RESPONSE TO QUESTIONS

1. Does the GSA wish to replace the refrigerant piping between the roof mounted air cooled condenser and the basement chiller?

Yes, please see Amendment 0003.

2. If the answer yes will the GSA require the replacement of all pipe shielding on the first floor including above the existing ceiling.?

Yes, please see Amendment 0003.

3. Does the GSA want permanently sealed filter dryers installed on the liquid service lines?

No.

4. Does the GAS want in lieu of sealed filter dryers, cartridge filter dryers with replaceable elements and isolation valves.

Please see Amendment 0003.

5. Confirm that the contractors are responsible for removal and disposal of the existing equipment.

Yes, please see Amendment 0003.

6. Does the GSA require moisture indicators to be installed in the refrigerant piping?

Yes, please see Amendment 0003.