This document provides information for the General Services Administration Public Buildings Service Region 6 Small Business Indefinite Delivery Indefinite Quantity Multiple Award Task Order Construction Contract solicitation number 47PG1023R1072. The solicitation seeks proposals for small business contractors to compete for construction task orders in five geographic regions across Missouri, Iowa, Nebraska, and Kansas. Awards will result in approximately 12 eligible contractors per region receiving minimum $1,000 guaranteed amounts and ability to compete for task orders up to $25 million maximum values over five-year contract periods. Proposals are due by October 16, 2023 and will be evaluated based on project experience, management approach, past performance, key personnel qualifications, and subcontractor relationships. Price will also be considered where all technical factors combined are significantly more important than price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
6P1QE
Maria Doedtman, Contracting Officer
Amendment 01 is hereby issued to incorporate the Pre-Proposal Conference Agenda, Attendee Roster, and answer all questions submitted to GSA. All other terms and conditions remain unchanged.
U.S. General Services Administration Capital Construction and IDV Branch Public Buildings Service, Region 6 2300 Main Street Kansas City, MO 64108
47PG1023R1072
1 2
10/02/2023
09/13/2023
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
U.S. General Services Administration Public Buildings Service, Region 6
Pre-Proposal Conference
Region 6 Small Business IDIQ MATOC for Construction Services 26 September 2023
1. Introductions.
a. Maria Doedtman, Contracting Officer
b. Skyler Danks, Contract Specialist
c. Kristin Gilliland, Contract Specialist
d. Sandra Gant, Contract Specialist
2. Procedures.
a. Please keep your microphones muted and hold all questions until the end.
b. Questions will be addressed as time allows during this meeting. Submit additional questions electronically to skyler.danks@gsa.gov by September 28, 2023.
c. Responses to questions will be assembled, answered, and disseminated to all offerors in the form of an amendment, which will be issued via www.sam.gov by October 5, 2023. Meeting minutes will also be provided.
d. Email your firm’s name and representative in attendance to skyler.danks@gsa.gov.
e. No oral statement made by a government representative during this pre-proposal conference, nor any written record of such oral statements as may be made and subsequently furnished to the offeror, will be deemed to have the effect of adding to, modifying, or otherwise varying from the written provisions of the request for proposal.
In the event the discussion or questions raised during the pre-proposal conference indicate a need to modify the RFP an amendment to solicitation will be issued in writing.
3. Contract Overview.
a. This Solicitation is set-aside for Small Businesses.
b. This Solicitation is for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple
Award Construction Contract (MATOC) for design-bid-build, design-build, construction manager as constructor (CMc) services.
c. GSA intends to award Contracts in each of the following geographic areas:
(1) Kansas City, Missouri and the State of Missouri West of Jefferson City and Columbia
(2) St. Louis, Missouri and the State of Missouri East of Jefferson City and Columbia
(3) State of Iowa (excluding Council Bluffs, IA)
(4) State of Nebraska (including Council Bluffs, IA)
(5) State of Kansas (including Kansas City, KS)
d. Offerors can submit proposals for eligibility to compete for Task Orders in multiple geographic areas.
4. The Solicitation. The Solicitation Documents are comprised of:
a. The Solicitation
b. The Agreement and Attachments to the Agreement
c. Offeror Representations and Certifications
d. Standard Form (SF) 1442 – Solicitation Offer and Award
e. Supplement to SF1442- Price Proposal Form
f. GSA Form 527 - Contractor’s Qualification and Financial Information
g. Technical Proposal Submission Forms
5. Period of Performance.
a. The initial Contract period (base year) is for 12 months from the date of Contract award.
b. The total duration of this Contract, including the exercise of any options under this clause, will not exceed five (5) years.
6. Contract Value.
a. Each Contract contains a minimum guaranteed amount of $1,000. Receiving eligibility to compete for Task Orders in multiple geographic areas does not warrant additional minimum guaranteed obligation(s).
b. The maximum Contract value for one (1) base year with four (4) one-year option periods is $25 million for each Contract awarded.
7. Estimated Number of Awards.
a. The intent is to award Contracts resulting in approximately 12 eligible Contractors per geographic area; however, the Government reserves the right to deviate from that number based on the quality of proposals received.
b. At a minimum, successful Offerors must have a satisfactory technical evaluation rating, submit a price deemed fair and reasonable, and provide evidence of $2,000,000 bonding capacity.
