7720123150ProjectChecklist.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Intelligent Facility & Security Systems and Solutions (Statewide)
Contract number
23150
Issued by
New York

About this file

This document is a Project Checklist for Award 23150 focused on Intelligent Facility & Security Systems and Solutions, specifically related to Group 772019. The checklist appears to be a comprehensive planning and evaluation tool for a New York State project, likely associated with the State Education Department (SED) and involving various regulatory and compliance considerations across multiple agency and infrastructure domains.

The checklist comprehensively covers 33 key questions spanning technical, regulatory, safety, and operational aspects of a systems implementation project. Critical areas of focus include permit requirements, code compliance, system integration, environmental considerations, insurance needs, trade classifications, cyber security implications, and project coordination. While specific pricing, contract amounts, or precise service details are not explicitly outlined, the document suggests a structured approach to scoping and preparing for a complex facility systems and security solutions project with multiple potential interdependencies and regulatory touchpoints.

View the file

Other files

File Type Posted
7720123150History.pdf PDF
7720123150ra.pdf PDF
7720123150HowToUse.pdf PDF
7720123150pm.pdf PDF
7720123150AppendixC.pdf PDF
7720123150Attachment1.xlsx XLSX spreadsheet
7720123150CheatSheet.xlsx XLSX spreadsheet
7720123150Instructions.pdf PDF
7720123150ProductLines.xlsx XLSX spreadsheet
7720123150ContractorPage.pdf PDF
7720123150CraneVehicle.xlsx XLSX spreadsheet
7720123150Distributors.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Award 23150 Project Checklist

GROUP 772019 - AWARD 23150: INTELLIGENT FACILITY & SECURITY SYSTEMS AND SOLUTIONS
PROJECT CHECKLIST
#QuestionAnswer
1Do your governing statutes allow you to use Centralized Contracts?
2Have you documented all of the existing Systems and utilities and incorporated these into the scope of work/design documents?
3Does the Work require stamped drawings, specifications, etc.?
4ADoes the Work require the preparation and approval of stampled plans, specifications, etc. by a Registered Architect or Professional Licensed Engineer?
4BIf the answer to #4A is "yes," have you determined who will be preparing and approving all stamped plans, specifications, etc.?
5Does the Work require the issuance of a Permit?
6Does the Work involve additional permitting by other agencies (e.g. Army Core of Engineers, State Historic Preservation Office, Department of State Coastal Areas, etc.)?
7Does the Work require Uniform Code Services such as issuing a Certificate of Occupancy, Code Compliance Certificates, etc.?
8Does the Work require Management Services such as an Engineer-in-Charge (EIC), Independent Construction Manager, etc.?
9Does the Work require/involve Commissioning?
10Does the Work require compliance with code or safety standards such as DigSafe, Occupational Safety and Health Administration (OSHA), etc.?
11Does the Work require firestopping?
12Does the Work involve penetrating the building envelope?
13Does the Work involve environmental issues (asbestos, lead, State Environmental Quality Review Act (SEQRA) activities, etc.)?
14Do the Building Codes require one Business Entity to perform all Work (e.g. one Business Entity must perform all sprinkler system work)?
15Are the Systems Proprietary and only able to be Serviced by one Contractor?
16Would having other Contractors work on the System void the warranty/Maintenance provided by the Contractor?
17Is the Work primarily for the System, or is it structural work on the building/Facility?
18Have you determined who is responsible for maintaining custody of Plans and Specifications as per the NYS State Education Deparment (SED) and NYS Law?
19Is the provision of these Systems classified as a capital project?
20Will the project require bonding?
21Are there any additional insurance requirements such as Pollution Legal Liability, Builder’s Risk/Installation Floater, etc.?
22Is the Work affected/covered by the Scaffold Law?
23Is the System required by Code to be Integrated with another System in the building/Facility?
24Does the Equipment have to be certified by an Industry Standards Body Such as Underwriter’s Laboratory (UL) or Firemen’s Mutual (FM)?
25Does a majority of the Work involve the performance of plumbing, steamfitter, or sheetmetal labor on a mechanical or plumbing/heating system as opposed to one of the Systems which fits the scope of This Award?
26Is the majority of the Work actually for implementing the System, or is it primarily for structural work on the building?
27Does the Work involve more than one (1) trade classification (e.g., Electrical and Carpenter)?
28Does the Work involve installing housekeeping pads for the Equipment?
29Will any of the Work involve high voltage wiring (greater than 600 volts)?
30ADoes the project include dismantling/removing existing Systems to be replaced?
30BIf the answer to #30A is "yes," do you know the disposal requirements for the dismantled/removed Equipment?
31Does the Work require any temporary system (e.g. firewatch for fire alarms, temporary chiller, etc.) while the System is being Installed/Integrated?
32Is there Cyber Security/Network Integrity work associated with this System (e.g. integrating two or more Systems)?
33ADo you currently have other ongoing projects at the same building/Facility?
33BIf the answer to question #33A is "yes," do you have a designated person(s), plan, or process in place to coordinate work among the different contractors, personnel, etc.?
33CIf the answer to question #33A is "yes," do you have a designated person(s) who will perform/oversee all management services, inspections, etc.?