About this file

This is Addendum No. 1 issued by LSU New Orleans Purchasing Office for a competitive sealed bid solicitation to replace boiler and chiller systems at NET Charter School (The Athletic Center) located at LSU New Orleans East Campus in New Orleans, Louisiana. The project requires complete replacement of existing boiler and chiller systems, including demolition, installation of replacement HVAC equipment, and system commissioning. The bid opening is scheduled for October 22, 2026 at 2:00 PM, with a non-mandatory pre-bid conference held on October 14, 2026 at 10:00 AM. The contract completion period is 180 calendar days from Notice to Proceed, subject to weather extensions. Key modifications outlined in this addendum include: provision of a temporary boiler with 1,500,000 BTUH input capacity for a four-month period; conversion of Boiler B-1 from a condensing boiler to a non-condensing high efficiency boiler with minimum 85% thermal efficiency and 3:1 turndown ratio; use of an existing gravel service drive for crane access to the chiller with restoration to original condition upon completion; and replacement of two exterior fully louvered metal doors with new doors and hardware matching existing campus requirements. LSU New Orleans will assess liquidated damages of $300 per day for non-compliance with the contract schedule.

The addendum specifies approved manufacturers for certain equipment components, including Patterson for pumps, Fulton for boilers, Vibro Acoustics for vibration isolation, and Yaskawa for variable frequency drives. Bidders may propose alternative products provided they meet or exceed specification requirements, fit available space, and satisfy capacity and performance requirements, subject to architect or engineer approval prior to actual acceptance. The purchasing representative is Troy Bacino, Assistant Director for Purchasing, and the university representative is Melanie Champagne. Contractors must demonstrate full compliance with all specification requirements and secure written approval from the architect or engineer before deploying alternative equipment. No set-asides, pricing terms, incumbent information, or alternate bid provisions are detailed in this addendum document.

View the file

Other files

File Type Posted
50013-btb2933.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LSU NEW ORLEANS

ADDENDUM NO. 1

FOR

Replacement of Boiler and Chiller NET Charter School (The Athletic Center)

LSU New Orleans – East Campus New Orleans, LA

NOTE:

THIS ADDENDUM SHALL BE ACKNOWLEDGED IN THE

APPROPRIATE BLANK ON THE PROPOSAL FORM.

PREPARED BY

LSU NEW ORLEANS

PURCHASING OFFICE

ADMINISTRATION ANNEX, ROOM 1004-G

LAKEFRONT - NEW ORLEANS - LOUISIANA - 70148

BTB #2933

PURCHASING REPRESENTATIVE: Troy Bacino, Assistant Director for Purchasing

PHONE(504)280-6172 FAX (504)280-6297 E-mail tabacino@lsuneworleans.edu

UNIVERSITY REPRESENTATIVE: Melanie Champagne

(504) 280-3237 E-mail: mmchamp2@lsuneworleans.edu

Date: October 16, 2026 SP 5331

Addendum #1 SP5331

ADDENDUM NO. 1

SP 5331

Bidders are informed that prior Bidding Documents for this project are modified, corrected and/or supplemented as herein enumerated. The following is hereby made a part of the Contract

Documents:

NOTICE TO BIDDERS:

This addendum which consists of 3 pages, shall be considered part of the Bid Documents for the above-mentioned project as though it had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original Bid Documents, this addendum shall govern and take precedence.

Bidders are hereby notified that they shall make any necessary adjustments in their Bid on account of this addendum. It will be construed that each bidder’s proposal is submitted with full knowledge of all modifications and supplemental data specified herein.

Attention is called to this:

1. Provide a temporary boiler for a period of four months. The boiler shall be

1,500,000 BTUH input. Connect to existing electrical, heating water piping and gas. Include all required temporary piping, electrical, controls, etc. as required for the safe and continuous operation of the temporary boiler. Contractor shall be responsible for maintaining the temporary system.

2. Change Boiler B-1 scheduled as a condensing boiler to a non-condensing high efficiency boiler. Minimum thermal efficiency shall be 85% with a minimum turndown of 3:1.

3. There is an existing gravel service drive (covered in grass) that shall be used for crane access to the chiller. The service drive and all surrounding grass areas shall be returned to original condition after completion of the project.

4. Replace two existing exterior fully louvered metal doors including frame and threshold with new doors and door hardware. Door lockset shall match existing campus requirements.

5. Prior Approvals:

Listed below are manufacturers who are recognized as capable of producing products or equipment equal to those specified. Products or equipment will be considered acceptable, providing the equipment meets, or exceeds the specification requirements, fits the available space, and has the capacity and performance requirements. Suppliers are cautioned that before their equipment is actually approved, it will be incumbent upon them to demonstrate to the architect or engineer, that the product or equipment is (in fact) equal to the requirements specified and conforms fully to all specification requirements.

Section 233000:

Approved manufacturers

Pumps – Patterson Boilers – Fulton Vibration Isolation – Vibro Acoustics Variable Frequency Drives - Yaskawa

End of Addendum No. 1