2018.01.23_Q&A.pdf
PDF 32 KB Posted
- Attached to
- Masonry and Stone Repair Project Federal contract opportunity
- Solicitation number
- 47PF-0018R-0042
About this file
Q & A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2018.02.02_Q&A.pdf | ||
| 2018.01.31_Amend_02.pdf | ||
| 2018.01.31_Q&A.pdf | ||
| 2018.01.17_Pre-Proposal_Sign-in_Sheet.pdf | ||
| 2018.01.23_Amendment_01.pdf | ||
| 2018.01.17_Pre-propsal_Meeting_Minutes.pdf | ||
| SOW_Attachment_2_-_Terracotta_Investigation.pdf | ||
| 2017.08.10_Reference_Dwgs.pdf | ||
| SOW_Attachment_3_-_Asb_and_LBP_Inspection_Report.pdf | ||
| RFP_47PF-0018R-0042_Masonry_and_Stone_Repairs.pdf | ||
| SOW_Attachment_1_-_2014_Repair_Project.pdf | ||
| SOW_Attachment_4_-_Spec_02_086_Lead_Mitigation.pdf | ||
| 2018.01.04_Scope_of_Work.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
In section 11.B , the RFP states, ”The technical proposal shall be organized to correspond with the evaluation criteria listed herein. The submission should not exceed 25 double-sided pages (not including the title page). Pages that exceed the 25 page limit may not be considered.” However, in section (4)(A)
Lead Designer / Design Team Experience and Past Performance the RFP states, “The offeror shall submit the lead designer/team’s portfolio of not more than five projects completed in the last (10) ten years (maximum of five pages per project).” If there is a 25 page limit total and the designer section allows 5 pages per project, how are we suppose to then show the other sections asked for in the technical side of the
RFP? Could you define what will be included in the 25 page limit? Is the table of contents, pictures of projects, and a representative floor plan/site plan/building section, or other appropriate drawings included in this limit?
Page limits are modified per amedment 01 - see Amendment
01. Everything except the title page will be included in the page limit.
Do I need to put together a subcontractor plan if the only sub-contractor I will have is our architect?
The only exception to submitting a subcontracting plan is if the prime company that will be submitting the proposal is a small business themselves. If the prime company is a large business, a subcontracting plan is required regardless of the number of subcontractors anticipated.
3 Do all employees need to have security clearances for this job?
All personnel requiring access into the building shall hold a
GSA issued security clearance.
Can the contractor store materials on the side of the road and can the sidewalks be closed during construction?
The contractor shall contact Crystal Trent with the City to obtain permits for closing sidewalks and storing materials and equipment along the parking lanes of the street.
Can the lintels be scraped and then painted from an aerial boom?
Answer is forthcoming.
Questions & Answers as of January 23, 2018
Question
No.
QUESTION GOVERNMENT RESPONSE
RFP 47PF-0018R-0042 - Masonry & Stone Repair Project
File details come from the government source that posted it.