This document contains a federal contract opportunity and related amendment for a roof replacement project at the Seattle U.S. Courthouse. The opportunity is set aside for women-owned small businesses and involves replacing the existing main entrance roof with a new Styrene-Butadiene-Styrene modified bituminous membrane roofing system, per project plans and specifications. Interested vendors must attend a mandatory pre-proposal conference and site visit on June 24, 2020 to be eligible to submit a proposal. The General Services Administration intends to award a firm fixed-price construction contract using best value design-build selection procedures. Proposals are due no later than July 15, 2020. The amendment provides an investigation report and partial question and answer log to assist offerors. Work must be completed while maintaining full building occupancy, with all work in public spaces to occur during unoccupied periods.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
A Date
Submitted
Question Response
Date Response Responded By Responded in Amendment
1 7/1/20
I see that there are plans for this project but as of yet I have not been able to find them. Can you provide them to me please or where can I get them?
7/1/20 https://drive.google.com/file/d/1ICvmC5CmFAZSRVng w4Up8IxQt7qRAUcm/view?usp=sharing
RFP Package and All Exhibits
5-b 100% drawings
PM A0002
2 7/1/20
There are some bollards that make access to the roof area difficult, can these be removed and re-installed after the project?
7/1/20 This will be handled on a case by case basis; you will need to be more specific and include these on your planned submission
PM A0002
3 7/1/20
The SOW calls out for an SBS Modified Roof System. At the pre job, a
PMMA and Copper Roof System was discussed. What is the actual correct roofing spec?
4 7/1/20
I understand the skylights are to be raised, how high shall the new curbs be?
5 7/2/20
Is it possible to get a very basic plan of the interior underneath the skylights? I’m mainly thinking about the location of the reflecting pools in relation to where work would occur above at the skylights.
6 7/2/20 Can we obtain a copy of the as built drawings for the roof?
7 7/2/20 Are there pictures or other information from the investigation mentioned at the site visit?
8 7/3/20
What is the anticipated date of award for this project?
7/6/20
The anticipated Award Date of this project is no later than Sep 30, 2020. CS A0002
9 7/3/20
What is the anticipated date of interim NTP so that the contractor can begin security clearances and projectengineering/planning?
7/6/20 The anticipated date of intrim NTP depends how soon
GSA receives Bonds and Insurance from the Awardee.
CS A0002
10 7/3/20
What is the anticipated construction NTP?
7/6/20
The anticipated construction NTP will be issued when
Exculsionary Period ends, and it will be no later than
April 15, 2020.
CS A0002
11 7/3/20
Page 4 of SOW states that POP is 180 but then below the breakdown designates 120days for construction and 30days for closeout. Please clarify the correct POP?
7/6/20
The Substantial Completion of the work is 180 Calendar
Days, and we give addtional 30 Calendar days for close out.
First 60 Days: Submittals and Security Process
Exclusionary Period
Day 61 througgh Day 180: Constuction
Day 181 through 210: Closeout
CS A0002
12 7/3/20
When is GSA intending to have this project 100% complete? Is that in
2020 or 2021? 7/6/20 2021 CS A0002
13 7/3/20
Based on average number of days per month with rainfall in Seattle, this project will have greatest efficiency andprogress of work if it is scheduled to start in April/May and complete by end of Sept/early Oct. Is that consistentwith GSA's plan for this project? 7/6/20 That's exactly what we are planning.
Plesae see the Statement of Work.
CS A0002
14 7/3/20
Page 5 of SOW designates testing & balancing of HVAC, electrical and security. Specs and drawing sheet do notcontain HVAC, electrical and security components. Please confirm there is no HVAC, electrical or securityrequirements on this project?
15 7/3/20
At the site visit the GSA team referenced a investigation report of the existing roof where copper roof panels wereremoved to reveal the roof assembly. It was stated this document was available to contractors? We are not able tolocate this document on Beta.Sam. Please confirm the title of the document and that it is available or will postedandwill be available through Beta.Sam?
16 7/3/20
At the site visit it was stated that contractors will be permitted to erect a scaffold stair tower to provide dailyaccess for crew to the roof level.
Please confirm this is acceptable?
17 7/3/20
It was stated at the site visit that no staging area will be provided to the contractor on site. Please confirm whatwill be permitted to remain onsite when the contractor is not working?
