This document provides details for a federal solicitation to perform maintenance dredging at the Portsmouth Naval Shipyard in Kittery, Maine. The solicitation seeks bids for labor, materials, equipment, transportation, supervision and related work to perform dredging at drydock berths 5/6 and 13/14. Bid option 1 includes additional work such as berth 6 rock removal, marine mammal monitoring, and post-dredge hydrographic surveys of berth 6. The solicitation is issued by the Naval Facilities Engineering Command on behalf of the Department of the Navy, with bids due by the response date specified in the full solicitation document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF1419 Abstract of Offers.pdf | ||
| N4008524B2504 PNSY Dredging Solicitation.pdf | ||
| 8_Berth 6 As Built Historic Boring Logs.pdf | ||
| DBIDS Access Request Form.pdf | ||
| 10_Dredging SOP for compressed gas cylinders.pdf | ||
| 5_Drawings PNSY MAINTENANCE DREDGING.pdf | ||
| 1_Bid Form PNSY Maintenance Dredge.pdf | ||
| DD 5512 Form.pdf | ||
| 7_PNSY Maintenance Dredge Permit combined.pdf | ||
| 9_Lobster Mitigation Plan.pdf | ||
| 6_Marine Mammal Monitoring Methods_TO BE UPDATED BY EV.pdf | ||
| 3_ Dredge Spec 35_20_23.pdf | ||
| 2_PNSY Div 1 Spec 112023.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 14 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| List of Contact Personnel | 1.4.1.1 | G | ||||||||||||||||
| 01 20 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Schedule of Prices | 1.3 | G | ||||||||||||||||
| 01 30 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Facility Turnover Planning | 1.11.1 | G | ||||||||||||||||
| Meeting Agenda and Red Zone | ||||||||||||||||||
| (RZ) Checklist-POAM | ||||||||||||||||||
| NAVFAC PWD ME Internal | 1.11.3 | G | ||||||||||||||||
| Service Requirements List | ||||||||||||||||||
| Archaeological Coordination | 1.9 | G | ||||||||||||||||
| Meeting | ||||||||||||||||||
| 01 31 23.13 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| List of Contractor's Personnel | 1.4.2 | G | ||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Schedule | 1.2 | G | ||||||||||||||||
| Outage Schedule | 1.7 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Monthly Updates | 1.4 | |||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Submittal register | 1.9 | G | ||||||||||||||||
| 01 35 26.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Accident Prevention Plan (APP) | 1.8.1 | G | ||||||||||||||||
| APP - Construction | 1.8.2 | G | ||||||||||||||||
| Dive Operations Plan | 1.18 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 35 26.00 22 | Monthly Exposure Reports | 1.4 | G | |||||||||||||||
| Notifications and Reports | 1.13 | G | ||||||||||||||||
| Accident Reports | 1.13.2 | G | ||||||||||||||||
| LHE Inspection Reports | 1.13.3 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Contractor Safety Self-Evaluation | 1.5 | G | ||||||||||||||||
| Checklist | ||||||||||||||||||
| Crane Operators/Riggers | 1.7.1.6 | G | ||||||||||||||||
| Standard Lift Plan | 1.8.4.2 | G | ||||||||||||||||
| Critical Lift Plan | 1.8.4.3 | G | ||||||||||||||||
| Naval Architecture Analysis | 1.8.4.4 | G | ||||||||||||||||
| Activity Hazard Analysis (AHA) | 1.9 | G | ||||||||||||||||
| Confined Space Entry Permit | 1.10.1 | G | ||||||||||||||||
| Hot Work Permit | 1.10.1 | G | ||||||||||||||||
| Certificate of Compliance | 1.13.4 | G | ||||||||||||||||
| Third Party Certification of | 1.13.5 | G | ||||||||||||||||
| Floating Cranes and | ||||||||||||||||||
| Barge-Mounted Mobile Cranes | ||||||||||||||||||
| License Certificates | 1.15 | G | ||||||||||||||||
| Radiography Operation Planning | 1.15.1 | G | ||||||||||||||||
| Work Sheet | ||||||||||||||||||
| 01 44 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Archaeologist Qualifications | 1.4 | G | ||||||||||||||||
| Archaeological Coordinator | 1.5 | |||||||||||||||||
| Archeological Monitoring Plan | 1.4 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 44 00.00 22 | Archaeological Monitoring | 3.2 | G | |||||||||||||||
