This is a clarification to the question raised on 4/27/18 regarding Section 8.9 of the SOW. Enclosed you will find the response and a revised Floor plan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q&A.pdf | ||
| bINDER_Amendment_to_47PE0218R0010_5.pdf | ||
| Pre-bid_Question.pdf | ||
| sign_in_sheet.pdf | ||
| BINDER_47PE0218R0010_Generated_PDF_with_TOC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA – USDC Hearing & Jury Rooms – Athens GA Pre-bid Questions
Question submitted 4/27/18 - 8.9 of the scope says floor boxes shall be wired for dual data connections with cat6 cable routed to the termination box in the southeast corner of the floor.
That's 12 cables. 8.9.4 says 2 boxes with 3 data cables each shall be wired to the same termination box. That's 6 more cables for a total of 18 cables. However, 8.9.5 says to route only
(2) data cables from the termination box to the Clerk’s office. What do we do with the remaining 16 cables?
Response: Section 8.9 shall be amended as follows, word substitutions written in italics.
8.9 The Contractor shall install the electrical and data outlets per the Proposed Floor plan. The Contractor shall install floor boxes for electrical and audio/video connections.
A (1) duplex receptacle shall be wired and installed on one side of each floor box. The Contractor shall install two (2) conduits with pull strings routed from each box connected to the A/V side routed to a termination box to be located at the southeast corner of the Judges area. The floor boxes and termination box shall be appropriately sized to accommodate required and spare conduit and wiring. All conduit shall be at least ¾” diameter.
CAT6 data cabling specified in section 8.9.4, 8.9.5, and new added section 8.9.6.
Added Section 8.9.6
8.9.6 One (1) data box with 3 data drops each shall be installed in Room 206, location shown on the Revised Proposed Floor Plan, the ¾” conduit and cable shall be routed to the termination data box located in the Hearing Room, southeast corner. USDC will determine the exact location in the room for the drop.