North Troy HVAC and AHU RFIs 8-17-22.pdf
PDF 208 KB Posted
- Attached to
- North Troy HVAC and AHU
- Solicitation number
- 47PB0022R0062
About this file
This document provides details for a federal contract opportunity with the General Services Administration to upgrade HVAC systems at the North Troy Land Port of Entry in North Troy, Vermont. The contractor will be responsible for providing all labor, materials, tools, equipment, and supervision necessary to install a large centralized air handler and condenser unit to replace multiple individual units. This will improve system reliability, performance, and the serviceability and maintainability of the facility. The procurement is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The estimated price range for the contract is between $250,000 and $500,000 under NAICS code 236220. Proposals are due August 24th, 2022 at 2:00 PM EST, with RFIs due August 15th at 2:00 PM EST. Technical documents can be requested on SAM.GOV including the UEI number.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
North Troy AHU and HVAC Amendment 0001
Government Responses to Industry’s Questions 8/17/2022
Equipment vendors’ products are produced both in the U.S. and foreign countries, and those products include domestic and foreign components and subcomponents, and no product offered by vendors is wholly produced in America and of 100% U.S.
materials as defined at 49 U.S.C. §50101(a).
Therefore, we request the Government project sponsor / Manager obtains a project specific Type III Waiver, at 49 U.S.C.
§50101(b)(3), for facility construction. To clarify, in order for this vendor to participate, it must be a Type III waiver for a FACILITY that is approved.”
Buy American policy for construction materials can be found at FAR 25.201. Section (a) of the policy states that “Except as provided in 25.202, use only domestic construction materials in construction contracts performed in the United States.” Further, section (b) provides the two-part test to define domestic construction materials: “The Buy American statute restricts the purchase of construction materials that are not domestic construction materials. For manufactured construction materials, the Buy American statute and E.O. 13881 use a two-part test to define domestic construction materials.
(1) The article must be manufactured in the United States;
and
(2)
(i) Except for construction material that consists wholly or predominantly of iron or steel or a combination of both, the cost of domestic components must exceed 55 percent of the cost of all the components. In accordance with 41 U.S.C.
1907, this domestic content test of the Buy American statute has been waived for acquisitions of COTS items (see 12.505(a)).
(ii)For construction material that consists wholly or predominantly of iron or steel or a combination of both, the cost of foreign iron and steel must constitute less than 5 percent of the cost of all the components used in such construction material (see the definition of "foreign iron and steel" at 25.003). The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. This domestic content test of the Buy American statute has not been waived for acquisitions of COTS items in this category, except for COTS fasteners.”
The citation 49 U.S.C. §50101(a) listed in the RFI is a Department of Transportation regulation and has no bearing on this procurement. The only exceptions to the Buy American policy can be found at FAR 25.202.