T10_Amend_4__Stucco.pdf
PDF 3 MB Posted
- Attached to
- Stucco Replacement Federal contract opportunity
- Solicitation number
- 47PH0419R0019
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Proposal_Form_NM.xlsx | XLSX spreadsheet | |
| T10_Amend_5__Stucco.pdf | ||
| T10_Amend_3__Stucco.pdf | ||
| T10_Amend_1__Stucco.pdf | ||
| T10_Amend_2__Stucco.pdf | ||
| T10_RFP_Drawings_05.31__Stucco.pdf | ||
| T10_RFP_Specs_05.31__Stucco.pdf | ||
| T10__RFP__Stucco.pdf | ||
| T10_RFP_Attch_1_Specs__Stucco.pdf | ||
| T10_RFP_Attch_2_Drawings__Stucco.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
7PQCMC
Rosalva Ramos, Contracting Officer
47PH0419R0019, Amendment 0004 - Stucco Replacement - Las Cruces Courthouse
Please see attached
7PQCMC
Acquisition Management Division Non-Prospectus Branch 1101 East Hackberry, Suite 200 McAllen, TX 78501 USA
Acquisition Management Division Non-Prospectus Branch 1101 East Hackberry, Suite 200 McAllen, TX 78501 USA
EQ7PCD-19-0003
47PH0419R0019
RMN10024
1 2
07/17/19
5/31/2019
07/17/19
RosalvaRamos Highlight
Description of Amendment/Modification
47PH0419R0019, Amendment 0004 - Stucco Replacement - Las Cruces Courthouse
This amendment is issued to add Option 2 - Optional Stucco System to the solicitation.
The following documents are hereby incorporated:
- Statement of Work, dated 07/17/19
- Specification Section 072423, dated 07/09/19
- Stucco Board Detail Drawings, dated 07/12/19
Offerors shall provide three separate price proposals:
1 - Base Bid - North Tower and low-rise central pavilion 2 - Option 1 - South Tower and low-rise central pavilion 3 - Option 2 - Optional Stucco System for the North Tower, South Tower and low-rise central pavilion
The proposal due date remains, Friday, July 26, 2019.
Offerors must acknowledge receipt of this amendment as stated on block 11.
47PH0419R0019/0004
1. Project Title: Las Cruces Federal Courthouse Optional Stucco Replacement Design – Polymer Based Finish System on Cement Fiber Panel
2. Project Location: Las Cruces Federal Courthouse 100 North Church Street Las Cruces, NM 88001 Building # NM0061ZZ
3. Description of Work for Optional Stucco System
3.1 Las Cruces Courthouse Stucco Design Guidelines: The Project shall be designed to remove and replace the stucco wall systems.
3.1.1 Refer to all project drawings and other related sections of this specification to determine the type and extent of the work.
3.1.2 This optional stucco method including the specification section represents an alternative stucco replacement solution in lieu of the base bid three part stucco replacement solution. Just like the base solution, this Polymer-Based Exterior Finish System Over Cement Board solution includes removal of the stucco, lathe, and Tyvek membrane. This proposed stucco replacement solution, however, includes leaving the existing sheathing in place as much as possible. Price the work assuming 20% of the sheathing shall need to be replaced due to damage during the stucco removal. This solution requires installation of the waterproofing system specified herein over the existing (and patched) sheathing prior to the installation of the cement board and polymer based exterior finish system. This work is to be priced in the same two phases as the base solution. If this solution is accepted for award, the work will be done leaving all windows in place, except for the windows at the sloped stucco exterior walls, that will be replaced.
3.1.3 Refer to attached Stucco Board detail sheet drawings for stucco panel installation and existing stucco criteria related to this optional method.
3.1.4 Refer to attached option specification: Section 072423 – Polymer-Based Exterior Finish System Over Cement Board.
3.1.5 Cement Board Stucco wall system: composite wall system consisting of air/water resistive barrier, Base Coat, Reinforcing Mesh, and Finish Coat.
3.1.6 Products are listed in the specification to establish a standard of quality.
BASF Senergy is the basis of design. The following cement board based systems are considered acceptable alternates: Parex; Dryvit; and Sto.
Substitutions to the specified systems shall be submitted to and receive approval from the Architect at least ten days before bidding. Proof of equality shall be borne by the submitter.
3.1.7 The Basis of Design (BOD) shall be Senergy Cement Board Stucco (CBS) 1000 wall system as manufactured by BASF Wall Systems, Statement of Work - Option 2 Stucco Replacement Project
July 17, 2019
Shakopee, Minnesota.
3.2 The assumption is that Bidders shall be allowed to remove the landscaping immediately adjacent to the building in order to install scaffolding to complete the stucco replacement. The landscaping will be replaced under a separate contract and are NIC for this stucco replacement scope.
3.3 Assumption is that only a maximum of two trees will need to be removed for the scaffolding to be placed for the work.
3.4 The current opening in the security bollard layout, at the building east side, will be left in place along with the “pad” for a crane for the purpose of the stucco replacement. The successful stucco contractor will be responsible for removing the dirt pad back to match the adjoining grades and uncover any sidewalk that was covered by the dirt pad.
3.5 A second security bollard opening at the paving on the west side of the building will be created during the current roofing work to allow access to the site for the purpose of the stucco replacement. This opening will remain for the work of the stucco replacement. A “jersey barrier” will be placed appropriately to maintain security containment as a part of the roofing rework and left in place for the successful stucco contractor to use.
3.6 New bollards to replace the bollards removed shall be provided under a separate contract and are NIC for this stucco replacement scope.
3.7 Bidders shall assume that one lane of the adjoining Campos Street may be shut down during the work.
3.8 The successful contractor shall be responsible for protection of the newly installed roofing during the stucco replacement. They shall retain the manufacturer for the new roof to monitor the work so that the warranty is maintained. Their contact information is xxxx. As a minimum, the successful contractor shall install 3” of polystyrene directly on the new roof with two layers of ¾” plywood on top as a platform for scaffolding and foot traffic.
