51-IFB-2358538856-HMM VIPER NEW CEDAR CREEK SITE BUILD.pdf

PDF 586 KB Posted

Attached to
VIPER - NEW CEDAR CREEK SITE BUILD
Solicitation number
Doc2358538870
Issued by
Cumberland County, North Carolina

About this file

This Invitation for Bid (IFB) is issued by the North Carolina State Highway Patrol for the construction of a new Cedar Creek site and decommissioning of an existing tower site in Cumberland County, NC, as part of the Voice Interoperable Plan for Emergency Responders (VIPER) network. The project encompasses building a new communications site and removing the old tower infrastructure to support the statewide, voice interoperable communications network utilized by local, state, and federal first responders. The entire project must be completed within approximately three months of contract award. Bidders are required to submit responses in accordance with the IFB terms and conditions, with evaluation based on technical capability, experience, and cost competitiveness to deliver the construction and decommissioning services.

The project is funded through the North Carolina State Highway Patrol's VIPER infrastructure program. Bidders should review all technical specifications, site conditions, and project requirements detailed in the IFB documents, including any addenda issued during the solicitation period. The bid process is competitive, and contractors should ensure compliance with all state procurement regulations and any applicable prevailing wage or set-aside requirements. Interested vendors must submit complete bid packages by the stated deadline to be considered for award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF NORTH CAROLINA

State Highway Patrol

Invitation for Bid #: 51-IFB-2358538856-HMM

VIPER – New Cedar Creek Site Build

Date Issued: August 17, 2026

Bid Opening Date: September 24, 2026

At 2:00 pm et

Direct all inquiries concerning this IFB to:

Heather Melton

Procurement Specialist III

Email: heather.melton@ncshp.govVIPER

Ver. 11/2023

Invitation for Bids # 51-IFB-2358538856-HMM

For internal State agency processing, including tabulation of bids, provide your company’s eVP (Electronic Vendor Portal) Number. Pursuant to G.S. 132-1.10(b) this identification number shall not be released to the public. This page will be removed and shredded, or otherwise kept confidential, before the procurement file is made available for public inspection.

This page shall be filled out and returned with your bid.

Failure to do so may subject your bid to rejection.

Vendor Name

Vendor eVP#

Note: For a contract to be awarded to you, your company (you) must be a North Carolina registered Vendor in good standing. You must enter the Vendor number assigned through eVP (Electronic Vendor

Portal). If you do not have a Vendor number, register at https://vendor.ncgov.com/vendor/login https://vendor.ncgov.com/vendor/login

Ver: 11/2024 1

EXECUTION

In compliance with this Invitation for Bids (IFB), and subject to all the conditions herein, the undersigned Vendor offers and agrees to furnish and deliver any or all items upon which prices are bid, at the prices set opposite each item within the time specified herein.

By executing this bid, the undersigned Vendor understands that false certification is a Class I felony and certifies that:

this bid is submitted competitively and without collusion (G.S. 143-54), that none of its officers, directors, or owners of an unincorporated business entity has been convicted of any violations of Chapter 78A of the General Statutes, the Securities Act of 1933, or the Securities Exchange Act of 1934 (G.S. 143-59.2), and it is not an ineligible Vendor as set forth in G.S. 143-59.1.

Furthermore, by executing this bid, the undersigned certifies to the best of Vendor’s knowledge and belief, that:

it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal or State department or agency.

As required by G.S. 143-48.5, the undersigned Vendor certifies that it, and each of its sub-Contractors for any Contract awarded as a result of this IFB, complies with the requirements of Article 2 of Chapter 64 of the NC General Statutes, including the requirement for each employer with more than 25 employees in North Carolina to verify the work authorization of its employees through the federal E-Verify system.

As required by Executive Order 24 (2017), the undersigned Vendor certifies will comply with all Federal and State requirements concerning fair employment and that it does not and will not discriminate, harass, or retaliate against any employee in connection with performance of any Contract arising from this solicitation.

G.S. 133-32 and Executive Order 24 (2009) prohibit the offer to, or acceptance by, any State Employee associated with the preparing plans, specifications, estimates for public Contract; or awarding or administering public Contracts; or inspecting or supervising delivery of the public Contract of any gift from anyone with a Contract with the State, or from any person seeking to do business with the State. By execution of this bid response to the IFB, the undersigned certifies, for Vendor’s entire organization and its employees or agents, that Vendor are not aware that any such gift has been offered, accepted, or promised by any employees or agents of Vendor’s organization.

By executing this bid, Vendor certifies that it has read and agreed to the INSTRUCTION TO VENDORS and the NORTH CAROLINA GENERAL TERMS AND CONDITIONS incorporated below. These documents can be accessed from the Ariba Sourcing Tool.

Failure to execute/sign bid prior to submittal may render bid invalid and it MAY BE REJECTED. Late bids cannot be accepted.

