Solicitation Amendment 02.pdf
PDF 7 MB Posted
- Attached to
- Fire Alarm Replacement, Dayton Ohio Federal contract opportunity
- Solicitation number
- 47PF0020R0030
About this file
This solicitation seeks proposals for a fire alarm replacement project at a federal building in Dayton, Ohio. The General Services Administration requires replacement of the existing fire alarm system with a new addressable automatic voice evacuation system and installation of an emergency responder radio coverage system. The construction cost is estimated between $1,000,000 to $5,000,000. The contractor must demonstrate experience installing comparable systems and use a NICET Level III or IV technician to supervise installation. The period of performance is 365 calendar days from notice to proceed with an additional 90 days for completion. The procurement is set aside for small businesses with a NAICS code of 236220. Proposals will be evaluated on experience, personnel, project management, and past performance. A pre-proposal conference is scheduled for March 18, 2020. The anticipated award date is August 3, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 03.pdf | ||
| Site Visit RSVP and Sign-in Sheet 2020 05 27.pdf | ||
| 2020 05 20 Pre Proposal Conference Call Minutes with Agenda.pdf | ||
| 2020 05 20 Virtual Pre proposal Call Attendence.xlsx | XLSX spreadsheet | |
| Cost Breakdown.xlsx | XLSX spreadsheet | |
| Solicitation Amendment 01 47PF0020R0030.pdf | ||
| RFP 47PF0020R0030.pdf | ||
| Limited Hazardous Materials Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
MichelleDNelson Typewriter
47PF0020R0030, Fire Alarm Replacement, Federal Building and U.S. Courthouse, 200 West 2nd St., Dayton, OH
Question 1: The 2 year warranty calls out that two years are nonpaid. We are only discussing issues with new work we installed, not the entire building?
Answer 1: The 2 year warranty is only for new materials and labor. The warranty only applies to the new work and does not apply to the entire building.
Question 2: In regards to hydrostatic testing, to isolate only the new floor control valves will almost be impossible unless the entire floor is tested. What does the GSA expect to see?
Answer 2: The GSA expects the hydrostatic testing shall follow the requirements within NFPA 13, latest edition.
Question 3: Drawings are to be submitted to GSA and AHJ. Can we assume you are referring to the AHJ as being the City of Dayton?
Answer 3: No, the AHJ (Authority Having Jurisdiction) is Todd Roeder, GSA Senior Fire Protection
Engineer, U.S. General Services Administration, Great Lakes Region Facilities Management and Services
Programs Division, 8899 E. 56th St. Indianapolis, IN 46249.
Question 4: Can we work the project (4) 10 hour evenings?
Answer 4: Yes, working (4) 10 hour days is acceptable keeping in mind the period of performance shall be met.
Question 5: When the GSA witness’s the acceptance testing of the new flows and tampers, will this also be during off shift hours?
Answer 5: Yes, all fire protection system and equipment will be tested after normal business hours.
Question 6: Will the sign in sheet be available to us?
Answer 6: Yes, the sign-in sheet for the pre-proposal meeting was made available via beta.SAM.gov in the project solicitation on May 21, 2020.
Question 7: The drawings for floors 2 – 8 show 2 FACP on each floor. There are no existing FACP extender panels in the north closets. Would this also be a change to the new design where only 1 new
FACP would need to be provided on these floors?
Answer 7: No, FACP (Fire Alarm Control Panel) and NAC (Notification Appliance Circuit) extenders shall be provided as shown. Floors 2 through 8 do not have an existing FAEP (Fire Alarm Extender
Panels) in the north corridor closets - the drawings show there is a FAEP in each north corridor closet.
New FAEP, as shown on the drawings, will be installed in the north corridor closets and the south corridor closets as shown on the drawings on these floors.
Question 8: Will blank covers be acceptable for all recessed fire alarm boxes inside existing walls when demolition starts or will the boxes need to be removed and patched? If boxes are to be removed and patched, does that also apply to the concrete walls by the elevators, and the ceramic block inside the first floor marshals area?
Answer 8: This is specified in the section CUTTING AND PATCHING 01 73 10.
Question 9: In the US Marshalls secure areas, the ceiling tiles are not removable and there are ceiling mount devices to be installed. Do we need to make the new boxes flush inside of these security panels or can we utilize surface mount boxes and drill a single small hole up into the ceiling space for the conduit penetration?
Answer 9: Contractor shall re-use existing fire alarm device boxes for new fire alarm devices in the following areas/rooms: 112 PRISONER PROCESSING and 118 SALLYPORT. An existing wall-mounted fire alarm strobe device is not shown on the drawings in the 124 FUR. corridor. This device is located on the east wall approximately 5'-0" from 124 BOND RELEASE CORRIDOR. This existing device is to be included in the scope of work. A new device will replace this device in the same location and box.
Question 10: In each of the courtrooms the ceilings are made of large special panels that will need to be removed and replaced after each nights work. There is a lot of furniture that will also need to be moved to enable utilizing a one man lift up that high into the ceiling space. Does the courtroom ever go for 3 days or more without being used where we could perform this process without re-arranging everything every night and replacing it only to accomplish 1- or 2-hours actual installation work each night?
Answer 10: The execution of this project will require detailed planning and scheduling. With proper notice, Property Management should be able to accommodate such a request with the understanding that the three days need could include Saturday, Sunday, and a Holiday. For example, the room would be available Friday, Saturday, and Sunday. New fire alarm devices shall be white color or finish.
Question 11: Will we be given a material and tool staging area? If so, where would that be?
Answer 11: Yes, approximately 750 sq ft of vacant space will be made available on the 8th floor of the facility for storage/staging.
Question 12: Yes, all notes stipulate that the new system is to be operational prior to removing any portion of the old system. Please clarify the scope of work associated with replacing flow switches and tamper switches on existing valves and sprinkler piping and how that is to be done. Are the new flow switches to be installed in the existing hubs where the existing flow switches are now? If so when will this work be performed? Will these new devices need to be compatible with the old system AND installed into the old system and at a later date change them over to the new system?
Answer 12: Yes. New dual contact water flow (WF) and tamper switches (TS) will be provided by the
Contractor as specified in the contract documents. After the new devices (along with new fire alarm interface modules) are installed as specified (by fire alarm/sprinkler contractor), the existing fire alarm system wiring can be connected to one set of contacts on the new WF/TS and the new system wiring connected to the other when ready. This allows both systems to be inservice/ tested as needed. Once the system is accepted and placed in service, the existing wiring would be removed from the first set of contacts of both the water flow and tamper switches.
Question 13: The FP100 shows a sprinkler control assembly. Will this be installed prior to the new system being commissioned or after? Each assembly shows a flow switch. If this is performed prior to the commissioning of the new system the new flow switch will have to be programmed into the old system first and then changed over to the new system when it is commissioned.
Answer 13: Please see the reply for Question 12.
Question 14: Will the government perform the commissioning of the system?
Answer 14: No. General contractor. Final acceptance and integrated testing of the new Fire Alarm System, Emergency Responder Radio Communication Enhancement System and Sprinkler System modifications will be completed by the general contractor and sub-contractors at the direction of GSA and consultants. A member of the
GSA Regional Fire Protection Team (FPT) shall witness the final tests. All inspections and tests will be completed in accordance with project specification section 283101, part 3.7.E and referenced code/standard requirements for each particular system.