8. Task Orders.
a. Ordering Limitation.
(1) The minimum ordering limit per Task Order is $2,000.
(2) There is no maximum ordering limit. While most Task Orders will not exceed the prospectus threshold (currently $3,613,000), the Government reserves the right to issue Task Orders for any amount.
b. Task Order Availability.
(1) The Government will provide awardees a fair opportunity to be considered for orders issued under this Contract.
(2) Contracting Officers have the option to issue Task Order Solicitations to all awardees in the geographic area or set aside acquisitions for either HUBZone, service-disabled veteran-owned, or women-owned small business (WOSB) concerns.
c. Task Order Methods.
(1) Design-bid-build: Design documents or Scope of Work provided to Contractors.
Design documents may be in various stages of completion. Contractors submit a firm fixed price for construction services.
(2) Design-build: Scope of Work provided to Contractors. Scope of Work drives design concept. Design shall be completed by Contractors. Contractors submit a firm fixed price for design and construction services.
(3) Construction Manager as Constructor (CMc): Design and construction are contracted concurrently through two separate Contracts and two separate Contractors.
Unlike the design-bid-build delivery method, under CMc, the Government awards a separate Contract to an Architect/Engineer (A/E) Contractor and to a Construction Contractor (the CMc) prior to the completion of the design documents. The Government retains the CMc during the design phase to work with the A/E to provide constructability reviews and cost estimating validation.
9. Proposal Format. Proposal file contents must be in the order indicated and use the prescribed file naming convention. Offerors submit proposals in two (2) PDFs as indicated below. Each submission is one (1) PDF with all required files.
a. File I- Price and Responsibility (Vendor Name - Price and Responsibility)
(1) SF 1442 – Solicitation Offer and Award
(2) Supplement to SF 1442- Price Proposal Form
(3) GSA Form 527, Contractor’s Qualifications and Financial Information
(4) Representations and Certifications
(5) Evidence of Bonding Capacity
(6) Qualifications, Exclusions and Conditions (If Applicable)
(7) Joint-Venture Agreement and Mentor-Protégé Agreements (If Applicable)
b. File II- Technical Proposal (Vendor Name – Technical Proposal)
(1) Two (2) Project Experience Forms
(2) One (1) Page for Contract Management and One (1) Page for Contract
Compliance
(3) Two (2) Past Performance Questionnaires (PPQ)
(4) One (1) Page for Contract Manager and One (1) Page for Site Superintendent
(5) Two (2) Subcontractor Agreements per Geographic Area
c. Past Performance Questionnaires can come from Offeror or Client completing questionnaire.
d. All pages in the technical proposal must comply with the standards provided in the solicitation. Mandatory forms are provided for Offeror use for every submission other than Subcontractor Relationships. Submissions on nonconforming pages or beyond the limit will not be evaluated.
10. Source Selection.
a. All technical evaluation factors, when combined, are significantly more important than price.
b. The evaluation criteria represent key areas of importance and emphasis to be considered in the source selection decision. Technical evaluation factors are listed in descending order of importance.
(1) Project Experience (30%)
(2) Management & Technical Approach (25%)
(3) Past Performance (20%)
(4) Qualifications of Key Personnel (10%)
(5) Subcontractor Relationships (10%)
(6) Socioeconomic Category (5%)
c. The Government will evaluate price by adding the total price for all options to the total price for the basic requirement and dividing the sum by the contract duration. The total evaluated price is the average maximum overhead and profit rates for the base and all option years proposed by the Offeror.
11. Key Contract Performance Standards.
a. Contractors are required to submit competitive proposals to at least 25% of Task Order solicitations. Contractors must meet the requirement in each awarded geographic area. Contractors failing to meet the 25% requirement, in any Contract year, are subject to removal from the impacted geographic area or the Contact at large. If failure to meet participation requirements occurs in the base year, the Contractor waives its right to the minimum guarantee.
b. Awarded overhead and profit rates are the maximum allowed at the Task Order level. Contractors can submit Task Order proposals with reduced rates to increase the competitiveness of their offer.
c. Maximum overhead and profit rates apply to the entirety of Task Orders issued under this Contract. Pricing for Contract modifications, bilateral or unilateral, shall not exceed maximum overhead and profit rates.
d. During performance of each Task Order and until the work is completed and accepted, the Contractor shall directly superintend the work and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. The site superintendent shall be the individual identified as performing that role in the Contactor’s “Key Personnel” proposal submission. No change in superintending personnel is allowed without prior approval of the Contracting Officer.
