49100423R0010 ARV INTEGRATOR (Draft as of 2023.09.28).docx

DOCX document 485 KB Posted

Attached to
Antarctic Research Vessel (ARV) Integrator, Draft Solicitation Release
Solicitation number
Not on record
Issued by

About this file

This draft solicitation is for an Antarctic Research Vessel Integrator to provide program management, design, construction, and delivery services for a new Antarctic research vessel. Key details include:

The National Science Foundation seeks an integrator to oversee the final design phase and construction stage of the Antarctic Research Vessel project. Services include managing design agents and shipbuilders, supporting regulatory approvals, conducting reviews, and delivering a fully operational vessel. The period of performance for final design is expected from March 2024 to February 2026, while construction may run from March 2026 to June 2031. The solicitation establishes requirements for reporting, reviews, data sharing, and outlines a work breakdown structure, schedule, and performance metrics for successful completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI//SP-CONTRACT/SP-SSEL//FED ONLY

49100423R0010

1. THIS CONTRACT IS A RATED ORDER

RATING

PAGE OF

PAGES

UNDER DPAS (15 CFR 700)

2. CONTRACT NUMBER

3. SOLICITATION NUMBER

4. TYPE OF SOLICITATION

5. DATE ISSUED

6. REQUISITION/PURCHASE NUMBER

SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

(If other than Item 7) NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

9. Sealed offers in original and _____________________________ copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until local time _______________________ (Hour) (Date) CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All Offers are subject to all terms and conditions contained in this solicitation.

A. NAME

B. TELEPHONE (NO COLLECT CALLS)

C. E-MAIL ADDRESS

AREA CODE

NUMBER

EXTENSION

(X)

SEC.

DESCRIPTION

PAGE(S)

(X)

SEC.

DESCRIPTION

PAGE(S)

PART I - THE SCHEDULE

PART II - CONTRACT CLAUSES

A

SOLICITATION/CONTRACT FORM

I

CONTRACT CLAUSES

B

SUPPLIES OR SERVICES AND PRICES/COSTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

C

DESCRIPTION/SPECS./WORK STATEMENT

J

LIST OF ATTACHMENTS

D

PACKAGING AND MARKING

PART IV - REPRESENTATIONS AND INSTRUCTIONS

E

INSPECTION AND ACCEPTANCE

F

DELIVERIES OR PERFORMANCE

G

CONTRACT ADMINISTRATION DATA

L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

H

SPECIAL CONTRACT REQUIREMENTS

M

EVALUATION FACTORS FOR AWARD

K

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ________ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

10 CALENDAR DAYS (%)

20 CALENDAR DAYS (%)

30 CALENDAR DAYS (%)

CALENDAR DAYS (%)

(See Section I, Clause No. 52-232-8)

14. ACKNOWLEDGEMENT OF AMENDMENTS

AMENDMENT NO.

DATE

AMENDMENT NO.

DATE

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

UEI:

EFT:

CODE

FACILITY

16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

15A. NAME AND

ADDRESS OF

OFFEROR

(Type or print)

15B. TELEPHONE NUMBER

17. SIGNATURE

18. OFFER DATE

AREA CODE

NUMBER

EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS DIFFERENT FROM

ABOVE - ENTER SUCH ADDRESS IN SCHEDULE.

19. ACCEPTED AS TO ITEMS NUMBERED

20. AMOUNT

21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

(4 copies unless otherwise specified) 10 U.S.C. 2304(c) 41 U.S.C. 3304(a) ( )

24. ADMINISTERED BY (If other than Item 7)

25. PAYMENT WILL BE MADE BY

CODE

PHONE:

FAX:

26. NAME OF CONTRACTING OFFICER (Type or print)

27. UNITED STATES OF AMERICA

28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

(Signature of Contracting Officer)

(REV. 6/2014)

10. FOR INFORMATION CALL:

11. TABLE OF CONTENTS

AUTHORIZED FOR LOCAL REPRODUCTION

STANDARD FORM 33

Previous edition is unusable Prescribed by GSA-FAR (48 CFR) 53.214(c)

SOLICITATION, OFFER AND AWARD

SOLICITATION

OFFER (Must be fully completed by offeror) AWARD (To be completed by Government)

N/A

TBD

49100423R0010

X

National Science Foundation Div. of Acq. & Cooperative Support 2415 Eisenhower Ave.

Alexandria VA 22314

15:00

EST

See Attached Table of Contents

X

X

X

X

X

X

X

X

X

X

National Science Foundation Div. of Acq. & Cooperative Support 2415 Eisenhower Ave.

Alexandria VA 22314

National Science Foundation DFM, Phone: (703) 292-8280 Commercial Cash Management 2415 Eisenhower Ave.

Alexandria VA 22314

REFERENCE NO OF DOCUMENT BEING CONTINUED

PAGE

ITEM NO.

SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

NSN 7540-01-152-8087

OPTIONAL FORM 336 (4/86)

Prescribed by GSA

FAR (48 CFR) 53.110

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

49100423R0010

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
SF 33 SOLICITATION, OFFER AND AWARD1
OF 336 - CONTINUATION SHEET2
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS8
B.1 PRICE/COST SCHEDULE8
B.2 CONTRACT TYPE8
B.3 IDIQ REQUIREMENTS8
B.4 ORDERING INSTRUCTIONS9
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK10
C.1 BACKGROUND10
C.2 STATEMENT OF WORK11
C.2.1 DESCRIPTION OF THE MREFC PROCESS11
C.2.2 MREFC PHASES11
C.2.3 FINAL DESIGN PHASE12
C.2.4 CONSTRUCTION STAGE16
C.2.5 PROJECT CLOSEOUT19
C.2.6 DOCUMENTATION FOR ACCEPTANCE19
C.2.7 TIMELINE [Dates are placeholders]20
C.2.8 PLACE OF PERFORMANCE20
C.2.9 VESSEL HOMEPORT AND PORTS OF OPPORTUNITY DURING TRANSITION TO OPERATIONS PHASE & SPECIAL REQUIREMENTS20
C.2.10 CONTRACTOR STAFF, ROLES, AND RESPONSIBILITIES21
C.2.11 GOVERNMENT FURNISHED PROPERTY22
SECTION D – PACKAGING AND MARKING23
D.1 GENERAL23
SECTION E – INSPECTION AND ACCEPTANCE24
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE24
E.2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)24
E.3 INSPECTION AND ACCEPTANCE24
SECTION F – DELIVERIES OR PERFORMANCE25
F.1 NOTICE LISTING OF CLAUSES INCORPORATED BY REFERENCE25
F.3 REPORTING REQUIREMENTS25
F.3.1 WEEKLY PROGRESS MEETINGS25
F.3.2 MONTHLY PROGRESS REPORT25
F.3.3 FORMAL REVIEWS26
F.3.4 ANNUAL REPORT27
F.3.5 PROPERTY REPORTING27
F.3.6 SERVICE CONTRACT LABOR STANDARDS AND WAGE DETERMINATIONS33
F.4 LEVEL-OF-EFFORT CERTIFICATION33
F.5 NEW SCOPE AND PROPOSED CHANGES34
F.6 CHANGE MANAGEMENT SYSTEM35
F.7 DOCUMENT SHARING SYSTEM36
F.8 SCHEDULE OF CONTRACT DELIVERABLES36
F.8.1 FINAL DESIGN PHASE DELIVERABLES36
F.8.2 CONSTRUCTION STAGE DELIVERABLES37
F.8.3 PROGRESS REPORTS37
F.8.4 PROPERTY REPORTS37
F.8.5 CONTRACTS, DATA, AND WEBSITE REQUIREMENTS38
SECTION G - CONTRACT ADMINISTRATION DATA39
G.1 NSF020 AUTHORITY OF GOVERNMENT PERSONNEL39
G.2 NSF230 PERFORMANCE EVALUATION SYSTEM (MAR 2021)39
G.3 NOTIFICATION OF CHANGES (ORAL OR WRITTEN)40
G.4 FINAL PAYMENT40
G.5 AGENCY STAFF, ROLES, AND RESPONSIBILITIES40
SECTION H - SPECIAL CONTRACT REQUIREMENT41
H.1 NSF030 SECURITY AND PRIVACY REQUIREMENTS – ACCESS TO NATIONAL SCIENCE FOUNDATION FACILITIES AND UNCLASSIFED INFORMATION TECHNOLOGY RESOURCES (MAY 2019)41
H.2 NSF070 REPLACEMENT OF PERSONNEL – CONTRACTOR PERSONNEL CONDUCT (AUG 2010)49
H.3 NSF100 INSURANCE REQUIREMENTS (AUG 2013)50
H.4 NSF110 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP) (FEB 2019)52
H.4 NSF120 KEY PERSONNEL FOR AWARD53
H.5 NSF240 GOVERNMENT SUPPORT (AUG 2013)53
H.6 NSF250 RESTRICTIONS AGAINST DISCLOSURE OF INFORMATION (JAN 2014)54
H.7 NSF300 DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST AFTER CONTRACT AWARD (MAR 2014)55
H.8 52.234-4 EARNED VALUE MANAGEMENT SYSTEM (NOV 2016)55
H.9 NON-DISCLOSURE56
H.10 COST ACCOUNTING SYSTEM56
H.11 PURCHASING SYSTEM56
H.12 OPERATIONAL LANGUAGE56
H.13 OPERATIONAL CURRENCY56
H.14 SHIP BUILDER SELECTION57
PART II - CONTRACT CLAUSES58
SECTION I - CONTRACT CLAUSES58
I.1 NOTICE OF HYBRID CONTRACT58
I.2 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE58
I.3 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)61
I.4 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)61
I.5 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021)61
I.6 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)63
I.7 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS (NOV 2021) ALTERNATE III (OCT 1997)64
I.7 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020) ALTERNATE I (OCT 2009)65
I.8 52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018)66
I.9 52.216-18 ORDERING (AUG 2020)72
I.10 52.216-19 ORDER LIMITATIONS (OCT 1995)72
I.11 52.216-22 INDEFINITE QUANTITY (OCT 1995)73
I.12 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)73
I.13 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)73
I.14 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAR 2023)74
I.15 @ 52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)76
I.17 52.223-99 ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021) (DEVIATION)77
I.18 52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL) (JUN 1987)77
I.19 @ 52.229-8 TAXES—FOREIGN COST-REIMBURSEMENT CONTRACTS (MAR 1990)78
I.20 52.232-7 PAYMENTS UNDER TIME-AND-MATERIALS AND LABOR-HOUR CONTRACTS (NOV 2021)78
I.21 52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)82
I.22 52.244-2 SUBCONTRACTS (JUN 2020) (ALTERNATE I) (JUN 2020)82
I.22 $ 52.246-19 WARRANTY OF SYSTEMS AND EQUIPMENT UNDER PERFORMANCE SPECIFICATIONS OR DESIGN CRITERIA (MAY 2001) ALTERNATE III (APR 1984)84
I.23 52.246-26 REPORTING NONCONFORMING ITEMS (NOV 2021)87
I.24 52.249-14 EXCUSABLE DELAYS (APR 1984)89
I.25 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)89
I.26 NSF110 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INVOICE PROCESSING PLATFORM (IPP) (FEB 2019)90
I.27 NSF140 TASK-ORDER AND DELIVERY-ORDER OMBUDSMAN (OCT 2018)91
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS92
SECTION J - LIST OF ATTACHMENTS92
PART IV - REPRESENTATIONS AND INSTRUCTIONS93
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS93
K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)93
K.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)97
K.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)99
K.5 52.209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2020)100
K.6 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)101
K.7 52.234-3 NOTICE OF EARNED VALUE MANAGEMENT SYSTEM—POSTAWARD INTEGRATED BASELINE REVIEW (NOV 2016)102
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS104
L.1 GENERAL INFORMATION104
L.2 AMBIGUITIES AND DESCREPANCIES104
L.3 DISCUSSIONS AND CLARIFICATIONS104
L.4 PROPOSAL ORGANIZATION, PAGE LIMITS104
L.5 PROPOSAL FORMATTING105
L.5.1 SUFFICIENT DETAIL105
L.5.2 VALIDITY STATEMENT105
L.5.3 PAGE FORMAT RESTRICTIONS AND LIMITATIONS105
L.5.4 PAGE LIMITATIONS106
L.5.5 PAGES COUNTED106
L.5.6 INDEXING106
L.5.7 ELECTRONIC COPIES106
L.5.8 VOLUME DESIGNATION107
L.5.9 GLOSSARY OF ABBREVIATIONS AND ACRONYMS107
L.5.10 PRICE INFORMATION107
L.6 VOLUME I – EXECUTIVE SUMMARY107
L.7 VOLUME II – EXPERIENCE107
L.8 VOLUME II – ORAL PRESENTATIONS108
L.9 VOLUME III – PRICE109
L.9.1 AUTHORIZED OFFEROR PERSONNEL110
L.9.2 COMPANY ADDRESS, IDENTIFYING CODES, AND APPLICABLE DESIGNATIONS110
L.9.3 TEAMING ARRANGMENTS AND/OR LETTERS OF COMMITMENT110
L.9.4 SMALL BUSINESS SUBCONTRACTING PLAN110
L.10 VOLUME IV – SMALL BUSINESS PARTICIPATION110
L.11 52.215-22 LIMITATIONS ON PASS-THROUGH CHARGES—IDENTIFICATION OF SUBCONTRACT EFFORTS (OCT 2009)110
L.12 52.216-1 TYPE OF CONTRACT (APR 1984)111
L.13 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA (NOV 2021) ALTERNATE III (OCT 1997)111
L.14 52.233-2 SERVICE OF PROTEST (SEP 2006)112
L.15 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)113
L.16 NSF270 NOTICE OF POTENTIAL ORGANIZATIONAL CONFLICT OF INTEREST (MAR 2014)113
L.17 NSF310 NOTICE OF REGISTERING IN RESEARCH.GOV (MAY 2018)114
SECTION M - EVALUATION FACTORS FOR AWARD115
M.1 EVALUATION OF PROPOSALS115
M.1.1 RELATIVE ORDER OF IMPORTANCE115
M.2 EVALUATION FACTOR I: EXPERIENCE115
M.3 EVALUATION FACTOR II: ORAL PRESENTATIONS116
M.4 EVALUATION FACTOR III: PRICE116
M.5 EVALUATION FACTOR IV: SMALL BUSINESS PARTICIPATION116
M.6 BASIS FOR CONTRACT AWARD116
M.6.1 GENERAL CONSIDERATIONS117
M.6.2 NUMBER OF CONTRACTS TO BE AWARDED117
M.6.3 AWARD WITHOUT DISCUSSIONS/COMPETITIVE RANGE117
M.7 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE117

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 PRICE/COST SCHEDULE

This Indefinite-Delivery Indefinite-Quantity (IDIQ) contract does not have a CLIN schedule at the base level – CLINs shall be captured on the orders, which may be task or delivery orders depending on the requirement. Orders will have their own CLIN schedules tailored to match the requirements of that order. Orders will be used to fulfill contractual requirements, generally captured as[footnoteRef:2]: [2: These categories are for illustrative purposes, the contractual requirement as it relates to the definition of the contract’s scope is captured in the ensuing contract sections. ]

1. Management/Integration Services

2. Final Design Phase

3. Construction Stage

a. Ship Builder Contract

b. Ship Builder Oversight

4. Transition to Operations

B.2 CONTRACT TYPE

This is a hybrid contract. NSF retains the ability to use the below contract types on subordinate orders. Line items on order schedules shall have their contract type identified.

1. Firm-Fixed-Price (FFP)

2. Fixed-Price with Economic Price Adjustment (FFP-EPA)

3. Cost Reimbursement (CR)

4. Cost-Plus-Fixed-Fee (CPFF)

5. Time & Materials (T&M)

B.3 IDIQ REQUIREMENTS

Per FAR 16.504, the following are required elements for an IDIQ contract:

FAR Reference
Requirement
Specification
16.504(a)(4)(i)
Contract Period, Ordering Period
Ten (10) years from the date of award

[Dates TBD]

16.504(a)(4)(ii)
Contract Ceiling
TBD
16.504(a)(4)(ii)
Minimum Order[footnoteRef:3] [3: The Government has no obligation to issue Task Orders under the resultant ID/IQ contract beyond the amount specified.]

TBD – likely comprise first task order, anticipate less than $10M

16.504(a)(4)(iii)
Specifications
See Sections C thru J
16.504(a)(4)(iv)
Ordering Instructions
See Section B.4
16.504(a)(4)(v)
Authorized Ordering Activities
The National Science Foundation (NSF) is the only authorized ordering activity.
16.504(a)(4)(vi)
Authorization for Oral Orders
Oral orders are not authorized for this requirement.

B.4 ORDERING INSTRUCTIONS

The following is an overview of the ordering process for orders under this IDIQ.

1. NSF will prepare a requirement to be fulfilled via order, drafting the appropriate order documentation which is provided to the Integrator.

2. The Integrator will review the order documentation and provide the Government with the necessary technical, contractual, and pricing documentation to properly evaluate the order for award. Depending on the order’s requirement, offerors may be required to submit documentation including, but not limited to:

a. Technical documentation or substantiating evidence (not otherwise captured as a contract deliverable or requirement) which endorses or advocates for a particular solution to the requirement.

b. Other than Certified Cost or Pricing Data, such that the Government can assess the integrator’s cost or pricing as fair and reasonable[footnoteRef:4]. [4: Determination of fair and reasonable price, conforming to the requirements of FAR 15.4, is required at the order level due to the base IDIQ not having a priced schedule. ]

c. Small business subcontracting plans, with goals that may be recommended or required by the Government.

3. The Integrator and the Government will negotiate the order. Failure to arrive at a satisfactory negotiated agreement may result in the cancellation of the order.

4. Pending a satisfactory agreement between the Integrator and the Government, the order is awarded.

Once an order is provided to the Integrator to propose to, the Government retains the right to revoke the order until it is awarded (signed by both parties), at which point termination procedures would be followed.

All orders, once placed, will conform to the requirements of FAR 16.505(a)(7).

[Note for Industry: The solicitation is anticipated to be released alongside a CLIN schedule for the initial, minimum task order. This is not present for the draft release.]

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 BACKGROUND

Project Title: Antarctic Research Vessel (ARV) Vessel Integrator for Final Design Phase and MREFC Construction Stage Purpose of the vessel and overall objective of the project. The U.S. maintains a world-class science program in Antarctica to advance the frontiers of knowledge and to ensure an active and influential role in the Antarctic Treaty System, now in force for over 50 years. By presidential mandate, the National Science Foundation (NSF) acts on behalf of the U.S. government as the single-point manager of the United States Antarctic Program (USAP). To carry out its responsibilities, NSF operates three year-round research stations in Antarctica, and two purpose-built research vessels. The current icebreaking research vessel, RVIB Nathaniel B. Palmer (NBP) is reaching the end of its service life and needs replacement. The Antarctic Research Vessel (ARV) project will design, construct, and deliver a new, more technologically advanced, and capable icebreaking research vessel that will replace the NBP and thus ensure the U.S. research community has a more viable, safe, and effective platform for supporting Antarctic science for up to 40 years beyond the retirement of the NBP.

History of requirements development Numerous reports developed by the science community over the last decade have strongly advocated for an Antarctic Research Vessel (ARV) with enhanced capabilities. These reports and relevant recommendations include:

· “Report of the Ad Hoc Subcommittee on the U.S. Antarctic Program’s Research Vessel Procurement”, Office of Polar Programs Advisory Committee, 2019.

· “A Strategic Vision for NSF Investments in Antarctic and Southern Ocean Research”, National Academy of Sciences, 2015. Committee recommended:

· “Prioritize the acquisition of a next-generation research icebreaker”

· “Ship support for research in ice-covered Southern Ocean coastal areas”

· “To support the science priorities recommended by this Committee, and to retain a leadership role in both Antarctic and Arctic research, NSF will need to prioritize the acquisition of a next-generation research icebreaker… to provide critically needed field opportunities for U.S. scientists.”

· “To maintain operations at U.S. Antarctic research stations and support all U.S. research carried out on the continent, progress must be made in acquiring one or more new polar class icebreakers.”

· “More and Better Science in Antarctica Through Increased Logistical Effectiveness”, Blue Ribbon Panel Report, 2012. Second of the top ten BRP recommendations: “Restore the U.S. polar ocean fleet to support science, logistics, and national security in both polar regions over the long term.”

· “Polar Research Vessel Science Mission Requirements Refresh Project” University National Oceanographic Laboratory System (UNOLS), 2012 (https://www.unols.org/polar-research-vessel-science-mission-requirements-smr-refresh-project).

· “Future Science Opportunities in Antarctica and the Southern Ocean”, National Academy of Sciences, 2011. “Maintain and enhance the unique logistical assets of the United States, including research stations, aircraft and research vessels…”

· “Critical Infrastructure for Ocean Research and Societal Needs in 2030”, National Academy of Science, 2011. The committee concluded that “Recover[ing] U.S. capability to access full and partially ice-covered seas” would help ensure that the U.S. has the capacity in 2030 to undertake and benefit from knowledge and innovations possible with oceanographic research.

C.2 STATEMENT OF WORK

The following sections describe the necessary components feeding into the development, design, construction, and delivery of the next generation Antarctic Research Vessel. Where possible, to avoid duplications references are made to the ARV’s Project Execution Plan (PEP) and other documents to assist offerors in understanding and responding to project task elements.

C.2.1 DESCRIPTION OF THE MREFC PROCESS

A reference document[footnoteRef:5] for completing the ARV project is the National Science Foundation Research Infrastructure Guide (RIG), Document Number: nsf21107, and subsequent revisions. [5: The RIG shall be last in preference when compared to the items established in FAR clause 52.215-8, which is incorporated by reference.]

The following figure taken from the RIG shows the overall life cycle of an NSF Major Facilities project.

Figure 2.1.3-1 Progressive steps in the facility life cycle, showing the high-level review and decision points for exit and entry into each stage. The Design Stage is further broken down into phases.

The ARV project has completed the Development Stage and is currently in the Preliminary Design Phase of the Design Stage.

The Scope of Work for this contract includes the Final Design Phase and the Construction Stage, which is dependent on successful completion of the Final Design Review (FDR), NSF approvals, Congressional funding for construction, and issuance of the appropriate task order.

The Construction Stage consists of a Detail Design Phase, the Ship Construction Phase, and a Transition to Operations/Warranty Period Phase, described in more detail below.

C.2.2 MREFC PHASES

C.2.2.1 Design Process through Preliminary Design Phase The ARV project successfully completed the Conceptual Design Phase and is in the process of completing the Preliminary Design Phase and related documents. The Preliminary Design Review (PDR) was successfully completed in February 2023. The finalized Preliminary Design documents are Government-provided.

C.2.2.2 Description of the Final Design Phase The Final Design Phase further refines the project definition and the Project Execution Plan and demonstrates that project planning and management meet requirements for readiness to receive funding and begin construction. This phase can also incorporate events or conditions that were unforeseen when the PDR was conducted. Final Design Phase ends with a Final Design Review (FDR) and an obligation of construction funds following internal approvals. See RIG Section 2.3.3.

C.2.2.2.1 Project Execution Plan (PEP) Update the Project Execution Plan based on the expectations in NSF RIG Sections 2.3.3 and 3.4 and associated RIG Sections. Carry out project management controls in accordance with the PEP. This includes preparation for and support for the FDR.

C.2.2.2.2 Final Design Development

a. Design Agent: Propose and engage a design agent to complete the Final Design (Bid Design) and supporting documentation.

b. Design Development: Continue development of ARV design to the Final Design (Bid Design) level based on design drawings and reports delivered for the Preliminary Design Phase. These deliverables are described below and included as part of this solicitation.

c. Model Testing: The Model Testing program will be continued as needed based on results during the Preliminary Design Phase.

d. Shipbuilder Selection: The Vessel Integrator will conduct a solicitation and selection of a prospective Shipbuilder to be engaged for value engineering prior to FDR. Shipbuilder award may be phased such that this subaward has distinct option periods allowing for value-engineering development prior to option periods for construction.

e. Shipbuilder’s Contract Specification: As part of design development (with value-engineering revisions), a Shipbuilder’s Specification that defines the requirements to build the vessel will be updated and finalized by the Design Agent and Vessel Integrator. An initial version will be used as part of the Shipbuilder solicitation by the Vessel Integrator. The initial version of the Shipbuilder’s Specification is a deliverable during the Preliminary Design Phase and will be included with this solicitation.

C.2.2.3 Description of the Construction[footnoteRef:6] Stage [6: Construction, as referenced by this requirement, is used in a colloquial or conventional means, and not to be misconstrued as the FAR 2.101 definition of “Construction”, which specifically prohibits “[…] the manufacture, production, furnishing, construction, alteration, repair, processing, or assembling of vessels[.]”]

C.2.2.3.1 Detail Design Phase: Engineering completion including completion of Detailed Design, production engineering and submittal of the Class Design for Regulatory Body approvals. Some long lead time purchases can take place during this phase as needed and approved by NSF.

C.2.2.3.2 Construction Phase: Construction, outfitting, testing, trials and inspections resulting in delivery of ARV that meets all performance specifications and preliminary acceptance by NSF.

C.2.2.3.3 Transition to Operations Phase: A one year Shipbuilder’s Warranty period with outfitting, science and ice trials and a Post-Shakedown Availability to complete all Shipbuilder Warranty work. This phase ends with ARV delivery to its home port in Punta Arenas, Chile, ready to support science and final NSF acceptance.

C.2.3 FINAL DESIGN PHASE

This section and the following sections describe what work the Vessel Integrator will perform during the Final Design Phase and the Construction Stage of the ARV project. This scope of work includes all major tasks, work elements and objectives and acceptance criteria. The ARV PEP provides details of the organization and tasks necessary for successful conduct of the Final Design Phase with Sections 2, 3, 5, 7 & 14 being especially pertinent to this phase. A nominal timeline for completion of the major elements of the project are included in Section C.2.7 of this Statement of Work.

C.2.3.1 Project Execution Plan The RIG and the PEP at the end of the Final Design Phase are incorporated as part of the construction award through reference to define the award scope, cost, schedule, risk register, and related contingencies, as well as configuration and contingency control, earned value management system, and project governance.

Some key project management elements of the PEP include:

· A deliverable-based Work Breakdown Structure (WBS) as described in RIG Section 4.2.2.7.

· A Cost Estimating Plan and Cost Estimate, including a Cost Book and well-documented Basis of Estimate (BOE), in accordance with FAR, RIG Section 4.2, and the GAO Cost Estimating and Assessment Guide (GAO-20-195G, March 2020) that follows the GAO’s twelve steps and best practices to meet the four characteristics of a high-quality estimate (well-documented, comprehensive, accurate, and credible).

· A Schedule Basis Document and Integrated Master Schedule in accordance with RIG Section 4.3 and the GAO Schedule Assessment Guide (GAO-16-89G, December 2015) that follows GAO’s ten steps and best practices to meet the four characteristics of a reliable schedule (comprehensive, well-constructed, credible, and controlled).

· Budget and Schedule Contingency calculations via probabilistic risk analysis (Monte Carlo) that are based on a risk register and uncertainties, in accordance with RIG Sections 4.2.5 and 6.2, and the GAO Cost and Schedule Guides.

· An Earned Value Management System (EVMS) plan in accordance with RIG Section 6.8 and the NSF EVM Gold Card that meets the intent of the 32 guidelines in the Electronic Industries Alliance standard (EIA-748) for EVMS.

· A Scope Management Plan in accordance with RIG Sections 3.4.1 and 4.2.5.1

· Project personnel and competencies in accordance with RIG Section 4.6.6.

The Vessel Integrator is responsible for ensuring the overall project meets RIG and PEP guidance. Specific data and documentation requirements should flow down to subcontractors to ensure sufficient supporting information is provided to the Vessel Integrator to meet the overall project requirements.

The following is an excerpt from the NSF RIG that describes the purpose and scope of the PEP.

Typical components of a construction-ready Project Execution Plan (PEP) are listed in Table 3.4.1-1 of the RIG as an example of the extensive nature of the pre-construction planning that should be conducted prior to expending construction funds to execute the project. Some topics will continue to be refined during the Construction Stage, for example, Commissioning Plans and related sub-plans.

The PEP should ideally contain or reference all project related documents and be the standalone source explaining how and why the project meets all requirements and should proceed as planned. Various components of the PEP may often be detailed in separate documents or as appendices, especially, living documents for future operations such as cybersecurity and data management plans. The PEP should reference these separate documents to summarize the complete scope of the pre-construction planning. In addition to referencing these separate plans, the PEP should provide a high-level summary, outline the associated goals, and/or identified responsibility for the specific plan.

It is important for the PEP to document all assumptions and boundary conditions driving project design and implementation. Additions or alterations to the typical PEP components listed below are likely, due to the unique nature of each specific project. Any special construction elements should be identified and addressed in the PEP or a separate document such as the work breakdown structure dictionary or design requirements, drawings, and specification documents.

C.2.3.2 Final Design Development

a. Preliminary Design and Performance Specifications The Final Design (Bid Design) will be completed based on the Preliminary Design documentation and the ARV Performance Specifications. Prior to the FDR, a series of Interim Design Reviews will be held with the NSF as described in ARV PEP Section 3.3. The following tables define the drawings, reports and documents that are part of the Preliminary Design deliverables and that will be finalized and delivered to NSF for FDR and at the conclusion of the Final Design Phase as a minimum.

Table 1 - Drawings

Hull Lines Drawing
Firemain System
Pilot House and Chart Area Arrangement Drawing
Seawater Service System
General Arrangement Drawing
Science Seawater System
Centerboard, Trunk and Handling System Drawing
Bilge and Oily Waste System
Blocking Plan
Jacket Water Cooling Drawing
Science Space Arrangement Drawing
Ballast System
Topside Arrangement Drawing
Roll Tank System
Structural Drawings: Midship, Decks and Platforms and Shell Expansion
Waste Heat Recovery System & Hot Water Heating System
Superstructure Structure Drawing
Potable Water Service System
Structural Fire Protection Drawing
Chilled Water System
Insulation Drawing
Freshwater Cooling System
Masts, Yardarms, and Flagstaff Drawing
Fuel Oil System
Propeller Drawing
Urea System
Navigation Lights Arrangement Drawing
Cargo Oil System
Machinery Arrangement Drawing
Fire Extinguishing Systems
Equipment Removal Drawing
Lifesaving Drawing
Handling Systems and Scientific Deployment Drawing
Shipwide Network Diagram
Container Handling, Transfer Tracks, and Securing Systems
Ship and Scientific Compressed Air System
Anchoring and Mooring Drawing
Sewage System
Electrical System One-Line Diagram
Hydraulic Systems
Scientific Electronic Arrangement Drawing
Deck De-icing Plan
Lighting Plan – Interior and Exterior
Lube Oil System
HVAC Systems Drawing
Refrigeration System

Table 2 - Analyses / Technical Documents

Requirements Verification Matrix
Range and Endurance Calculations Report
Life Cycle Fuel Estimate and Cost Savings Study Report
Stack Gas Flow Analysis Report
Speed and Power Analysis Report
Electric Power Load Analysis
Seakeeping Performance Report
Propulsion System Report
Maneuvering Performance Report
Auxiliary Systems Report
Dynamic Positioning System Performance Report
Pollution Control Systems Report
Bubble Sweepdown Computational Fluid Dynamics Report
Automation, Control, and Monitoring Systems Report
Regulatory Body Communications and Correspondence
Preliminary Power System Analysis Report
Airborne Noise Report
Preliminary Power Quality Analysis Report
Underwater Radiated Noise and Sonar Self-Noise Report
Waste Management Report
Vibration Report
Human Systems Interface (HSI) Report
Intact and Damage Stability Report
Science Systems Report
Design Weight Estimate
Novel or Emerging Technologies Report
Model Test Program Plan (open water and ice)
Ship Construction Report
Model Test Report (open water and ice)
Trade-Off Studies
Master Equipment List
Design Summary Report
Green Ship Alternative Studies
Polar Operation Design Features Report
Hull Form Trade-Off Study
Habitability Study
Icebreaking Performance Report
Structural Design Report
Transducer/Centerboard Trade-Off Study
Electric Propulsion Architecture Trade-Off Study
Fault Current Analysis Report
Area/Volume Report
Area/Volume Report
Master Equipment List
Critical Equipment List
Winterization Plan

Ship Builder’s Contract Specifications

b. System Engineering In conjunction with vessel design activities, a robust system engineering process is required to ensure proper requirements tracking and configuration control as defined in the System Engineering Plan (PEP Appendix 13). The Vessel Integrator will be responsible to ensure the Vessel Designer and the System Engineering Team coordinate their work to produce a verifiable engineering product that aligns to the Science Mission Requirements (PEP Appendix 01) and the Performance Specifications.

c. Model Testing The Model Test Program Plan (open water and ice) and Model Test Report (open water and ice) from the Preliminary Design Phase will be provided as part of this solicitation. A stage 4 model test campaign discussed in the Model Test Program Plan will need to be conducted if not completed during Preliminary Design. This will include physical model testing of an evolved propeller design with inputs from Stage 3B testing and further testing and optimization of maneuverability and seakeeping performance.

Any Model testing for the Final Design Phase will be proposed by the Vessel Integrator and their design agent and will be included in the scope of work if approved by NSF.

d. Shipbuilder Selection Shipbuilder source selection will be completed during the Final Design Phase based on the Bid Design Package defined in Table 1 above and selected documents from Table 2 along with contract documentation developed by the Vessel Integrator.

Shipbuilder contract terms shall be developed by the Vessel Integrator, incorporating flow-down requirements from NSF.

Shipbuilder award will be phased to allow for initial value-engineering development during the Final Design Phase with an option for the Construction Stage that would be contingent on successful completion of the FDR and Congressional appropriation of the MREFC Construction funding.

Shipbuilder selection criteria will be approved by NSF and will be based on a best value evaluation of Shipbuilder qualifications and proposed cost for value engineering and a preliminary not-to-exceed cost for the Construction Stage. Exercising the Construction Stage option for the Shipbuilder contract will be contingent on the continued qualification of the Shipbuilder and agreement to a final accepted price by all parties. Additional requirements concerning shipbuilder selection are in contract section H.14.

e. Value Engineering The Vessel Integrator and Design Agent will engage in Value Engineering with the selected Shipbuilder during the Final Design Phase to help ensure the buildability of the design and specifications. Value Engineering will also help to define the basis for a final negotiated Construction Stage cost.

f. Shipbuilder’s Contract Specification A draft Shipbuilder’s Contract Specification was developed during the Preliminary Design Phase and will be provided as part of this solicitation. The Design Agent and Vessel Integrator will update and further refine the Shipbuilder’s Contract Specification at the beginning of the Final Design Phase for use in the Shipbuilder solicitation. The Shipbuilder’s Contract Specification will continue to be updated and finalized based on continued design development and value engineering for inclusion in the final shipbuilder’s construction contract.

C.2.3.3 Preparation for Final Design Review Prepare a complete Final Design Review package that meets the requirements of the NSF Research Infrastructure Guide, Document Number: nsf21107. The FDR package will include, but is not limited to, the following:

· Project Execution Plan.

· Final Design (Bid Design) for the proposed ARV including Shipbuilder’s Specification.

· Updated risk register and probabilistic risk analysis (Monte Carlo) with defined mitigation strategies for construction, identifying enabling technologies, high-risk or long-lead items, and research and development (R&D) needed to reduce project risk to acceptable levels.

· Description of the proposed construction performance baseline (scope of work, budget, and schedule) needed to evaluate readiness for the Construction Stage.

· A bottom-up Total Project Cost for the Construction Stage C.2.3.4 Conduct of the Final Design Review The Vessel Integrator shall assist NSF in planning and managing the FDR. Activities to plan and manage the FDR include, but are not limited to, the following:

· Developing the FDR Panel’s charter,

· Preparing briefing materials for presentations to the FDR Panel,

· Presenting multiple briefing packages to the FDR Panel,

· Answering questions posed by the FDR Panel,

· Attending the FDR, which is anticipated to be three or four days and held at NSF’s headquarters building in Alexandria, Virginia,

· Managing the day-to-day activities of the FDR Panel, and

· Taking meeting minutes for each session

C.2.4 CONSTRUCTION STAGE

C.2.4.1 Detail Design (Engineering) Phase

a. Shipbuilder Contract The Vessel Integrator will enter into a contract with the Shipbuilder to deliver the ARV in accordance with the Shipbuilder’s Contract Specification and the finalized Bid Contract Design. The terms of the contract and final negotiated cost will be approved by NSF prior to award.

b. Regulatory Design Submittal The Vessel Integrator will ensure that with continued detailed design and engineering with the Shipbuilder, the Design Agent and/or Shipbuilder will submit all required drawings, reports, and specifications to regulatory bodies for review and approval. All comments and questions from regulatory bodies will be adjudicated and resolved so that the ARV will meet all requirements for USCG COI and ABS Notations per the Performance and Shipbuilder’s Contract Specifications. If regulatory bodies other than the U.S. Coast Guard (USCG) and the American Bureau of Shipping (ABS) are proposed, the Vessel Integrator will provide justification and must be approved by NSF.

Class Design approvals will be complete or pending final approvals with minimal risk to production before the start of actual construction. This will be reviewed and approved during the Production Readiness Review (PRR) described below. Any risk to production based on pending regulatory body approvals is the responsibility of the Vessel Integrator and Shipbuilder.

The Vessel Integrator will ensure that appropriate contracts are in place to support the regulatory review and approvals. A plan and appropriate contracts should be completed to support all required inspections and surveys necessary to meet all regulatory requirements during construction, tests, trials and at delivery.

c. Construction Detail Design and Production Engineering The Vessel Integrator will ensure that the Design Agent and Shipbuilder complete all required detailed design and production engineering required to successfully construct the ARV. This includes 3-D modeling, production engineering and construction drawings, spooling diagrams and others as required to support actual construction. It also includes all Class Design documentation to be submitted and reviewed by regulatory bodies (ABS, USCG).

This documentation will be reviewed and approved during the Production Readiness Review described below.

d. Long lead time equipment ordering The Vessel Integrator and Shipbuilder will develop a plan for long lead-time equipment and material ordering. The plan and actual ordering of equipment and materials will ensure that the production schedule can be maintained.

e. Production Readiness Review (PRR) A Production Readiness Review will be conducted prior to the start of actual steel cutting and fabrication. Any exceptions will be proposed by the Vessel Integrator and approved by NSF. The PRR will review the status of design development including regulatory review and approvals, detailed design including 3-D modeling and production engineering. Approval to begin fabrication will be made by the Vessel Integrator and NSF based on evidence that risks related to regulatory body approval are eliminated or minimal and the production engineering is sufficiently complete to support at least six months of construction.

C.2.4.2 Construction Phase

a. Keel Laying and Fabrication The Vessel Integrator will manage and oversee all sub-contracts and consultants to ensure high quality construction and outfitting of the ARV takes place within schedule, cost and scope baseline unless modified through approved change and configuration control process.

The Vessel Integrator and Shipbuilder will document Keel Laying per regulatory requirements. They will also schedule and carry out a Keel Laying Ceremony according to maritime traditions and NSF requirements.

The Vessel Integrator will ensure an appropriate onsite team is located at the Shipbuilder’s facility to provide direct oversight and inspection of the entire construction process.

b. Vessel Launch The Vessel Integrator will coordinate with the Shipbuilder to schedule the launch of the ARV in accordance with the Shipbuilder’s construction schedule. The Vessel Integrator and Shipbuilder will conduct an appropriate Launch and Christening Ceremony according to maritime traditions and NSF requirements.

c. Outfitting The Vessel Integrator will coordinate with and oversee outfitting of the ARV in accordance with the Shipbuilder’s Specifications.

d. Integration The Vessel Integrator will ensure that the Ship Builder assigns appropriate responsibility for integration of power, propulsion, monitoring, and alarm systems. In addition, an integrator for over-the-side handling systems and other systems may be required as specified in the Shipbuilder’s Specification.

e. Test and Trials The Vessel Integrator will coordinate with the Ship Builder to produce and execute a verifiable Test and Trials plan, schedule, and documentation in accordance with the Shipbuilder’s Specifications and ARV PEP sections 15.1 and ARV PEP Appendix 17.

f. Delivery The Vessel Integrator will ensure that the ARV is fully tested, has passed all regulatory inspections, and meets all Performance Specifications prior to initial acceptance by NSF before delivering the vessel to NSF and the NSF assigned Vessel Operator. Criteria for initial acceptance will be included in the final Shipbuilder’s Specification.

C.2.4.3 Transition to Operations Phase The Vessel Integrator will assign responsibility for planning, scheduling, executing, monitoring, and verifying all required tasks to complete a one-year period after delivery to ensure a smooth and effective transition to full operations and to ensure that all Shipbuilder and Vendor Warranty issues are identified, tracked, and resolved. The ARV PEP section 15.2 and ARV PEP Appendix 18 contain the requirements for the Operational Readiness Plan that will guide the project from Delivery until full operational readiness and final acceptance by NSF.

a. Outfitting The Vessel Integrator will ensure that all project provided outfitting is ordered and installed within one week after delivery unless otherwise proposed and approved by NSF.

b. Crew training The Vessel Integrator will coordinate with the Shipbuilder and select vendors to provide training to ARV Crew and engineering management personnel on the proper operation and maintenance of key systems. A training plan, syllabus and schedule will be provided by the Vessel Integrator no later than six months prior to delivery. Key systems will include electrical generation and distribution, propulsion, select auxiliary systems, alarm and monitoring system, safety systems, HVAC, over-the-side handling systems including cranes and others as determined by NSF. The Total hours of training and number of attendees will be negotiated and approved by NSF based on the final suite of installed equipment.

c. Science Trials The Vessel Integrator will ensure appropriate access to vendors and integrators to resolve issues during the period of time that the NSF and Vessel Operator will be conducting trials of installed science systems and over-the-side handling systems in open water as detailed in the ARV PEP Appendix 18. An open water multi-disciplinary science verification cruise planned in coordination with the NSF Science Advisory Subcommittee will be conducted.

d. Ice Trials The Vessel Integrator will ensure appropriate experts are assigned to plan, conduct and report on ice trials and ice science trials per PEP Appendix 18. A multi-disciplinary science verification cruise in ice will be planned in coordination with the NSF Science Advisory Subcommittee and carried out after the completion of ice performance trials.

e. Warranty Period & Post Shakedown Availability (PSA) The Vessel Integrator will manage the warranty period and ensure that the Shipbuilder and associated vendors have the opportunity and assume the responsibility for addressing warranty issues that arise post-delivery until the end of the warranty period.

The Vessel Integrator in coordination with the Vessel Operator engineering staff will develop the specifications to conduct a drydock of the vessel shortly before the expiration of the Shipbuilder warranty period. The Vessel Integrator will work with the Shipbuilder to coordinate the scope of what the Shipbuilder is responsible for under warranty versus work the Vessel Integrator will have done based on lessons learned from operating the ship. It will also allow for inspection on the underwater hull and propulsion components prior to expiration of the warranty period.

C.2.5 PROJECT CLOSEOUT

Project closeout will be completed in accordance with section 16 of the ARV PEP and procedures associated with the NSF Project Award documents.

C.2.6 DOCUMENTATION FOR ACCEPTANCE

The following is the list of documents to be used by NSF to determine acceptance of the services and/or deliverables provided under the SOW.

C.2.6.1 Final Design Phase – Successful Final Design Review of:

a. ARV PEP

· Baseline Scope, Cost & Schedule

· Risk Register, Contingencies

b. Performance Specifications

c. Ship Builder’s Contract Specifications

d. Final Design Drawings (Table 1 above)

e. Final Design Analysis and Technical Documents (Table 2 above) C.2.6.2 Construction Stage:

a. Detail Design Phase

· ABS/USCG approved design documents

· Sufficient construction detail drawings to support 6 months of fabrication work.

· Successful PRR

b. Construction Stage

· Completed vessel in accordance with Ship Builder’s Specification and Contract.

· Successful Acceptance Trials

· Successful certification by ABS and USCG

· Conditional Acceptance by NSF

· Delivery of vessel to NSF & Ship Operator

c. Transition to Operations

· Successful Open Water Science and Ice Trials

· Satisfactory resolution of all Warranty Items

· Completion of the Post Shipyard Availability (PSA)

· Transit of vessel to homeport (Punta Arenas)

· Final Acceptance by NSF

C.2.7 TIMELINE [Dates are placeholders] Final Design Phase: Start approximately March 1, 2024, and end approximately February 28, 2026 Construction Stage: Start approximately March 1, 2026, and end approximately June 30, 2031, not including schedule contingency for delays and project closeout.

C.2.8 PLACE OF PERFORMANCE

· Contractor and Sub-Contractor sites

· Construction Shipyard Site

· At Sea for open water trials and warranty period operations

· Ice covered waters of the Arctic or Antarctic for ice trials

· Post Shakedown Availability Shipyard C.2.9 VESSEL HOMEPORT AND PORTS OF OPPORTUNITY DURING TRANSITION TO OPERATIONS PHASE & SPECIAL REQUIREMENTS c.2.9.1 Regulatory Requirements Vessel must meet or exceed all regulatory requirements and receive all regulatory certifications and notations as detailed in the ARV Performance Specifications and Ship Builder’s Specification valid at the time of entering Ship Builder’s Construction Contract.

c.2.9.2 Special Skills [Reserved for future use] c.2.9.3 Knowledge Requirements [Reserved for future use]

C.2.10 CONTRACTOR STAFF, ROLES, AND RESPONSIBILITIES

Key Vessel Integrator Staff[footnoteRef:7] are detailed in the ARV PEP section 5. The expected Project Personnel and Competencies are included in RIG Section 4.6.6. Vessel Integrator is to provide planned staff organization, position description summary including roles and responsibilities, and names of planned key staff with a short biographical summary. [7: Key Personnel, for the purposes of adherence to clause NSF120, will be identified on the relevant contract action (IE, the base IDIQ or appropriate task order). ] c.2.10.1 Final Design Phase:

a. Program Manager

b. Project Manager

c. Project Engineer

d. Science Mission Coordinator

e. Design Agent

f. Marine Engineering Consultant

g. Model Test Basin

h. System Engineering Lead

i. Cyber Infrastructure Lead

j. Program Consultants – EVM, Scheduling, Cost Estimating c.2.10.2 Construction Stage – Project Management Office

a. Program Manager

b. Project Manager

c. Project Engineer

d. Science Mission Coordinator c.2.10.3 Construction Stage – Project Field Office

a. Shipyard Onsite Representative

b. Assistant Contract Manager

c. Field Inspectors c.2.10.4 Construction Stage – Transition to Operations

a. Warranty Manager

b. Transition Team Manager

C.2.11 GOVERNMENT FURNISHED PROPERTY

Government Furnished Property (GFP) – This section is reserved for future use on the contract, as applicable.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .