This document provides information about an upcoming federal contract solicitation for design and construction services. The Department of Veterans Affairs intends to solicit proposals and award a firm-fixed-price design-build contract to design and construct a physical therapy and prosthetics building at the Omaha VA Medical Center. The contractor will be responsible for all labor, materials, equipment, site preparation including demolition, and integration with existing systems to deliver a completed facility within approximately 550 calendar days of the notice to proceed. The solicitation will use a two-phase design-build selection process and be set aside entirely for Service-Disabled Veteran-Owned Small Businesses. The estimated value of construction is between $10-20 million under NAICS code 236220 with a small business size standard of $39.5 million. Questions must be submitted in writing by July 13th and responses will be advertised on July 10th.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36E77620R0030
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
X 06-30-2020
636-503
36C776 Department of Veterans Affairs Program Contracting Activity Central
6150 Oak Tree Blvd, Suite 300 Independence OH 44131
Department of Veterans Affairs Program Contract Activity Central 6150 Oak Tree Blvd, Suite 300
Independence OH 44131 Samantha Mihaila 216-447-8300 X49606
IN ACCORDANCE WITH 38 U.S.C 8127 (PUBLIC LAW 109-461), THIS PROJECT IS A COMPETITIVE SERVICE-DISABLED VETERAN-OWNED
SMALL BUSINESS SET-ASIDE
THE PURPOSE OF THIS CONTRACT IS TO PROVIDE DESIGN AND CONSTRUCTION SERVICES FOR A NEW PHYSICAL THERAPY AND PROSTHETICS BUILDING AT THE OMAHA, NE VA MEDICAL CENTER. THE LOCATION OF THE PROJECT IS:
OMAHA VA MEDICAL CENTER VA NEBRASKA-WESTERN IOWA HEALTH CARE SYSTEM
4104 WOOLWORTH AVE
OMAHA, NE 68105
NAICS CODE: 236220 ($39.5M)
THE ESTIMATED PROJECT BUDGET IS $17,905,136.00
MINOR PROGRAM THRESHOLD SHALL NOT EXCEED $20 MILLION DOLLARS
x X
52.211-10 X
2 PM ET
07-30-2020 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
00076 Department of Veterans Affairs Department of Veterans Affairs
6150 Oak Tree Blvd, Suite 300 Independence OH 44131
VAFSC
Department of Veterans Affairs Financial Services Center Invoices to be Submitted Electronically www.ob10.com/us/en/veterans-affairs/ e-Invoice Setup Info Phone 877-489-6135 877-353-9791 512-460-5429
Andrew Neiss Contracting Officer
Table of Contents
| A.3 Price Schedule | 6 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 7 |
| 1.1 PROPOSAL MATERIAL: | 7 |
| 1.2 BID GUARANTEE: | 7 |
| 1.3 PAYMENT & PERFORMANCE BONDS: | 7 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 8 |
| 2.1 AVAILABILITY OF SOLICITATION DOCUMENTS: | 8 |
| 2.2 SELECTION PROCEDURES: | 8 |
| 2.3 SDVOSB SET-ASIDE: | 9 |
| 2.4 TECHNICAL QUESTIONS: | 9 |
| 2.5 AMENDMENTS: | 9 |
| 2.6 PREPARATION OF PROPOSALS: | 9 |
| 2.7 PROPOSAL REQUIREMENTS: | 9 |
| 2.8 USE OF ADVISORS: | 17 |
| 2.9 DETERMINATION OF RESPONSIBILITY: | 17 |
| 2.10 VETS 4212: | 18 |
| 2.11 SYSTEM FOR AWARD MANAGEMENT (SAM): | 18 |
| 2.12 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM (CPARS): | 18 |
| 2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS: | 19 |
| 2.14 REFERENCES TO VA ENGINEER, RESIDENT ENGINEER OR PROJECT MANAGER: | 19 |
| 2.15 ORGANIATIONAL CONFLICT OF INTEREST: | 19 |
| 2.16 BRIDGING DOCUMENTS: | 19 |
| 2.17 52.216-1 TYPE OF CONTRACT (APR 1984) | 19 |
| 2.18 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 19 |
| 2.19 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 20 |
| 2.20 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) | 21 |
| 2.21 52.228-1 BID GUARANTEE (SEP 1996) | 22 |
| 2.22 52.233-2 SERVICE OF PROTEST (SEP 2006) | 22 |
| 2.23 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 23 |
| 2.24 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 23 |
| 2.25 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 24 |
| 2.26 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 24 |
| REPRESENTATIONS AND CERTIFICATIONS | 26 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) | 26 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019) | 29 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 30 |
| 3.4 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018) | 32 |
| GENERAL CONDITIONS | 34 |
| 4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 34 |
| 4.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAY 2020) | 34 |
| 4.3 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013) | 37 |
| 4.4 52.223-20 AEROSOLS (JUN 2016) | 37 |