COMPLETE/FORMAL NAME OF VENDOR:

STREET ADDRESS: P.O. BOX: ZIP:

CITY & STATE & ZIP: TELEPHONE NUMBER: TOLL FREE TEL. NO:

PRINCIPAL PLACE OF BUSINESS ADDRESS IF DIFFERENT FROM ABOVE (SEE INSTRUCTIONS TO VENDORS ITEM #21):

PRINT NAME & TITLE OF PERSON SIGNING ON BEHALF OF VENDOR:

VENDOR’S AUTHORIZED SIGNATURE: DATE: E-MAIL:

State Highway Patrol

Refer ALL Inquiries regarding this IFB to:

The Procurement Lead through the Message Board in the Sourcing Tool. See section 2.5 for details: heather.melton@ncshp.gov

Invitation for Bids # 51-IFB-2358538856-HMM Bids will be publicly opened: 09/24/26 @ 2:00 PM ET

Using Agency: State Highway Patrol Commodity No. and Description: 721516 – Specialized Communication System Services Requisition No.: RQ304034

Bid Number: 51-IFB-2358538856-HMM Vendor: ____________________________________

Ver: 11/2024 2

FOR STATE USE ONLY: Offer accepted and Contract awarded this ____ day of _______________, 20____, as indicated on the attached certification, by ______________________________________________________

VALIDITY PERIOD

Offer shall be valid for at least ninety 90 days from date of bid opening, unless otherwise stated here: ______ days, or if extended by mutual agreement in writing of the parties. Any withdrawal of this offer shall be made in writing, effective upon receipt by the agency issuing this IFB.

BID ACCEPTANCE

If your bid is accepted, all provisions of this IFB, along with the written results of any negotiations, shall constitute the written agreement between the parties (“Contract”). The NORTH CAROLINA GENERAL TERMS AND CONDITIONS are incorporated herein and shall apply. Depending upon the Goods or Services being offered, other terms and conditions may apply, as mutually agreed.

(Authorized Representative of NC State Highway Patrol)

Ver: 11/2024 3

1.0 PURPOSE AND BACKGROUND

1.1 CONTRACT TERM

2.0 GENERAL INFORMATION

2.1 INVITATION FOR BID DOCUMENT

2.2 E-PROCUREMENT FEE

2.3 NOTICE TO VENDORS REGARDING IFB TERMS AND CONDITIONS

2.4 IFB SCHEDULE

2.5 MANDATORY SITE VISIT

2.6 BID QUESTIONS

2.7 BID SUBMITTAL

2.8 BID CONTENTS

2.9 ALTERNATE BIDS

2.10 DEFINITIONS, ACRONYMS, AND ABBREVIATIONS

3.0 METHOD OF AWARD AND BID EVALUATION PROCESS

3.1 METHOD OF AWARD

3.2 CONFIDENTIALITY AND PROHIBITED COMMUNICATIONS DURING EVALUATION

3.3 BID EVALUATION PROCESS

3.4 PERFORMANCE OUTSIDE THE UNITED STATES

3.5 INTERPRETATION OF TERMS AND PHRASES

4.0 REQUIREMENTS

4.1 PRICING

4.2 ESTIMATED QUANTITIES

4.3 PRODUCT IDENTIFICATION

4.4 TRANSPORTATION AND IDENTIFICATION

4.5 REFERENCES

4.6 VENDOR’S REPRESENTATIONS

4.7 FINANCIAL STABILITY

4.8 AGENCY INSURANCE REQUIREMENTS MODIFICATION

4.9 SECRETARY OF STATE REGISTRATION ........................................................ Error! Bookmark not defined.

5.0 PRODUCT SPECIFICATIONS

5.1 SPECIFICATIONS

5.2 CERTIFICATION AND SAFETY LABELS

5.3 DEVIATIONS

6.0 CONTRACT ADMINISTRATION

6.1 PROJECT MANAGER AND CUSTOMER SERVICE

6.2 INVOICES

6.3 POST AWARD PROJECT REVIEW MEETINGS

6.4 CONTINUOUS IMPROVEMENT

6.5 ACCEPTANCE OF WORK

6.6 DISPUTE RESOLUTION

Ver: 11/2024 4

6.7 PRODUCT RECALL

6.8 PRICE ADJUSTMENTS

6.9 CONTRACT CHANGES

6.10 ATTACHMENTS

Ver: 11/2024 5

1.0 PURPOSE AND BACKGROUND

The North Carolina State Highway Patrol has the responsibility of constructing and maintaining the statewide, voice interoperable communications network for NC. This network is called the Voice Interoperability Plan for Emergency Responders (VIPER) and consists of local, state, and federal first responders.

This project seeks a vendor through a competitive bid process to build a new Cedar Creek site and decommission the old tower site in Cumberland County, NC. The entire project shall be complete within approximately (3) months of award. The intent of this solicitation is to award an Agency Specific Contract.

1.1 CONTRACT TERM

The Contract shall have an initial term of one (1) year, beginning on the date of final Contract execution (the “Effective Date”).

Bids shall be submitted in accordance with the terms and conditions of this IFB and any addenda issued hereto.

2.0 GENERAL INFORMATION

2.1 INVITATION FOR BID DOCUMENT

The IFB is comprised of the base IFB document, any attachments, and any addenda released before Contract award, which are incorporated herein by reference.

2.2 E-PROCUREMENT FEE

ATTENTION: This is an NC eProcurement solicitation facilitated by the Ariba Network. The E-Procurement fee may apply to this solicitation. See paragraph entitled ELECTRONIC PROCUREMENT of the North Carolina General Terms and Conditions.

General information on the E-Procurement Services can be found at: http://eprocurement.nc.gov/.

What is the Ariba Network?

The Ariba Network is a web-based platform that serves as a connection point for buyers and Vendors. Vendors can log in to the Ariba Network to view purchase orders, respond to electronic requests for quotes, participate in Sourcing Events, and collaborate with buyers on contract documents.

For training on how to use the Sourcing Tool to view solicitations, submit questions, develop responses, upload documents, and submit offers to the State, Vendors should go to the following site:

http://eprocurement.nc.gov/training/vendor-training.

2.3 NOTICE TO VENDORS REGARDING IFB TERMS AND CONDITIONS

It shall be the Vendor’s responsibility to read the Instructions to Vendors, the North Carolina General Terms and Conditions, all relevant exhibits and attachments, and any other components made a part of this IFB and comply with all requirements and specifications herein. Vendors also are responsible for obtaining and complying with all Addenda and other changes that may be issued in connection with this IFB.