| Reports | ||||||||||||||||||
| Archaeologist Resource Reports | 1.1 | G | ||||||||||||||||
| Archaeologist Resource Reports | 1.1 | G | ||||||||||||||||
| Archaeologist Resource Reports | 1.1 | G | ||||||||||||||||
| Archaeologist Resource Reports | 1.1 | G | ||||||||||||||||
| Curated Artifacts | 3.3 | G | ||||||||||||||||
| 01 45 00.10 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| QC Plan | 1.6 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Contractor QC Self-Evalaution | 1.16 | G | ||||||||||||||||
| 01 50 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction site plan | 1.3 | G | ||||||||||||||||
| Traffic control plan | 3.4.1 | G | ||||||||||||||||
| Haul Road Plan | 2.2.1 | G | ||||||||||||||||
| Contractor Computer | 1.6.1.4 | G | ||||||||||||||||
| Cybersecurity Compliance | ||||||||||||||||||
| Statements | ||||||||||||||||||
| Contractor Temporary Network | 1.6.6 | G | ||||||||||||||||
| Cybersecurity Compliance | ||||||||||||||||||
| Statements | ||||||||||||||||||
| Employee Parking Plan | 1.7 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Backflow Preventers | 1.4 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Backflow Preventer Tests | 2.5 | G | ||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 50 00.00 22 | Backflow Preventer Tests | 3.5 | G | |||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Backflow Tester | 1.4.1 | G | ||||||||||||||||
| Backflow Preventers | 1.4 | G | ||||||||||||||||
| 01 57 19.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Preconstruction Survey | 1.5.1 | G | ||||||||||||||||
| Solid Waste Management Plan | 3.4 | G | ||||||||||||||||
| Regulatory Notifications | 1.5.2 | G | ||||||||||||||||
| Environmental Management Plan | 3.1 | G | ||||||||||||||||
| (EMP) | ||||||||||||||||||
| Dirt and Dust Control Plan | 3.14.1 | G | ||||||||||||||||
| Contractor Hazardous Material | 3.6 | G | ||||||||||||||||
| Inventory Log | ||||||||||||||||||
| Stormwater Management/Erosion | 3.2.1 | G | ||||||||||||||||
| and Sedimentation Control Plan | ||||||||||||||||||
| Spill Prevention, Control, and | 3.1 | G | ||||||||||||||||
| Countermeasures (SPCC) Plan | ||||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Laboratory Analysis | 3.13.4.2 | G | ||||||||||||||||
| Disposal Requirements | 3.15.2 | G | ||||||||||||||||
| Erosion and Sediment Control | 3.2.3 | G | ||||||||||||||||
| Inspection and Corrective Action | ||||||||||||||||||
| Solid Waste Management Report | 3.4.1 | G | ||||||||||||||||
| SD-11 Closeout Submittals |
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 57 19.00 22 | Stormwater Management and | 3.2.1 | G | |||||||||||||||
| Erosion Control Compliance | ||||||||||||||||||
| Notebook | ||||||||||||||||||
| Waste Determination | 3.5 | G | ||||||||||||||||
| Documentation | ||||||||||||||||||
| Disposal Documentation for | 3.13.4.5 | G | ||||||||||||||||
| Hazardous and Regulated Waste | ||||||||||||||||||
| Contractor 40 CFR Employee | 1.5.5 | G | ||||||||||||||||
| Training Records | ||||||||||||||||||
| Solid Waste Management Report | 3.4.1 | G | ||||||||||||||||
| Contractor Hazardous Material | 3.6 | G | ||||||||||||||||
| Inventory Log | ||||||||||||||||||
| Hazardous Waste/Debris | 3.13.4 | G | ||||||||||||||||
| Management | ||||||||||||||||||
| Regulatory Notifications | 1.5.2 | G | ||||||||||||||||
| Asbestos Free Certification Form | 3.13.4.3 | G | ||||||||||||||||
| 01 74 19 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Waste Management | 1.7 | G | ||||||||||||||||
| Plan | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Final Construction Waste | 1.9 | G | ||||||||||||||||
| Diversion Report | ||||||||||||||||||
| 01 78 00.00 22 | SD-03 Product Data | |||||||||||||||||
| Warranty Management Plan | 1.6.1 | |||||||||||||||||
| Warranty Tags | 1.6.4 | |||||||||||||||||
| Final Cleaning | 3.4 | |||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 78 00.00 22 | Spare Parts Data | 1.5 | ||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Preventative Maintenance | 1.8 | G | ||||||||||||||||
| Condition Monitoring (Predictive | 1.8 | G | ||||||||||||||||
| Testing) | ||||||||||||||||||
| Inspection | 1.8 | G | ||||||||||||||||
| Instructions | 1.6.1 | |||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Operation and Maintenance | 1.6.1 | G | ||||||||||||||||
| Manuals | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| As-Built Drawings | 3.1 | G | ||||||||||||||||
| Record Drawings | 3.2 | G | ||||||||||||||||
| Record Drawings | 3.3.1 | G | ||||||||||||||||
| As-Built Record of Equipment | 1.6.1 | |||||||||||||||||
| and Materials | ||||||||||||||||||
| As-Built Record of Equipment | 1.7.1 | |||||||||||||||||
| and Materials | ||||||||||||||||||
| Certification of EPA Designated | 2.1 | G | ||||||||||||||||
| Items | ||||||||||||||||||
| Certification Of USDA | 2.2 | G | ||||||||||||||||
| Designated Items | ||||||||||||||||||
| Interim DD FORM 1354 | 3.5.1 | G | ||||||||||||||||
| Checklist for DD FORM 1354 | 3.5.2 | G | ||||||||||||||||
| Red Zone Documents | 1.7.5 | G | ||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 78 00.00 22 | eOMSI, Final Submittal | 1.7.6 | G | |||||||||||||||
| Post Installation Sanitary System | 1.7.7 | G | ||||||||||||||||
| Survey | ||||||||||||||||||
| 01 78 23 | SD-10 Operation and Maintenance | |||||||||||||||||
| Data | ||||||||||||||||||
| Training Plan | 3.1.1 | G | ||||||||||||||||
| Training Outline | 3.1.3 | G | ||||||||||||||||
| Training Content | 3.1.2 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Training Video Recording | 3.1.4 | G | ||||||||||||||||
| Validation of Training Completion | 3.1.6 | G | ||||||||||||||||
| 01 78 24.00 22 | SD-11 Closeout Submittals | |||||||||||||||||
| eOMSI, Progress Submittal | 1.4.1 | G | ||||||||||||||||
| eOMSI, Prefinal Submittal | 1.4.2 | G | ||||||||||||||||
| eOMSI, Final Submittal | 1.4.3 | G | ||||||||||||||||
| 02 82 00.00 22 | SD-03 Product Data | |||||||||||||||||
| Amended Water | 1.2.2 | G | ||||||||||||||||
| Safety Data Sheets (SDS) for All | 1.3.9 | G | ||||||||||||||||
| Materials | ||||||||||||||||||
| Encapsulants | G | |||||||||||||||||
| Respirators | 3.1.2.1 | G | ||||||||||||||||
| Local Exhaust Equipment | 3.1.7 | G | ||||||||||||||||
| Pressure Differential Automatic | 3.1.7 | G | ||||||||||||||||
| Recording Instrument | ||||||||||||||||||
| Vacuums | 3.1.8 | G | ||||||||||||||||
| Glovebags | 3.1.10 | G | ||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 02 82 00.00 22 | SD-06 Test Reports | |||||||||||||||||
| Air Sampling Results | 1.5.5 | G | ||||||||||||||||
| Pressure Differential Recordings | 1.5.6 | G | ||||||||||||||||
| for Local Exhaust System | ||||||||||||||||||
| Clearance Sampling | 3.2.14.5 | G | ||||||||||||||||
| Asbestos Disposal Quantity | 3.3.3.2 | G | ||||||||||||||||
| Report | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Employee Training | 1.3.4 | G | ||||||||||||||||
| Notifications | 1.3.5 | G | ||||||||||||||||
| Respiratory Protection Program | 1.3.7 | G | ||||||||||||||||
| Asbestos Hazard Abatement | 1.3.10 | G | ||||||||||||||||
| Plan | ||||||||||||||||||
| Asbestos Hazard Abatement | 1.3.10 | G | ||||||||||||||||
| Plan Checklist | ||||||||||||||||||
| Testing Laboratory | 1.3.11 | G | ||||||||||||||||
| Medical Certification | 1.3.14 | G | ||||||||||||||||
| Private Qualified Person | 1.5.1 | G | ||||||||||||||||
| Documentation | ||||||||||||||||||
| Competent Person | 1.5.2 | G | ||||||||||||||||
| Worker's License | 1.5.3 | G | ||||||||||||||||
| Contractor's License | 1.5.4 | G | ||||||||||||||||
| Federal, State or Local Citations | 1.5.7 | G | ||||||||||||||||
| on Previous Projects | ||||||||||||||||||
| Equipment Used to Contain | 3.1 | G | ||||||||||||||||
| Airborne Asbestos Fibers | ||||||||||||||||||
| SUBMITTAL REGISTER | CONTRACT NO. | |||||||||||||||||
| TITLE AND LOCATION | ||||||||||||||||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||||||||||||||||
| A C T I V I T Y | ||||||||||||||||||
| N O | T R A N S M I T T A L | |||||||||||||||||
| N O | S P E C | |||||||||||||||||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 02 82 00.00 22 | Water Filtration Equipment | 3.1.3.3 | G | |||||||||||||||
| Vacuums | 3.1.8 | G | ||||||||||||||||
| Ventilation Systems | 3.1.8 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Permits | 1.3.5 | |||||||||||||||||
| Licenses | 1.3.5 | G | ||||||||||||||||
| Notifications | 1.3.5 | G | ||||||||||||||||
| Respirator Program Records | 1.3.7.1 | G | ||||||||||||||||
| Rental Equipment | 1.7.1 | G | ||||||||||||||||
| 02 83 00.00 22 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Competent Person | 1.5.1.1 | G | ||||||||||||||||
| Training Certification | 1.5.1.2 | G | ||||||||||||||||
| Occupational and Environmental | 1.5.2.4 | G | ||||||||||||||||
| Assessment Data Report | ||||||||||||||||||
| Medical Examinations | 1.5.2.5 | G | ||||||||||||||||
| Lead, Cadmium, and Chromium | 1.5.2.9 | G | ||||||||||||||||
| (VI) Waste Management Plan | ||||||||||||||||||
| Licenses, Permits and | 1.5.4 | G | ||||||||||||||||
| Notifications | ||||||||||||||||||
| Occupant Protection Plan | 1.5.2.1 | G | ||||||||||||||||
| Occupant Protection Plan | 1.5.5 | G | ||||||||||||||||
| Lead, Cadmium, and Chromium | 1.5.2.2 | G | ||||||||||||||||
| (VI) Compliance Plan | ||||||||||||||||||
| Lead, Cadmium, and Chromium | 1.5.2.3 | G | ||||||||||||||||
| (VI) Compliance Plan Checklist |
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 02 83 00.00 22 | Waste Characterization Sampling | 1.5.2.10 | G | |||||||||||||||
| Plan | ||||||||||||||||||
| Sample Results | 3.4.1.1 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Respirators | 1.6.1 | G | ||||||||||||||||
| Vacuum Filters | 1.6.4 | G | ||||||||||||||||
| Negative Air Pressure System | 1.6.7 | G | ||||||||||||||||
| Materials and Equipment | 2.1 | G | ||||||||||||||||
| Expendable Supplies | 2.1.1 | G | ||||||||||||||||
| Local Exhaust Equipment | 3.1.1.5 | G | ||||||||||||||||
| Pressure Differential Automatic | 3.1.1.5 | G | ||||||||||||||||
| Recording Instrument | ||||||||||||||||||
| Pressure Differential Log | 3.1.1.6 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Sampling and Analysis | 1.3.3 | G | ||||||||||||||||
| Occupational and Environmental | 1.5.2.4 | G | ||||||||||||||||
| Assessment Data Report | ||||||||||||||||||
| Sampling Results | 1.5.2.4 | G | ||||||||||||||||
| Pressure Differential Recordings | 1.5.3 | G | ||||||||||||||||
| For Local Exhaust System | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Testing Laboratory | 1.5.1.3 | G | ||||||||||||||||
| Third Party Consultant | 1.5.1.4 | G | ||||||||||||||||
| Qualifications | ||||||||||||||||||
| Occupant Notification | 3.1.1.1 | G |
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| DIV1 MEP PROJECTS_1123 | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 02 83 00.00 22 | Notification of the | 3.1.1.1 | G | |||||||||||||||
| Commencement of Work | ||||||||||||||||||
| Impacting Lead, Cadmium, or | ||||||||||||||||||
| Chromium (VI) | ||||||||||||||||||
| Clearance Certification | 3.5.1.1 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Turn-In Documents or Weight | 3.5.2.1 | G | ||||||||||||||||
| Tickets | ||||||||||||||||||
| 35 20 23 | Construction Operations Plan | G | ||||||||||||||||
| Seawater Intake Turbidity Protection Plan | G | |||||||||||||||||
| Lobster Mitigation Plan | G | |||||||||||||||||
| Marine Mammal Monitoring Plan | G | |||||||||||||||||
| Hydrographic Survey Methods | G | |||||||||||||||||
| Pre-Final Design | G | |||||||||||||||||
| Ready for Construciton Documents | G | |||||||||||||||||
| Dredge Area Turbidity Protection Plan | G | |||||||||||||||||
| Method for Computing Quantities | G | |||||||||||||||||
| Estimated Quantitiy Calculations | G | |||||||||||||||||
| Dewatering Plan | G | |||||||||||||||||
| Soundings | G | |||||||||||||||||
| Material Sampling and Testing Plan | G | |||||||||||||||||
| Material Test Results | G | |||||||||||||||||
| Post-dredge Hydrographic Survey | G | |||||||||||||||||
| Quantity Calculations | G | |||||||||||||||||
| Approved Manifest | G |