| 4.5 52.223-21 FOAMS (JUN 2016) | 38 |
| 4.6 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT 2019) | 39 |
| 4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS | 43 |
| 4.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 43 |
| 4.9 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 46 |
| 4.10 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 47 |
| 4.11 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 49 |
| 4.12 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 49 |
| 4.13 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 49 |
| 4.14 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 50 |
| 4.15 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 53 |
| 4.16 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 54 |
| 4.17 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 55 |
| 4.18 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 55 |
| 4.19 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (APR 2019) | 55 |
| 4.20 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (APR 2019) | 56 |
| 4.21 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 57 |
| 4.22 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 58 |
| 4.23 MANDATORY WRITTEN DISCLOSURES | 58 |
| DESIGN BUILD SPECIFICATIONS | 59 |
| 4.24 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES | 59 |
| 4.25 OWNERSHIP OF ORIGINAL DOCUMENTS | 59 |
| 4.26 RETENTION OF REVIEW DOCUMENTS | 59 |
| 4.27 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING INFORMATION | 59 |
| 4.28 COORDINATION WITH MEDICAL CENTER | 60 |
| 4.29 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR | 60 |
| ATTACHMENTS | 61 |
| Attachment 1 - SOW PT and Prosthetics Bridging Docs. | 61 |
| Attachment 2 - 010000 General Requirements Final 05_14_2020. | 61 |
| Attachment 3 - PT and Prosthetics Specs Final 03_09_2020. | 61 |
| Attachment 4 - ACC Geotechnical Report. | 61 |
| Attachment 5 - VAMC Omaha PT and Prostetics_Simple CATEX_20200402 (002) (002). | 61 |
| Attachment 6 - Past Performance Questionnaire. | 61 |
| Attachment 7 - Contractor Safety and Environmental Record Evaluation Form. | 61 |
| Attachment 8 - Wage Determination Douglas County 6-5-2020. | 61 |
| Attachment 9 - JA - Brand Name Items - PT and Prosthetics_Redacted. | 61 |
A.3 Price Schedule *PLEASE NOTE: Pricing will only be required for Phase II of the Design-Build process. NO Pricing is to be submitted as part of Phase I.
The contractor shall complete the entire project not later than 550 calendar days after the contractor receives the NOTICE TO PROCEED.
| CLIN 0001: Design & Construction Documents: Contractor shall provide the complete design of the Physical Therapy and Prosthetics Clinic at the Omaha, NE VA Medical Center. |
| Contractor shall furnish all labor, material, equipment, and supervision to provide the required documents for construction including Drawings, Specifications, and other documents as necessary in accordance with the SOW and all Specifications. |
Lump Sum Amount, CLIN 0001: $__________________________________
| CLIN 0002: Construction: Contractor shall provide all construction related activities such as pre-construction, site-prep, general construction, alterations, demolition to include removal of existing components, renovations, post-construction services, commissioning, project close-out and any other required elements of work to provide a complete and usable facility. |
| Contractor shall furnish all labor, material, equipment, and supervision to perform all required elements of work in accordance with the SOW, Specifications and all applicable attachments. |
| Lump Sum Amount, CLIN 0002: $__________________________________ |
TOTAL (CLINs 0001 and 0002): $__________________________________
NOTICE
1. The Offeror must submit a proposal based on a 550 Calendar day Schedule. This duration includes, but is not limited to design services, construction, clean-up, acceptance, and submitting final project record drawings.
2. The Offeror shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.
3. Contractor is required to fill in DUNS NUMBER in Block No. 14 on Standard Form (SF) 1442.
4. During Phase Two of the Two-Phase Design Build Process, the Contractor is required to fill in their pricing on the above pricing schedule and in Block No. 17 of the SF 1442. Pricing is not to be submitted in Phase One.
5. PLEASE NOTE: The Contractor agrees to attend any Post Award conference convened by the contracting activity or contract administration in accordance with Federal Acquisition Regulation subpart 42.5.