GSA
27.7285.545
July 09, 2019
Las Cruces Federal Courthouse
Roof & Stucco Replacement
Las Cruces, New Mexico
Polymer-Based Exterior Finish System over Cement Board GSA FY20 Update July 9, 2019
07 24 23 -1
SECTION 072423 – POLYMER-BASED EXTERIOR FINISH SYSTEM
OVER CEMENT BOARD
PART 1 – GENERAL
1.1 SECTION INCLUDES
A. Refer to all project drawings and other related sections of this specification to determine the type and extent of the work.
B. Cement Board Stucco wall system: composite wall system consisting of air/water resistive barrier, Base Coat, Reinforcing Mesh, and Finish Coat.
C. Products are listed in this specification to establish a standard of quality.
BASF Senergy is the basis of design. The following cement board based systems are considered acceptable alternates: Parex; Dryvit; and Sto. Any substitutions to this specification shall be submitted to and receive approval from the Architect at least ten days before bidding. Proof of equality shall be borne by the submitter.
D. The Basis of Design (BOD) shall be Senergy Cement Board Stucco (CBS)
1000 wall system as manufactured by BASF Wall Systems, Shakopee, Minnesota.
E. This specification section represents an alternative stucco replacement solution in lieu of the base bid three part stucco replacement solution. Just like the base solution, this Polymer-Based Exterior Finish System Over Cement Board solution includes removal of the stucco, lathe, and Tyvek membrane. This proposed stucco replacement solution, however, includes leaving the existing sheathing in place as much as possible. Price the work assuming 20% of the sheathing shall need to be replaced due to damage during the stucco removal.
This solution requires installation of the waterproofing system specified herein over the existing (and patched) sheathing prior to the installation of the cement board and polymer based exterior finish system. This work is to be priced in the same two phases as the base solution. If this solution is accepted for award, the work will be done leaving all windows in place, except for the windows at the sloped stucco exterior walls.
07 24 23 -2
1.2 RELATED SECTIONS
A. Section 01 24 00 Options
B. Section 06 16 00 Sheathing
C. Section 07 62 00 Sheet Metal Flashing and Trim
D. Section 07 92 00 Joint Sealants
1.3 REFERENCES
A. ASTM C150 Specification for Portland cement.
B. ASTM D1682 Test for Break Load and Elongation of Textile Fabrics.
C. ASTM E84 Tests for Surface Burning Characteristics of Building Materials.
D. ASTM G23 Operating Light and Water Exposure Apparatus (Carbon-Arc
Type) for Exposure of Non-metallic Materials.
E. ASTM G53 Operating Light and Water Exposure Apparatus (Fluorescent
UV-Condensation Type) for Exposure of Nonmetallic Materials.
F. ASTM C67 Sampling and Testing Brick and Structural Clay Tile.
G. ASTM B117 Standard Method of Salt Spray (Fog) Testing.
H. ASTM D968 Abrasion Resistance of Organic Coatings by Falling Abrasive.
I. FS TT-C-555B Coating Textured for Interior and Exterior Masonry Surfaces.
J. MIL-Y-114OG Yarn, Cord, Sleeving, Cloth and Tape-Glass.
K. Mil. Std. 810B Mildew Resistance (Method 508)
L. ASTM E96 Water Vapor Transmission (Method B)
M. ASTM A653/Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated
A63M (Galvannealed) by the Hot-Dip Process
07 24 23 -3
1.4 DEFINITIONS
A. Senergy CBS 1000 System: Exterior cement board based stucco assembly comprised of air/water-resistive barrier, Base Coat, Reinforcing Mesh and
Finish Coat.
1.5 SUBMITTALS
A. Product Data: Provide current published data on Senergy CBS 1000
System materials, product characteristics, performance criteria, limitations and durability, or similar materials for approved alternates.
B. Shop Drawings: Indicate wall joint pattern and joint details, thickness, and all installation details.
C. Samples: Submit two, 24 x 24 inch size samples of system illustrating
Finish Coat color and texture range.
D. Certificate: System manufacturer’s approval of applicator.
E. Sealant: Sealant manufacturer’s certificate of compliance with ASTM C920.
F. System manufacturer’s current specifications, typical details, system design guide and related product literature which indicate preparation required, storage, installation techniques, jointing requirements and finishing technique.
G. Copy of system manufacturer’s system 10 year warranty for the specified system.
1.6 QUALITY ASSURANCE
A. Manufacturer: More than ten years in the cement board stucco industry, with more than five hundred completed cement board stucco projects.
B. Applicator: Approved by Systems Manufacturer in performing work of this section.
C. Regulatory Requirements: Conform to applicable code requirements for finish
07 24 23 -4
D. Field Samples:
1. Construct one field sample panel for each color and texture, minimum twenty foot by sixteen foot in size, of system materials illustrating method of demolition, new material, attachment, finish, color and texture. Install at location where mock-up replaces an existing full panel from joint to joint.
2. Prepare each sample panel using the same tools and techniques to be used for the actual application.
3. Locate sample panel where directed.
4. Accepted sample panel may remain as part of the work.
5. Field samples shall be comprised of all wall assembly components including substrates, air/water- resistive barrier, base coat, reinforcing mesh, primer, as required, finish coat and typical sealant/flashing conditions.
