Q&A.pdf
PDF 8 KB Posted
- Attached to
- USDC Hearing and Jury Room Alterations Federal contract opportunity
- Solicitation number
- 47PE0218R0010
About this file
Q&A part 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Binder_Q&A_floorplan.pdf | ||
| bINDER_Amendment_to_47PE0218R0010_5.pdf | ||
| Pre-bid_Question.pdf | ||
| sign_in_sheet.pdf | ||
| BINDER_47PE0218R0010_Generated_PDF_with_TOC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q: 8.9 of the scope says floor boxes shall be wired for dual data connections with cat6 cable routed to the termination box in the southeast corner of the floor. That's 12 cables.
8.9.4 says 2 boxes with 3 data cables each shall be wired to the same termination box.
That's 6 more cables for a total of 18 cables. However, 8.9.5 says to route only (2) data cables from the termination box to the Clerk’s office. What do we do with the remaining 16 cables?
A: The Court IT will be connecting distribution equipment at the termination box. The Contractor just routes the cabling to the termination box and floor boxes as described, the Court IT personnel will make the final connections.