12. Proposal Submission.
a. Submit proposals via email to skyler.danks@gsa.gov no later than 12:00 P.M.
Central Time on October 16, 2023.
b. To prevent proposals from going to GSA spam folders, do not submit compressed file attachments. If a proposal exceeds the maximum file size of 25 MB, divide the proposal into smaller attachments.
c. I will confirm receipt of proposals received. Please call 314-312-8655 if you submitted a proposal and have not received confirmation of receipt.
Attendees
GSA Organization
Skyler Danks GSA
Maria Doedtman GSA
Kristin Gilliland GSA
Sandra Gant GSA
Sebastian Pastor Sevan Solutions
Thomas Rusk Cardinal Points Construction
Marissa Jones Cardinal Points Construction
Kari Gibb Cardinal Points Construction
John Keis Air Control, Inc.
Bob Berger J.E. Novack Construction Co.
Aaron Novack J.E. Novack Construction Co.
Chris Hof Hof Construction, Inc.
Frank Kral Gale Construction Company
Haley Ricklefs Vazquez Commercial Contracting, LLC
Scott Siegwald Firelake Construction
Rex Holtze RGC Constructors
Nelson Gonzalez D&S International
Tyler Zehrer DAX Contracting Solutions, LLC
Dan Bajic Gale Construction Company
U.S. General Services Administration
Public Buildings Service, Region 6
DATE: October 2, 2023
SUBJECT: 47PG1023R1072 Pre-Proposal Conference Questions
Question: Would the government accept CPARS in lieu of PPQs
Answer: We will not accept CPARS in lieu of PPQs. CPARS typically don't provide enough information for the Government to determine if the project submitted is similar in size, scope, and complexity to projects described in the solicitation. We are able to determine quality through CPARS, but not similarity.
Question: An authorized representative of each member of the joint venture must sign the SF 1442” – there’s only room for one signature on SF 1442 – block 20(b) – is fine for the president of our MPA JV to sign?
Answer: Both parties must sign. It's acceptable if signatures spill over into box 21.
Question: II.D.(2) states, “Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8) which is 70 pages. Does the Government want that submitted?
Answer: Offerors are not required to submit Annual Representations and Certifications from sam.gov. Only the C301 Offeror Representations and Certifications included with the Price and Responsibility Forms is required.
Question: Is FAR Clause 52.225-11, Buy American-Construction Materials under Trade Agreements, applicable to the contract?
Answer: No, 52.225-11, Buy American-Construction Materials under Trade Agreements, is only applicable to contracts for construction valued at $7,032,000 or more.
Question: Please confirm the projects (PPQs) submitted under Factor 3 (Past Performance) do not necessarily have to be the same projects submitted under Factor 1 (Past Experience).
Answer: They do not have to be the same projects.
Question: Under Factor 5 (Subcontractor Relationships), the solicitation requires offerors to submit two (2) subcontract agreements per geographical area. However, this factor is limited to 2 pages per geographical area. Please confirm that a PDF of the first page (i.e. cover page) of each subcontract agreement would satisfy the solicitation requirements for Factor 5.
Answer: The front page of one agreement may be different than the front page of another. Whatever two pages are provided, they must provide the amount and duration for the project, subcontract amount and duration, project location, and contact/reference information for the project(s). It must also include specific contact information for the subcontractor, to include name, address, phone, and email.
Question: Please clarify the contract value.
Answer: The maximum Contract value for one (1) base year with four (4) one-year option periods is $25 million for each Contract awarded. Since the Government issues one Contract, the maximum value is $25 million regardless of the number of geographic areas awarded.
Question: With subcontractor relationships, is there a limit for document submission?
Answer: Submissions shall not exceed a total of two (2) pages, one-sided, per geographic area. Offerors submitting for all geographic areas may have up to ten (10) pages. Pages beyond the limit will not be evaluated. At a minimum, submissions must include detailed project information as it relates to the subcontractor agreement.
Specifically, provide the amount and duration for the project, subcontract amount and duration, project location, and contact/reference information for the project(s). Please provide specific contact information for the subcontractor, to include name, address, phone, and email.