Question 15: The Drawing FA505 General Note 11 states: 11. AN INITIAL BUILDING RF SURVEY
HAS BEEN COMPLETED TO ASSIST IN DESIGN OF THE SYSTEM ENHANCEMENT. RESULTS
OF THIS SURVEY ARE PROVIDED IN THE SOLICITATION. I nor my BDA Sub can find the RF
Survey Report.
Answer 15: This survey has been made available via beta.SAM.gov in the project solicitation. The file name is Radio Communications Test Results.pdf.
Question 16: Can blank plates be used over old junction boxes when removal of old fire alarm/strobe devices? Some of the existing are on custom architectural panels that will be impossible to patch.
Answer 16: Please see the reply for Question 8.
Question 17: Can bid date of June 10, 2020 be extended? Will need additional time to review answers to questions asked in pre-bid RFI’s, as well as information gathered during the March 27th walk-thru.
Answer 17: No, the bid due date is not extended.
Question 18: Can a list of contractors w/contact information responding to the RFP and/or attended any of the site visit be made available?
Answer 18: Yes, the sign-in sheet for the pre-proposal meeting was uploaded to the solicitation via beta.SAM.gov on May 21, 2020. The list of attendees to the site visit was posted to the solicitation via beta.SAM.gov on 6/3/2020. The awardee will be public knowledge once the award is made.
Question 19: In regards to the section below, if the project is not a design/build, and bidders shall only provide a system per the construction drawings, then does that mean that if “intelligibility” or “audibility” of the system is not reached, that the fire alarm contractor will be compensated to add to or modify the system to meet these requirements? Also, please describe minimum requirements for fire watch. (Number of people required, qualifications of people performing the fire watch, communication methods for in-house personnel and with fire department etc.)
Section 011000 SUMMARY
Subsection 1.7 MISCELLANEOUS (page 5 of 274) ·
C: Acoustically Distinguishable Spaces (ADS) shall including the following areas: entry/main building lobbies, elevator lobbies……………..Contractor shall pay for acoustical analysis design and make all necessary modifications to meet the specifications for ADS’s. ·
D: Contractor shall provide a full fire alarm system replacement as represented in the construction drawings and within the specifications. This project is not design/build delivery method. Has an acoustical design analysis already been performed by the engineer/architect?
J: Contractor shall provide a fire watch while the fire alarm and/or fire protection system is off-line.
Answer 19: See attached the specification Section 28 31 01. Section 2.3 Fire watch requirements follow specification section 013525. This was not included in specification manual in the solicitation and shall be added now via this Amendment.
Question 20: In reference to the section below, at some point in the replacement of the existing system, existing connections to the FIRE PROTECTION SYSTEM, MECHANICAL SYSTEM, AND
ELEVATOR RECALL, will need to be switched over from the old system to the new system. So it will be impossible to keep the existing system completely maintained and fully operational before the new system is completely tested and accepted by the government.
Section 28 31 01 MULTIPLEX/ADDRESSABLE VOICE EVACUATION FIRE ALARM SYSTEMS
Subsection 1.1 DESCRIPTION OF WORK (page 197 of 274) ·
E: Existing Fire Alarm Equipment
1. Existing fire alarm equipment shall be maintained fully operational until the new equipment has been tested and accepted by the Government
Answer 20: This would be part of the construction phasing from the existing system to the new system during final testing and integrated testing. It is expected the contractor will have all wiring, controls, relays, etc. installed, programmed, ore-tested and ready for switch over. This would apply to elevator recall, smoke control, HVAC fan shut down. The intent being that all switchover and tie-in to existing systems/equipment would occur during final testing near the end of final testing.
Question 21: Can you identify specific areas/room numbers/floors in the building that the below subsection applies to?
Subsection 1.4 SYSTEM DESIGN (page 208 of 274) ·
A.20: Where speakers are installed in a high security area (FBI, DEA, Witness Protection, etc.) one of the following methods shall be used to meet fire and security requirements.
Answer 21: There are no spaces in the building this subsection applies to.
Question 22: In regards to the section below, can you tell me which is the preferred method of secondary transmission: IP or cellular? Is the purpose of this RFP to change the existing monitoring company? If so, should new monitoring costs be included in this proposal? If not, can you provide information about the existing monitoring company?
Subsection 1.4 SYSTEM DESIGN (page 207 of 274) ·
A.14.C: The second means of transmission shall be as required by NFPA 72, latest edition. If IP transmission……….The remote supervising station shall be identified in the submittals and the methodology of transmission shall be confirmed in writing.
Answer 22: The preferred means is cellular for the secondary transmission. The existing monitoring account can be transferred to the new system upon placing it in service. The current monitoring company is Select Fire Protection, Midwest Electronics 7300 Chimney Ridge Rd, Columbia MO, 65203. The company’s phone number is 314-569-2814
Question 23: In regards to the section below, can you identify specific areas/room numbers/floors in the building that this applies to?
Subsection 1.4 SYSTEM DESIGN (page 208 of 274) · A.20: Where speakers are installed in a high security area (FBI, DEA, Witness Protection, etc.) one of the following methods shall be used to meet fire and security requirements.
Answer 23: Please see the reply for Question 21.
Question 24: In regards to the subsection below, has this been done already? What recourse does the fire alarm contractor have if changes/modifications to the notification system are required to meet this requirement? Is the proposed new fire alarm system being used as a MNS? Do notification devices for this project have to have “Alert” or “Fire”?
Subsection 2.3 NOTIFICATION APPLIANCES (page 222 of 274) ·
A.6: To ensure that audible signals are clearly heard and intelligible in atria, large spaces………..It is required that in spaces that are acoustically distinguishable, that the Contractor physically test speaker layout with demonstration speaker systems or mockups of the speaker systems to validate the design prior to installation. Mockups shall comply with 28 31 01, Par. 3.5………..Meeting the required decibel levels without providing a clearly intelligible messaging system will not be considered to be in compliance with this specification.
A.8: Provide speaker appliances listed under UL Standard 1480. Speakers which are used for Emergency
Communication System (MNS) shall be labeled “Alert “instead of “Fire.”
Answer 24: See Specification 28 31 01, Section 2.3 for audibility and intelligibility. Mockups have not been completed and shall be completed as specified.
Question 25: In regards to the subsection below, is a VDU required for this project? It is mentioned/referred to in several other sections of the specification. If so, can a specification for the VDU be provided? Is this meant to be a graphical command center – computer w/graphical screens displayed on a separate monitor – using CAD drawings showing locations of alarms and providing action messages and virtual command prompts?
Subsection 2.13 FIRE ALARM CONTROL PANEL VIDEO DISPLAY UNIT (Typical for systems with
150 or more initiating devices): NOT USED (page 235 of 274)
Answer 25: Items labeled "NOT USED" are not used on the project. No Vision Video Display Unit
(VDU) and/or graphical interface is required for the project.
Question 26: In regards to the subsection below, has this been done already? Is this required?
Subsection 3.5 MOCKUPS FOR AUDIBLE VOICE INTELLIGIBILITY IN ACOUSTICALLY
DISTINGUISHABLE SPACE (Entire section pages 244-246 of 274)
Answer 26: No, mockups have not been completed. Yes, mockups shall be completed as specified.
Question 27: In regards to the subsection below, device locations and speaker taps are already identified on the drawings. Will the fire alarm contractor be compensated if modifications need to be made to the system to meet this requirement?