6. The Offeror’s total price shall be rounded up to the nearest dollar.
Page 1 of Page 1 of
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
Page 1 of
Page 1 of
1.1 PROPOSAL MATERIAL:
Proposal materials consisting of drawings, specifications, and contract forms are included and/or attached as part of this Request for Proposal. The VA will not provide printed copies of drawings and bridging documents. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.
1.2 BID GUARANTEE:
A Bid Guarantee, SF 24, is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid (proposal) guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the rejection of the proposal. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
1.3 PAYMENT & PERFORMANCE BONDS:
The offeror to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Solicitation. Copies of SFs 25 and 25A may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 AVAILABILITY OF SOLICITATION DOCUMENTS:
All solicitation related documents will be published to http://www.beta.sam.gov.
2.2 SELECTION PROCEDURES:
This solicitation is issued as a Request for Proposal (RFP) utilizing the two-phase design-build selection procedures in accordance with FAR 36.301. Phase II of the solicitation shall be prepared in accordance with FAR Part 15, with evaluation criteria developed in accordance with FAR 15.304. The Government intends to award a contract resulting from this solicitation to the responsible Offeror whose proposal represents the best value to the Government. It is the intent of the Government to award without discussions; however, the Government reserves the right to conduct discussions if necessary.
All Phase I and Phase II proposals shall be subject to evaluation by a team of Government personnel. The proposals will be evaluated in accordance with the content provided in the solicitation. In Phase I of the Two-Phase Design-Build process, Offerors will submit a proposal in accordance with the four (4) evaluation factors listed below. Upon receipt of Phase I proposals, the VA team will evaluate and determine the highest qualified Offerors based on their Phase I submissions. Phase I evaluation factors 1-3 are of equal importance, while evaluation factor 4 will be rated as acceptable or unacceptable. Offerors must receive a rating of acceptable for evaluation factor 4 in order to receive consideration for Phase II. A maximum of five (5) Offerors will be selected to provide a proposal for Phase II. Offerors not selected to provide a Phase II proposal will be notified that they are no longer being considered for this project. Phase II proposals will be evaluated in accordance with FAR Part 15 and the four (4) evaluation factors listed below for Phase II. Using the tradeoff process to obtain the best value, the Government may consider award to other than the lowest price Offeror or other than highest technically rated Offeror. Offerors must receive a minimum rating of acceptable for Technical Solution, Draft Project Schedule, and Design Concept in order to be eligible for award. Technical solution and design concept are of equal importance and are each more important than draft project schedule. Technical Solution, Draft Project Schedule, and Design Concept, when combined, are approximately equal to price.
Evaluations will be based on the following evaluation factors:
Phase I
1. Past Performance
2. Technical Approach
3. Key Personnel Experience
4. Capability to Perform
Phase II
1. Technical Solution
2. Design Concept
3. Draft Project Schedule
4. Price
2.3 SDVOSB SET-ASIDE:
This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Business concerns. Offers received from other than Service-Disabled Veteran-Owned Small Business concerns will not be considered. All Service-Disabled Veteran-Owned Small Businesses must be listed as verified by the VA’s Center for Veterans Enterprises (CVE) (http://www.vetbiz.gov). Offerors must be verified by CVE and visible in the Vendor Information Portal (VIP) database at TIME OF SUBMISSION OF OFFERS AND TIME OF AWARD. Failure to be BOTH visible and verified at the time of proposal submission and time of award will result in the offeror’s proposal being deemed unacceptable and ineligible for award.
2.4 TECHNICAL QUESTIONS:
Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to Samantha Mihaila. Questions shall be submitted only via e-mail to: Samantha.Mihaila@va.gov. The subject line must read: Providence PT and Prosthetics Clinic – Technical Questions. Oral questions of a technical nature are not acceptable. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS JULY 13, 2020 at 2:00 PM (ET).
2.5 AMENDMENTS:
Amendments to this solicitation will be posted at http://www.beta.sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Potential Offerors are advised that they are responsible for obtaining and acknowledging any amendments to the solicitation. Failure to acknowledge an amendment shall result in your proposal being considered unacceptable and will not be considered any further.
2.6 PREPARATION OF PROPOSALS:
PCAC will not pay for any costs incurred in preparation and submission of proposals.