Question: Is determination for award based on coefficient and can a contractor submit multiple regions with different coefficients?
Answer: The total evaluated price is the average maximum overhead and profit rates for the base and all option years proposed by the Offeror. Contractors can submit different rates for different geographic areas as all geographic areas are evaluated independently.
Question: Can you ultimately choose to award one or both?
Answer: Yes, all are evaluated independently.
Question: I am having problems with opening the forms.
Answer: If having problems with forms, contact Skyler Danks and he can send forms individually.
Question: Will a letter of intent satisfy the requirement for subcontractor relationship?
Answer: No, it must be an agreement for work completed within the last three (3) years.
Question: Is there a form for bonding?
Answer: No, Offerors must submit a letter of bonding ability on the Surety’s letterhead stating the Offeror has the bonding capacity for projects up to $2,000,000.
Question: In the Factor 4 form – Key personnel forms. Does the list of the 3 projects need to include the 2 projects listed in the Project Experience Form (Factor 1) or can they be different projects?
Answer: The projects can be the same or different as those submitted for Factor 1 and Factor 3.
Question: On the Project Experience Form – Factor 1. If the proposed project is not completed do we just insert the most current final contract amount and end date? What is the minimum percentage of completion that is allowed for an uncompleted project?
Answer: To be considered, a submitted project must have reached the stage of substantial completion, or if submitting information for current projects, the project must be at least 50% complete by time of the closing date of this solicitation for those projects to be evaluated as part of the Offeror’s relevant prior experience.
Question: For the Project Experience Form – Factor 1. For the project to qualify, should the 3-year period be from the project completion date till the Solicitation bid date?
Answer: Yes
Question: Can different projects be proposed for Factor 1 – Project Experience Forms than the projects listed in PPQ - Factor 3, or do they need to be the same projects?
Answer: They can be different.
Question: Is a title page or table of contents required for this submission?
Answer: No
Question: On factor 5 – Subcontractor Relationships, do the subcontractor agreements we submit have to be one of the proposed projects in Factor 1 or 3 or can it be another project within the 3-year timeframe?
Answer: No, it can be another project.
Question: On factor 5 - Subcontractor Relationships, just confirming that the cover sheet of the subcontractor agreement needs to be submitted. Typically, our subcontractor agreements are eight pages with the signature on the last page. Just wanted to confirm that we can submit our cover page that has all of the requested information on it.
Answer: The submission shall not exceed two (2) pages. Whatever page(s) are provided, they must provide the amount and duration for the project, subcontract amount and duration, project location, and contact/reference information for the project(s). It must also include specific contact information for the subcontractor, to include name, address, phone, and email.
Question: On Form 527 are we to complete Section VI, Items 44 – 47 for Supplier references?
Answer: Yes
Question: On Form 527 section VII, Items 48 -55 are we to complete this section with other Governmental agencies IDIQ-MATOC contracts that we have currently under contract with our firm?
Answer: Provide Public Buildings Service contracts only.
Question: Since financial information is being requested on Form 527 can you provide information on who will view this information and if the financial information will be destroyed after the evaluation is completed?
Answer: All information is confidential and will be treated as such. Our auditing team will review the submission. The information will be kept on file throughout the life of the contract.
Question: Subcontractor agreements requirements to provide two (2) per region. Many of our subcontractors have regional/national footprints, so for example, if one is based in Kansas City, MO can I use this same contractor as one of my two subcontractor submittals for each region if I were to submit for both West Missouri Region (Kansas City, MO – Columbia/Jefferson City) and Kansas (including Kansas City, KS)? This particular contractor has operations in both Kansas and Missouri.
Answer: You can use the same subcontractor, but you must provide different agreements for work within the different geographic areas. We’re evaluating where the subcontracted work took place rather than where the subcontractor is located or where they also perform work.
Question: Filling out the Contractor's Qualifications and Financial Information. Can we provide information on this from the Mentor or Protégé or would it need to come from the JV itself?
Answer: Financial information must be submitted for each member of the joint venture.
Question: Contractor’s Qualifications and Financial Information – What year of financials are you looking for? 2022 or this year to date?
Answer: Provide the most recent prepared financial statements available. A representative from GSA Credit and Finance will reach out if they need additional information.
File details come from the government source that posted it. Updated .