500 Pearl St Jury Room Kitchenettes
Solicitation number
47PC0219R0006
Issued by

About this file

STATEMENT OF WORK - JR Kitchenettes & Suite 120 Kitchenette.pdf

View the file

Other files

File Type Posted
SF30-16b1AM0003.pdf PDF
SF1442_update_47PC0219R0006__Form.pdf PDF
DB_Agreement_Rev_2.0.pdf PDF
Site_Visit_Pictures.pdf PDF
2019.0402-_Jury_Room_Kit.pdf PDF
SF24-16.pdf PDF
SF30-16b1AM0002.pdf PDF
SF30-16b1.pdf PDF
120_KITCHENETTE__SK-34.pdf PDF
GSA527-15c.pdf PDF
A-200_-24th_Fl-_Kitch.pdf PDF
DB_Agreement.pdf PDF
C301_GC_Reps_&_Certs.pdf PDF
PBS_Past_Performance_Form_Rev_6_12_15.docx DOCX document
DOL_Wage_rates.pdf PDF
SF1442_47PC0219R0006__Form.pdf PDF
Solicitaion___47PC0219R0006_.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

GSA Pubic Building Services

Moynihan Courthouse

500 Pearl St

NY,NY

MODIFICATION: Jury Room Kitchenettes and Suite 120 Kitchenette

LOCATION: 500 Pearl St, NYC – Floors 9,11,12,14, 17, 18,20, 21,23,24,and 26 (a total of 37 jury room kitchenettes) plus one kitchenette in Suite 120. Thirty eight (38) kitchenettes in all)

PROJECT TYPE: Repair and Alteration

CCR: W. DeMaso

Contracting Official: Jeisel Sandoval

SOW Dated: 3/11/2019 ePM # 51721

Scope of Work: The contractor shall provide all equipment, materials, labor and supervision necessary to achieve fully functional kitchenettes in the locations specified.

To achieve this the following work is deemed necessary:

- Install kitchenettes in 37 jury rooms and one kitchenette in suite 120. Kitchenette cabinetry and installations shall be per attached design intent drawings SK34 for

Suite120 Kitchenette and A-200 for Jury Rm kitchenettes . Back splashes and side splashes are required and shall be of the same material as the countertops.

Refrigerators and microwaves to be court provided: the contractor shall assure openings in their cabinetry will accept the court provided appliances. New jury room kitchenettes were previously installed on floor15 and these installations should be viewed as a basis for the jury rooms under this scope. For the jury room kitchenettes it may be necessary to relocate an existing coat rack to enable installation of the new cabinetry. It is noted that necessary plumbing and electrical connections will need to be installed to bring these services to the various kitchenette locations. Availability of a jury room is dictated by the court’s need schedule. If a particular jury room is not available the court will give the contractor a place to store tools and cabinetry in the vicinity until the jury room becomes available. For all kitchenette installations the contractor shall protect all existing surfaces (floors, walls, corners, furnishings, woodwork, etc) from potential damage due to construction activities. The contractor is encouraged to take dated photos of any existing damages to protect themselves from being held liable for repairing such pre-existing damages. Without such proof that the damage was pre-existing the contractor will be responsible for repairing the damage at no additional cost to this contract.

- Contractors need proper security clearances to work in the courthouse. If employee clearances are not already in place for each of the contractor’s employees expected to work on the project then such clearances must be applied for. Applications for clearances can be obtained through the contracting official noted above. Clearances can take several weeks to several months to come through and this must be taken into account when preparing project schedules – required elsewhere in this scope,

- Period of Performance – 40 calendar days per kitchenette installation. The two jury room kitchenettes on the 24th floor and the one installation in suite 120 are expected to form the base contract. The other 35 kitchenette installations – all in jury rooms – are expected to be awarded as pre-priced options (either one option at a time or in groups – depending on funding availability) and are planned to be done in the following sequence:

26th Fl (2 kitch)

23rd Fl (2 kitch)

21st Fl (4 kitch)

20th Fl (4 kitch)

18th Fl (4 kitch)

17th Fl (4 kitch)

14th Fl (4 kitch)

12th Fl (4 kitch)

11th Fl (4 kitch)

9th Fl (3 kitch)

This sequence is subject to change and, if changed, shall not be cause for additional cost to the contract.