18 7/3/20
It is anticipated a crane will be necessary at various times in the project phasing to remove and setnew skylightsas well as to remove salvaged copper panels that are set into crates to avoid damage of the delicate panels.Staging a crane on adjacent streets, either 7th Ave or Stewart St, is largely problematic. It involves removal oftrolley wires which can be up to $100,000 and involves three entities. Permitting for removal of the trolley wirescan take up to 14 weeks or more. Uniformed police are required when all traffic closures are necessary. Multipleset ups for craning under these conditions will be excessively expensive. Will GSA permit long term staging of acrane on an engineered platform on the plaza steps off of 7th Ave? This will minimize costs for multiplemobilizations for craning on weekends and all associated permits for streets closures and trolley line removal.
19 7/3/20
Or will GSA permit establishment of larger exterior scaffold and staging area to install an engineered hoistingsystem for hoisting of the skylights via that system? This would require building a large engineered platform off ofthe steps adjacent to the roof off of 7th Ave. This platform would stage the scaffold and provide necessary stagingfor the scaffold hoisting operation.
20 7/3/20
Are all tools and equipment 100% required to be removed daily?
21 7/3/20
Are all materials not installed to be100% removed daily?
22 7/3/20
Please confirm to what extent scaffolding components are permitted to remain onsite when the contractor is notworking?
23 7/3/20
Specification section 012300 refers to the base bid with a requirement to have a phased scaffold approach toreachunderside of the skylights for repair of the drywall and install of the additional framing and skylight itself. Itis not stated how this will be phased. Is it GSA's intent to phase this over three operations?
24 7/3/20
Durations and sequences of work may require the skylight openings to be
"open" for extended periods of timewhile framing alterations and skylights are installed. This will require temporary dry-in measures of each openingrespectively. In addition to temporary dry-in measures, will
GSA require the contractor to provide 24 hour securitypersonnel to ensure no breaches of the building occur when the contractor is not present?
25 7/3/20
If contractor is required to provide this security service, please provide criteria and qualifications?
26 7/3/20
If GSA will back charge the contractor for this service, please designate how much it will cost per hour or per unittime?
27 7/3/20
To what extent is the contractor responsible for security cameras that may have views obstructed by scaffoldinstalled in the lobby/entrance area?
28 7/3/20
Section 015000 references wood fencing & open mesh fencing, a job office trailer etc. Please confirm if thecontractor will be permitted to stage a job trailer and fencing onsite?
29 7/3/20
Will contractor be permitted to stage and maintain a temporarysanitary station on site? Or will GSA permitcontractor personnel to use building restroom facilities?
30 7/3/20
Where will the contractor be permitted to located temporary sanitary station relative to the work zone?
31 7/3/20
Section 017410 addresses indoor air quality formore general construction projects larger in scope and magnitudethan this project will be. The section contains provisions that will be expensive to comply with in the context ofthis project. Please confirm GSA intends for the contractor to comply with all provisions stated in 017410? If not,please provide a revised spec section 017410 and provide a scope of work necessary to support indoor air qualityrelative to this project?
32 7/3/20
Section 017419 addresses waste management, disposal and recycling requirements. With all stated requirementsplease state where the contractor will be permitted to stage multiple dumpsters for sorting of recycled ordisposed materials?
33 7/3/20
Section 079200 & 079219 contain warranty requirements for five year installers warranty for jointsealants andacoustical joint sealants. Please confirm these warranties will be a non-bonded warranty? Surety companies willnot bond projects with installer warranties longer than 2-3 years depending on the warranty.
34 7/3/20
Please confirm location(s) and extent of exterior painting applicable to section 099113?
35 7/3/20
For spec section 012700 there is no corresponding price schedule for these unit prices. What is the purpose of thespec section 012700 Unit
Prices?
36 7/3/20
Are the unit prices intended to adjust compensation tocontractor for actual work completed? Or to makemodifications to the contract for added or deleted work?
37 7/3/20
Section 012700 contains unit prices 1-28. Descriptions of the unit prices do not contain specific item for which toprice and are not clear on that basis. Please provide specific materials by type, dimension or appropriate criteriafor pricing. For example Unit Price #1 Structural Steel Framing-what size member? What manner of fabrication orconfiguration of the member? Is this an installed price or bare material price? As stated the unit price schedulecannot be quoted.
7/6/20
The request is prescriptive. The industry shall use the pricing as a guide to determine what items and quantity are required for the project. The expectation is the
Roofing Firm shall provide an itemized list of materials, equipment, Labor rates and hours to successfully perform this project. Your technical approach to this project is reflective in the pricing schedule.
CO/ Kim Johnson A0002
38 7/3/20
Page 18 of the solicitation states that this contract will be a firm fixed price contract. The Agreement does notconfirm this. The proposal price schedule contains language that states "the NTE amount may not be definitizedinto a FFP amount" indicating this contract may be a GMP type contract? Please clarify the contract and providerevised documents accordingly.
7/6/20
The NTE amounts are used as "Allowances" if cost cannot be fully determined at time of offer. The offeror may be awarded an Not to Exeed amount and would be required to bill Actuals. Example: Copper panels: Cost to Replace vs. Clean and re-install. The Contractor may choose to provide a price that replaces "ALL" when in fact only some will truly be replaced. This reduces risk in
Contractor pricing, however allows the government to see the full magnitude if the scenario exists. This is not a GMP project, GSA writes Firm Fixed Price Contracts as outlined in FAR 16. The RFP does include the contract type on page 18, IV.C via FAR 52.216-1 Type of
Contract. The provision is required in Solicitations as the
"Firm Fixed Price" is a fill in requirement by the Contracting
Officer. It is not required in the Agreement.
CO/ Kim Johnson A0002
39 7/3/20
Price schedule includes language indicating a design package by the contractor on page 3. Please confirm whatdesign requirements are included in this contract? 7/6/20 Disregard the word "Design". GSA provided 100% design in the RFP package.
CS A0002
40 7/3/20
Given the magnitude of effort to prepare pricing and a technical plan for this project, will GSA extend the proposaldue 10-14 days?
7/6/20
GSA will consider extension of the RFP Response Date and Time based on the number of questions received and date amendment is issued for all answers to those questions.
CS A0002
| NPS Furniture - Questions and Responses (running log) 04052017.pdf |
| Sheet1 |
| QA Running Log for IRS.pdf |
| Sheet1 |
| ADP1E91.tmp |
| Sheet1 |
| ADP2C9B.tmp |
| Sheet1 |
| 1Point Roberts Roofing PPI Log - Technical Questions and Responses.xlsx.pdf |
| Point Roberts Roofing DB |
| 1QA Running Log for Seattle USCH Roofing.xlsx.pdf |
| Sheet1 |
| topmostSubform[0]: |
| Page1[0]: |
| AmendmentNo[0]: A0002 |
| Code[0]: 10PQCB |
| Code[1]: |
| AccountingData[0]: |
| A13[0]: |
| C13[0]: |
| D13[0]: |
| NameandTitleSigner[0]: |
| NameandTitleOfficer[0]: KIMBERLY M. JOHNSON, Contracting Officer |
| Description[0]: A. The purpose of this amendment is to provide 1) Attachment 9 Investigation Report and Recommended Repairs, and 2) PPI Log with partial Q&As. |
Attachment 9 is a recommendation Only, and Government is NOT directing means and methods to the offerors. Attachment 9 can be found in Contractor Solicitation Documents / GSA Policy and Guidance folder in Google Drive.
B. All terms and conditions of this solicitation remain unchanged.
| FacilityCode[0]: |
| Code[2]: 10PQCB |
| IssuedBy[0]: Acquisition Management Division |
400 15th St. SW Auburn, WA 98001
| NameandAddress[0]: |
| AdministeredBy[0]: Same as Block 6 |
| ContractIDCode[0]: |
| ReqNumber[0]: EQ10PCPA-20-0013 |
| AmendmentNo[1]: 47PL0120R0034 |
| ModificationNo[0]: |
| ProjectNo[0]: |
| Page[0]: 1 |
| Pages[0]: 4 |
| EffectiveDate[0]: 7/7/2020 |
| Dated9B[0]: 6/11/2020 |
| Dated10B[0]: |
| CheckBox9[0]: 1 |
| CheckBox10[0]: Off |
| CheckBox11[0]: 1 |
| CheckBox13A[0]: Off |
| CheckBox13B[0]: Off |
| CheckBox13C[0]: Off |
| CheckBox13D[0]: Off |
| IsNot[0]: Off |
| Is[0]: Off |
| Extended[0]: Off |
| NotExtended[0]: 1 |
| DateSigned[0]: |
| DateSigned[1]: |
| Copies[0]: 1 |
| CopiesReturned[0]: |
File details come from the government source that posted it. Updated .