36H79718R0019-0006002.docx

DOCX document 22 KB Posted

Attached to
Bay Pines, FL Textile Laundry Equipment
Solicitation number
36H79718R0019
Issued by

About this file

36H79718R0019 0006 Updated Schedule of Supplies Amendment 0006.docx

View the file

Other files

File Type Posted
36H79719C0014-001.docx DOCX document
36H79718R0019-0006000.docx DOCX document
36H79718R0019-0006003.docx DOCX document
36H79718R0019-0006001.docx DOCX document
36H79718R0019-0005000.docx DOCX document
36H79718R0019-0005001.docx DOCX document
36H79718R0019-0004000.docx DOCX document
36H79718R0019-0003000.docx DOCX document
36H79718R0019-0003001.docx DOCX document
36H79718R0019-0002001.docx DOCX document
36H79718R0019-0002000.docx DOCX document
36H79718R0019-0001001.docx DOCX document
36H79718R0019-001.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B.2 SCHEDULE OF SUPPLIES & DELIVERY

This will be a single award contract and 100% SDVOSB set aside. The line items must be delivered within 120 days after receipt of award. Installation of the equipment shall be within 120 days after delivery of equipment. A shakedown period of 30 days must be included in the installation period. Removal of any trade-in equipment shall be the contractor’s responsibility and must be removed prior to delivery of new equipment. All items must be installed in accordance with the attached Technical Performance Specifications. Final cost should include the price of each item, installation costs, minus any trade-in value. All trade-ins listed must have a dollar value greater than $0 in order to provide a valid offer for each line item.

ITEM # 1 – NON-RECESSED FLOOR SCALES: Furnish and install two (2) non-recessed floor scales on the soiled dock and clean side of the laundry with a minimum weight capacity of 3000 pounds.

Unit Price$ ______________ each Total for 2 $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

1 each – Toledo Weigh recessed Floor Scale Soiled SideLess Trade-in Value$ __________
1 each – Toledo Weigh recessed Floor Scale Clean SideLess Trade-in Value$ __________
1 each – Toledo Weigh Non-recessed Floor Scale Loading DockLess Trade-in Value$ __________

Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

Total Installed Price (Total price of equipment plus installation minus trade-in): $___________

ITEM # 2 – AUTOMATED SOILED STORAGE/SORTING SYSTEM: Furnish and install new 1 (one) automated Soiled Storage/Sorting System.

Unit Price$ ______________ System Total for 1 System $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

1 each – Gardner Soiled Storage Conveyor – G090901 1 each – Gardner Soiled Transfer Conveyor – RSB3609 1 each – Gardner Soil Sorting Conveyor – TA 2825 19 each –Gardner Soiled Sort Weight Carts –Model Number –None Less Trade-in Value $ __________

Total Installation Costs: $______________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

Total Installed Price (Total price of equipment plus installation minus trade-in): $_______________

ITEM # 3 – AUTOMATED SOIL/STORAGE MONORAIL SYSTEM: – Furnish and install One (1) new automated monorail system on the soiled side of the textile care processing facility.

Unit Price$ _________ System Total for 1 Systems $____________

Trade In 1 Gardner Overhead semi-automatic soiled side Monorail/Storage System – 100 VG

Less Trade-in Value $ __________

Total Installation Costs: $______________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment ad any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation minus trade-in): $_______________

ITEM # 4 WASTEWATER HEAT RECOVERY, WATER STORAGE/PUMPING/REUSE, STEAMLESS HEATING SYSTEM: Furnish and install new, one (1) Steam-less system.

Unit Price$ ______________ System Total for 1 System $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

1 each – Kemco Waste Water Storage TankLess Trade-in Value $____________
1 each – Kemco Heat Recovery SystemLess Trade-in Value $____________
1 each – Re-use Water Storage TankLess Trade-in Value $____________
1 each – Hot Water Storage TankLess Trade-in Value $____________
1 each – Tempered Water Storage TankLess Trade-in Value $____________
1 each – Water Storage Pumping ControlLess Trade-in Value $____________
1 each – Kemco Triple Pump System & ControlLess Trade-in Value $____________
2 each – Cleaver Brooks Mini BoilersLess Trade-in Value $____________
1 each – Kanson Shaker UnitLess Trade-in Value $____________
1 system – Kibler Soft Water SystemLess Trade-in Value $____________
2 each – Kaeser Air CompressorsLess Trade-in Value $____________
2 each – Kaeser Compressor Air DryersLess Trade-in Value $____________

Total Installation Costs: $______________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation minus trade-in): $_______________

ITEM 5 – ENERGY MONITORING SYSTEM: Furnish and install new one (1) system.