For the jury room kitchenettes the following plumbing services must be brought to the kitchenette locations:

- a drain line of a size to permit easy hook up to the new kitchenette sink drain may be tapped off the existing water fountain drain/vent system. The existing water fountain plumbing is readily visible by removing an access panel below the fountain.

The newly run drain piping shall be brought into the intended kitchenette area and terminated in the proximity of where the new sink will be installed – see attached design intent drawing. The new drain piping shall be sloped as necessary to function as a gravity drain from the new sink to the existing drain. The final connection of the sink drain to this new drain line shall be done at the time the kitchenette cabinetry is put in place.

- ½” copper hot and a ½” copper cold water supplies – with conveniently located shut-off valves and with back flow prevention shall be tapped off existing hot and cold water piping. Cold water piping may be tapped off the water fountain piping and shall be insulated to prevent unwelcomed sweating. Hot water may be tapped into the adjacent bathroom hot water piping. Final connections to the new sink shall be accomplished at the time of cabinet installations.

- All plumbing connections shall be integrity tested to assure no leaks when subjected to the building’s water supply. Such testing shall be inspected by a GSA and/or court official. Any leaks shall be corrected by the contractor and another leak test conducted.

For the jury room kitchenettes, the following electric services are required:

- Four dedicated 120 v, 20 amp circuits with ground shall be run from the nearest electrical panel to the intended kitchenette areas and terminated in duplex outlets as show on the attached design intent drawings.

- Relocate existing telephone/data jacks from/to opposing alcove – see attached drawings.

For the jury room kitchenettes, the relocated coat rack may need to be shortened to fit its new location. Existing coat rack hardware may be retained and re-used if in good condition. If the existing coat rack has a bow or set in it , the contractor shall install a concealed center support, when re-installing the rack in an attempt to straighten the rack and prevent further bowing. Walls in the area where the coat rack was removed shall be repaired and re-painted. Painting shall be done from break point to break point in order not to be recognizable as a patch job.

Painting of the entire space is not part of this scope. If the existing coat rack is shorter than the new space do not attempt to lengthen the rack but, instead, just simply center it within its new locale.

For the Suite 120 kitchenette, core drill the floor as necessary for the installation and connection of pipes for the new sink. The contractor shall assure no utilities or structural steel is in way of desired hole locations before core drilling. Core drilling may have to be done off hours because of the noise and disruption it causes. Install the waste line and bring hot and cold water lines with isolation valves and back flow prevention to serve the new sink. Install electrical outlets as shown in attached sketch SK-34. Provide and install cabinetry, sink, countertop, back and side splashes, faucet, etc as shown in SK-34. Note cabinetry is required on either side of this room. Also note the cabinet details as provided in the sketch. Create storage room; provide and install storage room doors and shelving. The number of shelves for the cabinets and for the storage room shall be shown on the contractor produced shop drawings and be coordinated with the court architect prior to cabinet/storage room construction. Existing floor shall remain but shall be thoroughly cleaned and restored by the contractor to appear as if new. The new storage room and portions of walls not covered by the new cabinetry shall be prepared and painted by the contractor – colors to be chosen by the court architect based on samples provided by the contractor. The existing ceiling and grid shall remain but shall be cleaned so as to appear new. Light fixtures and fire sprinklers can remain as is but may need to be temporarily repositioned to permit the basic project to move forward.

General Requirements, Materials and Workmanship

It is not the intent of the scope of work to fully detail the work associated with this project, but it is expected that the type, materials, design, workmanship and construction shall be fully adequate, durable, and properly coordinated for the service required; additionally all work and materials shall be in accordance with the best applicable commercial standards and efficiency possible.

1.1. It is understood that all work shall be designed, fabricated, modified and/or upgraded in full compliance with applicable local laws, federal standards, and building codes. The absence of a particular item or requirement shall not relieve the Contractor of the full and sole responsibility for such equipment, features and procedures.

1.2. With the exception of only those items specifically identified as being performed by others, the contractor shall include all material and labor needed to achieve the work specified. It is understood that any incidental work necessary to complete the project is also included. Bidders are cautioned to familiarize themselves with the existing job site conditions. Additional charges for material or labor shall not be permitted subsequent to execution of the Contract.

1.3. Materials and Workmanship

1.3.1. The contractor shall identify elements of the project that the contractor will demolish, retain, refurbish, and supply as new. Retained and refurbished materials must meet safety requirements, manufacturer specifications, and city, federal, and state code for such materials. The contractor shall use materials that are new and the best quality. Installation of such materials shall be accomplished in a neat workmanlike manner. If the Contractor should receive written notification from GSA stating the presence of inferior, improper, or unsound materials or workmanship, the Contractor shall, within twenty-four (24) hours proceed to remove such work or materials and make good all other work or materials damaged thereby. If GSA permits said work or materials to remain, GSA shall be allowed the difference in value or shall, at its election, have the right to have said work or materials repaired or replaced as well as the damage caused thereby, at the expense of the Contractor, at any time within one (1) year after the completion of the work; and neither payments made to the Contractor, nor any other acts of the GSA shall be construed as evidence of acceptance and waiver.

1.4. Changes in Scope of Work

1.4.1. GSA reserves the right to revise the scope of work any time prior to final acceptance of the completed project. Each such addition or deletion to the Contract shall require GSA and the Contractor to negotiate a mutually acceptable adjustment in the contract price, and, for the Government to issue a change order describing the nature of the change and the amount of price adjustment.

1.5. Submittals

1.5.1. Prior to the beginning of the work, the Contractor shall submit and have approved materials used for this project. Color samples for paint that may be needed for the floor repairs shall be provided. GSA shall pass on the submittals with reasonable promptness and the Contractor shall make the submittals in good time so there will be no delay in their work or that of any other trade involved. Contractor shall also maintain a submittal log showing each submittal item, date it was delivered to GSA and date it was approved by

GSA.

1.6. Progress of Work

1.6.1. Upon signing of the contract, the Contractor shall submit a schedule showing material delivery and installation dates for coordination with the tenant agency.

The contractor shall understand that the building is a fully occupied and functioning Federal Courthouse therefore all installations and deliveries must be coordinated with court personnel and/or the building manager to prevent any delays in construction or interruption of Court operations. Noisy work shall be scheduled to occur before or after the court’s normal business hours and shall be worked out with the GSA building manager and the court’s facility manager.

1.6.2. The Contractor shall submit in writing the following information to GSA throughout the construction or modernization period:

1.6.2.1. A completion schedule, including material delivery times and anticipated completion dates for each project work phase.

1.6.2.2. A schedule of values used for itemized progress payments (material and labor itemized breakdown).

1.6.2.3. A progress report with submission of each payment request, or upon request of GSA, showing the progress being made and the percentage of the job completed and shall certify to the Owner that labor and materials listed on the request for payment have been performed or installed.

2. Payment by Electronic Funds Transfer. All payments by the Government under this contract shall be made by electronic funds transfer (EFT). The Government shall make payment to the Offeror using the EFT information contained in the SAM database. In the event that the EFT information changes, the Offeror shall be responsible for providing the updated information to the SAM database.

The services called for under this order shall be performed in accordance with the terms, conditions, and specifications that may be stated herein until such time as said services are completed to the satisfaction of the Government.

File details come from the government source that posted it.