2.7 PROPOSAL REQUIREMENTS:
A. General:
1. Proposals shall be based on solicitation document issued for RFP number 36E77620R0030. Proposals will be in the format stipulated in this document.
2. Proposals shall be received on or before the date and time specified in Block 13 of the SF 1442. There will be no public opening of the proposals.
3. Submit proposals via email to:
i. samantha.mihaila@va.gov
ii. Emails are limited to five (5) MB.
iii. Only e-mail proposals will be accepted. Hard-copy proposals will not be accepted.
4. Submit the original of the Bid Bond (PHASE II Only) by mail to:
i. US Postal Service Deliveries:
Samantha Mihaila Veterans Health Administration Program Contracting Activity Central (VHA-PCAC) 6150 tree Blvd., Suite 300 Independence, OH 44131
ii. Commercial Delivery Services / Hand Carry (Monday- Friday, 8:00 AM to 4:30 PM (EDT)) Samantha Mihaila Veterans Health Administration Program Contracting Activity Central (VHA-PCAC) 6150 Oaktree Blvd., Suite 300 Independence, OH 44131
iii. Failure to furnish the required bid guarantee in the proper form (i.e. SF 24) and amount, by the time specified in Block 13 of SF 1442, may result in rejection of the proposal. SEE FAR Provision 52.228-1, Bid Guarantee, of this Solicitation.
5. Page size for all proposal documents will be 8.5 x 11 inches, with 1-inch margins around the page perimeter. Pages will be single spaced. Each page shall count as one (1) page. Proposals shall be submitted using Times New Roman, with font no smaller than 11 point with normal proportional spacing.
6. Page formatting restrictions do not apply to drawings, but each page does apply to the page count. Submission of the draft project schedule can be submitted utilizing larger paper of 11 x17 inches. Pages submitted in excess of the page count will not be evaluated.
B. Phase I Proposal Format and Evaluation:
1. PHASE I, VOLUME I: offerors shall format Volume I as listed below. Including title page, detailed table of contents, preface, for Volume I Evaluation Factors shall not exceed a total of FOURTY (40) pages in Microsoft Times New Roman with font no smaller than 11 point. This page limit does not apply for any Past Performance Questionnaires that are submitted directly to the contract specialist. The SF 1442, Representations and Certifications, and acknowledged amendments shall all be part of the offer and will not count against the page limitations. A page is defined as each face of an 8.5 X 11inch sheet of paper containing information. All information (except for document numbers, page numbers, etc.) shall be provided in an image area of 7 X 9 inches. The background color of each page of the submission shall be white or ivory stock only. Excess pages will not be evaluated. Text lines will be single-spaced. A smaller font size for any graphics presented in a proposal is permitted as long as the information is legible to the human eye. Fonts other than Arial are permissible in the presentation of graphic material only. The Offeror’s responses shall clearly address each evaluation factor listed in this solicitation. Failure to submit in the format required and clearly address those factors may result in this offer being rated unacceptable.
2. Volume I – Evaluation Factors
i. Factor 1, Past Performance:
Provide a minimum of one (1) and a maximum of five (5) projects completed within the last five years (5) years similar in size, complexity and scope to this project. Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors to include A-E firms if applicable. If the offeror does not possess Design-Build (D-B) experience, provide a minimum of (1) and a maximum of five (5) projects completed by the A-E firm similar in size, complexity, and scope to this project in addition to the one (1) to five (5) projects submitted for the prime contractor. For purposes of this evaluation, a relevant project is further defined as “design and/or construction completed in a clinical, hospital or other medical facility space similar in size and scope to this project. Similar size would include at least 10,000 feet of new construction or total renovation. Similar scope would include outpatient clinic type space with an intended use for physical therapy, occupational therapy, or similar type clinical usage” Project(s) shall be 100% completed for Design-Bid-Build (D-B-B) or D-B. Projects shall be 100% completed for designs completed by the A-E firm in support of D-B or D-B-B. Offerors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project. If the Offeror is a Joint Venture (JV), relevant past performance should be submitted for projects completed by each Joint venture partner and the joint venture entity if applicable. Joint venture partners and joint venture entities without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. However, if the offeror does not have past performance, it shall be indicated that the joint venture partner(s) or joint venture entity does not have past performance.
The Offeror’s submission should include at a minimum:
· Project Title, Project Location (Physical Address); Contract Type (Example: Design-Build, Design-Bid-Build)
· Project owner name and contact information
· A brief description of the scope of work
· Project prime contractor and major subcontractors
· Project statistics including start and completion dates (original vs actual) and project cost (original vs actual). If original vs actual completion dates and project cost differ, please provide an explanation as to why they differ.
· Problems encountered on identified contracts, if applicable, and the offeror’s corrective actions.
If a completed past performance evaluation for a relevant project is available in the CPARS, it shall be submitted with the proposal for each project referenced for Past Performance. If there is not a completed past performance evaluation available in CPARS, then the Offeror shall submit a Past Performance Questionnaire (PPQ) (reference Attachment 6) for each project referenced for Past Performance. The Offeror shall notify their client that the PPQ shall be submitted via email to the Government’s point of contact, samantha.mihaila@va.gov. If the Offeror is unable to obtain a completed PPQ from a client for a project before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project. The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. Although the Government may make attempts, it is not responsible for ensuring that complete PPQ information is provided and that the Government will evaluate past performance even if complete information isn’t provided. Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. The page limit does not apply for the CPARS and PPQs.
| ii. | Factor 2, Technical Approach |
| Provide a brief narrative (page limitation: ten pages) describing the Offeror’s method to manage the project to achieve design and construction objectives as described in the solicitation. If the page limits are exceeded, the pages in excess of the limit will not be read or considered. Include at minimum all aspects covered in the scope of work (see Attachment 1 – SOW PT and Prosthetics Bridging Documents.) The technical approach section should include language that validates the offeror’s knowledge of this type of project and should not be written in general terms. The following shall be included in the narrative: |
| • | Design Approach: Describe the techniques methods for an efficient, effective Physical Therapy and Prosthetics design. | |
| • | Construction Approach: Describe the techniques and methods for this construction project to include coordination with the design packages, projected timelines and phases, and coordination of work. | |
| • | Quality and Control: Describe quality control processes during design and construction phases that will lead to an effective and successful project that completes on-time and meets performance needs and requirements. | |
| • | Cost Control: Describe cost control measures during design and construction phases that will lead to an effective and successful project that completes within budget. |
| iii. | Factor 3, Key Personnel Experience | |
| The Offeror shall provide a resume for each of the following key A-E personnel: Architect, Mechanical Engineer – Plumbing, Mechanical Engineer – HVAC, Electrical Engineer, Civil Engineer, Hospital Planner, Geo-Technical Engineer, and Surveyor. |
For each resume, include company name; name of individual; relevant listing of experience; qualifications such as specialized training, education, experience, etc. The Offeror shall also provide a resume for each of the following key construction personnel: Project Manager, Project Engineer, Site Supervisor, independent CPM consultant, and any known major subcontractors. For each resume, include company name; name of individual; relevant listing of experience; qualifications such as specialized training, education, experience, etc. For any subcontractors identified, provide a resume for that company, identify any key personnel that will be assigned to the contract resulting from this solicitation, and the relevant experience of both the company and any key personnel that were identified.
iv. Factor 4, Capability to Perform The Offeror shall provide a letter from their surety demonstrating the offeror’s total bonding capacity and current available bonding capacity. Total bonding capacity and current available bonding capacity must be outlined in a letter dated no earlier than the solicitation release date.
3. Evaluation of Offerors:
i. Factor 1, Past Performance:
Will be evaluated on recent and relevant experience as well as the quality rendered of the projects provided. If D-B experience is not applicable, the construction contractor and the A-E firm will be evaluated on relevant and recent projects to the applicable portion of the project, construction or design respectively. Past performance will be evaluated on the quality of the Offeror’s past performance with respect to the projects provided. When evaluating quality aspects that may be considered are timeliness of contract completion, adherence to contract schedules and timely submission of data deliverables, the contractor’s ability to comply with the terms and conditions of the contract, the overall quality of the work performed on the contract, the Offeror’s managerial performance, and if the reference would enter into a contract with the contractor again. Contractors without relevant past performance or for whom past performance information is not available, will be rated neither favorably nor unfavorably on past performance. In accordance with Procurement Policy Memorandum 2013-03, past performance evaluations may also be conducted using information obtained from CPARS and any other sources deemed appropriate by the CO. Other sources may include, but are not limited to, inquiries of owner representatives, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
ii. Factor 2, Technical Approach:
Will be evaluated based on the Offeror’s proposed technical approach for this design-build project as defined in the solicitation submittal requirements. The assessment of the offeror’s method to manage the project shall be used as a means of evaluating the offeror’s ability to successfully meet the requirements of the solicitation.
iii. Factor 3: Key Personnel Experience:
Will be evaluated based on the resumes provided by the Offeror. The VA will evaluate the personnel requested and subcontractors based on capabilities and qualifications to provide the required planning, implementation and completion of the project. The team will consider experience and qualifications such as specialized training, education, certifications, and experience in an operational healthcare facility.
iv. Factor 4: Capability to Perform:
Will be evaluated as acceptable or unacceptable based on whether the Offeror has adequate total bonding capacity and available bonding capacity to accommodate the design and construction of the project.
C. Phase 2 Proposal Format and Evaluation:
1. PHASE II, VOLUME I AND II: Phase II proposals shall be based on solicitation documents and the instructions provided by the Contracting Officer in the Phase II Notice of Offerors notifying Offerors that they were selected as one of the most qualified Offerors in Phase I. Non-Price and Price sections of the Offerors proposals will be evaluated independently; therefore, the Offeror shall submit the proposal in two (2) Volumes (Volume I: Non-Price and Volume II: Price). The contractor shall include NO price information in Volume I. Both volumes must be labeled with the Offeror's organization, business address, and VA Solicitation Number. Volume I: including all non-pice factors shall not exceed a total of FIFTY (50) pages. Volume II including price only shall not exceed a total of TWENTY (20) pages following the formatting requirements stated in general proposal requirements. Offeror shall include and acknowledge receiving amendments by filling out section 19 of the SF 1442 and returning a signed copy of the amendment(s) with the offer. The acknowledged Amendments shall be included in Volume II of the proposal and will not count as part of the page limitations. The offeror shall submit Volumes I and II in electric format as searchable PDF documents. The proposal in its entirety shall not exceed two emails of 5MB each. Include page numbers and the company name in the header and footer of each page.
2. Evaluation Factors - Technical solution and design concept are more important than draft project schedule. Technical Solution, Draft Project Schedule, and Design Concept, when combined, are approximately equal to price:
i. Volume I Factor 1, Technical Solution: Based on the solicitation documents, site visit, and the Offeror’s Phase I Technical Approach, the Offeror shall provide a detailed narrative describing the Offeror’s technical solution to the project to achieve design and construction objectives as described in the solicitation. If the page limits are exceeded, the pages in excess of the limit will not be read or considered. The Offeror’s narratives shall include, at a minimum, the following technical areas:
| • | Architecture |
| • | Integration with the adjoining ACC building |
| • | Structural |
| • | HVAC |
| • | Electrical |
| • | MEP |
| • | Building Utilities |
| • | Commissioning of systems |
| • | QC management and solutions |
| • | Safety management |
The Offeror shall address areas of concern and describe how they will minimize risk in conjunction with the identified areas of concern. The narrative shall indicate that the Design-Build team understands the complexities of physical therapy, rehab, and prosthetics and address how their approach offers advantages in that type of hospital setting.
ii. Volume I Factor 2, Design Concept: The Offeror shall submit a preliminary design schematic to demonstrate their understanding of the project scope (see Attachment 1 – SOW PT and Prosthetics Bridging Documents) and their plan to accomplish the project. The design schematic shall be based on the information provided in the bridging documents. The intent of the design concept it to show a clear understanding of the bridging documents, as well as allow for creative latitude of the Offeror’s design team. Acceptable methods of demonstrating design concept include digital design software. Include at a minimum the following:
1. A site layout showing relation of the proposed building to the existing buildings, roads, utilities, etc. as well as future expansion. The layout shall include building entrances and exits, proposed parking and walkway modifications and utility service road changes, and a sampling of proposed plant materials.
2. An integration plan showing the connection between the PT building and the adjacent ACC building, including considerations for patient corridor connections as well as “back of house connections”: i.e. employee, janitorial, and materials movement.
3. An architectural floor plan including proposed rooms, corridors, columns, MEP rooms/shafts, stairs, elevators (future), etc. Use of lines between spaces to indicate the centerline of the partition is acceptable. Provide exterior dimensions/total building gross area.
4. Exterior building elevations to show all facades indicating massing, proposed fenestration and the building relationship to adjacent structures and the approximate finish grade. Show all significant building materials, including their colors, architectural screens, skylights, and stacks on the elevation drawings. For building future expansion (vertical and horizontal), delineate elevations with and without the future expansion.
iii. Volume I Factor 3, Draft Project Schedule: The Offeror shall demonstrate their understanding of the requirement and timeline by submitting a draft project schedule for design and construction that adheres to the period of performance of this project. The Offeror shall prepare and submit a practicable design and construction schedule showing all necessary work elements to complete the project identified under this solicitation. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable form.
Each Offeror's construction schedule shall address the following:
| • | Design period milestones and timeframes |
| • | Construction period milestones and timeframes |
| • | When the contractor plans to break ground |
| • | Identification of number of days estimated for weather delays |
| • | Identification of long lead materials/equipment |
The proposed schedule must include the activities which are consistent with those described within the project drawings and bridging documents and must not exceed the Government's maximum allowable performance period, as noted in Block 11 of the SF 1442. The project’s Period of Performance will start at the issuance of the Notice to Proceed. For scheduling purposes, assume an estimated award date of September 30, 2020, and that the Notice to Proceed will be issued ten (10) calendar days after the award date. (Note that there is no guarantee the award will be made or the Notice to Proceed will be issued within this timeframe.)
iv. Volume II Factor 4 Price: Carefully follow “Instructions, Conditions, and Notices to Offerors”. Standard form (SF) 1442 Solicitation, Offer and Award (Construction, Alteration, or Repair) and the pricing schedule when submitting price offers. The prices shall be Firm Fixed Price. Submit a bid guarantee as stipulated in the Section “Instructions, Conditions, and Notices to Offerors”. The offeror’s total price shall be rounded up to the nearest dollar.
3. Evaluation of Offerors - Technical solution and design concept are more important than draft project schedule. Technical Solution, Draft Project Schedule, and Design Concept, when combined, are approximately equal to price:
i. Factor 1, Technical Solution: Will be evaluated and used as an aid to help determine that the Offeror understands the complexity and risks performing the required elements. The technical solution will be evaluated for inclusion of the technical areas listed in the criteria. The VA will evaluate Offeror’s specific detail in each of the technical areas regarding design and constructability of design. The Offeror’s narrative should provide enough detail to demonstrate that the scope (see Attachment 1 – SOW PT and Prosthetics Bridging Documents) and complexity of the project requirements are understood and will be successfully completed.
ii. Factor 2, Design Concept: Will be evaluated and used as an aid to help determine that the Offeror understands all project requirements and is able to design a complete and usable space. The Offeror’s Design Concept will be evaluated on the ability to provide all required areas in the allotted square footage. Additionally, specific information/plans required to be part of the design concept (see submission requirements above) will be evaluated based on completeness, innovation and adherence to the bridging documents.
iii. Factor 3, Draft Project Schedule: Will be evaluated and used as an aid to help determine that the Offeror understands and can perform all required elements of the project in the timeframe specified with limited impact, to the greatest extent possible, to the Medical Center. (The draft schedule submitted with the offer should not be construed as the agreed upon schedule as per FAR 52.236-15, the contractor shall, within twenty-one (21) Calendar days after receiving the Notice to Proceed, submit an interim project schedule which will supersede the draft project schedule. The interim project schedule will be subject to VA approval and must show the project being accomplished within the time frame specified on the SF 1442).
iv. Factor 4, Price: Will be evaluated in accordance with the process identified in the Price Schedule. The total evaluated price will be determined by the Offeror’s price for all the CLINs listed. Note: The VA will look at the total evaluated price and non-price factors to determine the best value. “Best Value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirements.
4. Phase II, Volume III Safety and Environmental Record:
i. Offeror shall provide their Representations and Certifications or their response to FAR 52.204-8 (2) (i) or (ii) Annual Representations and Certifications.
ii. Offeror shall provide their response to FAR 52.209-7 (b) Information Regarding Responsibility Matters.
iii. Offeror shall provide their response to FAR 52.209-13 (b) (1) or (2) Violation of Arms Controls Treaties or Agreements.
iv. Offeror shall provide their response to FAR 52.219-28 (g) Post-Award Small Business Program Representations.
v. Offeror shall include the Safety or Environmental Violations and Experience Modification Rating Information, including filling out ATTACHMENT 15.
vi. All Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the Offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, an Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
vii. All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an Offeror’s EMR is above 1.0, Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.
viii. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.
ix. If the NCCI cannot issue an EMR because the Offeror lacks insurance history, Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Offeror a Unity Rating of 1.0.
x. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
xi. This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.* If the EMR rating for the subcontracting tiers cannot be provided at time of proposal submission, the prime contractor shall acknowledge this and provide as a submittal with the insurance and bonding requirements.
xii. Failure to provide the ATTACHMENT 15 containing the above information, may result in a determination that an Offeror is not responsible and therefore ineligible for award.
D. Discussions
1. If determined to be necessary, proposal revisions will be requested from the proposals received. The CO will identify those Offerors, whose proposals are within the competitive range, considering the selection criteria identified in this section. Discussions may be conducted with those Offerors falling within the competitive range, after which proposal revisions will be requested. Proposal revisions will be submitted as per Section 2.7(A), above, and will be due at a time and place to be determined.
2. Proposal revisions shall include a completed SF 1442 that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final proposal revisions Offeror’s price proposal is greater than its initial price proposal.
2.8 USE OF ADVISORS:
Contractors are advised that VA contractor personnel may assist the Government during the Government’s evaluation of Proposals. The persons shall be authorized access to only those portions of the proposal and discussions that are necessary to enable them to provide specific technical advice on specialized matters or on particular problems. These individuals will be required to protect the confidentiality of any specifically identified trade secrets and/or privileged or confidential commercial or financial information obtained as a result of their participation in this evaluation. They shall be expressly prohibited from scoring, ranking or recommending the selection of an Offeror.
2.9 DETERMINATION OF RESPONSIBILITY:
A responsibility determination will be made in accordance with FAR 9.1 “Responsible Prospective Contractors.” The required information from the proposal, along with other information obtained from Government systems, such as, but not limited to the OSHA and EPA online inspection history databases, as well as any other information the Contracting Officer has determined to be valid, will be used to make the Determination of Responsibility. Failure to affirm being within the guidelines (see Phase II, Volume III Safety and Environmental Record) in the proposal may result in a determination of “Non-Responsible” for the Offeror. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility may make the Offeror ineligible for award.
2.10 VETS 4212:
Title 38, USC Section 4212(d), codified at 41 CFR Section 61-300, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. Submission of the VETS-4212 reporting information can be done electronically at: http://www.dol.gov/vets/vets4212.htm. Award cannot be made unless the awardee has filed their VETS-4212 report. Therefore, all offerors are encouraged to file every year. The Contracting Officer may request a copy of the email confirmation of receipt notification, prior to awarding the project.
2.11 SYSTEM FOR AWARD MANAGEMENT (SAM):
Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their proposal.
2.12 REVIEW REQUIRED REGISTRATION WITH CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM (CPARS):
As prescribed in Federal Acquisition Regulation (FAR) Part 42.1502(e), the Department of Veterans Affairs (VA) evaluates contractor past performance on all construction contracts that exceed $700,000, and shares those evaluations with other Federal Government contract specialists and procurement officials. The FAR requires that the contractor be provided an opportunity to comment on past performance evaluations prior to each report closing. To fulfill this requirement VA uses an online database, CPARS, which is maintained by the Naval Seal Logistics Center in Portsmouth, Virginia. CPARS has connectivity with the Contract Performance Assessment Reporting System (CPARS) database, which is available to all Federal agencies. CPARS is the system used to collect and retrieve performance assessment reports used in source selection determinations and completed CPARS report cards transferred to CPARS.
Each contractor whose contract award is estimated to exceed $700,000 is required to register with CPARS database at the following web address: http://www.cpars.gov/. Help in registering can be obtained by contacting Customer Support Desk @ DSN: 684-1690 or COMM: 207- 438-1690. Registration should occur no later than thirty days after contract award, and must be kept current should there be any change to the contractor’s registered representative.
For contracts with a period of one year or less, the contracting officer will perform a single evaluation when the contract is complete. For contracts exceeding one year, the contracting officer will evaluate the contractor’s performance annually. Interim reports will be filed each year until the last year of the contract, when the final report will be completed. The report shall be assigned in CPARS to the contractor’s designated representative for comment. The contractor representative will have thirty days to submit any comments and re-assign the report to the VA contracting officer.
Failure to have a current registration in the CPARS database, or to re-assign the report to the VA contracting officer within those thirty days, will result in the Government’s evaluation being placed on file in the database with a statement that the contractor failed to respond.
2.13 BACKGROUND INVESTIGATIONS AND SPECIAL AGREEMENT CHECKS:
All contractor employees are subject to the same level of investigation as VA employees who have access to VA Sensitive Information.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .