About this file

This is a technical specification document for a metal roof panel installation project for the City of Chino City Hall Building in California. The project involves the removal of an existing tile roofing system, inspection and replacement of damaged roof deck areas, installation of self-adhering metal underlayment, installation of a new standing seam metal roofing system (R-Mer Shield by Garland Company, Inc.), and installation of new 22-gauge Kynar gutters and coping. The specification requires the metal roofing system to meet stringent performance criteria including thermal expansion and contraction capabilities of 200 degrees Fahrenheit, wind load capacity of 105 mph with a safety factor of 1.67, and positive load capacity of 20 psf roof live load. The project requires a pre-roofing conference approximately two weeks before installation, with attendance from installers, mechanical contractors, the architect, and the manufacturer's representative. Manufacturer field inspections are required three days per week during installation, with a final inspection upon completion. The specification mandates a 40-year No Dollar Limit warranty from the manufacturer and a 5-year warranty from the installer covering installation and water-tightness.

The specification designates Garland Company, Inc. (3800 E. 91st St., Cleveland, OH 44105) with local representative Sean Jarvis as the basis of design, with allowance for equal or approved substitute products. Bidders proposing alternate products must submit supporting technical data and manufacturer information a minimum of seven days prior to bid opening or face disqualification. The contractor assumes full responsibility for all materials upon receipt, including replacement of any lost or stolen materials. All labor and specified materials must be included in the bid, with any additional Garland materials required for project completion to be the contractor's responsibility at their cost. No substitutions are permitted after bid opening. The specification requires submission of product data, test reports, certifications, manufacturer's design load calculations, shop drawings, color and texture samples, a 40-year warranty copy, applicator qualifications, and proof of manufacturer's intent to provide inspections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07410 -1

SECTION 07410

METAL ROOF PANELS

City of Chino

City Hall Building

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Standing seam metal roofing system.

B. Metal roofing accessories.

1.2 SCOPE OF WORK

1. Remove existing tile roofing system and dispose of properly.

2. Inspect existing roof deck and replace any rotted or damaged areas.

3. Install new self-adhering metal underlayment over wood decking.

4. Install new metal roofing system over substrate per shop drawings. Follow all details as indicated in shop drawings.

5. Install new 22-ga Kynar gutters and coping as indicated. Color TBD by owner.

1.3 REFERENCES

A. ASCE 7 - Minimum Design Loads for Buildings and Other Structures.

B. FM 4470 Approval Standard for Class 1 Panel Roofs.

C. FM 4471 - Class 1 Panel Roof; Factory Mutual Research Corporation.

D. UL 263 - Fire Tests of Building Constructions and Materials.

E. UL 580 - Standard for Tests for Uplift Resistance of Roof Assemblies.

F. UL 790 - Standard Test Methods for Fire Tests of Roof Coverings.

G. UL 1897 - Uplift Test for Roof Covering Systems.

H. ICC-ES AC166 - Test Procedure for Wind Driven Rain Resistance of Metal Roof Coverings.

I. SMACNA - Architectural Sheet Metal Manual.

J. National Coil Coating Association (NCCA)

K. NRCA - The NRCA Roofing and Waterproofing Manual.

1.4 DESIGN / PERFORMANCE REQUIREMENTS

A. Standing Seam Roofing System: R-Mer Shield

1. Thermal Expansion and Contraction:

a. Completed metal roofing and flashing system shall be capable of withstanding expansion and contraction of components caused by changes in temperature without buckling, producing excess stress on structure, anchors or fasteners, or

07410 -2 reducing performance ability.

b. Design temperature differential shall be not less then 200 degrees F.

c. Interface between panel and toprail/clip shall provide for unlimited thermal movement in each direction along the longitudinal direction.

d. Location of metal roofing rigid connector shall be at roof ridge unless otherwise approved by the manufacturer. Metal ridge connector may require design as per job conditions by specified manufacturer.

2. Uniform Wind Load Capacity:

a. Installed roof system shall withstand negative (uplift) design wind loading pressures complying with the following criteria.

1) Design Code: ASCE 7, Method 2 for Components and Cladding.

2) Safety Factor: 1.67 after any load reduction or material stress increase.

3) Category III Building with an Importance Factor of 1 .

4) Wind Speed: 105 mph.

5) Ultimate Pullout Value: 633 pounds per each of the two fasteners holding the panel anchor to the roof decking or framing system.

