4.3.1 S3155-cost-schedule.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- On Call HVAC- Eastern Region
- Solicitation number
- 70CNR-S3237
- Issued by
- Washoe County, Nevada
About this file
The document is a cost schedule spreadsheet (S3155-cost-schedule.xlsx) for a state or local government contract opportunity, designed for vendor pricing submission. The spreadsheet provides a template for vendors to input pricing details across 16 line items, with an additional row for estimated annual travel costs. The contract allows for travel expenses to be billed at current GSA rates, as referenced by the gsa.gov link included in the document.
The cost schedule appears to be an open pricing document with no pre-populated pricing information, requiring vendors to complete the shaded areas and calculate their proposed costs. While the specific details of the goods or services are not explicitly outlined in this document, the structure suggests a comprehensive pricing submission is expected, with vendors responsible for ensuring calculation accuracy. The total estimated project value will be determined by the vendor's completed pricing inputs across the line items and travel cost estimates.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4.3.2 Certification-regarding-lobbying.pdf | ||
| 4.2.1 Standard form contract.pdf | ||
| S3237 RFP.docx | DOCX document | |
| Quote Instructions.pdf | ||
| 4.1.1 Terms-and-conditions-for-services.pdf | ||
| 4.1.2 Scope of Work S3237.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost schedule
| S3155 cost schedule | |||||
| Vendor | |||||
| Please complete shaded areas with proposed pricing. Vendor is responsible for ensuring calculations are correct. | |||||
| Line | Description and term | Type | Price | Est. Usage | Extended |
| 1 | $ - 0 | ||||
| 2 | $ - 0 | ||||
| 3 | $ - 0 | ||||
| 4 | $ - 0 | ||||
| 5 | $ - 0 | ||||
| 6 | $ - 0 | ||||
| 7 | $ - 0 | ||||
| 8 | $ - 0 | ||||
| 9 | $ - 0 | ||||
| 10 | $ - 0 | ||||
| 11 | $ - 0 | ||||
| 12 | $ - 0 | ||||
| 13 | $ - 0 | ||||
| 14 | $ - 0 | ||||
| 15 | $ - 0 | ||||
| 16 | Estimated travel costs | per year | 4 | $ - 0 | |
| Estimated project value | $ - 0 | ||||
| Travel is allowed as a billable costs of this contract, at then current GSA rates. | |||||
| gsa.gov |
&"Times New Roman,Italic"&10Page &P of &N http://www.gsa.gov/
File details come from the government source that posted it. Updated .