Exhibit D

View the file

Other files for this federal contract opportunity

Other files attached to Chiller Replacement, newest first.
File Type Posted
Midland_RFI_(1)_(2).docx DOCX document
Site_Visit_Record_.pdf PDF
SOW_Midland_Chillers_-091718_(1).docx DOCX document
Exhibit_A_-_Midland_SOO.docx DOCX document
TX0311.pdf PDF
C301_GC_Reps_&_Certs.pdf PDF
Exhibit_A_-_Midland_SOO_(1).pdf PDF
GSA527-15b_Att_2.pdf PDF
Exhibit_E_-_LED_Fixture_(2).pdf PDF
Exhibit_B_-_DDC_Controls_vers_20170417_(1).pdf PDF
1442__Form_(1).pdf PDF
PBS_PPQ_Att_1.pdf PDF
C101_The_Agreement.docx DOCX document
Exhibit_C_-_Gauge_Setup_(1).pdf PDF
SOW_Midland_Chillers_-_Final_7-26-2017_(1).pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GSA

Point Naming Convention for Building Management Systems

The intent of this section is to establish and require a consistent means of naming building automation points across the

GSA

portfolio.

The term ‘Point’ is a generic description for the class of object represented by analog and binary inputs, outputs, and values either physical or virtual.

The Contractor shall configure the systems with the perspective of the GSA’s overall portfolio and not just for one project in particular.

The value of using an alphanumeric point-‐naming standard is to provide a unique, logical and concise description of the purpose and function of the point being described.

All systems shall use this naming convention and process.

Any deviations from this process require prior approval of the

GSA

and/or their representative1.

Point naming shall be consistent through system drawings, records, files and documents.

A Point Summary Table shall be created and kept current throughout the duration of the

Project, by the Contractor, as the Master List of all points for the Project.

Project closeout documents shall include an up-‐to-‐date accurate Point Summary Table.

The Contractor shall submit the final Point Summary Table for approval, prior to final acceptance of the system, for each individual project.

The Point Summary Table shall be used as a reference and guide during the Commissioning process.

Point naming and Identification:

The following shall be used as a basis of design.

The goal is to apply logic when possible, and keep the design simple and concise, which in turn will minimize the chance of inadvertently introducing needless complexity.

A consistent point naming convention shall be utilized to facilitate familiarity and operational ease across the

GSA

portfolio.

Inter-‐facility consistency shall be maintained to ensure transparent operability to the greatest degree possible.

The tables below detail the object naming convention and general format of the descriptor string.

A maximum of characters shall be used.

Other attributes such as point address, descriptors and other system specific information may be required.

The same level reasoning should be applied when establishing the framework for this as well.

Where not defined by

GSA

Point Naming Standard, contractor shall reference Project Haystack

StuartALamkin Typewritten Text Exhibit D

Point Object Name Requirements (Central Equipment)

Sample:

DC0001ZZ

_02_AHU_05_

RaTmp

(DC0001ZZ)

Building Code alpha characters Facility

ID

character Underscore;

acts as a separator2

(02) –Equipment Floor Location characters character Underscore;

acts as a separator2

(AHU)

Equipment Type alpha characters

(05) Equipment Number, Equipment

Letter, or Combination upper case alpha and/or numeric characters character Underscore;

acts as a separator2

(RaTmp) –Point Name Component alpha characters

Point Object Name Requirements (Distribution Equipment)

Sample:

DC0001ZZ

_02_VAV_0005_

RaTmp

(DC0001ZZ)

Building Code alpha characters Facility

ID

character Underscore;

acts as a separator2

(02) –Equipment Floor Location characters character Underscore;

acts as a separator2

(VAV)

Equipment Type alpha characters

(0005) Equipment Number, Equipment Letter, or Combination upper case alpha and/or numeric characters character Underscore;

acts as a separator2

(RaTmp) –Point Name Component alpha characters4

Underscores or other characters are prohibited in point naming by some Building Automation System software.

Consult with the system manufacturer to confirm proper application and consider possible alternatives.

Reference attachment

GSA

point naming Database.xlxs for

GSA

Equipment Naming Standard

Reference attachment

GSA

point naming Database.xlxs for

GSA

Std Point Name Components

Point summary table:

The Point Summary Table shall contain all data fields on a single row per point.

The purpose of a Point Summary Table is to have a single master source for all point information in the building that is easily sorted and kept up-‐to-‐date.

The point description shall be an easily understandable English-‐language description of the point.

A sample Point Summary Table is displayed below:

Point Name Point Description Kind Unit

DC0001ZZ

_02_AHU_05_

RaTmp 2nd Floor

AHU

Return Air

Temperature

Number Fahrenheit

The following specific references exist:

GSA

Point Naming Database.xlsx

• GSA

Equipment Naming Standard

• GSA

Standard Point Name Components