6) Exposure Category: C

b. ASTM E 1592: Capacity shall be determined using pleated airbag method in accordance with ASTM E 1592, testing of sheet metal roof panels. Allowable safe working loads shall be determined by dividing the ultimate test load by the safety factor specified above.

3. Uniform Positive Load Capacity.

a. Installed roof system shall be capable of resisting the following positive uniform roof loads: Roof Live Load of 20 psf;

b. Dead Load: Loading of the roof structure, due to tear off of existing, and/or installation of new roofing materials shall not exceed the present loading due to weight of the existing roofing system.

4. ASTM E 1680: Static pressure air infiltration (roof panels):

a. Pressure Leakage Rate:

1) 1.57 PSF 0.034 cfm/sq.ft.

2) 6.24 PSF 0.048 cfm/sq.ft.

3) 12.0 PSF 0.051 cfm/sq.ft.

4) 20.0 PSF 0.010 cfm/sq.ft.

5. ASTM E 1646: Static pressure water infiltration (roof panels):

a. Pressure Result:

1) 5 Gal. /Hr. per S.F. and Static No Leakage

2) Pressure of 12.0 Psf for 15 minutes

6. Capacities for gauge, span or loading other than those tested may be determined by interpolation of test results within the range of test data. Extrapolations for conditions outside test range are not acceptable.

1.5 SUBMITTALS

A. Product Data: Submit product data, test reports, and certifications in accordance with quality assurance and performance requirements specified herein.

B. Design Loads: Submit manufacturer's minimum design load calculations according to ASCE 7, Method 2 for Components and Cladding. In no case shall the design loads be taken to be less than those specified herein.

C. Shop Drawings: Prepared specifically for this project; showing dimensions of metal roofing and accessories, fastening details and connections and interface with other products.

D. Selection Samples: For each finish product specified, two complete sets of samples representing manufacturer's full range of available colors and textures.

E. Verification Samples: For each finish product specified, two samples, minimum size 6 inches

07410 -3

(150 mm) square, representing actual product, color, and textures.

F. Warranty Sample: Provide unexecuted copy of standard 40 -Year NDL Warranty.

G. Applicator Qualifications: Submit manufacturer’s written acceptance of applicator stating contractor is qualified to install system and receive specified warranty.

H. Manufactures Inspections: Provide letter from corporate officer of manufacture stating intent to provide inspections (3) per week, during project as outlined in section 3.4 “Field Quality Control”.

I. Manufacturer's Certificates: Certify products meet or exceed specified requirements.

J. Closeout Submittals:

1. Provide manufacturer's maintenance instructions that include recommendations for periodic checking and maintenance of installed roof system.

2. Provide executed copy of manufacturer's warranty.

1.6 QUALITY ASSURANCE

A. Manufacturer Qualifications: Manufacturer shall have in place a documented, standardized quality control program such as ISO-9001 approval.

B. Installer Qualifications: Certified and approved installer of the sheet metal roofing manufacturer.

C. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship.

1. Finish areas designated by Architect.

2. Do not proceed with remaining work until workmanship, color, and sheen are approved by Architect.

3. Refinish mock-up area as required to produce acceptable work.

D. Source Limitations: Obtain all components of metal roof system from the same manufacturer as the low slope roofing manufacturer and provide comprehensive warranty coverage at all low slope to metal transitions. Secondary products that are required shall be recommended and approved in writing by the roofing system Manufacturer. Upon request of the Architect or Owner, submit Manufacturer's written approval of secondary components in list form, signed by an authorized agent of the Manufacturer.

1.7 PRE-INSTALLATION CONFERENCE

A. Convene a pre-roofing conference approximately two weeks before scheduled commencement of roofing system installation and associated work.

B. Require attendance of installers of deck or substrate construction to receive roofing, installers of rooftop units and other work in and around roofing which must precede or follow roofing work including mechanical work, Architect, Owner, roofing system manufacturer's representative.

C. Objectives include:

1. Review foreseeable methods and procedures related to roofing work, including set up and mobilization areas for stored material and work area.

2. Tour representative areas of roofing substrates, inspect and discuss condition of substrate, roof drains, curbs, penetrations and other preparatory work.

3. Review structural loading limitations of deck and inspect deck for loss of flatness and for required attachment.

4. Review roofing system requirements, Drawings, Specifications and other Contract

07410 -4

Documents.

5. Review and finalize schedule related to roofing work and verify availability of materials, installer's personnel, equipment and facilities needed to make progress and avoid delays.

6. Review required inspection, testing, certifying procedures.

7. Review weather and forecasted weather conditions and procedures for coping with unfavorable conditions, including possibility of temporary roofing.

8. Record conference including decisions and agreements reached. Furnish a copy of records to each party attending.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in manufacturer's original, unopened, undamaged containers with identification labels intact.

B. Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer.

1. Store materials above ground, on skids.

2. Protect material with waterproof covering and allow sufficient ventilation to prevent condensation buildup or moisture entrapment on the materials.

1.9 PROJECT CONDITIONS

A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.

1.10 WARRANTY

A. Warranty: Upon completion of the work, provide the Manufacturer's written and signed NDL System Warranty, warranting that, if a leak develops in the roof during the term of this warranty, due either to defective material or defective workmanship by the installer, the manufacturer shall provide the Owner, at the Manufacturer's expense, with the labor and material necessary to return the defective area to a watertight condition including Garland Metal Components.

B. Warranty Terms

1. 40-year, No Dollar Limit, Warranty.

2. Provide installers 5-year warranty covering roofing system installation and water-tightness.

PART 2 PRODUCTS

2.1 MANUFACTURERS

Basis of Design: The Garland Company, Inc.; 3800 E. 91st St., Cleveland, OH 44105. Or equal.

Local representative: Sean Jarvis (sjarvis@garlandco.com)

A. City has no responsibility to provide any equipment for handling and / or loading the materials to the Contractor’s trucks. Upon signature of receiving the materials, Contractor assumes full responsibility for all received materials. Any materials lost or stolen are the responsibility of the Contractor to replace, including freight and tax charges.

B. Contractor must provide all labor and specified materials as part of their bid. Any additional Garland material required to complete this project is the responsibility of the Contractor, including all freight and tax charges.

mailto:sjarvis@garlandco.com

07410 -5

C. The Products specified are intended and the Standard of Quality for the products required for this project. If other products are proposed the bidder must disclose in the bid the manufacturer and the products that they intend to use on the Project. If no manufacturer and products are listed, the bid may be accepted only with the use of products specified.

1. Bidder will not be allowed to change materials after the bid opening date.

2. If alternate products are included in the bid, the products must be equal to or exceed the products specified. Supporting technical data shall be submitted to the Architect/ Owner for approval prior to acceptance.

3. In making a request for substitution, the Bidder/Roofing Contractor represents that it has:

a. Personally investigated the proposed product or method, and determined that it is equal or superior in all respects to that specified.

b. Will provide the same guarantee for substitution as for the product and method specified.

c. Will coordinate installation of accepted substitution in work, making such changes as may be required for work to be completed in all respects.

d. Will waive all claims for additional cost related to substitution, which consequently become apparent.

e. Cost data is complete and includes all related cost under his/her contract or other contracts, which may be affected by the substitution.

f. Will reimburse the Owner for all redesign cost by the Architect for accommodation of the substitution.

4. Architect/ Owner reserves the right to be the final authority on the acceptance or rejection of any or all bids, proposed alternate roofing systems or materials that has met ALL specified requirement criteria.

5. Failure to submit substitution package, or any portion thereof requested a minimum of 7 days prior to bid opening will result in immediate disqualification and consideration for that particular contractors request for manufacturer substitution.

2.2 STANDING SEAM METAL ROOFING

A. R-Mer Shield:

1. Width of Standing Seam Panel:

a. 16-3/4 inches.

2. Standing Seam: 2-1/16 inch tall mechanically seamed with factory installed hot melt sealant in-seam cap. Panel/Cap is configured with a total of 4 layers of metal surrounding anchor clip and top rail.

3. Panel Profile: Provided with minimum 1-1/2 inches wide elevated mesa's every 2 inches on center continuous throughout panel. Stiffening ribs shall also be located in flat of panel next to the standing seam legs. Panel profile shall be symmetric in shape.

a. Slope: Open Purlins or Solid Substrate down to 1/4:12.

4. Panel material:

a. Galvanized steel 22 gauge, G90, smooth as per ASTM A 653.

5. Flashing and flat stock material: Fabricate in profiles indicated on Drawings of same material, thickness, and finish as roof system, unless indicated otherwise.

6. Coated Finish:

a. Exposed surfaces for coated panels:

b. Unexposed surfaces for coated panels shall be baked-on polyester coating with

.20 to .30 dry film thickness (TDF).

7. Accessory Components:

a. Anchor Clips:

1) Concealed Standard Anchor Clips: Clips must be extruded aluminum

ONE (1) piece clip with projecting legs for additional panel alignment and provision for unlimited thermal movement in each direction along the longitudinal dimension.

2) Top Rail shall be snap-in-place extruded aluminum retainer. The top rail

07410 -6 shall be used as a 6 inch length aligned with each panel clip, or in continuous lengths spanning one or more wind uplift zones, as required by the manufacturer's testing data and project engineering calculations.

a) Two piece clips are unacceptable.

b) Sealant applied in panel cap must be isolated from clip to ensure that no sealant damage occurs from the movement of the panel during expansion and contraction.

c) Clip must maintain a clearance of a minimum of 1/2 inch between panel and substrate for proper ventilation to help prevent condensation on underside of panel and eliminate the contact of panel fastener head to panel.

b. Fasteners:

1) Concealed fasteners: Corrosion resistant steel fasteners (zinc plated, stainless steel or equal) designed to meet structural loading requirements.

2) Exposed fasteners: Series 410 stainless steel fasteners or 1/8 inch diameter stainless steel waterproof rivets. All exposed fasteners shall be factory painted to match the color of the standing seam panels.

c. Closures: Factory precut closed cell foam meeting ASTM D 1056 or ASTM D 3575, enclosed in metal channel matching panels when used at hip, ridge, rake, and jamb.

d. Provide all miscellaneous accessories for complete installation.

2.3 METAL ROOFING ACCESSORIES

A. R-Mer SS Sheet Stock: High gloss, factory painted aluminum

1. Material and Thickness:

a. 22-gauge steel

2. Color: TBD by Owner.

PART 3 EXECUTION

3.1 EXAMINATION

A. Examine surfaces to receive metal roofing. Notify the Architect in writing of any defective conditions encountered. Starting of work shall constitute acceptance of such conditions.

B. Structural Framing Substrate:

1. Verify primary and secondary framing members are installed and fastened, properly aligned and sloped.

2. Verify damaged shop coatings are repaired with touch up paint.

C. Verify roof openings, curbs, pipes, sleeves, ducts, or vents through roof are solidly set, reglets are in place, and nailing strips located.

D. Correct defective conditions before beginning work.

3.2 INSTALLATION

A. Install in conformance with the NRCA Roofing and Waterproofing Manual and Manufacturers installation requirements.

B. Form panel shape as indicated on Drawings, accurate in size, square, and free from distortion or defects.

C. Install underlayment and eave protection sheet underlayment as recommended by the Manufacturer.

07410 -7

D. Install all panels continuous from ridge to eave. Transverse seams are not permitted.

E. Panel lengths that exceed maximum shipping lengths shall be field rolled on equipment owned by the panel manufacturer. Seam sealant must be factory applied.

F. Exposed fasteners, screws and/or roof mastic are unacceptable and will be rejected. System configuration only allows for exposed fasteners at panel overlap, if required, and at trim details in accordance with the Manufacturer's requirements.

G. Where not otherwise indicated conform to SMACNA details including flashings and trim.

H. Install sealants where indicated to clean dry surfaces only without skips or voids.

I. Install metal edge treatment in accordance with the manufacturer's instructions and the approved shop drawings.

J. Install metal roofing accessories in accordance with the manufacturer's instructions and the approved shop drawings.

3.3 PROTECTION

A. Protect installed products until completion of project.

B. Touch-up, repair or replace damaged products before Substantial Completion.

3.4 FIELD QUALITY CONTROL

A. Inspection: Provide manufacturer's field observations (3) days per week. Provide a final inspection upon completion of the Work.

1. Warranty shall be issued upon manufacturer's acceptance of the installation.

2. Field observations shall be performed by a Sales Representative employed full-time by the manufacturer and whose primary job description is to assist, inspect and approve membrane installations for the manufacturer.

3. Provide observation reports from the Sales Representative indicating procedures followed, weather conditions and any discrepancies found during inspection.

4. Provide a final report from the Sales Representative, certifying that the roofing system has been satisfactorily installed according to the project specifications, approved details and good general roofing practice.

END OF SECTION

File details come from the government source that posted it. Updated .