E. Testing:
1. General Air/Water-Resistive Barrier Minimum Performance:
a. ASTM E2570 Water-resistive barrier coatings used under EIFS
b. ASTM E2357 Air leakage of air barrier assemblies
i. Criteria: 0.2 l/(s.m2) @ 75 Pa, (0.04 cfm/ft2 @ 1.57 psf)
c. ASTM E2178 Air permeance of building materials
i. Criteria: 0.02 l/(s.m2) @ 75 Pa, (0.004 cfm/ft2 @ 1.57 psf)
d. ASTM E283 Rate of air leakage
e. ASTM E96 Water vapor transmission
f. ASTM D4541 Pull-off strength of coatings
i. Criteria: Min. 110 kPa (15.9 psi) or substrate failure
g. ASTM D1970 Nail sealability (without sheathing fabric)
i. Criteria: No water penetration at galvanized roofing nail penetration under 127 mm (5 inches) head of water after 3 days at 4° C (40° F)
h. ASTM E84 Surface burning
i. Criteria: Flame spread < 25; Smoke development < 450
2. Air/Water-Resistive Barrier ICC-ES AC-212:
a. Sequential testing:
i. ASTM E1233 Structural
ii. ASTM E72 Racking
07 24 23 -5
iii. ICC-ES AC-212 Restrained Environmental conditioning
A. Criteria: No cracking at joints or interface of flashing
iv. ASTM E331 Water Penetration
A. Criteria: No water penetration after 15 min @
137 Pa (2.86 psf)
b. Sequential testing:
i. ICC-ES AC-212 UV light exposure
ii. ICC-ES AC-212 Accelerated aging
A. Criteria: No cracking or bond failure to substrate
iii. AATCC 127-1985 Hydrostatic pressure test
A. Criteria: No water penetration after 21.7 inches
(550 mm) water for 5 hours
c. ASTM E2485 Freeze-thaw
i. Criteria: No sign of deleterious effects after 10 cycles
d. ASTM D2247 Water resistance
i. Criteria: No deleterious effects after 14 day exposure
e. ASTM C297 Tensile bond
i. Criteria: Minimum 103 kPa (15 psi)
f. ASTM C197 Tensile bond (after freeze-thaw)
i. Criteria: Minimum 103 kPa (15 psi) avg; no failure after 10 cycles freeze-thaw
3. Air/Water-Resistive Barrier ICC-ES AC 148:
a. Sequential testing:
i. ICC-ES AC148 UV light exposure
ii. ICC-ES AC148 Accelerated aging
A. Criteria: No cracking or bond failure to substrate
iii. AATCC 127-1985 Hydrostatic pressure test
A. Criteria: No water penetration after 21.7 inches (550
mm) water for 5 hours
b. ASTM D3330 Method F Peel adhesion
i. Criteria: After UV exposure; After accelerated aging; After elevated temperature exposure; After water immersion
c. ASTM D1970 (Modified) & AAMA 711 Nail sealability after thermal cycling
i. Criteria: No water penetration at galvanized roofing nail penetration under 31 mm (1.2 inch) head of water after 24 hours at
4° C (40° F)
07 24 23 -6
d. ASTM D5034 & AAMA 711 Tensile strength after UV exposure
i. Criteria: Minimum 0.5 N/mm (2.9 lbs/inch)
e. ASTM D1970 & AAMA 711 Cold temperature pliability
i. Criteria: No cracking after bending around a 25 mm (1 inch) mandrel after 2 hour exposure to -18° C (0° F)
f. AAMA 711 Resistance to peeling
i. Criteria: No signs of distress or failure after 24 hours of exposure at room temperature, 50° C (122° F), 65° C ·149° F), 80° C (176° F)
4. CBS 1000 System and Component Performance:
a. ICC_ES AC59 Direct-applied Exterior Finish Systems (DEFS)
b. ASTM E330 Transverse wind-load
i. Criteria: Steel stud framing (16 gauge, 3 5/8”) @ 16” o.c.
ii. Criteria: Steel stud framing (20 gauge, 3 5/8”) @ 16” o.c.
iii. Criteria: Wood assembly (2” x 4”) @ 16” o.c.
c. AC59 Bond strength after accelerated weathering and freeze-thaw test
i. Criteria: Minimum 34.3 kPa (5 psi)
d. ASTM E72 Racking test
i. Criteria: No failure of finish at substrate joints before failure of substrate OR no failure at 1” net deflection
e. AC59 Restrained environmental cycling test
i. Criteria: No cracking of finish or other distress after 5 cycles of water spray (24 hrs.) and radiant heat (72 hrs.)
f. ASTM E331 Water penetration
i. Criteria: No water penetration after 15 minutes @ 137 Pa
(2.86 psf)
g. NFPS 268 Radiant heat exposure
i. Criteria: No ignition at 20 minutes
h. ASTM E119 Fire endurance
i. Criteria: Maintain fire resistance of existing rated assembly
i. NFPA 285 & UBC Standard 26-9 Intermediate scale multi-story fire test
i. Criteria: Resist flame propagation over the exterior surface.
Resist vertical spread of flame within combustible core / component of panel from one story to the next. Resist vertical spread of flame over the interior surface from one story to the next. Resist lateral spread of flame from the compartment of fire origin to adjacent spaces.
07 24 23 -7
j. ASTM E84/UL 723 Surface burning
i. Criteria: Flame spread < 25; Smoke developed < 450
k. ASTM D968 Abrasion resistance
i. Criteria: No cracking or loss of film integrity at 528 qt.
(500L) of sand
l. ASTM G153 (formerly G23) Accelerated weathering
i. Criteria: No deleterious effects after 2,000 hours
m. AC59 Freeze-thaw
i. Criteria: No deleterious effects after 10 cycles
n. Mil Std 810B, Method 508 Mildew resistance
i. Criteria: No fungus growth after 28 days
o. ASTM B117 Salt fog resistance
i. Criteria: No deleterious effects after 300 hours
p. ASTM D2247 Water resistance
i. Criteria: No deleterious effects after 14 days exposure
5. Reinforcing Mesh Testing:
a. ATM E2098 Alkali resistance of reinforcing mesh
i. Criteria: Greater than 120 pli (21 dN/CM) retained tensile strength
1.7 DELIVERY, STORAGE AND HANDLING
A. Deliver, store and handle products per manufacturer’s recommendations.
B. Deliver materials in original unopened packages with manufacturer’s labels intact.
C. Protect materials during transportation and installation to avoid physical damage.
D. Store materials in cool, dry place protected from freezing. Store at no less than 40°F/4°C.
E. Store cement boards flat and protected from direct sunlight and extreme heat.
F. Store reinforcing mesh and flexible flashing in cool, dry place protected from exposure to moisture.
07 24 23 -8
1.8 PROJECT/SITE CONDITIONS
A. Do not apply system materials in ambient temperatures below 40°F/4°C).
Provide properly vented, supplementary heat during installation and drying period when temperatures less than 40°F/4°C.
B. Do not apply materials to frozen surfaces.
C. Maintain ambient temperature at or above 40°F/4°C during and at least 24 hours after materials are installed and until dry.
1.9 SEQUENCING AND SCHEDULING
A. Coordinate and schedule installation of materials with related work of other sections.
B. Coordinate and schedule installation of trim, flashing, and joint sealers to prevent water infiltration behind the System.