Unit Price$ ______________ each Total for 1 system $____________

No Trade in

Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation): $____________

ITEM # 6 – CONTINUOUS WASH EXTRACT TUNNEL SYSTEM WITH DRYERS ( STEAM-LESS): Furnish and install One (1) each, Continuous Wash Extract tunnel washing system (CWES).

Unit Price$ ______________ System Total for 1 system $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

3 each – G.A. Braun 800# Washer/ExtractorsLess Trade-in Value – $ _________
1 each – G.A. Braun 400# Washer/ExtractorLess Trade-in Value – $ _________

Total Installation Costs: $______________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) (Total price of equipment plus installation minus trade-in): $_______________

ITEM # 7 – 200/300-POUND OPEN POCKET WASHER-EXTRACTORS: Furnish and install new, Two (2) each, steam-less open pocket automatic loading and unloading non-production washer extractors. Equipment shall be in accordance with technical specifications.

Unit Price$ ______________ each Total for 2 each $____________

No Trade in

Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

Final Cost $ _____________ ITEM # 8 – SEMI AUTOMATIC CART WASHER/DRYER: Furnish and install one (1) each, semi-automatic linen cart washer/dryer system.

QTY. 1 Unit Price_________________ Total for 1 each $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

1 each – McClure Semi-Automatic Cart Washer – Model 500Less Trade-in Value – $ _________
1 each – McClure Truck Washing StationLess Trade-in Value – $ _________

Total Installation Costs: $______________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) (Total price of equipment plus installation minus trade-in): $_______________

ITEM # 9 – CONTINUOUS WASH EXTRACT SYSTEM (CWES) AND NON-PRODUCTION OPEN POCKET WASHER EXTRACTORS STAPH BARRIER: Furnish and install one (1) staph barrier wall around the Continuous Wash Extract System, non-production open pocket washer extractors and cart washing system.

Unit Price$ ______________ each Total for 1 system $____________

No Trade in

Total Installation Costs: $______________ Equipment Rigging Electrical work (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) (Total price of equipment plus installation): $____________

ITEM # 10 – SEMI-AUTOMATED CLEAN SIDE MONORAIL SYSTEM: – Furnish and install One (1) new semi-automated monorail system on the clean side of the textile care processing facility.

Unit Price$ _________ System Total for 1 System $____________

Trade In 1 Gardner Overhead semi-automatic Clean side Monorail System – Model – 200VC, 3-Stage, Single Stage Less Trade-in Value – $ _________

Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation minus trade-in): $_______________

ITEM # 11 – 200/300 POUND GAS HEATED DRYING AND CONDITIONING TUMBLER WITH EXTERNAL LINT COLLECTION: Furnish and install new, one (1) each, 200/300 LB drying and conditioning tumbler.

Unit Price $ ______________ each Total for 1 each $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

3 each –G. A. Braun 400# Lb. Gas Heated Dryer –Model–500 PT–NFG Less Trade-in Value – $ ___________

1 each – Energenics Dry Type Lint Collection System and Associated Components – Model – FRP – 30 Less Trade-in Value – $ ___________

Total Installation Costs: $______________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation minus trade-in): $_______________

ITEM # 12 – Flatwork Sheet Separator with Conveyor System: Furnish and install two (2) each – Flatwork Sheet Separator Machines with feed conveyor.

Unit Price$ ______________ each Total for 2 system $____________

No Trade in

Total Installation Costs: $______________ Equipment Rigging Electrical work (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) (Total price of equipment plus installation): $____________

ITEM 13 – MEDIMUM PRODUCTION THERMAL FLUID FLATWORK IRONING SYSTEMS: Furnish and install two (2) each, medium production thermal fluid flatwork ironing systems.

Each folder shall be equipped with an Automatic Linen Inspection and Quality Control Scanning system. The quality grading controls shall AUTOMATICALLY detect and recognize stains, tears, holes and imperfections to assure consistent production and delivery of high-quality bed sheets, pillowcases, surgical wraps and spreads and shall work in conjunction with the entire ironing system.

Automatic Linen Inspection and Quality Control Scanning system shall be compatible with ironing system offered

Unit Price $ ______________ System Total for 2 systems $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

2 each – G. A. Braun ALPHA Spreader FeedersLess Trade-in Value – $ _________
2 each – G. A. Braun DELTA 3-Roll Steam IronersLess Trade-in Value – $ _________
2 each – G. A. Braun OMEGA Folder Cross FoldersLess Trade-in Value – $ _________
2 each – G.A. Braun Large Piece Stacker ConveyorsLess Trade-in Value – $ _________

Total Installation Costs: $____________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation minus trade-in): $_______________

ITEM # 14 – NON-PRODUCTION 100/110 LB WASHER EXTRACTORS

Furnish and install new, two (2) each, 100/110 LB steam-less washer extractors

Unit Price $ ______________ each Total for 2 each $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

2 each – Unimac 100 Lb. Washer Extractors Model –UX100PV Less Trade-in Value – $ _________

Total Installation Costs: $____________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation minus trade-in): $_____________

ITEM # 15 – 110/120 POUND (NON-PRODUCTION) GAS HEATED DRYING AND CONDITIONING TUMBLERS: Furnish and install two (2) each 110/120-pound gas heated drying and conditioning tumblers with internal lint collection.

Unit Price $ ______________ each Total for 2 each $____________

2 each – Unimac 120 Lb. Gas Heated Dryer Model – UT120NRM Less Trade-in Value – $ _________

Total Installation Costs: $____________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation minus trade-in): $_______________

ITEM # 16 – SMALL PIECE FOLDING MACHINES: Furnish and install 6 (ea.) small piece folding machines.

Unit Price $ ______________ each Total for 5 Each $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

6 each – G.A. Braun SIGMA Small Piece Folders – Model –SPFRF Less Trade-in Value – $ _________

Total Installation Costs: $______________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation minus trade-in): $____________

ITEM # 17 – SMALL PIECE FOLDER MACHINES FEEDING/STORAGE CONVEYORS: Furnish and install 3 (EA), small piece folder machine feeding/storage conveyors.

Unit Price $ ______________ Each Total for 3 Each $____________

No Trade-in

Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment plus installation): $_____________

ITEM # 18 – AUTOMATED CLEAN SIDE CLEAN TAKE AWAY CONVEYOR: – Furnish and install One (1) system Clean take a way conveyor system.

Unit Price $ ______________ Total for 1 System $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

1 system Gardner clean take-a-way conveyorLess Trade-in Value - $___________
Installation:$______________

Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation) Total Installed Price (Total price of equipment, plus installation, minus trade-in equipment): $_______________

ITEM # 19 – BLANKET FOLDER SYSTEM: Furnish and install (1) ea. blanket folding systems.

Unit Price$ ______________ Sys Total for 1 Sys $____________

Less Trade-in allowance "AS IS - WHERE IS" condition

1 each –G. A. Braun THETA Blanket Folder System–Model–TBFCF Less Trade-in Value–$ _________

Total Installation Costs: $____________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment, plus installation, minus trade-in equipment): $____________

ITEM # 20 – STEAM-LESS GARMENT TUNNEL FINISHER: Furnish and install 1 (ea) Steam-less Garment Tunnel Finisher.

Unit Price $ ______________ Each Total for 1 EA $____________

1 each –Colmac Garment Tunnel Finisher – Model CFS 900 Less Trade-in Value – $ _________

Total Installation Costs: $_____________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment, plus installation, minus trade-in equipment): $____________

ITEM # 21 – TEXTILE PLANT INDUSTRIAL LINT BLOW DOWN FANS: Furnish and install 1 automatic blow down system.

Unit Price $ ______________ Each Total for 1 SYS $____________

No Trade-in

Total Installation Costs: $____________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment, plus installation, minus trade-in equipment): $_____________

ITEM # 22 – INDUSTRIAL LAUNDRY PLANT MANAGEMENT SYSTEM: Furnish and install new, one (1) each Industrial Laundry Plant Management System.

Unit Price $ ______________ Each Total for 1 EA $____________

1 system –ICS Plant Management Less Trade-in Value – $ _________

Total Installation Costs: $____________

Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price of equipment, plus installation, minus trade-in equipment): $_______________

ITEM # 23 – CHEMICAL STORAGE/CONTAINMENT AREA – Remove and relocate the chemical supply area from the soiled side of the laundry to the mechanical room. Relocation shall be in accordance with attached Technical Performance Specifications.

Unit Price $ ______________ Total for Removal $____________

No Trade-in

Total Installation Costs: $______________ Equipment Rigging Plumbing and Pressure Piping work Electrical work Other (Identify) (Include all material and labor necessary for the installation of equipment and any modifications necessary for its connection and proper operation, in offered price for installation)

(Total price for equipment removal and relocation): $_____________

SHIP TO:

C.W Bill Young VAMC, Bay Pines VAHCS 10000 Bay Pines Blvd Laundry Building 13 Bay Pines Florida 33744

File details come from the government source that posted it.