If Vendors have questions, or issues regarding any component within this IFB, those must be submitted as questions in accordance with the instructions in the BID QUESTIONS Section. If the State determines that any changes will be made as a result of the questions asked, then such decisions will be communicated in the form of an IFB addendum. The State may also elect to leave open the possibility for later negotiation and amendment of specific provisions of the Contract that have been addressed during the question-and-answer period.

Other than through the process of negotiations under 01 NCAC 05B.0503, the State rejects and will not be required to evaluate or consider any additional or modified terms and conditions submitted with Vendor’s bid. This applies to any language appearing in or attached to the document as part of the Vendor’s bid that purports to vary any terms and conditions or Vendors’ instructions herein or to render the bid non-binding or subject to further negotiation. Vendor’s bid shall constitute a firm offer that shall be held open for the period required herein (“Validity Period” above).

http://eprocurement.nc.gov/

Ver: 11/2024 6

The State may exercise its discretion to consider Vendor proposed modifications. By execution and delivery of this IFB Response, the Vendor agrees that any additional or modified terms and conditions, whether submitted purposely or inadvertently, shall have no force or effect, and will be disregarded unless expressly agreed to during negotiations and incorporated by way of a Best and Final Ofer (BAFO). Noncompliance with, or any attempt to alter or delete, this paragraph shall constitute sufficient grounds to reject Vendor’s bid as non-responsive.

2.4 IFB SCHEDULE

The table below shows the intended schedule for this IFB. The State will make every effort to adhere to this schedule.

Event Responsibility Date and Time Issue IFB State August 17, 2026 Mandatory Site Visit State & Vendor(s) September 10, 2026 @ 10am et Submit Written Questions Vendor September 17, 2026 Provide Responses to Questions State September 18, 2026 Submit Bids Vendor September 24, 2026 @ 2:00 pm et Contract Award State TBD

2.5 MANDATORY SITE VISIT

Mandatory Site Visit

Date: September 10, 2026 Time: 10:00 am et Location: Cedar Creek Tower Site 7109 Cedar Creek Road Fayetteville, NC 28312 Contact #: Tanya Luter 984-349-6913

Instructions: It shall be MANDATORY that a representative from each Vendor be present for a pre-bid site visit and attendees must arrive promptly. All attendees must sign in upon arrival and clearly indicate each prospective Vendor represented on the sign in sheet. LATE ARRIVALS WILL NOT BE ALLOWED TO SIGN IN OR PARTICIPATE IN THE SITE VISIT, NOR SHALL THEIR BID BE CONSIDERED. Once the sign-in process is complete, all other persons wishing to attend may do so to the extent that space and circumstances allow.

FAILURE TO ATTEND THE MANDATORY SITE VISIT SHALL RESULT IN VENDOR’S BID BEING DEEMED NON-

RESPONSIVE AND NOT CONSIDERED FOR AWARD.

The purpose of this visit is for all prospective Vendors to apprise themselves of the conditions and requirements which will affect the performance of the work called for by this IFB. Vendors must stay for the duration of the site visit. No allowances will be made for unreported conditions that a prudent Vendor would recognize as affecting the work called for or implied by this IFB.

Vendors are cautioned that any information released to attendees during the site visit, other than that involving the physical aspects of the facility referenced above, and which conflicts with, supersedes, or adds to requirements in this IFB, must be confirmed by written addendum before it can be considered to be a part of this IFB and any resulting contract.

Vendor is cautioned that any information released to attendees during the site visit, other than that involving the physical aspects of the facility referenced above, and which conflicts with, supersedes, or adds

Ver: 11/2024 7 to requirements in this IFB, must be confirmed by written addendum before it can be considered to be a part of this IFB and any resulting contract.

2.6 BID QUESTIONS

Upon review of the IFB documents, Vendors may have questions to clarify or interpret the IFB in order to submit the best bid possible. To accommodate the Bid Questions process, Vendors shall submit any such questions by the “Submit Written Questions” date and time provided in the IFB SCHEDULE Section above, unless modified by Addendum.

Questions related to the content of the solicitation, or the procurement process should be directed to the person on the title page of this document via the Sourcing Tool's message board by the date and time specified in the IFB SCHEDULE Section of this IFB.

Vendors will enter “IFB #51–IFB-2358538856-HMM Questions” as the subject of the message. Question submittals should include a reference to the applicable IFB section. This is the only manner in which questions will be received.

Questions or issues related to using the Sourcing Tool itself can be directed to the North Carolina eProcurement Help Desk at 888- 211-7440, Option 2. Help Desk representatives are available Monday through Friday from 7:30 AM ET to 5:00 PM ET.

Questions received prior to the submission deadline date, the State’s response, and any additional terms deemed necessary by the State will be posted in the Sourcing Tool in the form of an addendum and shall become an Addendum to this IFB. No information, instruction or advice provided orally or informally by any State personnel, whether made in response to a question or otherwise in connection with this IFB, shall be considered authoritative or binding. Vendors shall rely only on written material contained in an Addendum to this IFB.

2.7 BID SUBMITTAL

IMPORTANT NOTE: This is an absolute requirement. Late bids, regardless of cause, will not be opened or considered, and will be automatically disqualified from further consideration. Vendor shall bear the sole risk of late submission due to unintended or unanticipated delay. It is the Vendor’s sole responsibility to ensure its bid has been received as described in this IFB by the specified time and date of opening. Failure to submit a bid in strict accordance with instructions provided shall constitute sufficient cause to reject a Vendor’s bid(s). Solicitation responses are subject to Sealed Bidding requirements.

Vendor’s bids for this procurement must be submitted through the Sourcing Tool. For training on how to use the Sourcing Tool to view solicitations, submit questions, develop responses, upload documents, and submit offers to the State, Vendors should go to the following site: https://eprocurement.nc.gov/training/vendor-training

Questions or issues related to using the Sourcing Tool itself can be directed to the North Carolina eProcurement Help Desk at 888- 211-7440, Option 2. Help Desk representatives are available Monday through Friday from 7:30 AM EST to 5:00 PM EST.

Tips for Using the Sourcing Tool

1. Vendors should review available training and confirm that they are able to access the Sourcing Event, enter responses, and upload files well in advance of the date and time response are due to allow sufficient time to seek assistance from the North Carolina eProcurement Help Desk.

2. Vendors may submit their responses early to make sure there are no issues, and then submit a revised response any time prior to the response due date and time. The State will only review the most recent response.

3. Vendors should respond to all relevant sections of the Sourcing Event. Certain questions or items are required in order to submit a response and are denoted with an asterisk. The Sourcing Tool will not allow a response to be submitted unless all required items are completed. The Sourcing Tool will provide error messages to help identify any required information that is missing when response is submitted.

4. Simply saving your response in the Sourcing Tool is not the same as submitting your response to the State. Vendors should make sure they complete the submission process and receive a message that their response was successfully submitted.

5. Only Bids submitted through the Content Section of the Ariba Sourcing Event will be considered. Bids submitted through the Message Board will not be accepted or considered for award.

https://eprocurement.nc.gov/training/vendor-training

Ver: 11/2024 8

2.8 BID CONTENTS

Vendors shall provide responses to all questions and complete all attachments for this IFB that require the Vendor to provide information and upload them to the Sourcing Event in the Sourcing Tool. Vendor may not be able to submit its response in the Sourcing Tool unless all required items are addressed. Vendors shall provide authorized signatures where requested. Failure to provide all required items, or Vendor’s submission of incomplete items, may result in the State rejecting Vendor’s bid, in the State’s sole discretion.

Vendors shall upload the following items and attachments in the Sourcing Tool:

a) Completed and signed version of EXECUTION PAGES, along with the body of the IFB.

b) Signed receipt pages of any addenda released in conjunction with this IFB, if required to be returned.

c) Vendor Response

d) Completed version of ATTACHMENT A: PRICING

e) Completed and signed version of ATTACHMENT E: CUSTOMER REFERENCE FORM

f) Completed and signed version of ATTACHMENT F: LOCATION OF WORKERS UTILIZED BY VENDOR

g) Completed and signed version of ATTACHMENT G: CERTIFICATION OF FINANCIAL CONDITION

h) Completed and signed version of ATTACHMENT H: CERTIFICATION FOR CONTRACTS, GRANTS, LOANS, AND COOPERATIVE AGREEMENTS and OMB STANDARD FORM LLL

2.9 ALTERNATE BIDS

Unless provided otherwise in this IFB, Vendor may submit alternate bids for comparable Goods, various methods or levels of Service(s), or that propose different options. Alternate bids must specifically identify the IFB requirements and advantage(s) addressed by the alternate bid. Each bid must be for a specific set of Goods and Services and must include specific pricing. Each bid must be complete and independent of other bids offered. If a Vendor chooses to respond with various offerings, Vendor shall follow the specific instructions for uploading Alternate Bids in the Sourcing Tool

2.10 DEFINITIONS, ACRONYMS, AND ABBREVIATIONS

Relevant definitions for this IFB are provided in 01 NCAC 05A .0112 and in the Instructions to Vendors found Sourcing Tool, which are incorporated herein by this reference.

3.0 METHOD OF AWARD AND BID EVALUATION PROCESS

3.1 METHOD OF AWARD

North Carolina G.S. 143-52 provides a general list of criteria the State shall use to award contracts, as supplemented by the additional criteria herein. The Goods or Services being procured shall dictate the application and order of criteria; however, all award decisions shall be in the State’s best interest.

All responsive bids will be reviewed, and award or awards will be based on the responsive bid(s) offering the lowest price that meets the specifications provided herein, to include any required verifications set out herein such as but not limited to past performance, references, and financial documents.

While the intent of this IFB is to award a Contract(s) to a single Vendor for all line items, the State reserves the right to make separate awards to different Vendors for one or more line items, to not award one or more line items or to cancel this IFB in its entirety without awarding a Contract, if it is considered to be most advantageous to the State to do so.

The State reserves the right to waive any minor informality or technicality in bids received.

Ver: 11/2024 9

3.2 CONFIDENTIALITY AND PROHIBITED COMMUNICATIONS DURING EVALUATION

While this IFB is under evaluation, the responding Vendor, including any subcontractors and suppliers, is prohibited from engaging in conversations intended to influence the outcome of the evaluation. See the Paragraph of the Instructions To Vendors entitled

COMMUNICATIONS BY VENDORS.

Each Vendor submitting a bid to this IFB, including its employees, agents, subcontractors, suppliers, subsidiaries and affiliates, is prohibited from having any communications with any person inside or outside the using agency; issuing agency; other government agency office or body (including the procurement lead named above, any department secretary, agency head, members of the General Assembly and Governor’s office); or private entity, if the communication refers to the content of Vendor’s proposal or qualifications, the content of another Vendor’s proposal, another Vendor’s qualifications or ability to perform a resulting contract, and/or the transmittal of any other communication of information that could be reasonably considered to have the effect of directly or indirectly influencing the evaluation of proposals, the award of a contract, or both.

Any Vendor not in compliance with this provision shall be disqualified from evaluation and award. A Vendor’s proposal may be disqualified if its subcontractor and/or supplier engage in any of the foregoing communications during the time that the procurement is active (i.e., the issuance date of the procurement until the date of contract award or cancellation of the procurement). Only those discussions, communications or transmittals of information authorized or initiated by the issuing agency for this IFB or inquiries directed to the procurement lead named in this IFB regarding requirements of the IFB (prior to proposal submission) or the status of the award (after submission) are excepted from this provision.

3.3 BID EVALUATION PROCESS

Only responsive submissions will be evaluated.

The State will conduct an evaluation of responsive Bids, as follows:

Bids will be received according to the method stated in the Bid Submittal section above.

All bids must be received by the issuing agency not later than the date and time specified in the IFB SCHEDULE Section above, unless modified by Addendum. Vendors are cautioned that this is a request for offers, not an offer or request to contract, and the State reserves the unqualified right to reject any and all offers at any time if such rejection is deemed to be in the best interest of the State.

At the date and time provided in the IFB SCHEDULE Section above, unless modified by Addendum, the bids from each responding Vendor will be opened publicly and all offers (except those that have been previously withdrawn, or voided bids) will be tabulated. The tabulation shall be made public at the time it is created. When negotiations after receipt of bids are authorized pursuant to G.S. 143-49 and 01 NCAC 05B.0503, only the names of offerors and the Goods and Services offered shall be tabulated at the time of opening. Cost and price shall become available for public inspection at the time of the award... Interested parties are cautioned that these costs and their components are subject to further evaluation for completeness and correctness and therefore may not be an exact indicator of a Vendor’s pricing position.

At their option, the evaluators may request oral presentations or discussions with any or all Vendors for clarification or to amplify the materials presented in any part of the bid. Vendors are cautioned, however, that the evaluators are not required to request presentations or other clarification—and often do not. Therefore, all bids should be complete and reflect the most favorable terms available from the Vendor. Prices bid cannot be altered or modified as part of a clarification.

Bids will generally be evaluated, based on completeness, content, cost, and responsibility of the Vendor to supply the requested Goods and Services. Specific evaluation criteria are listed in Section 3.1 METHOD OF AWARD.

Upon completion of the evaluation process, the State will make Award(s) based on the evaluation and post the award(s) to the electronic Vendor Portal (eVP), https://evp.nc.gov, under the IFB number for this solicitation. Award of a Contract to one Vendor does not mean that the other bids lacked merit, but that, all factors considered, the selected bid was deemed most advantageous and represented the best value to the State.

https://evp.nc.gov/

Ver: 11/2024 10

The State reserves the right to negotiate with one or more Vendors, or to reject all original offers and negotiate with one or more sources of supply that may be capable of satisfying the requirement, and in either case to require Vendor to submit a Best and Final Offer (BAFO) based on discussions and negotiations with the State.

3.4 PERFORMANCE OUTSIDE THE UNITED STATES

Vendor shall complete ATTACHMENT F: LOCATION OF WORKERS UTILIZED BY VENDOR. In addition to any other evaluation criteria identified in this IFB, the State may also consider, for purposes of evaluating proposed or actual contract performance outside of the United States, how that performance may affect the following factors to ensure that any award will be in the best interest of the State:

a) Total cost to the State

b) Level of quality provided by the Vendor

c) Process and performance capability across multiple jurisdictions

d) Protection of the State’s information and intellectual property

e) Availability of pertinent skills

f) Ability to understand the State’s business requirements and internal operational culture

g) Particular risk factors such as the security of the State’s information technology

h) Relations with citizens and employees

i) Contract enforcement jurisdictional issues

3.5 INTERPRETATION OF TERMS AND PHRASES

This IFB serves two functions: (1) to advise potential Vendors of the parameters of the solution being sought by the State; and (2) to provide (together with other specified documents) the terms of the Contract resulting from this procurement. The use of phrases such as “shall,” “must,” and “requirements” are intended to create enforceable contract conditions. In determining whether bids should be evaluated or rejected, the State will take into consideration the degree to which Vendors have proposed or failed to propose solutions that will satisfy the State’s needs as described in the IFB. Except as specifically stated in the IFB, no one requirement shall automatically disqualify a Vendor from consideration. However, failure to comply with any single requirement may result in the State exercising its discretion to reject a bid in its entirety.

4.0 REQUIREMENTS

This Section lists the requirements related to this IFB. By submitting a bid, the Vendor agrees to meet all stated requirements in this Section, as well as any other specifications, requirements, and terms and conditions stated in this IFB. If a Vendor is unclear about a requirement or specification or believes a change in a requirement would allow for the State to receive a better bid, the Vendor is encouraged to submit these items in the form of a question during the question-and-answer period in accordance with the Bid Questions Section above.

4.1 PRICING

Bid price shall include the total price for each item, including shipping, delivery, handling, administrative and other similar fees.

Assembly and set-up at the State’s location shall be shown as an additional line price for each applicable item. Complete ATTACHMENT A: PRICING FORM and upload in the Sourcing Tool. The pricing provided in ATTACHMENT A, or resulting from any negotiations, is incorporated herein and shall become part of any resulting Contract.

4.2 ESTIMATED QUANTITIES

The quantities indicated herein are annual estimates only and are provided for informational purposes based on the anticipated usage during the previous year period. No maximum or minimum quantities are guaranteed. It shall be understood and agreed that the State may purchase more or less than the estimated quantities during the contract period. The State reserves the right to increase or decrease the quantities as needed. The State shall not be obligated to purchase more than its normal requirements.

The State will be responsible only for items requested and received.

Ver: 11/2024 11

4.3 PRODUCT IDENTIFICATION

SUITABILITY FOR INTENDED USE

Vendors are requested to offer only items directly complying with the specifications, features and diversity called for herein. The State reserves the right to evaluate all bids for suitability for the required use and to award the one best meeting requirements and considered to be in the State’s best interest.

4.4 TRANSPORTATION AND IDENTIFICATION

The Vendor shall deliver Free-On-Board (FOB) Destination to any requested location within the State of North Carolina with all transportation costs and fees included in the total bid price.

Duncan tower site: 8494 Christian Light Road, Fuquay Varina, NC 27526 (Harnett County).

4.5 REFERENCES

Vendors shall upload to the Sourcing Tool at least three (3) references, using ATTACHMENT E: CUSTOMER REFERENCE FORM, for which your company has supplied the exact model of equipment offered. References shall not be from the same company or from the soliciting State entity. The State may contact these users to determine quality level of the offered equipment; as well as, but not limited to user satisfaction with Vendor performance. Information obtained may be considered in the evaluation of the bid.

4.6 VENDOR’S REPRESENTATIONS

If Vendor’s bid results in an award, Vendor agrees that it will not enter any agreement with a third party that may abridge any rights of the State under the Contract. If any Services, deliverables, functions, or responsibilities not specifically described in this solicitation are required for Vendor’s proper performance, provision and delivery of the Service and deliverables under a resulting Contract, or are an inherent part of or necessary sub-task included within such service, they will be deemed to be implied by and included within the scope of the contract to the same extent and in the same manner as if specifically described in the Contract.

Unless otherwise expressly provided herein, Vendor will furnish all of its own necessary management, supervision, labor, facilities, furniture, computer and telecommunications equipment, software, supplies and materials necessary for the Vendor to provide and deliver the Services and/or other Deliverables.

4.7 FINANCIAL STABILITY

As a condition of contract award, the Vendor must certify that it has the financial capacity to perform and to continue to perform its obligations under the Contract; that Vendor has no constructive or actual knowledge of an actual or potential legal proceeding being brought against Vendor that could materially adversely affect performance of this Contract; and that entering into this Contract is not prohibited by any contract, or order by any court of competent jurisdiction

Each Vendor shall certify it is financially stable by completing the ATTACHMENT G: CERTIFICATION OF FINANCIAL CONDITION. The State is requiring this certification to minimize potential performance issues from Contracting with a Vendor that is financially unstable. This Certification shall be deemed continuing, and from the date of the Certification to the expiration of the Contract, the Vendor shall notify the State within thirty (30) days of any occurrence or condition that materially alters the truth of any statement made in this Certification.

4.8 AGENCY INSURANCE REQUIREMENTS MODIFICATION

A. Default Insurance Coverage from the General Terms and Conditions applicable to this Solicitation:

☒ Contract value in excess of $1,000,000.00

4.10 SECRETARY OF STATE REGISTRATION

Upon notification of award, the selected Vendor(s) shall complete registration with the NC Secretary of State and shall furnish evidence of filing to the Procurement Lead. Failure to provide proof of registration will result in the removal as a selected Vendor(s) from the contract award. Note that any prolonged (longer than ten (10) business days) notification of evidence of filing may result

Ver: 11/2024 12 in a disqualification for award. No purchase orders shall be issued prior to confirmation of completed registration with the Secretary of State.

A contract award under the above-referenced solicitation, and the resulting purchase orders, will produce repeated orders and transactions in North Carolina and will constitute “transacting business” in the State, which requires a certificate of authority from the North Carolina Secretary of State as provided in G.S. §55-15-01 (corporations) or §57D-7-01 (LLCs). Please go to: https://www.sosnc.gov/ to register.

Vendor registered with the North Carolina Secretary of State: Yes☐ No ☐

5.0 PRODUCT SPECIFICATIONS

5.1 SPECIFICATIONS

Specifications for this project will be detailed in the attachments TOWER PROCUREMENT PACKAGE BY ETS, GEOTECH REPORT, CONSTRUCTION DRAWINGS and the WORLD TOWER DESIGN document that are attached in the Sourcing Tool.

NC State Highway Patrol proposes to construct a replacement tower site and decommission the existing tower at our Butner tower location. The new tower and all modifications shall be installed and affixed with the highest quality of workmanship. The selected Vendor will advise NC State Highway Patrol’s Contracting Officer two weeks in advance of the date the work will start.

The Vendor will provide to the Contracting Officer weekly project progress reports and immediately report any abnormal conditions encountered during construction.

Scope of Work:

New build:

1. Vendor will order all materials for new tower and tower foundation per the tower procurement package document by ETS, the approved pad & pier tower design by World Tower Company, Inc. and all released documents provided as part of this bid.

2. Vendor will order materials and install all civil work per CD. Civil work encompasses everything from grounding, fencing, etc. identified in the CD.

3. Vendor will be responsible for coordinating with State Construction Office (SCO) for site inspection. Final SCO approval is needed prior to connecting power and startup of generator & UPS.

4. Vendor is responsible for the labor and equipment needed to offload the building and generator from the VFP truck onto the foundations.

5. The Vendor MUST contact the NCSHP engineer of record, ETS, PRIOR to starting any work so that the engineer can stake the tower location. The tower staking will be at the expense of NCSHP. All expenses incurred due to the failure to contact ETS prior to work starting will be the responsibility of the Vendor.

6. As a minimum, the Tower shall be designed to the specifications outlined in the Butner Tower Procurement Package by Engineered Tower Solutions (ETS), as well as all released addendums.

7. All concrete will have a 30-day cure period prior to any weight bearing, no exceptions.

8. Vendor is responsible for all civil work outlined in the CD and tower manufacturer drawings, to include the road to the compound (if applicable).

9. Vendor is responsible for the repair of any damage to access road caused during construction.

Old site decommissioning – occurs only AFTER (1) the new site is built, (2) all equipment for NCSHP & other tenants have been relocated to the new building, and (3) power has been removed from old site:

1. Vendor is responsible for removing fencing from old tower site.

2. Vendor is responsible for decommissioning & disposal of old tower and all equipment on the tower with the exception of the Drake lighting strobes (see NOTE #3 below).

3. Vendor is responsible for demolition and disposal of old building.

4. Vendor is responsible for transport of old generator to State Surplus at 6501 Chapel Hill Road, Raleigh, NC

27607 to be coordinated with NCSHP.

https://www.sosnc.gov/

Ver: 11/2024 13

5. Vendor is responsible for bringing foundation to 24” below grade for all guy anchors, bollards and tower foundation, while building and generator slab can remain onsite.

6. All debris related to this project will be removed promptly.

Notes:

1. New building and generator will be supplied and delivered to site by VFP per bidder’s schedule.

2. NCSHP will coordinate generator, UPS startup and materials/installation of the lines and antennas.

3. Drake lighting strobes are to be kept and given to NCSHP for future use.

COMPLETION DEADLINE: Work should be completed within 90 calendar days after contract award, not counting inclement weather days. If the above time is not possible, state completion time in days from contract issue: _____ days.

Bidders are to check the appropriate “YES”, “NO” or ALTERNATE” response for each section as requested. For all “ALTERNATE” responses bidders are to provide supporting documentation for the “ALTERNATE” with their bid price proposal for evaluation.

Please identify the supporting information by referencing the page number and section of the bid specifications.

Understand the construction process: YES _____ NO _____ ALTERNATE ____________________

Vendor License:

The GC and/or the subcontractor designated by the GC, performing work, must be licensed to operate a contracting business in the State of North Carolina

NC General Contractors License Number ________________

NC Vendor must have a Public Utilities (PU Communications) Classification on their License.

NC Electrical Contracting License Number __________________

Permits:

Any and all permits shall be the responsibility of the Vendor.

YES _____ NO _____ ALTERNATE ____________________

Grounding:

Any existing grounding that is disturbed, disconnected, and/or damaged shall be restored by the GC to its pre-construction condition. The final condition of the repair shall be approved by the MI and Contract Officer.

YES _____ NO _____ ALTERNATE ____________________

Inspections (Foundation, Concrete testing and Post Construction):

The Foundation inspection, Concrete testing and Post Construction inspection (PCI) will be completed by the State’s engineering vendor, ETS at the State’s expense. Any discrepancies found by ETS will be corrected to ETS’s satisfaction on behalf of the State.

YES _____ NO _____ ALTERNATE ___________________

Required Construction Photos

1. Tower grounding installation before trenching is backfilled.

YES _____ NO _____ ALTERNATE ____________________

GENERAL NOTES:

1. All references to the owner in these documents shall be considered NC Highway Patrol or its designated representative.

Ver: 11/2024 14

2. All work presented on these drawings must be completed by the Vendor unless noted otherwise. The Vendor must have considerable experience in performance of work similar to that described herein. By acceptance of this assignment, the Vendor is attesting that he does have sufficient experience and ability, that he is knowledgeable of the work to be performed and that he is properly licensed and properly registered to do this work in the state of North Carolina.

3. Work shall be completed in accordance with the most current North Carolina State Building Code.

4. Unless shown or noted otherwise on the contract drawings, or in the specifications, the following notes shall apply to the materials listed herein, and to the procedures to be used on this project.

5. All hardware assembly manufacturers’ instructions shall be followed exactly and shall supersede any conflicting notes enclosed herein.

6. It is the Vendor’s sole responsibility to determine erection procedure and sequence to ensure the safety of the structure and its component parts during erection and/or field modifications. This includes, but is not limited to, the addition of temporary bracing, guys or tied downs that may be necessary. Such material shall be removed and shall remain the property of the Vendor after the completion of the project.

7. All dimensions, elevations, and existing conditions shown on the drawings shall be field verified by the Vendor prior to beginning any materials ordering, fabrication or construction work on this project. Vendor shall not scale contract drawings in lieu of field verifications. Any discrepancies shall be immediately brought to the attention of the owner and the owner’s engineer. The discrepancies must be resolved before the Vendor is to proceed with the work. The contract documents do no indicate the method of construction. The Vendor shall supervise and direct the work and shall be solely responsible for all construction means, methods, techniques, sequences, and procedures. Observation visits to the site by the owner and/or the engineer shall not include inspection of the protective measures or the procedures.

8. All materials and equipment furnished shall be new and of good quality, free from faults and defects and in conformance with the contract documents. Any and all substitutions must be properly approved and authorized in writing by the owner and engineer prior to installation. The Vendor shall furnish satisfactory evidence as to the kind of quality the materials and equipment being substituted.

9. The Vendor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work. The Vendor is responsible for ensuring that this project and related work complies with all applicable local, state, and federal safety codes and regulations governing this work.

10. Access to the proposed work site may be restricted. The Vendor shall coordinate intended construction activity, including work schedule and materials access, with the resident leasing agent for approval.

11. All permits that must be obtained are the responsibility of the Vendor. The Vendor will be responsible for abiding by all conditions and requirements of the permits.

12. If applicable, all concrete work shall comply with local codes and the ACI standards, “building requirements for structural concrete”.

13. 24 hours prior to the beginning of any construction, the Vendor must notify the applicable jurisdictional (state, county or city) engineer.

14. All materials and workmanship shall be warranted for one year from acceptance date.

15. All tower dimensions shall be verified with the plans (latest revision) prior to commencing construction. Notify the engineer immediately if any discrepancies are discovered.

16. The owner shall always have a set of approved plans available at the site while work is being performed. A designated responsible employee shall be available for contact by governing agency inspectors.

17. The climbing facilities, safety climb, and all parts thereof shall not be impeded, modified, or altered without the express written approval of the tower owner or engineer of record.

18. Any work performed without prefabrication mapping is done at the risk of the GC and/or fabricator.

Ver: 11/2024 15

YES _____ NO _____ ALTERNATE ____________________

5.2 CERTIFICATION AND SAFETY LABELS

All manufactured items and/or fabricated assemblies subject to operation under pressure, operation by connection to an electric source, or operation involving a connection to a manufactured, natural, or LP gas source shall be constructed and approved in a manner acceptable to the appropriate state inspector which customarily requires the label or re-examination listing or identification marking of the appropriate safety standard organization; such as the American Society of Mechanical Engineers for pressure vessels; the Underwriters Laboratories and /or National Electrical Manufacturers’ Association for electrically operated assemblies; or the American Gas Association for gas operated assemblies, where such approvals of listings have been established for the type of device offered and furnished. Further, all items furnished shall meet all requirements of the Occupational Safety and Health Act (OSHA), and state and federal requirements relating to clean air and water pollution.

5.3 DEVIATIONS

The nature of all deviations from the Specifications listed herein shall be clearly described by the Vendor. Otherwise, it will be considered that items offered by the Vendor are in strict compliance with the Specifications provided herein, and the successful Vendor shall be required to supply conforming goods. Deviations shall be explained in detail below or on an attached sheet.

However, no implication is made or intended by the State that any deviation will be acceptable. Do not list objections to the North Carolina General Terms and Conditions in this section.

6.0 CONTRACT ADMINISTRATION

All Contract Administration requirements are conditioned on an award resulting from this solicitation. This information is provided for the Vendor’s planning purposes

6.1 CONTRACT MANAGER AND CUSTOMER SERVICE

The Vendor shall be required to designate and make available to the State a contract manager. The contract manager shall be the State’s point of contact for Contract related issues and issues concerning performance, progress review, scheduling, and service.

Contract Manager Point of Contact

Name:

Office Phone #:

Mobile Phone #:

Email:

Contract Customer Service Point of Contact

Name:

Office Phone #:

Mobile Phone #:

Email:

Ver: 11/2024 16

6.2 INVOICES

Vendor shall invoice the Procurement Entity. The standard format for invoicing shall be Single Invoices meaning that the Vendor shall provide the Procurement Entity with an invoice for each order. Invoices shall include detailed line-item information to allow Procurement Entity to verify pricing at point of receipt matches the correct price from the original date of order. At a minimum, the following fields shall be included on all invoices:

Vendor’s Billing Address, Customer Account Number, NC Contract Number, Order Date, Buyer’s Order Number, Item Descriptions, Price, Quantity, and Unit of Measure.

INVOICES MAY NOT BE PAID UNTIL AN INSPECTION HAS OCCURRED AND THE GOODS ACCEPTED.

6.3 POST AWARD BUSINESS REVIEW MEETINGS

The Vendor, at the request of the State, shall be required to meet periodically with the State for Business Review meetings. The purpose of these meetings will be to review project progress reports, discuss Vendor and State performance, address outstanding issues, review problem resolution, provide direction, evaluate continuous improvement and cost saving ideas, and discuss any other pertinent topics.

6.4 CONTINUOUS IMPROVEMENT

The State encourages the Vendor to identify opportunities to reduce the total cost the State. A continuous improvement effort consisting of various ideas to enhance business efficiencies as performance progresses.

6.5 ACCEPTANCE OF WORK

Performance of the work and delivery of Goods shall be conducted and completed at least in accordance with the Contract requirements and recognized and customarily accepted industry practices. Performance shall be considered complete when the Services or Goods are approved as acceptable by the Contract Manager.

The State shall have the obligation to notify Vendor, in writing ten (10) calendar days following completion of such work or delivery of a deliverable described in the Contract that it is not acceptable. The notice shall specify in reasonable detail the reason(s) it is unacceptable. Acceptance by the State shall not be unreasonably withheld; but may be conditioned or delayed as required for reasonable review, evaluation, installation, or testing, as applicable to the work or deliverable. Final acceptance is expressly conditioned upon completion of all applicable assessment procedures. Should the work or deliverables fail to meet any specifications, acceptance criteria or otherwise fail to conform to the Contract, the State may exercise any and all rights hereunder, including, for Goods deliverables, such rights provided by the Uniform Commercial Code, as adopted in North Carolina.

6.6 DISPUTE RESOLUTION

During the performance of the Contract, the Parties agree that it is in their mutual interest to resolve disputes informally. Any claims by the Vendor shall be submitted in writing to the State’s Contract Manager for resolution. Any claims by the State shall be submitted in writing to the Vendor’s Project Manager for resolution. The Parties shall agree to negotiate in good faith and use all reasonable efforts to resolve such dispute(s).

During the time the Parties are attempting to resolve any dispute, each shall proceed diligently to perform their respective duties and responsibilities under this Contract. The Parties will agree on a reasonable amount of time to resolve a dispute. If a dispute cannot be resolved between the Parties within the agreed upon period, either Party may elect to exercise any other remedies available under the Contract, or at law.