Subsection 3.7 TESTS (Entire section pages 247 of 274) · C: Sound Pressure Levels: o Item #2: Make repairs, re-tap speakers, or add speakers to correct any deficiencies in audibility found.
Answer 27: See general note #4 on sheet FA001. Drawings are diagrammatic in nature. The proposal shall be in accordance with plans and specifications. Reference 283103 section 2.3.
Question 28: In regards to the Subsection 3.9 SPARE PARTS AND TOOLS (Pages 252-253 of 274),
(1) Complete set of Beam type smoke detectors. No beam detectors are in base bid. Is a spare necessary?
(4) Water flow switches. Shouldn’t this be provided by fire protection contractor?
(4) Tamper switches. Shouldn’t this be provided by fire protection contractor?
Answer 28:
No beam detectors are required for spare inventory.
The water flow and tamper switches are included in the spare inventory of the fire alarm system components and not covered/included in specification section 211313
Question 29: Drawing FA500 “Fire Alarm Power Riser Diagram” references electrical panel EML1 at the
Basement Level. Drawing E100 “Basement Electrical Plan” does not appear to evidence panel EML1.
Please provide the location of said panel.
Answer 29: Fire alarm control and extender panel power will be from a new power conditioner located on all floors. The line side of the power conditioner will be connected to the existing power circuit that feeds either the fire alarm control or extender panel being removed on that floor. The load side of the power conditioner will be connected to the new fire alarm control or extender panel(s) being installed on that floor. For floors 2 through 8, the power conditioner will be installed in the south corridor closet. On floor
5, FACU-02 will receive power from the power conditioner on the 5th floor. On floor 8, FACU-03 and
BDA will receive power from the power conditioner on the 8th floor.
Question 30: Drawing FA101 “1st Floor Fire Alarm Plan” Note 7 references electrical panel 'DP-BE' which directly contradicts information identified on Drawing FA500 “Fire Alarm Power Riser Diagram”.
Please confirm intent.
Answer 30: FA500 information shown is incorrect for power for FACU-01. Use information shown on drawing FA101 "First Floor Fire Alarm Plan" plan coded note 7 is the design intent.
Question 31: Drawing E100 “Basement Electrical Plan” Note 12 states contractor shall procure and install a new power conditioner. Information referencing the requirements for a new power conditioner do not appear to be outlined in the specifications, nor are any details evidenced in drawings distributed. Please confirm intent.
Answer 31: See 28 31 01, Section 2.18 for power conditioner specification.
Question 32: Information contained in Specification 283101 3.1 A and B does not appear to be reflected on drawings. Please confirm intent and provide design clarification.
Answer 32: For Specification 283101 3.1A, fire alarm control and extender panel power will be from a new power conditioner located on all floors. The line side of the power conditioner will be connected to the existing power circuit that feeds either the fire alarm control or extender panel being removed on that floor. The load side of the power conditioner will be connected to the new fire alarm control or extender panel(s) being installed on that floor. For floors 2 through 8, the power conditioner will be installed in the south corridor closet. On floor 5, FACU-02 will receive power from the power conditioner on the 5th floor. On floor 8, FACU-03 and BDA will receive power from the power conditioner on the 8th floor. For
Specification 283101 3.1B, use existing fire alarm control or extender panel circuits unless drawings state otherwise.
Question 33: Drawing FA505 General Note 11 states “An initial building RF Survey has been completed to assist in design of the system enhancement. Results of this survey are provided in the Solicitation” yet the referenced survey does not appear to be evidenced in the Solicitation. Please provide the RF Survey as referenced.
Answer: Please see the response for question 15.
RADIO COMMUNICATIONS
SURVEY TEST RESULTS OF
EXISTING RADIO SIGNAL STRENGTH
DATE OF SURVEY: 02/21/2019
FOR REFERENCE ONLY
ANY ITEMS NOT RELATING TO RADIO
COMMUNICATIONS TEST RESULTS (E.G., CODED AND
GENERAL NOTES, FIRE ALARM DEVICES, ETC.) ARE NOT
BE USED FOR DESIGN AND/OR CONSTRUCTION)
F
15 cd
F
15 cd
F
S
S
S
S
F
15 cd
F
30 cd
F
30 cd
F
F
S
F
15 cd
F
15 cd
F
30 cd
S
F
30 cd
F
F
15 cd
15 cd
S
30 cd
S
S
S
S
S
F
15 cd
F
15 cd
S
S 10
S
S
S 10
S
S
S
M
M
M
F
F
S
F
F
15 cd
F
F
F F
15 cd
F
30 cd
F
S
MECH.
B10
F.P.
B12
MECH.
B34
GEN.
B13
STAIR
ST4-B1
MECH.
B11
LOCKERS
B18A
WET AREA
B19A
ELEC.
B14
TOILET
B16
EXERCISE RM.
B21
OFFICE
B22
SHOP
B24
LOCKERS
B27
STORAGE
B28
STORAGE
B29
STORAGE
B30
OFFICE
B31
BREAK
B32
TOILET
B07
TOILET
B08
TELE.
B09
MECH.
BMA
VERT. PEN.
VP1-B1
WET AREA
208B
WET AREA
B07B
CUST.
B5
STAIR
ST1-B1
STORAGE
B4
CORR.
B10A
ELEVATOR(S)
EL2-B1
ELEVATOR(S)
EL3-B1
ELEV. LOBBY
BLOB
ELEV. PIT
B03
MECH.
B02
STAIR
ST2-B1
LOCKERS
B16A
EXERCISE RM.
B20
SHOP
B23
CLOSET
B20A
VEST.
B17
FRT. ELEV.
EL1-B1
CORR.
BCORA
STORAGE
B25
STAIR
ST3-B1
VEST.
B19
TOILET
B18
WET AREA
B16B
WET AREA
B27B
TOILET
B27A
TELE.
B01
F
0.25 W
TS
FS
F A
A 3
F
F
F
F
F
30 cd
30 cd
30 cd
F
TS
FS
TSTS
TS
F A
E P
TS
TSTS
TSTS
TSTS
TSTS
TSTS
TS
AI
AI
AI
S
S
S
S
S
S
S
0.5 W
0.25 W
1.0 W
30 cd
1.0 W
30 cd
1.0 W
30 cd
1.0 W
1.0 W
1.0 W
30 cd
1.0 W
30 cd
1.0 W
30 cd
0.5 W
0.5 W
0.25 W
0.5 W
0.25 W
0.25 W
0.5 W
0.25 W
0.5 W
0.5 W
0.25 W
0.25 W
0.25 W
0.25 W
0.25 W
0.25 W
0.25 W
0.5 W
15 cd
0.5 W
0.25 W
15 cd
0.5 W
0.5 W
0.5 W
0.25 W
0.25 W
0.5 W
0.5 W
0.25 W
0.5 W
0.5 W
F A
E P
11 12
FS
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AI
AH-6
AH-5
AH-4
AH-3
AH-2
AH-1
FS
TS
AI
11 12
30 cd
0.5 W
15 cd
0.25 W
30 cd
0.5 W
15 cd
30 cd
0.5 W
0.5 W
1. PROVIDE ADDRESSABLE INTERFACE MODULE FOR EACH TAMPER SWITCH DEVICE. ALL
MODULES LOCATED WITHIN PUMP ROOM SHALL BE MOUNTED WITHIN A WEATHERPROOF
ENCLOSURE.
2. EXISTING ENCLOSURE WITH TAMPER SWITCH CONTROL FOR FIRE PROTECTION SPRINKLER
SYSTEM TO REMAIN. E.C. IS RESPONSIBLE FOR PROTECTING THIS ENCLOSURE DURING ALL
PHASES OF CONSTRUCTION, AND ENSURE THAT THE DEVICES WITHIN DO REMAIN
OPERATIONAL DURING ALL COURSES OF CONSTRUCTION.
3. PROVIDE NEW FIRE ALARM ANNUNCIATOR PANEL AT FIRE DEPARTMENT ENTRANCE.
4. SPEAKER DEVICES LOCATED WITHIN STAIRWELL SHALL ONLY CONVEY LIVE VOICE.
5. PROVIDE (4) ADDRESSABLE INPUT MODULES. (1) FOR FIRE PUMP CONTROLLER, (1) FOR FIRE
PUMP RUN MONITORING, (1) POWER LOSS, AND (1) FOR PHASE REVERSAL. SEE FIRE PUMP
SYSTEM SCHEMATIC ON SHEET FP200. COORDINATE WITH SPRINKLER CONTRACTOR PRIOR TO
STARTING WORK.
6. PROVIDE NEW SPRINKLER TAMPER SWITCHES AND FLOW SWITCHES FOR NEW SPRINKLER
CONTROL ASSEMBLY. VERIFY EXACT QUANTITIES REQUIRED IN FIELD PRIOR TO STARTING
WORK. COORDINATE WITH SPRINKLER CONTRACTOR PRIOR TO STARTING WORK. FIELD VERIFY
EXACT LOCATION PRIOR TO STARTING WORK. EXACT QUANTITIES NOT SHOWN FOR CLARITY.
7. LOCATION OF PANEL "DP-BE" WHICH PROVIDES POWER TO FACP IN RM101. SHOWN FOR
ROUTING OF CONDUIT PURPOSES.
8. PROVIDE (16) NEW SPRINKLER TAMPER SWITCHES AND (1) NEW FLOW SWITCH. SEE FIRE PUMP
SYSTEM PIPING SCHEMATIC ON SHEET FP200 FOR ADDITIONAL INFORMATION. COORDINATE
WITH FIRE SPRINKLER CONTRACTOR PRIOR TO STARTING WORK.
9. PROVIDE NEW FIRE ALARM EXTENDER PANEL SIZED AS REQUIRED FOR THIS FLOOR.
10. SMOKE DETECTOR FOR ACTIVATION OF STAIR PRESSURIZATION.
11. NETWORK AND AUDIO RISER LOCATION, OUTGOING.
12. NETWORK AND AUDIO RISER LOCATION, RETURN.
13. PROVIDE NEW PRESSURE WATER FLOW SWITCH FOR DRY-PIPE SYSTEM. COORDINATE WITH
FIRE SPRINKLER CONTRACTOR PRIOR TO STARTING WORK.
PLAN CODED NOTES
SCALE: 1/8"=1'-0"
BASEMENT FIRE ALARM PLAN N
GENERAL FIRE ALARM NOTES
1. COORDINATE LOCATIONS OF ALL NEW FIRE ALARM DEVICES WITH EXISTING LIGHT
FIXTURES AND ALL OTHER EXISTING CEILING MOUNTED DEVICES.
2. PRIOR TO SUBMITTING BID, THIS ELECTRICAL CONTRACTOR SHALL PERFORM A THOROUGH
SITE SURVEY AND BECOME FAMILIAR WITH EXISTING FIELD CONDITIONS.
3. THIS ELECTRICAL CONTRACTOR SHALL FIELD VERIFY EXACT LOCATIONS OF ALL EXISTING
FIRE ALARM DEVICES, FIRE ALARM CONTROL PANEL, FIRE ALARM ANNUNCIATORS, ETC.
THAT ARE TO BE REMOVED PRIOR TO STARTING WORK. E.C. SHALL INCLUDE IN BID ALL
WORK REQUIRED TO INSTALL A NEW FIRE ALARM SYSTEM AND DEVICES, THEN REMOVE
EXISTING FIRE ALARM SYSTEM AND DEVICES, CONDUIT, WIRING, ETC. AFTER THE NEW FIRE
ALARM SYSTEM HAS BEEN INSTALLED, AND IS OPERATIONAL AND APPROVED BY THE LOCAL
FIRE MARSHAL AND ALL OTHER GOVERNING AUTHORITIES.
4. ALL WIRING SHALL BE SOLID COPPER AND INSTALLED WITHIN CONDUIT.
5. ALL FIRE ALARM WIRING SHALL BE COPPER, SOLID OR STRANDED.
6. PROVIDE ALL NEW FIRE ALARM DEVICES AS INDICATED. PROVIDE NEW FIRE ALARM SYSTEM
TO REPLACE EXISTING FIRE ALARM SYSTEM THAT IS BEING REMOVED. ELECTRICAL
CONTRACTOR SHALL CONTRACT WITH A LICENSED FIRE ALARM CONTRACTOR FOR THE
DESIGN AND INSTALLATION OF NEW SYSTEM. FIRE ALARM CONTRACTOR SHALL BE
APPROVED BY GOVERNMENT REPRESENTATIVE. INCLUDE ALL FIRE ALARM RELATED WORK
AS A SEPARATE LINE ITEM WITHIN INITIAL BID. NO ADDITIONAL MONIES SHALL BE AWARDED
FOR FAILURE TO INCLUDE ALL COSTS ASSOCIATED TO FIRE ALARM WORK AS A SEPARATE
LINE ITEM WITHIN INITIAL BID.
Metro CD Engineering, LLC 3510 Snouffer Rd, Suite 200
Columbus , OH 43235 614-923-3930 info@metrocdengineering.com
ISSUED FOR
95% CONSTRUCTION
DOCUMENTS
10/01/2018
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UNEXCAVATED
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
UNITED STATES GOVERNMENT
AutoCAD SHX Text
PROPERTY OF THE
AutoCAD SHX Text
GREAT LAKES REGION 5
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DISCIPLINE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PCN NO.
AutoCAD SHX Text
GSA PM
AutoCAD SHX Text
PROJ. DESC.
AutoCAD SHX Text
BLDG NO.
AutoCAD SHX Text
CITY/ST./ZIP
AutoCAD SHX Text
STREET
AutoCAD SHX Text
BLDG NAME
AutoCAD SHX Text
MARK
AutoCAD SHX Text
FLOOR NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
201 SUPERIOR AVENUE, ROOM 450
AutoCAD SHX Text
SHEET DESIGNATOR
AutoCAD SHX Text SENSITIVE BUT UNCLASSIFIED (SBU) - PROPERTY OF THE UNITED STATES GOVERNMENT. COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED. Do not remove this notice. Properly destroy documents when no longer needed.
AutoCAD SHX Text
SHEET SIZE
AutoCAD SHX Text
SUB A/E
AutoCAD SHX Text
PRIME A/E
AutoCAD SHX Text
CONS. CONTR.
AutoCAD SHX Text
A/E CON. NO.
AutoCAD SHX Text
CONTRACTORS
AutoCAD SHX Text
CONSTR. CON.
AutoCAD SHX Text
A/E TASK NO.
