North Troy HVAC and AHU RFIs 8-16-22.pdf
PDF 121 KB Posted
- Attached to
- North Troy HVAC and AHU
- Solicitation number
- 47PB0022R0062
About this file
This document provides details for an upcoming federal contract opportunity with the General Services Administration to upgrade HVAC systems at the North Troy Land Port of Entry in North Troy, Vermont. The solicitation will seek proposals to install a centralized air handler and condenser unit to replace multiple individual units, improving system reliability, performance, and maintainability. Offerors must be Service-Disabled Veteran-Owned Small Businesses. The estimated price range is $250,000 to $500,000 under NAICS 236220. Proposals are due August 24, 2022 and RFIs by August 15th. Technical documents are available on SAM.gov including the UEI number. The incumbent will be responsible for all labor, materials, tools, equipment, and supervision to complete the upgrades.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
North Troy AHU and HVAC Amendment 0001
Government Responses to Industry’s Questions 8/16/2022
Please confirm if taxes should be carried in proposals?
Pursuant to FAR 52.229-3 Federal, State, and Local Taxes, the Contract price includes all applicable Federal, State, and local taxes and duties. This same clause further states that the Government shall, without liability, furnish evidence appropriate to establish exemption from any Federal, State, or local tax when the Contractor requests such evidence and a reasonable basis exists to sustain the exemption. The U.S. General Services Administration (GSA) has no authority to exempt the Contractor from Federal, State, or Local taxes. The Contractor’s performance under this Contract is that of an independent contractor. The Contractor under this Contract is neither an agent nor principal of the United States Government or GSA. GSA is an Executive Agency of the United States Government
Please confirm if any state, local, and/or Federal permits will be required on this project?
This is Federal Property, no permits are required.
Please confirm if there are any known hazardous materials?
There are no known hazardous materials.
Please send information on HVAC controls since data room was locked during walk through. Controls sub would like to know what is in building currently.
1.2 SUMMARY
A. Section Includes:
1. DDC system for monitoring and controlling of HVAC systems.
2. The building’s DDC is an open BACNet compatible system with a Tridium Niagara framework and Distech components. It is a flexible open architecture that will accept components from any manufacturer supporting an open protocol. JASIC controllers provide a range of options and features for upgrades and retrofits of the existing control systems. An operator workstation/user interface that provides for management of building wide system operations such as alarms and overrides, is located in the penthouse.
Is there a place to leave either a truck or shipping container on site during the job for materials that will not affect security or
A staging area suitable for new materials and some contractor equipment will be provided during construction. Space is somewhat limited depending on the travel season and snowfall, so demolished materials traffic. Also what are the security requirements for this?
shall be removed promptly. HSPD12 security requirements must be met and CBP vetting will be required.
Are there any specifications for temporary cooling/heating during the job? Does the temp cooling/heating need outside make up air or is it just for temperature control? Also will mobile units in space be sufficient and does GSA already have these in their system for use or will it be in the job bid?
The facility must remain operational throughout the project. Outside make-up air should be provided as much as possible, however GSA will allow up to 10 working days (facility open) with no outside make-up air. GSA can provide up to 3 temporary 120 volt 1.1 ton air conditioners with ducting for temporary cooling if needed, however, the contractor is responsible for installing and removing the temporary ductwork.
What is required to remove ceilings in holding areas if necessary? How many do they have to keep operational at one time?
Holding area ceilings should not require removal for this project. If needed, access is available from above.
Are you going to post a site visit roster on SAV.gov for this project.
Site visit attendance now posted on SAM.gov.