C. Coordinate and schedule installation of air/weather barrier, windows, doors, AC units etc.
1.10 WARRANTY
A. Provide 10 year wall systems manufacturer’s material warranty for wall system installations.
PART 2 – PRODUCTS
2.1 MANUFACTURERS
A. Basis of Design: CBS 1000 System manufactured by BASF Corporation
B. Approved alternatives:
1. Dryvit Cement Board MDTM
2. StoQuik® Silver Cement Board Stucco Systems
3. Parex® NuTech WaterMaster
07 24 23 -9
2.2 MATERIALS
A. Air/water-Resistive Barrier Components:
1. Air/Water-Resistive Barrier:
a. SENERSHIELD-R: A one-component fluid-applied vapor permeable air/water-resistive barrier.
b. Or Approved Equal.
2. Rough Opening and Joint Treatment to meet project conditions:
a. SHEATHING FABRIC: A spun-bonded non-woven reinforced polyester web for use with Senergy fluid applied air/weather-resistive barriers; OR
b. A one-component elastomeric material for use as a flexible flashing membrane.
3. Transitional Membrane / Expansion Joint Flashing:
a. WS FLASH: 30-mil thick, self-sealing, self-healing composite membrane of polyester fabric and rubberized asphalt. Compatible with Senergy liquid air/weather resistive barriers.
b. FLASHING PRIMER: A water-based primer for use prior to application of WS FLASH on all acceptable surfaces.
B. Base Coats:
1. ALPHA GENIE Base Coat: A100% acrylic, fiber-reinforced base coat, adhesive and leveler that is field-mixed with Type I or Type II
Portland cement.
C. Portland cement:
1. Conform to ASTM C150, Type I, II, or I/II, grey or white; fresh and free of lumps.
D. Water:
1. Clean and potable without foreign matter.
E. Senergy Reinforcing Mesh: Balanced, open-weave glass, fiber reinforcing mesh, twisted multi-end strands treated for compatibility with Senergy Base
Coats.
1. FLEXGUARD 4: Standard weight, 4 oz.
2. INTERMEDIATE 12: Intermediate weight, 12 oz.
3. CORNER MESH: Intermediate weight, pre-marked for easy bending, for reinforcing at exterior corners.
07 24 23 -10
4. SELF-ADHERING MESH TAPE: a standard weight mesh coated with a pressure sensitive adhesive for use with base coat as reinforcement over acceptable sheathing joints, rough openings and at terminations
F. BASF Primer:
1. BASF TINTED PRIMER: A 100% acrylic-based primer to alleviate shadowing and enhances performance of the Senergy Wall Systems.
Color to closely match the selected Senergy Finish Coat color.
G. Senergy Finish Coat:
1. SENERFLEX Finish: 100% acrylic polymer compatible with base coat;
Senergy finishcolor to match existing:
a. TEXTURE: can achieve a wide variety of free-formed, textured appearances, including stipple and skip-trowel
2. SENERFLEX TERSUS Finish: Modified acrylic based finish with water repellent properties, compatible with base coat:
a. M1.5: A 1.5 mm uniform aggregate creating a medium sand texture.
2.3 ACCESSORIES
A. Starter track, L bead, J bead, angled termination bead, casing beads, corner beads, expansion joints and weep screed must comply with ASTM D1784 or
C1063 for vinyl. Type as recommended by manufacturer of approved wall
PART 3 – EXECUTION
3.1 EXAMINATION
A. Site Conditions:
1. Verify project site conditions.
B. Walls:
1. Substrates/Sheathing:
a. Wall sheathing shall be securely fastened per applicable building code and sheathing manufacturer’s requirements.
07 24 23 -11
b. Examine surfaces to receive materials and verify that substrate and adjacent materials are dry, clean, sound, and free of releasing agents, paint, or other residue or coatings. Verify substrate is flat, free of fins or planar irregularities greater than 1/4" in 10'.
2. Air/weather Barrier:
a. Verify that the air/weather barrier is installed over the sheathing per applicable building code requirements, manufacturers’ specifications and project details, prior to application of the
Stucco System.
3. Furring:
a. Install 18 gauge galvanized 3-inch x ½-inch x 2 ½-inch furring over steel stud framing in compliance with project documents.
4. Cement-Board Substrates:
a. Acceptable substrates are cement-boards which satisfy ASTM C1325
(Type A, Exterior).
b. Cement-board must be securely fastened per manufacturers’ recommendations, applicable building code and project requirements.
c. Walls shall have maximum deflection not to exceed L/360 of span under positive or negative design loads
d. Cement-board must be a single piece around corners of openings.
e. Cement-board must be fastened with corrosion resistant fasteners.
f. Cement-board and sheathing joints must be offset.
5. Flashings:
a. Head, jamb and sills of all openings shall be flashed with secondary air/weather barrier in compliance with project drawings.
b. Windows and openings shall be flashed in compliance with project drawings.
c. Individual windows that are ganged to make multiple units require that the heads be continuously flashed and/or the joints between the units shall be fully sealed.
6. Utilities: The system shall be properly terminated at all lighting fixtures, electrical outlets, hose bibs, dryer vents, etc.
7. Kick-out flashing shall be installed and angled (min 100 degrees) to allow for proper drainage and water diversion.
07 24 23 -12
C. Do not proceed until all unsatisfactory conditions have been corrected.
D. Install supplemental framing/blocking may be required to secure cement board at vertical control/expansion joints.
3.2 PREPARATION
A. Protect all surrounding areas and surfaces from damage and staining during application of Cement Board Stucco System.
B. Protect finished work at end of each day to prevent water penetration.
C. Prepare substrates in accordance with manufacturer’s instructions.
3.3 MIXING
General: No additives are permitted unless specified in product mixing instructions.
Close containers when not in use. Prepare in a container that is clean and free of foreign substances. Do not use a container which has contained or been cleaned with a petroleum-based product. Clean tools and equipment with water immediately after use. Dried material can only be removed mechanically.
A. Air/Water-Resistive Barriers:
1. WS FIL & SENERSHIELD-R/RS/VB: Mix with a clean, rust-free paddle and drill until thoroughly blended. Do not add water.
2. Cold Temperature Additive: LT ADDITIVE: Pour the entire contents of one (1) bottle of LT ADDITIVE into one (1) full pail of
SENERSHIELD-R/RS/VB. Mix with a clean, rust-free paddle and drill until fully blended.
B. Senergy Base Coat:
1. ALPHA GENIE Base Coat: Mix base coat with a clean, rust-free paddle and drill until thoroughly blended, before adding Portland cement. Mix one-part (by weight) Portland cement with one-part base coat. Add Portland cement in small increments, mixing until thoroughly blended after each additional increment. Clean, potable water may be added to adjust workability.
07 24 23 -13
C. BASF Primer:
1. BASF TINTED PRIMER: Mix the factory-prepared material with a clean, rust-free paddle and drill until thoroughly blended. A small amount of clean, potable water may be added to adjust workability.
Do not overwater.
D. Senergy Finishes:
1. SENERFLEX, and SENERFLEX TERSUS Finish: Mix the factory-prepared material with a clean, rust-free paddle and drill until thoroughly blended. A small amount of clean, potable water may be added to adjust workability. Do not overwater.
3.4 APPLICATION
A. Accessories:
1. Attach Window/Door Drip Edge level and per manufacturer’s instructions.
2. Attach starter track per manufacturer's instructions and details.
B. Air/Water-Resistive Barrier:
1. Air/Water Resistive Barrier:
a. All sheathing joints and windows/openings must be protected, and the air/water-resistive barrier applied in accordance with
Air/Water-Resistive/Vapor Barrier Application Guideline technical bulletin.
b. Substrate shall be dry, clean, sound, and free of releasing agents, paint, or other residue or coatings. Verify substrate is flat, free of fins or planar irregularities greater than ¼" in 10'
(6.4 mm in 3 m).
c. Unsatisfactory conditions shall be corrected before application of the air/water-resistive barriers.
d. Apply the SHEATHING FABRIC (or flexible flashing membrane) and air/water-resistive barrier in accordance with the air/water-resistive barrier product bulletin.
e. Installed materials shall be checked before continuing system application.
f. Ensure the air/water-resistive barrier or flexible flashing membrane overlaps the top flange of the starter track.
07 24 23 -14
2. Water-Resistive Barrier:
a. Install according to the specific water resistive barrier manufacturer’s specifications and all applicable building code requirements. The water resistive barrier shall be free of any damage such as holes or breaks and must be applied to all surfaces to receive the stucco wall system. Wrap the water resistive barrier into rough openings (doors, windows, etc.) in accordance with manufacturer’s guidelines to increase the level of moisture protection to the building frame and interior.
Coordinate work with other trades to assure proper sequencing, detailing and installation of materials.
C. Cement Board: Install cement board over secondary weather barrier, securely fastened, per manufacturers’ recommendations, applicable building code and project requirements.
D. Trim Accessories: Install per manufacturer’s recommendations. Refer to stucco system’s manufacturer’s guidelines for accessory placement.
E. SELF-ADHERING MESH TAPE (4"):
1. Center the SELF-ADHERING MESH TAPE (4") over all cement board joints and terminations and firmly press while unrolling.
2. Ensure SELF-ADHERING MESH TAPE is continuous, void of wrinkles. Overlap SELF-ADHERING MESH TAPE a minimum 2
1/2" (65 mm).
3. Apply mixed Base Coat to surface of SELF-ADHERING
MESH TAPE by troweling from the center to the edges.
4. Allow Base Coat and SELF-ADHERING MESH TAPE to dry prior to application of Reinforcing Mesh and Base Coat.
F. CORNER MESH:
1. Install CORNER MESH at corners.
2. Apply CORNER MESH prior to application of reinforcing mesh.
3. Cut CORNER MESH to workable lengths.
4. Apply mixed Base Coat to insulation board at outside corners using a stainless-steel trowel.
5. Immediately place CORNER MESH against the wet base coat and embed the CORNER MESH into the base boat by troweling from the corner; butt edges and avoid wrinkles.
07 24 23 -15
6. After base coat is dry and hard, apply a layer of selected Reinforcing
Mesh over the entire surface of the CORNER MESH in accordance with 3.04 H.
G. Reinforcing Mesh: Standard or Medium Impact Resistance
Reinforcing Mesh: FLEXGUARD 4 INTERMEDIATE 6 and
INTERMEDIATE 12:
1. Install Reinforcing Mesh where indicated on drawings.
2. Apply mixed Base Coat to entire surface of the cement board with a stainless-steel trowel to embed the reinforcing mesh.
3. Immediately place Reinforcing Mesh against wet base coat and embed the reinforcing mesh into the base coat by troweling from the center to the edges.
4. Lap reinforcing mesh 2 ½" (64 mm) minimum at edges.
5. Ensure reinforcing mesh is continuous at corners, void of wrinkles and embedded in base coat so that no reinforcing mesh color is visible.
6. If required, apply a second layer of base coat to achieve total nominal base coat/reinforcing mesh thickness of 1/16" (1.6 mm).
7. Allow base coat with embedded reinforcing mesh to dry hard (normally 8 to
10 hours).
I. TINTED PRIMER:
1. Apply TINTED PRIMER to the base coat/reinforcing mesh with a sprayer, ⅜" (10 mm) nap roller, or good quality latex paint brush at a rate of approximately 150 - 250 ft² per gallon (3.6 - 6.1m² per liter).
2. TINTED PRIMER shall be dry to the touch before proceeding to the Finish coat application.
J. Finish Coat: SENERFLEX, SENERFLEX TERSUS
1. Apply Finish directly to the base coat with a clean, stainless steel trowel.
2. Apply and level Finish during the same operation to minimum obtainable thickness consistent with uniform coverage.
3. Maintain a wet edge on Finish by applying and texturing continually over the wall surface.
4. Work Finish to corners, joints or other natural breaks and do not allow material to set up within an uninterrupted wall area.
5. Float Finish to achieve final texture.
07 24 23 -16
3.5 CLEANING
A. Clean work per manufacturer’s recommendations.
B. Clean adjacent surfaces and remove excess material, droppings, and debris.
3.6 PROTECTION
A. Protect base coat from rain, snow and frost for 48 - 72 hours following application.
B. Protect installed construction until acceptance.
END OF SECTION
PROPOSED WALL SYSTEM BUILD-UP - BLAST PANEL [SECTION VIEW]
A2
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
WALL BASE SECTION AT HARD SURFACE DETAIL
C1
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
PROPOSED WALL SYSTEM BUILD-UP [PLAN VIEW]A3
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
WALL BASE SECTION AT GRADE DETAIL
C3
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
INSIDE CORNER DETAIL [PLAN VIEW]B4
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
OUTSIDE CORNER DETAIL [PLAN VIEW]C4
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
ASSEMBLY PER A2/WP3.00
ASSEMBLY PER A2/WP3.00
ASSEMBLY PER A2/WP3.00
BASIS OF DESIGN:
SENERGY CEMENT BOARD
STUCCO 1000SYSTEM BYBASF
M
I N
A S
S E
M B
L Y
P
E R
A
W
P
12"
SENERGY CASING BEAD
WRB
SENERGY CASING BEAD
ADJACENT GRADE
EXISTING FOUNDATION
PERFORATED VENT STRIP
VERTICAL BATTENS TO
ALIGN AT CORNERS
REINFORCE CORNER
WITH 24" PIECE OF WRB
SPECIFIED WRB WRAPPED
MIN 12" BEYOND CORNER
VERTICAL BATTENS
TO ALIGN AT CORNER
REINFORCE CORNER
WITH 24" PIECE OF WRB
SPECIFIED WRB WRAPPED
MIN 12" BEYOND CORNER
STUDS SIZES IN WALL
VARIES PER ARCHITECT
A S
S E
M B
W
P
PERFORATED VENT STRIP
PROPOSED WALL SYSTEM BUILD-UP [SECTION VIEW]
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
BASIS OF DESIGN:
SENERGY CEMENT BOARD
STUCCO 1000 SYSTEM BY BASF
1/2" CEMENT BOARD - ATTACH WITH
CORROSION RESISTANT BUGLE HEAD #8
SCREWS MIN AT 8" OC AT PERIMETER AND IN
FIELD - FULL EMBEDMENT INTO BATTEN (4
THREADS MIN)
SENERGY BASE COAT
SENERGY REINFORCING MESH
1/2" 18 GA GALV STEEL Z FURRING
ATTACH WITH CORROSION RESISTANT
#12 SCREWS AT 12" OC (4 THREADS
MIN EMBEDMENT INTO METAL STUDS)
SENERGY BASE COAT
SENERGY FINISH COAT
SENERGY SENERSHIELD-VB
FLUID-APPLIED WEATHER
RESISTIVE AND AIR BARRIER (WRB)
B2
PROPOSED WALL SYSTEM BUILD-UP - BLAST PANEL [PLAN VIEW]B3
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
A S
S E
M B
B
W
P
OR ASSEMBLY PER B2/WP3.00
OR ASSEMBLY PER B2/WP3.00
OR ASSEMBLY PER B2/WP3.00
O
S S
E M
B
W
P
A1
EXISTING WALL SYSTEM BUILD-UP [SECTION VIEW]
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
EXISTING WALL SYSTEM BUILD-UP - BLAST PANEL [SECTION VIEW]
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
B1
SENERGY BASE COAT
SENERGY REINFORCING MESH
SENERGY BASE COAT
SENERGY FINISH COAT
SENERGY SENERSHIELD-VB
FLUID-APPLIED WEATHER
RESISTIVE AND AIR BARRIER (WRB)
2" 2 1/2"
Z FURRING PROFILE
1/2" CEMENT BOARD - ATTACH WITH
CORROSION RESISTANT BUGLE HEAD #8
SCREWS MIN AT 8" OC AT PERIMETER AND IN
FIELD - FULL EMBEDMENT INTO BATTEN (4
THREADS MIN)
1/2" 18 GA GALV STEEL Z FURRING
ATTACH WITH CORROSION RESISTANT
#12 SCREWS AT 12" OC (4 THREADS
MIN EMBEDMENT INTO METAL STUDS)
1/2" 18 GA GALV STEEL Z FURRING
ATTACH WITH CORROSION RESISTANT
#12 SCREWS AT 12" OC (4 THREADS
MIN EMBEDMENT INTO METAL STUDS)
1/2" 18 GA GALV STEEL Z FURRING
ATTACH WITH CORROSION RESISTANT
#12 SCREWS AT 12" OC (4 THREADS
MIN EMBEDMENT INTO METAL STUDS)
WRB - WEATHER LAP
OVER BASE FLASHING
NOTE: MODIFY SCREW LENGTHS
FOR DIFFERENT WALL
ASSEMBLIES - 4 THREAD MIN.
EMBEDMENT INTO METAL STUDS
NOTE: MODIFY SCREW LENGTHS
FOR DIFFERENT WALL
ASSEMBLIES - 4 THREAD MIN
EMBEDMENT INTO METAL STUDS
(E) TYVEK TO BE REMOVED
(E) DENSGLASS GOLD GYPSUM SHEATHING -
2 LAYERS TO REMAIN
(E) STEEL STUD FRAMING
(E) STUCCO BUILD-UP TO BE REMOVED
(E) DENSGLASS GOLD GYPSUM SHEATHING -
1 LAYER TO REMAIN
(E) STEEL STUD FRAMING
22 GA TYPE 'B' METAL PANEL TO REMAIN
(E) TYVEK TO BE REMOVED
(E) STUCCO BUILD-UP TO BE REMOVED
ASSEMBLY PER A1/WP3.00
ASSEMBLY PER B1/WP3.00
STUDS SIZES IN WALL
VARIES PER ARCHITECT
C2
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
ASSEMBLY PER A2/WP3.00
M
I N
SENERGY CASING BEAD
ADJACENT HARD SURFACE
EXISTING FOUNDATION
PERFORATED VENT STRIP
OR ASSEMBLY PER B2/WP3.00
WRB
2" 2 1/2"
Z FURRING PROFILE
12"
WALL BASE SECTION AT ROOF DETAIL
24 GA PREFINISHED METAL
BASE FLASHING TO MATCH
EXISTING PROFILE
24 GA PREFINISHED METAL
COUNTER FLASHING TO MATCH
EXISTING PROFILE
EXISTING ROOF MEMBRANE
CLOSED END RIVET @ 8" OC
EXISTING WALL CONSTRUCTION
PROPOSED WALL SYSTEM BUILD-UP [ISOMETRIC VIEW]A4
WP3.00
SCALE: 3" = 1'-0" [EXPLODED]
S T
U C
C
A
D
T
A I L
S
W P
D R
A W
N
T R
IN
IT
D
Y E
SL
E R
W A
Y
SU
IT
E
SE
A
T T
L E W
T E L
F A
X
W W
W .T
R
IN
IT
Y
E R
D .C
O M
B U
IL
D
IN
G
S C
IE
N
C E R
E
SE
A R
C H
D
E
SI
G N
C
O N
SU
L T
A T
IO
N
S H
E E
T
N
O
P R
O J E
T
N
W A
S H
E E
T
N
A M
E
I S
S U
E
F
O R
N O
D
A T
E
C H
E C
K E
D
S C
A L E
A
S
N
O T
E D
O R
I G
I N
A L
S
H E
I Z
E x
A
T
F
U L L
S
I Z
E
S J H
C R
M
B I D
L a s
C r u c e s
F e d e r a l
C o u r t h o u s e
S t u c c o
D e s i g n
S e r v i c e s
B u i l d i n g
N
M Z
Z
N o r t h
C h u r c h
S t r e e t
L a s
C r u c e s
N e w
M x i c o
ASSEMBLY PER A2/WP3.00
ASSEMBLY PER A2/WP3.00
ASSEMBLY PER A2/WP3.00
ASSEMBLY PER A2/WP3.00
VENT PENETRATIONDETAIL
A1
WP3.01
SCALE: 3" = 1'-0" [EXPLODED]
SOFFIT DETAIL
C1
WP3.01
SCALE: 3" = 1'-0" [EXPLODED]
ELECTRICAL PENETRATION DETAIL
A2
WP3.01
SCALE: 3" = 1'-0" [EXPLODED]
HOSE BIBB PENETRATION DETAIL
B1
WP3.01
SCALE: 3" = 1'-0" [EXPLODED]
PERFORATED VENT STRIP
PERFORATED VENT STRIP
PERFORATED VENT STRIP
PERFORATED VENT STRIP
TYPICAL CEMENT BOARD CONTROL JOINT DETAIL
B2
WP3.01
SCALE: 3" = 1'-0" [EXPLODED]
ASSEMBLY PER A2/WP3.00
MIN 1/4"
VERTICAL RAINSCREEN FURRING ATTACHMENT DETAIL
C3
WP3.01
SCALE: N T S
END OF FURRING
END OF FURRING
1 1/4"
MIN
M I N
M I N
O
C
FASTENER
FASTENER
VERTICAL RAINSCREEN FURRING
SHEATHING
FRAMING
PERFORATED VENT STRIP
PERFORATED VENT STRIP
C2
WP3.01
SCALE: 3" = 1'-0" [EXPLODED]
CLADDING STANDARD ATTACHMENT DETAIL
ATTACH CEMENT BOARD TO FURRING
WITH MIN #8 @ 8" OC AT EDGES AND IN
FIELD - ATTACH TO FURRING ONLY
OR ASSEMBLY PER B2/WP3.00
OR ASSEMBLY PER B2/WP3.00
OR ASSEMBLY PER B2/WP3.00
OR ASSEMBLY PER B2/WP3.00
OR ASSEMBLY PER B2/WP3.00
ASSEMBLY PER A2/WP3.00
OR ASSEMBLY PER B2/WP3.00
TYPICAL CEMENT BOARD FLOOR LINE CONTROL JOINT DETAIL
A3
WP3.01
SCALE: 3" = 1'-0" [EXPLODED]
ASSEMBLY PER A2/WP3.00
OR ASSEMBLY PER B2/WP3.00
FRY REGLET 2-PIECE PLASTER
SCREED AT FLOOR LINE
CONTROL JOINT
T
Y P
T
Y P
T
Y P
T
Y P
T
Y P
TYPICAL CEMENT BOARD EXPANSION JOINT DETAIL
B3
WP3.01
SCALE: 3" = 1'-0" [EXPLODED]
ASSEMBLY PER A2/WP3.00
OR ASSEMBLY PER B2/WP3.00
CONTROL JOINTS TO BE LOCATED PER
EXISTING LAYOUT - FIELD VERIFY - OR -
PER MFR - LOCATE CONTROL JOINTS
APPROXIMATELY EVERY 600 SF OF
WALL SURFACE AREA WITH MAXIMUM
UNCONTROLLED LENGTH OR WIDTH OF
24 LINEAL FEET AND A MAXIMUM
UNCONTROLLED LENGTH-TO-WIDTH
RATIO OF 2-1/2:1
CONTROL JOINTS TO BE LOCATED PER
EXISTING LAYOUT - FIELD VERIFY
T
Y P
HOSE BIBB HOUSING BOX
COMMERCIAL HOSE BIBB
EPDM TARGET FLASHING ADHERED
WITH BUTYL ON 3 SIDES - EXTEND 6"
IN EACH DIRECTION FROM THE EDGE
OF THE PENETRATION
SPECIFIED WRB
UNDERNEATH TARGET FLASHING
EXTERIOR SHEATHING
SOFFIT PANEL
BACKER ROD AND ONE PART
POLYURETHANE SEALANT
VENT INSERT WHERE APPLICABLE
NEW SPECIFIED WRB OVER TARGET FLASHING
TURN A PIECE OF THERMFLASH
SELF-ADHERING MEMBRANE DOWN
SHROUD OF VENT
VENT SHROUD - 24 GA PRE-FINISHED
BAKED ENAMEL FINISH METAL -
SECURE WITH CLOSE ENDED POP
RIVETS TWO EACH SIDE
PERFORATED VENT STRIP
EPDM TARGET FLASHING ADHERED ON 3
SIDES - EXTEND 6" IN EACH DIRECTION
FROM THE EDGE OF THE PENETRATION
NEW SPECIFIED WRB
UNDERNEATH TARGET FLASHING
NEW SPECIFIED WRB OVER TARGET FLASHING
24 GA METAL HEAD FLASHING
TURN A PIECE OF THERMFLASH
SELF-ADHERED MEMBRANE DOWN BLOCKING
ELECTRICAL BOX
CONDUIT
EPDM TARGET FLASHING ADHERED ON 3
SIDES - EXTEND 6" IN EACH DIRECTION
FROM THE EDGE OF THE PENETRATION
NEW SPECIFIED WRB
UNDERNEATH TARGET FLASHING
#093 ZINC CONTROL JOINT TRIM
ACCESSORY - CLARK DIETRICH
MIN 1/4"
ZINC EXPANSION JOINT TRIM
ACCESSORY - CLARK DIETRICH
EXPANSION JOINTS TO BE LOCATED
PER EXISTING LAYOUT - FIELD VERIFY
S T
U C
A
T
A I L
S
W P
D R
A W
N
T R
IN
D
Y E
SL
E R
W A
Y
SU
IT
E
SE
A
T T
L E
T E L
F A
X
W W
W .T
R
IN
IT
Y
E R
D .C
O M
B U
IL
D
IN
G
S C
IE
N
C E R
E
SE
A R
C H
D
E
SI
G N
C
O N
SU
L T
A T
IO
N
S H
E E
T
N
O
P R
O J E
W A
S H
E E
T
N
A M
E
I S
S U
E
F
O R
N O
D
A T
E
C H
E C
K E
D
S C
A L E
A
S
N
O T
E D
O R
I G
I N
A L
S
H E
Z
E x
A
T
F
U L L
S
I Z
E
S J H
C R
M
B I D
L a s
C r u c e s
F e d e r a l
C o u r t h o u s e
S t u c c o
D e s i g n
S e r v i c e s
B u i l d i n g
N
M Z
Z
N o r t h
C h u r c h
S t r e e t
L a s
C r u c e s
N x i
BOARD STUCCO AT WINDOW JAMB
B1
WP4.00
SCALE: ARCH REF:3" = 1'-0" [EXPLODED] NONE
BOARD STUCCO AT WINDOW HEAD - SLOPED WALL
A2
WP4.00
SCALE: ARCH REF:3" = 1'-0" [EXPLODED] NONE
BOARD STUCCO AT WINDOW HEAD
A1
WP4.00
SCALE: ARCH REF:3" = 1'-0" [EXPLODED] NONE
CEMENT (EVERYWHERE) BOARD STUCCO AT SILLC1
WP4.00
SCALE: ARCH REF:3" = 1'-0" [EXPLODED] NONE
BOARD STUCCO AT SILL - SLOPED WALL
C2
WP4.00
SCALE: ARCH REF:3" = 1'-0" [EXPLODED] NONE
TOE BEAD OF
SEALANT
(E) INSIDE
CLOSED CELL BACKER ROD AND ONE
PART POLYURETHANE SEALANT -
SEALANT ONLY TO BASE COAT ONLY
3/8"
FIELD VERIFY LOCATION
OF WINDOW IN OPENING
EXTEND LIQUID WRB INTO
OPENING AND SEAL TO
EXISTING WRB
ASSEMBLY PER A2/WP3.00
OR ASSEMBLY PER B2/WP3.00
CORNER ATTACHMENT CLIP
A
S
S
E
M
B
W
P
S
E
M
B
W
P
CLOSED CELL BACKER ROD AND ONE
PART POLYURETHANE SEALANT -
SEALANT ONLY TO BASE COAT ONLY
EXISTING WINDOW TO BE
REMOVED AND REPLACED
APPLY NEW LIQUID WRB INTO
WINDOW OPENING -
REINFORCING FABRIC WITHIN
WINDOW FLASHING AT ALL
CORNERS
APPLY NEW LIQUID WRB INTO
WINDOW OPENING - REINFORCING
FABRIC WITHIN WINDOW FLASHING
AT ALL CORNERS
CORNER ATTACHMENT CLIP
CORNER ATTACHMENT CLIP
BUGLE HEAD FASTENER -
TYPICAL - INSTALL (2)
ROWS ON RETURN -
STAGGERED
A S
S E
M B
W
P
S
E M
B
W
P
EXISTING WINDOW
CLOSED CELL BACKER ROD AND ONE
PART POLYURETHANE SEALANT -
SEALANT ONLY TO BASE COAT ONLY
ASSEMBLY PER A2/WP3.00
OR ASSEMBLY PER B2/WP3.00
24 GA PREFINISHED
METAL FLASHING SET
IN BUTYL SEALANT
CLOSED CELL BACKER
ROD AND ONE PART
POLYURETHANE SEALANT
EXISTING WINDOW
REINFORCING FABRIC
WITHIN WINDOW FLASHING
AT ALL CORNERS
(2) ROWS OF FASTENERS ON
RETURN - STAGGERED
BUGLE HEAD FASTENER - TYPICAL -
INSTALL (2) ROWS ON RETURN -
STAGGERED
3" END DAMS
EXISTING
WINDOW
WALL ASSEMBLY PER
A2/WP3.00 OR B2/WP3.00
24 GA PREFINISHED METAL
FLASHING WITH 3/4" BACK DAM
AND 3" END DAMS - SET IN
BUTYL SEALANT
CLOSED CELL BACKER
ROD AND ONE PART
POLYURETHANE SEALANT
W I N
D O
W
D
E T
A I L
S
W P
D R
A W
N
T R
IN
D
Y E
SL
E R
W A
Y
SU
IT
E
SE
A
T T
L E
T E L
F A
X
W W
W .T
R
IN
IT
Y
E R
D .C
O M
B U
IL
D
IN
G
S C
IE
N
C E R
E
SE
A R
C H
D
E
SI
G N
C
O N
SU
L T
A T
IO
N
S H
E E
T
N
O
P R
O J E
W A
S H
E E
T
N
A M
E
I S
S U
E
F
O R
N O
D
A T
E
C H
E C
K E
D
S C
A L E
A
S
N
O T
E D
O R
I G
I N
A L
S
H E
Z
E x
A
T
F
U L L
S
I Z
E
S J H
C R
M
B I D
L a s
C r u c e s
F e d e r a l
C o u r t h o u s e
S t u c c o
D e s i g n
S e r v i c e s
B u i l d i n g
N
M Z
Z
N o r t h
C h u r c h
S t r e e t
L a s
C r u c e s
N x i
| 2019-07-17T13:49:23-0500 | |
| Rosalva Ramos |
File details come from the government source that posted it.