AutoCAD SHX Text
CONS. WORK
AutoCAD SHX Text
CONTRACTOR INFO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MIDDOUGH INC.; FIRELOGIX
AutoCAD SHX Text
METRO CD ENGINEERING
AutoCAD SHX Text 24 X 36
AutoCAD SHX Text
CLEVELAND, OH 44114
AutoCAD SHX Text
XXX
AutoCAD SHX Text
OH0301AA
AutoCAD SHX Text 45402-1443
AutoCAD SHX Text
OH
AutoCAD SHX Text
DAYTON
AutoCAD SHX Text
200 W SECOND STREET
AutoCAD SHX Text
DAYTON FEDERAL BUILDING
AutoCAD SHX Text
EP-47PF0017F0312
AutoCAD SHX Text
A. ADEJOBI
AutoCAD SHX Text
FIRE ALARM AND FIRE PUMP REPLACEMENT
AutoCAD SHX Text
AutoCAD SHX Text 05/25/2018
AutoCAD SHX Text 1901 East 13th Street, Suite 400 Cleveland, Ohio 44114
AutoCAD SHX Text
LIMITED OFFICIAL USE ONLY
AutoCAD SHX Text
NOT FOR CONSTRUCTION
AutoCAD SHX Text
RLM
AutoCAD SHX Text
BASEMENT FIRE ALARM PLAN
AutoCAD SHX Text
FA100
AutoCAD SHX Text
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box C - 112 D - 115 metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box C - 115 D - 114 metro19 Text Box
D - NS
C - 110 metro19 Text Box C - 115
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
D - NS
C - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
D - NS
C - NS
metro19 Text Box
C - NS
D - NS
metro19 Text Box
D - NS
C - NS
metro19 Text Box
ANTENNA
metro19 Typewritten Text Doner Antenna on roof on 700 MHZ = 50
800 MHZ = 40
metro19 Rectangle metro19 Typewritten Text D = Dayton 700MHZ system C = Montgomery county 800 MHZ system NOTE: Readings marked as "NS" = No Signal Readings below <95 Good, marked with Blue Readings above >95 Bad, marked with Red metro19 Line metro19 Line metro19 Rectangle metro19 Text Box metro23user Line metro23user Line metro23user Line metro23user Line
S
F
15 cd
F
15 cd
F
15 cd
2S
F
30 cd
S
F
F F
0.25 W
F
15 cd
F
S F
30 cd
S
F
F
15 cd
S
S
15 cd
F
15 cd
F
15 cd
S
F
SF
F
15 cd
F
F
F
F
8 S
S
M
M
M
S
S
4S
F
15 cd
F
15 cd
S
F
30 cd
F
S
S
F
S
F
F
F
15 cd
F
F
15 cd
15 cd
S
F
15 cd
S
TS
FS
F
F
30 cd
F
F
F
F
F
30 cd
D N
PRISONER
PROCESSING
VEHICLE
SALLYPORT
D N
CONFERENCE
BREAK
MEN
SECURE
STORAGE
SQUAD ROOM
SDUSM
VISITING OFFICE
PUBLIC
RECEPTION
WOMEN
BOND RELEASE
CORRIDOR
INTERVIEW
INTERVIEW
INTERVIEW
INTERVIEW
CORRIDOR
SALLYPORT
COMMAND &
CONTROL
CELL
ADA CELL
CELL
COMPUTER
ADMIN
SECURITY EQUIPT
TACT. EQPT
SALLYPORT
MAIL ROOM
JANITOR
SALLYPORT
SALLYPORT
VESTIBULE
RECEIVING
MEN'S
TOILET
WOMEN'S
TOILET
HALL
CORRIDOR
GSA RECEIVING
ISOLATION CELL
REF
FUR.
122A
WET AREA
112A
STAIR
ST4-1
V E
R T
P
E N
V P
LOADING DOCK
123A
VERT. PEN.
VP-1
VERT. PEN.
VP4-1
LOG
133A
STAIR
ST3-1
STORAGE
101A
OFFICE
STAIR
ST2-1
ELEVATOR (S)
EL2-1
ELEVATOR (S)
EL5-1
TRAINING
OFFICE
107A
OFFICE
CORR.
LOBBY
STAIR
ST1-1
STORAGE
100A
OPEN OFFICE
BREAK
VERT. PEN.
VP3-1
ELEVATOR (S)
EL4-1
ELEVATOR (S)
EL1-1
ELEV. LOBBY
CONFERENCE
VERT. PEN.
VP1-1
CLOSET
103A
CUST.
J1E
CORR.
1CORA
ELEC.
T15
FRT. ELEV.
EL3-1
ELEC.
E15
FACP
M
M
M
0.5 W
0.25 W
0.25 W 0.25 W
0.25 W
0.5 W
30 cd
0.5 W
30 cd
0.5 W
0.25 W
0.25 W
30 cd
0.5 W
30 cd
0.5 W
0.25 W
15 cd
0.5 W
15 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.25 W
30 cd
0.5 W
0.5 W
15 cd
0.5 W
30 cd
0.5 W
0.5 W
0.25 W
0.25 W
15 cd
0.25 W
0.25 W
15 cd
0.5 W
0.25 W
15 cd
0.5 W
0.5 W
0.25 W
0.5 W
0.5 W
0.25 W
1.0 W
0.5 W
30 cd
0.5 W
15 cd
0.25 W
0.5 W
1.0 W
0.25 W
0.25 W
1 3
F
WP
15 cd
1.0 W
15 cd
0.25 W
1 3
F
WP
15 cd
1.0 W
1. NETWORK AND AUDIO RISER LOCATION, OUTGOING.
2. PROVIDE A WIRE GUARD FOR THIS DEVICE TO PROTECT DEVICE
AGAINST POTENTIAL TAMPERING. WIRE GUARD SHALL BE COATED IN
POLYESTER. THE POLYESTER COATING SHALL BE THE SAME COLOR
AS THE DEVICE THAT IT IS PROTECTING.
3. NETWORK AND AUDIO RISER LOCATION, RETURN.
4. SPEAKER DEVICES LOCATED WITHIN STAIRWELL SHALL ONLY
CONVEY LIVE VOICE AND NOT ANYTHING PRE-RECORDED.
5. PROVIDE NEW SPRINKLER TAMPER SWITCHES AND FLOW SWITCHES
FOR NEW SPRINKLER CONTROL ASSEMBLY. VERIFY EXACT
QUANTITIES REQUIRED IN FIELD PRIOR TO STARTING WORK.
COORDINATE WITH SPRINKLER CONTRACTOR PRIOR TO STARTING
WORK. FIELD VERIFY EXACT LOCATION PRIOR TO STARTING WORK.
EXACT QUANTITY NOT SHOWN FOR CLARITY.
6. PROVIDE NEW FIRE ALARM CONTROL PANEL. COORDINATE EXACT
MOUNTING LOCATION IN FIELD PRIOR TO ROUGH-IN. NEW FIRE ALARM
CONTROL PANEL SHALL BE LOCATED WITHIN THE SAME ROOM AS
THE EXISTING FIRE ALARM CONTROL PANEL.
7. LOCATION OF PANEL "DP-BE" DIRECTLY BELOW IN ROOM B24, WHICH
PROVIDES POWER TO FACP IN RM101. PROVIDE NEW CIRCUIT
BREAKERS, SIMILAR TO G.E. THQB TYPE FOR THE AVAILABLE SPACES
TO PROVIDE POWER FOR THE NEW FACP LOCATED IN ROOM 101A.
8. SMOKE DETECTOR FOR ACTIVATION OF STAIR PRESSURIZATION.
9. PROVIDE REMOTE ANNUNCIATOR WITH MIC. DO NOT PROVIDE WITH
ABILITY TO SILENCE, ACKNOWLEDGE OR RESET.
10. ALL OUTDOOR APPLIANCES SHALL BE ON A SEPARATE CIRCUIT SO
THEY CAN BE MANUALLY SILENCED FROM THE FIRE ALARM CONTROL
PANEL.
11. PROVIDE TAMPER PROOF COVERS ON MANUAL FIRE ALARM PULL
STATIONS LOCATED AT THE BUILDING EXITS.
PLAN CODED NOTES
SCALE: 1/8"=1'-0"
FIRST FLOOR FIRE ALARM PLAN N
Metro CD Engineering, LLC 3510 Snouffer Rd, Suite 200
Columbus , OH 43235 614-923-3930 info@metrocdengineering.com
ISSUED FOR
95% CONSTRUCTION
DOCUMENTS
10/01/2018
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DN
AutoCAD SHX Text
AREAWAY
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
UNITED STATES GOVERNMENT
AutoCAD SHX Text
PROPERTY OF THE
AutoCAD SHX Text
GREAT LAKES REGION 5
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DISCIPLINE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PCN NO.
AutoCAD SHX Text
GSA PM
AutoCAD SHX Text
PROJ. DESC.
AutoCAD SHX Text
BLDG NO.
AutoCAD SHX Text
CITY/ST./ZIP
AutoCAD SHX Text
STREET
AutoCAD SHX Text
BLDG NAME
AutoCAD SHX Text
MARK
AutoCAD SHX Text
FLOOR NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
201 SUPERIOR AVENUE, ROOM 450
AutoCAD SHX Text
SHEET DESIGNATOR
AutoCAD SHX Text SENSITIVE BUT UNCLASSIFIED (SBU) - PROPERTY OF THE UNITED STATES GOVERNMENT. COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED. Do not remove this notice. Properly destroy documents when no longer needed.
AutoCAD SHX Text
SHEET SIZE
AutoCAD SHX Text
SUB A/E
AutoCAD SHX Text
PRIME A/E
AutoCAD SHX Text
CONS. CONTR.
AutoCAD SHX Text
A/E CON. NO.
AutoCAD SHX Text
CONTRACTORS
AutoCAD SHX Text
CONSTR. CON.
AutoCAD SHX Text
A/E TASK NO.
AutoCAD SHX Text
CONS. WORK
AutoCAD SHX Text
CONTRACTOR INFO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MIDDOUGH INC.; FIRELOGIX
AutoCAD SHX Text
METRO CD ENGINEERING
AutoCAD SHX Text 24 X 36
AutoCAD SHX Text
CLEVELAND, OH 44114
AutoCAD SHX Text
XXX
AutoCAD SHX Text
OH0301AA
AutoCAD SHX Text 45402-1443
AutoCAD SHX Text
OH
AutoCAD SHX Text
DAYTON
AutoCAD SHX Text
200 W SECOND STREET
AutoCAD SHX Text
DAYTON FEDERAL BUILDING
AutoCAD SHX Text
EP-47PF0017F0312
AutoCAD SHX Text
A. ADEJOBI
AutoCAD SHX Text
FIRE ALARM AND FIRE PUMP REPLACEMENT
AutoCAD SHX Text
AutoCAD SHX Text 05/25/2018
AutoCAD SHX Text 1901 East 13th Street, Suite 400 Cleveland, Ohio 44114
AutoCAD SHX Text
LIMITED OFFICIAL USE ONLY
AutoCAD SHX Text
NOT FOR CONSTRUCTION
AutoCAD SHX Text
RLM
AutoCAD SHX Text
FIRST FLOOR FIRE ALARM PLAN
AutoCAD SHX Text
FA101
AutoCAD SHX Text
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text metro19 Text Box
ANTENNA
metro19 Text Box C - 100 D - 100 metro19 Typewritten Text D-77 C-86 metro19 Typewritten Text D-87 C-88 metro19 Typewritten Text D-77 C-86 metro19 Typewritten Text C-87 D-90 metro19 Typewritten Text C-89 D-86 metro19 Typewritten Text D-93 C-89 metro19 Typewritten Text C-90 D-92 metro19 Typewritten Text C-93 D-90 metro19 Text Box D-95 C-101 metro19 Typewritten Text C-77 D-86 metro19 Typewritten Text D-82 C-86 metro19 Typewritten Text C-84 D-94 metro19 Typewritten Text C-82 D-87 metro19 Typewritten Text C-84 D-93 metro19 Typewritten Text C-92 D-93 metro19 Typewritten Text C-80 D-89 metro19 Typewritten Text C-98 D-112 metro19 Typewritten Text D-103 metro19 Typewritten Text C-83 metro19 Typewritten Text C-90 metro19 Typewritten Text D-98 metro19 Text Box D-95 C-103 metro19 Text Box C-102 D-107 metro19 Text Box C-110 D-112 metro19 Text Box D-105 C-103 metro19 Typewritten Text D-104 metro19 Typewritten Text C-110 metro19 Text Box C-104 D-117 metro19 Typewritten Text C-88 D-90 metro19 Typewritten Text C-88 D-92 metro19 Typewritten Text D-90 C-80 metro19 Typewritten Text D-105 metro19 Typewritten Text C-80 metro19 Typewritten Text C-79 metro19 Typewritten Text D-98 metro19 Typewritten Text D-101 metro19 Typewritten Text C-89 metro19 Typewritten Text C-98 metro19 Typewritten Text D-107 metro19 Typewritten Text D-92 metro19 Typewritten Text C-88 metro19 Text Box C-104 D-104 metro19 Typewritten Text C-102 metro19 Typewritten Text D-115 metro19 Typewritten Text C-115 metro19 Typewritten Text D-107 metro19 Typewritten Text C-100 D-105 metro19 Typewritten Text D-106 C-100 metro19 Typewritten Text D-98 metro19 Typewritten Text C-90 metro19 Typewritten Text D-85 C-80 metro19 Typewritten Text C-90 D-90 metro19 Typewritten Text D-85 C-73 metro19 Typewritten Text C-73 D-85 metro19 Typewritten Text D-80 C-83 metro19 Typewritten Text D-93 C-74 metro19 Typewritten Text D-89 C-77 metro19 Typewritten Text C-89 D-94 metro19 Typewritten Text D-93 C-86 metro19 Typewritten Text C-99 D-104 metro19 Typewritten Text C-98 D-105 metro19 Typewritten Text C-98 metro19 Typewritten Text D-105 metro19 Typewritten Text D-112 metro19 Typewritten Text C-87 metro19 Typewritten Text C-90 metro19 Typewritten Text D-100 metro19 Typewritten Text C-92 metro19 Typewritten Text D-108 metro19 Typewritten Text D-110 metro19 Typewritten Text C-90 metro19 Typewritten Text D-100 metro19 Typewritten Text C-88 metro19 Typewritten Text C-77 metro19 Typewritten Text D-100 metro19 Typewritten Text C-75 metro19 Typewritten Text D-103 metro23user Line
30 cd
S
F
F
15 cd
1 F1
F
S
S
S
F
F
30 cd
F
30 cd
F
F
S1
S1
S4
S4
F 1 15 cd
F 1 15 cd
F 1
30 cd
F
F1 15 cd
F1 15 cd
F1 15 cd
F1 15 cd
F1 15 cd
F 1
30 cd
15 cd
M
M
S
S
F
F
F
F
F
F
F
F
F
F
F
F
S
F
F
F
F
30 cd
F
OPEN OFFICE
VERT. PEN.
VP5-2
COMPUTER
209A
EXAM
210H
EXAM
210G
CONFERENCE
TOILET
210F
EXAM
210E
EXAM
210D
SUPPLY
210G
STORAGE
210B
OFFICE
210A
CLOSET
210J
STORAGE
WAITING
TELE.
T2S
ELEV. LOBBY
2LOB
CUST.
J2W
ELEC.
E2W
FRT. ELEV.
EL3-2
ELEVATOR(S)
EL1-2
ELEVATOR(S)
EL2-2
ELEVATOR(S)
EL4-2
ELEVATOR(S)
EL5-2
VERT. PEN.
VP1-2
CUST.
J2E
VERT. PEN.
VP3-2
TELE.
T2N
STORAGE
TOILET
TOILET
BREAK
OFFICE
209C
OFFICE
209B
CORR.
2CORA
MEN
2TA
WOMEN
2TB
STAIR
ST1-2
STAIR
ST2-2
TSFS
S
F
F
F A
E P
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
0.25 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
15 cd
0.5 W
0.25 W
0.25 W
0.5 W
0.5 W
30 cd
0.25 W
30 cd
0.5 W
0.5 W
30 cd
0.5 W
15 cd
0.5 W
15 cd
0.5 W
15 cd
0.5 W
15 cd
0.5 W
0.5 W
0.25 W
0.25 W
15 cd
0.25 W
0.25 W
S
F A
E P
S
0.5 W
S
0.5 W
1. PROVIDE NEW FIRE ALARM DEVICE AS INDICATED. PROVIDE NEW FIRE ALARM
SYSTEM TO REPLACE EXISTING FIRE ALARM SYSTEM THAT IS BEING REMOVED.
ELECTRICAL CONTRACTOR SHALL CONTRACT WITH A LICENSED FIRE ALARM
CONTRACTOR FOR THE DESIGN AND INSTALLATION OF NEW SYSTEM. FIRE
ALARM CONTRACTOR SHALL BE APPROVED BY GOVERNMENT
REPRESENTATIVE. INCLUDE ALL FIRE ALARM RELATED WORK AS A SEPARATE
LINE ITEM WITHIN INITIAL BID. NO ADDITIONAL MONIES SHALL BE AWARDED
FOR FAILURE TO INCLUDE ALL COSTS ASSOCIATED TO FIRE ALARM WORK AS A
SEPARATE LINE ITEM WITHIN INITIAL BID.
2. SPEAKER DEVICES LOCATED WITHIN STAIRWELL SHALL ONLY CONVEY LIVE
VOICE AND NOT ANYTHING PRE-RECORDED.
3. PROVIDE NEW SPRINKLER TAMPER SWITCHES AND FLOW SWITCHES FOR NEW
SPRINKLER CONTROL ASSEMBLY. VERIFY EXACT QUANTITIES REQUIRED IN
FIELD PRIOR TO STARTING WORK. COORDINATE WITH SPRINKLER
CONTRACTOR PRIOR TO STARTING WORK. FIELD VERIFY EXACT LOCATION
PRIOR TO STARTING WORK. EXACT QUANTITY NOT SHOWN FOR CLARITY.
4. SMOKE DETECTOR FOR ACTIVATION OF STAIR PRESSURIZATION.
5. PROVIDE NEW FIRE ALARM EXTENDER PANEL SIZED AS REQUIRED FOR THIS
FLOOR.
6. NETWORK AND AUDIO RISER LOCATION, OUTGOING.
7. NETWORK AND AUDIO RISER LOCATION, RETURN.
PLAN CODED NOTES
SCALE: 1/8"=1'-0"
SECOND FLOOR FIRE ALARM PLAN N
Metro CD Engineering, LLC 3510 Snouffer Rd, Suite 200
Columbus , OH 43235 614-923-3930 info@metrocdengineering.com
ISSUED FOR
95% CONSTRUCTION
DOCUMENTS
10/01/2018
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text M
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
DN
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
FOR OFFICIAL USE ONLY
AutoCAD SHX Text
UNITED STATES GOVERNMENT
AutoCAD SHX Text
PROPERTY OF THE
AutoCAD SHX Text
GREAT LAKES REGION 5
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
DISCIPLINE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PCN NO.
AutoCAD SHX Text
GSA PM
AutoCAD SHX Text
PROJ. DESC.
AutoCAD SHX Text
BLDG NO.
AutoCAD SHX Text
CITY/ST./ZIP
AutoCAD SHX Text
STREET
AutoCAD SHX Text
BLDG NAME
AutoCAD SHX Text
MARK
AutoCAD SHX Text
FLOOR NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
201 SUPERIOR AVENUE, ROOM 450
AutoCAD SHX Text
SHEET DESIGNATOR
AutoCAD SHX Text SENSITIVE BUT UNCLASSIFIED (SBU) - PROPERTY OF THE UNITED STATES GOVERNMENT. COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, OR SPECIFICATIONS TO UNAUTHORIZED PERSONS IS PROHIBITED. Do not remove this notice. Properly destroy documents when no longer needed.
AutoCAD SHX Text
SHEET SIZE
AutoCAD SHX Text
SUB A/E
AutoCAD SHX Text
PRIME A/E
AutoCAD SHX Text
CONS. CONTR.
AutoCAD SHX Text
A/E CON. NO.
AutoCAD SHX Text
CONTRACTORS
AutoCAD SHX Text
CONSTR. CON.
AutoCAD SHX Text
A/E TASK NO.
AutoCAD SHX Text
CONS. WORK
AutoCAD SHX Text
CONTRACTOR INFO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MIDDOUGH INC.; FIRELOGIX
AutoCAD SHX Text
METRO CD ENGINEERING
AutoCAD SHX Text 24 X 36
AutoCAD SHX Text
CLEVELAND, OH 44114
AutoCAD SHX Text
XXX
AutoCAD SHX Text
OH0301AA
AutoCAD SHX Text 45402-1443
AutoCAD SHX Text
OH
AutoCAD SHX Text
DAYTON
AutoCAD SHX Text
200 W SECOND STREET
AutoCAD SHX Text
DAYTON FEDERAL BUILDING
AutoCAD SHX Text
EP-47PF0017F0312
AutoCAD SHX Text
A. ADEJOBI
AutoCAD SHX Text
FIRE ALARM AND FIRE PUMP REPLACEMENT
AutoCAD SHX Text
AutoCAD SHX Text 05/25/2018
AutoCAD SHX Text 1901 East 13th Street, Suite 400 Cleveland, Ohio 44114
AutoCAD SHX Text
LIMITED OFFICIAL USE ONLY
AutoCAD SHX Text
NOT FOR CONSTRUCTION
AutoCAD SHX Text
RLM
AutoCAD SHX Text
SECOND FLOOR FIRE ALARM PLAN
AutoCAD SHX Text
FA102
AutoCAD SHX Text
AutoCAD SHX Text 1/8" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text metro19 Text Box
ANTENNA
metro19 Typewritten Text D-83 C-78 metro19 Typewritten Text C-84 D-84 metro19 Typewritten Text C-76 D-83 metro19 Typewritten Text D-81 C-72 metro19 Typewritten Text D-80 C-81 metro19 Typewritten Text D-85 C-87 metro19 Typewritten Text D-90 C-87 metro19 Typewritten Text D-98 metro19 Typewritten Text C-89 metro19 Typewritten Text C-79 metro19 Typewritten Text D-101 metro19 Typewritten Text D-83 C-84 metro19 Typewritten Text D-83 C-88 metro19 Typewritten Text D-107 metro19 Typewritten Text C-82 metro19 Typewritten Text D-80 C-88 metro19 Typewritten Text D-77 C-83 metro19 Typewritten Text C-87 D-94 metro19 Typewritten Text C-98 D-97 metro19 Typewritten Text D-98 C-100 metro19 Typewritten Text C-100 metro19 Typewritten Text D-95 metro19 Typewritten Text D-88 metro19 Typewritten Text C-98 metro19 Typewritten Text D-91 metro19 Typewritten Text C-101 metro19 Typewritten Text C-99 metro19 Typewritten Text D-90 metro19 Typewritten Text D-100 C-98 metro19 Typewritten Text C-103 D-95 metro19 Typewritten Text D-105 C-101 metro19 Typewritten Text C-110 D-96 metro19 Typewritten Text C-89 D-88 metro19 Typewritten Text D-98 C-98 metro19 Typewritten Text D-109 C-98 metro19 Typewritten Text D-101 metro19 Typewritten Text C-92 metro19 Typewritten Text C-89 metro19 Typewritten Text D-101 metro19 Typewritten Text D-90 C-84 metro19 Typewritten Text C-71 D-84 metro19 Typewritten Text D-86 C-89 metro19 Typewritten Text C-82 D-86 metro19 Typewritten Text C-90 D-92 metro19 Typewritten Text C-91 metro19 Typewritten Text D-111 metro19 Typewritten Text C-96 D-100 metro19 Typewritten Text D-106 C-98 metro19 Typewritten Text C-89 metro19 Typewritten Text D-97 metro19 Typewritten Text D-103 metro19 Typewritten Text C-94 metro19 Typewritten Text D-104 metro19 Typewritten Text C-90 metro19 Typewritten Text D-88 C-80 metro19 Typewritten Text C-79 D-91 metro19 Typewritten Text D-90 C-76 metro19 Typewritten Text C-77 D-80 metro19 Typewritten Text C-86 metro19 Typewritten Text D-100 metro19 Typewritten Text C-110 D-105 metro19 Typewritten Text C-88 D-91 metro19 Typewritten Text D-94 C-80 metro19 Typewritten Text C-86 metro19 Typewritten Text D-100 metro19 Typewritten Text C-100 metro19 Typewritten Text D-104 metro19 Typewritten Text C-79 D-87 metro19 Typewritten Text C-100 metro19 Typewritten Text D-104 metro19 Typewritten Text D-96 metro19 Typewritten Text C-90 metro19 Typewritten Text D-104 metro19 Typewritten Text D-100 metro19 Typewritten Text C-88 metro19 Typewritten Text D-110 metro19 Typewritten Text C-110 metro19 Typewritten Text C-87 metro19 Typewritten Text D-100 C-102 metro19 Typewritten Text C-100 D-110 metro19 Typewritten Text D-115 C-103 metro19 Typewritten Text C-99 D-103 metro19 Typewritten Text D-115 C-100 metro19 Typewritten Text C-100 D-110 metro19 Typewritten Text C-80 D-89 metro19 Typewritten Text D-90 metro19 Typewritten Text C-76 metro19 Typewritten Text C-86 metro19 Typewritten Text D-104 metro19 Typewritten Text D-97 metro19 Typewritten Text C-82 metro19 Typewritten Text C-90 metro19 Typewritten Text C-87 metro19 Typewritten Text D-114 metro19 Typewritten Text D-110 metro23user Line
S
F
S
S
1 S
F
15 cd
S
F
F
S1
S 1
S4
F
15 cd
F
15 cd
M
M
S
F
F
S
F
S
S
S
1S
S
F
F
F
F
F
F
S
F
15 cd
S
F
F 1
F
30 cd
S
S
F
15 cd
S
S
F
F
OPEN OFFICE
OFFICE
307D
OFFICE
309C
OFFICE
307C
STORAGE
307B
OFFICE
309B
OFFICE
311D
OPEN OFFICE
311A
CORR.
STORAGE
309A
CONFERENCE
COMPUTER
311C
STORAGE
311B
WAITING
CUST.
J3W
ELEC.
E3W
CUST.
J3E
VERT. PEN.
VP3-3
TELE.
T3S
VERT. PEN.
VP5-3
CONFERENCE
307A
VERT. PEN.
VP5-3
MEN
3TA
WOMEN
3TB
CAFETERIA
CAFETERIA
VENDING
OFFICE
305D
OFFICE
305C
COPY
305B
WAITING
OFFICE
OPEN OFFICE
305A
OFFICE
307A
CORR.
3CORA
STAIR
ST1-3
ELEV. LOBBY
3LOB
ELEVATOR(S)
EL4-3
ELEVATOR(S)
EL5-3
ELEVATOR(S)
EL2-3
ELEVATOR(S)
EL1-3
FRT. ELEV.
EL3-3
STAIR
ST2-3
TELE.
T3N
TSFS
F
F
F
F
F
F
F
F
30 cd
FF
F A
E P
0.5 W
30 cd
0.5 W
0.25 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
30 cd
0.5 W
0.25 W 0.25 W
0.5 W
0.25 W
0.25 W 0.25 W
30 cd
0.5 W
30 cd
0.5 W
0.5 W
15 cd
0.5 W
15 cd
0.5 W
15 cd
0.25 W
0.25 W
0.25 W
0.25 W
0.5 W
30 cd
0.25 W
30 cd
0.25 W
0.25 W
30 cd
0.25 W
0.25 W
0.25 W
0.25 W
30 cd
0.5 W
30 cd
0.5 W
0.5 W
0.25 W
15 cd
0.5 W
15 cd
0.5 W
15 cd
0.5 W
0.25 W
0.25 W
15 cd
0.25 W
0.25 W
COMPUTER
0.5 W
0.5 W
F A
E P
S
0.5 W
S1
0.5 W
1. PROVIDE NEW FIRE ALARM DEVICE AS INDICATED. PROVIDE NEW FIRE
ALARM SYSTEM TO REPLACE EXISTING FIRE ALARM SYSTEM THAT IS BEING
REMOVED. ELECTRICAL CONTRACTOR SHALL CONTRACT WITH A LICENSED
FIRE ALARM CONTRACTOR FOR THE DESIGN AND INSTALLATION OF NEW
SYSTEM. FIRE ALARM CONTRACTOR SHALL BE APPROVED BY GOVERNMENT
REPRESENTATIVE. INCLUDE ALL FIRE ALARM RELATED WORK AS A
SEPARATE LINE ITEM WITHIN INITIAL BID. NO ADDITIONAL MONIES SHALL BE
AWARDED FOR FAILURE TO INCLUDE ALL COSTS ASSOCIATED TO FIRE
ALARM WORK AS A SEPARATE LINE ITEM WITHIN INITIAL BID.
2. SPEAKER DEVICES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .