50017-D2700016-1.pdf

PDF 2 MB Posted

Attached to
Smart Grid Training System - Additional Specifications
Solicitation number
50017-D2700016
Issued by
Calcasieu Parish, Louisiana

About this file

This is a specification document and bid solicitation for a Lucas Nuelle Smart Grid Training System issued by McNeese State University's Purchasing Department in Louisiana. The system comprises approximately 25 distinct product components organized into two basic workstations (ESG 1.1 and ESG 1.2) designed for power engineering and energy management training. Basic Workstation 1 (ESG 1.1) includes a double busbar unit, three-phase transmission line models (150km and 300km), time overcurrent relays, ohmic loads, a three-phase power supply (0-450V/2A), power switch modules, multiple outlet strips, interactive lab assistants, SCADA software, patch cables, USB adapters, ethernet switches, safety connecting plugs and measurement cables, interface converters, mobile workstations, and monitoring equipment. Basic Workstation 2 (ESG 1.2) includes lamp boards, inductive and capacitive loads, variable ohmic loads, a three-phase asynchronous motor, a star-delta switch, reactive power controllers, switchable capacitor batteries, a servo machine test stand with software, coupling equipment, power supplies with motor protection, and additional measurement cables and accessories. Sealed bids are due September 3, 2026 at 2:00 p.m., with delivery required on a prepaid, F.O.B. basis to McNeese State University at 150 Lawton Drive, Lake Charles, Louisiana. No substitutions are permitted as the scope involves proprietary equipment and components only.

Bid submissions must be delivered in sealed envelopes to McNeese State University Purchasing Department, Smith Hall Room 120A, or mailed to MSU Box 92415, Lake Charles, LA 70509, with fax and email submissions explicitly prohibited. Bidders must include completed Standard Terms & Conditions to Bidders forms, prepaid delivery terms, contact phone numbers, and ARO information with their bids. Bid prices must remain valid for 30 days following bid opening if an order is placed within that period. McNeese State University is tax-exempt and requires the successful bidder to accept purchase orders. The institution will not accept USPS deliveries to the physical address, requiring bidders using mail to allow sufficient transmission time to the box address.

View the file

Other files

File Type Posted
50017-D2700016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page: 1

Description Order No.

Basie Workstations:

ESG 3. Smart Grid.Tralner

Basic Workstation 1: ESG 1.1 Three-phase double busbar svstem

Line items 1

Training contents:

o Basic circuits of a three-pole, double busbar system r Three-phase, double busbar system with load o Busbar changeover without interruption of the branch o Preparation of algorithms for various switching operations o Busbar coupling Investigations on Three-phase Transmission Lines

Training contents:

o Voltage increases on open-circuit lines r Voltage drop as a function of line length o Voltage drop as a function of cos-phi o Capacitive and inductive power losses on a line as a function of U and I o Phase shift on a line

Overcurrent time protection for lines

Training contents:

r Designing and parameterizing overcurrent time orotection o Determining the reset ratio in the case of single-, double-and triple-pole short circuit o Determining a relay's shortest release time o Checking a circuit breaker's release behavior in the event of a failure

Equipment set comprisinq the followins:

Double busbar unit, three-phase, incoming / outgoing feeder

Double busbar unit, three-phase, coupler panel

Transmission line model 150km/300km (93'2miles/186'4miles)

Time Overcurrent RelaY

Ohmic load 3x 560 Ohm co3301-5R co3301-5S co3301-3A co3301-4J co3301-3H iE*

.*. ,o-

.$, .i. "1 ,s,...

l r 'l I :: L.

Order No.Description

Page: 2

Power supplv:

6 Adjustable 3-phase power supply, 0-450V/2A

7 Power switch module

8 Multiple power outlet strip, 6 outlets, US-standard

Media:

10 Interactive Lab Assistant: Smart Grid

11 Interactive Lab Assistant: Bus bar systems

12 Interactive Lab Assistant: High-voltage transmission lines

13 Interactive Lab Assistant: Protective systems for high-voltage transmission line

Software:

Software SCADA for Power Engineering, designer software

Accessories:

15 Patch cable Cat5E lx 1 m yellow, 2x 2 m yellow

15 USB 2.0 Ethernet adapter, L0/100

L7 5-Port Ethernet Switch (lnternational)

18 Safety connecting plug 4mm with tap (2x), black, 1000V/32A CAT ll lgsafetyconnectingplug4mmwithtap(2x),blue,1000V/32ACATll 20 Safety connecting plug 4mm with tap (2x), gr/ye, TOOOY/32A CAT ll

2I Set of safety measurement cables, 4mm, 31 pcs

22 Safety measurement cable 4mm, 25cmf LO", black, 600V CAT lll

-1000v cAT ll / 32A

23 lnterface converter USB/RS485

24 Mobile workstation, 3 level frame, 5 sockets, 1250x1'970x800 mm'

49"x77.5"x31.5" (WxHxD)

25 Monitor holder for flat screen monitor of weight up to 15kg/33lbs

26 Display for Smart Grid equipment

Measuring instruments:

Three-phase power quality meter, display and long-term memory CO5127-15 co3301.-327 co3301-5P sT8010-4J8 so2800-327 so2800-9N so2800-317 so2800-617 so4001-3F

1M9057 1M8257

1M9988-8 so5125-3R so5126-3V so5126-3W so5148-11 so5126-88

LM902s sr7200-747 sT8010-47 sT8000-4A

Page: 3 rrr'e I I rt .3 '8 rl ,'- ...

n

.l co3208-417 co3301-3D co3301-3E co3301-3F sE2683-l-R7 co32t2-2D co3301-5C7 co3301-5J7 co3636-6Y7 sE2662-64 sE2662-7D

Order No.Description

Basic Workstation 2: ESG 1.2 Complex loads' power consumption measurement and peak load monitoring

Training contents:

o Three-phase consumers with star and delta connections

(R, L, C, RL, RC and RLC loads) r Measurement with active and reactive energy meters:

- for symmetric and asymmetric RL loads

- in the event of a Phase failure

- in the event of over-compensation (RC load)

- for active loads

- in the event of energy-flow reversal o Determination of the first and second power maxima

. Determination of the power maximum in the event of an asymmetric load r Recording of load Profiles Dynamic loads

Training contents:

o Dynamic, three-phase load (asynchronous motor)

. Power measurement in the case of energy-flow reversal

Manual and automatic compensation of reactive power

Trainine contents:

o Operating an asynchronous machine and recording its characteristic Para meters o Calculating parameters for compensation capacitors

. Compensation using various capacitors r Determining stage Power r Manual compensation of reactive power

. Automatic identification of a reactive power controller's connections o Automatic compensation of reactive power

Equipment set comprising the following:

27 LamP board 120V

28 lnductive load, three-Phase, 1kW

29 Capacitive load, three-phase, lkW

30 Variable Ohmic load, three-phase, 1kW

31 Three-phase asynchronous motor, squirrel-cage' 1 kW' 360/208

32 Star-Delta switch

33 Reactive Power controller

34 Switchable CaPacitor Battery

Additionallv required' dvnamic servo machine test stand:

35 Servo machine test stand for 1kW machines incl' software

ActiveServo (D,GB,F,E)

36 Rubber coupling sleeve for 1kW machines

37 Coupling guard with LED lighting for 1kW machines

Page:4

4L

Power supplv:

Three-phase power supply with motor protection switch

Motor protection switch, 3 pole, 2,8-44

Power switch module Multiple power outlet strip, 6 outlets, US-standard

Media:

44 lnteractive Lab Assistant: Energy management

Accessories:

45 Patch cable Cat5E 1x 1 m yellow, 2x 2 m yellow

46 USB 2.0 Ethernet adapter, 10/L00

47 5-Port Ethernet Switch (lnternational)

48 Safetv connecting plug 4mm with tap (2x), black, 1000V/32A CAT ll

49 Safety connecting plug 4mm with tap (2x), blue, 1000V/32A CAT ll

50 Safety connecting plug 4mm with tap (2x), gr/Ve,L000V/32A CAT ll

51 Set of safety measurement cables, 4mm, 31 pcs

52 Set of safety measurement cables, 4mm, 10m, 5 pcs, incl. fastening

53 Mobile workstation, 3 level frame, 5 sockets, 1250x1970x800 mm, 49" x7 7 .5" x3L 5" (WxHxD)

54 Protected power distribution for working stations

55 Monitor holder for flat screen monitor of weight up to 15kg/33lbs

56 Display for Energy Management equipment co32t2-5v7 co32t2-tP7 co3301-5P sT8010-4J8 so2800-3Y7

1M9057 1M8257

1M9988-8 so5126-3R so5126-3V so5126-3W so5148-11 so5148-12 sT7200-7A7 sT8008-8N7 sT8010-47 sr8000-4c

Measuring instruments:

42 Three-phase power quality meter, display and long-term memory CO5127-1S

43 Power-Multimeter Co5t27-24

File details come from the government source that posted it. Updated .