =$46.960
Total Material Price After Adjustment:$46.960