36E77619B0009-006.pdf

PDF 13 MB Posted

Attached to
Renovate NFS Kitchen JLM Little Rock Federal contract opportunity
Solicitation number
36E77619B0009
Issued by
Department of Veterans Affairs Headquarters

About this file

36E77619B0009 ATTACHMENT 5 - Drawings 3 of 4.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Renovate NFS Kitchen JLM Little Rock, newest first.
File Type Posted
36E77619C0076-000.docx DOCX document
36E77619B0009-0004000.docx DOCX document
36E77619B0009-0004001.pdf PDF
36E77619B0009-0003000.docx DOCX document
36E77619B0009-0002002.docx DOCX document
36E77619B0009-0002003.pdf PDF
36E77619B0009-0002001.pdf PDF
36E77619B0009-0002004.pdf PDF
36E77619B0009-0002000.docx DOCX document
36E77619B0009-0001000.docx DOCX document
36E77619B0009-0001001.pdf PDF
36E77619B0009-007.pdf PDF
36E77619B0009-001.docx DOCX document
36E77619B0009-005.pdf PDF
36E77619B0009-002.pdf PDF
36E77619B0009-003.pdf PDF
36E77619B0009-009.pdf PDF
36E77619B0009-011.docx DOCX document
36E77619B0009-010.pdf PDF
36E77619B0009-004.pdf PDF
36E77619B0009-008.pdf PDF
36E77619B0009-000.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

100% BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMP RENOVATE NFS KITCHEN JLM

4300 WEST 7TH STREET, LITTLE ROCK, AR 72205

598-18-113

06/17/19

T: F:

www.bancroft-ae.com Bancroft-AE Project No. 17-119 www.bancroft-ae.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

100% BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMP RENOVATE NFS KITCHEN JLM

4300 WEST 7TH STREET, LITTLE ROCK, AR 72205

598-18-113

06/17/19

AutoCAD SHX Text

PLUMBING FIXTURE SCHEDULE NOTES

AutoCAD SHX Text

PLUMBING GENERAL NOTES

AutoCAD SHX Text

PLUMBING MATERIALS AND PROCEDURES NOTES

AutoCAD SHX Text

SYMBOL

AutoCAD SHX Text

PROCEDURES:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

1. THE PLUMBING FIXTURE AND EQUIPMENT SCHEDULE, IN GENERAL, THE PLUMBING FIXTURE AND EQUIPMENT SCHEDULE, IN GENERAL, SPECIFIES THE PLUMBING FIXTURES, EQUIPMENT AND DEVICES: HOWEVER, UNLESS NOTED OTHERWISE, ALL FIXTURES SHALL BE PROVIDED WITH APPLICABLE ACCESSORIES (SUCH AS SUPPLY STOPS, WASTE TRAPS, FIXTURE MOUNTING SUPPORTS, BOLT CAPS, WATER CLOSET SEATS, ETC., AS REQ'D TO COMPLETE THE INSTALLATION.) 2. ALL ITEMS SPECIFIED HEREAFTER SHALL BE NEW, CLEANED AND ALL ITEMS SPECIFIED HEREAFTER SHALL BE NEW, CLEANED AND ADJUSTED FOR THE SPECIFIED DESIGN PURPOSE (UNLESS OTHERWISE SPECIFIED). 3. ALL EQUIPMENT AND DEVICES SHALL BEAR AGA, CSA OR UL APPROVED ALL EQUIPMENT AND DEVICES SHALL BEAR AGA, CSA OR UL APPROVED LABELS AND CERTIFICATIONS FOR THE SPECIFIED DESIGN PURPOSE. 4. PLUMBING CONTRACTOR SHALL VERIFY IN FIELD ALL FINAL FIXTURE AND PLUMBING CONTRACTOR SHALL VERIFY IN FIELD ALL FINAL FIXTURE AND EQUIPMENT LOCATIONS AND MOUNTING HEIGHTS REQUIRED FOR THE DESIGN PURPOSE. 5. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES OF SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES OF EACH CATALOG CUT, FOR EACH ITEM, TO BE APPROVED BY THE VA/COR AND SUCCESSFULLY REVIEWED BY THE ARCHITECT/ENGINEER AND SUCCESSFULLY REVIEWED BY THE ARCHITECT/ENGINEER ARCHITECT/ENGINEER (PRIOR TO THE BEGINNING OF CONSTRUCTION) FOR ALL NEW ITEMS SPECIFIED HEREAFTER. 6. THE CONTRACTOR SHALL SUBMIT EQUIPMENT CUTS FOR EACH PIECE OF THE CONTRACTOR SHALL SUBMIT EQUIPMENT CUTS FOR EACH PIECE OF EQUIPMENT PRIOR TO ORDERING. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES FOR APPROVAL BY THE VA/COR AND VA/COR AND AND SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER. THIS CONTRACTOR ARCHITECT/ENGINEER. THIS CONTRACTOR . THIS CONTRACTOR SHALL ALSO ASSEMBLE PRINTED INSTRUCTIONS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM INSTALLED AND BIND TOGETHER WITH EQUIPMENT CUTS AND CONTROL WIRING CONTROL WIRING DIAGRAMS. 7. FIXTURES FURNISHED BY VA SHALL BE INSTALLED BY PLUMBING FIXTURES FURNISHED BY VA SHALL BE INSTALLED BY PLUMBING CONTRACTOR, ALL OTHER FIXTURES SHALL BE FURNISHED & INSTALLED BY PLUMBING CONTRACTOR.

AutoCAD SHX Text

1. ALL MATERIALS SHALL BE NEW OF FIRST QUALITY AND UL LISTED FOR ALL MATERIALS SHALL BE NEW OF FIRST QUALITY AND UL LISTED FOR THE SPECIFIC DESIGN PURPOSE. 2. SANITARY AND VENT LINES SHALL BE SCHEDULE 40 CAST IRON OR SANITARY AND VENT LINES SHALL BE SCHEDULE 40 CAST IRON OR COPPER PIPE. 3. DOMESTIC WATER SUPPLY PIPING LOCATED BELOW THE DOMESTIC WATER SUPPLY PIPING LOCATED BELOW THE SLAB-ON-GRADE LESS THAN 2" SHALL BE TYPE "K" COPPER LINES 2" AND LARGER SHALL BE DUCTILE IRON. 4. DOMESTIC WATER SUPPLY PIPING LOCATED ABOVE THE FINISHED FLOOR DOMESTIC WATER SUPPLY PIPING LOCATED ABOVE THE FINISHED FLOOR SHALL BE PRO-PRES. COPPER PIPING SYSTEM. 5. THREADED FITTINGS ON GALVANIZED STEEL PIPING SHALL BE 150# THREADED FITTINGS ON GALVANIZED STEEL PIPING SHALL BE 150# CLASS GALVANIZED MALLEABLE IRON FITTING CONFORMING TO ASTM A-197 SPECIFICATION. 6. FURNISH AND INSTALL UNIONS WHERE INDICATED OR AS DEEMED FURNISH AND INSTALL UNIONS WHERE INDICATED OR AS DEEMED NECESSARY FOR REPAIR OR SERVICE. UNIONS 2" AND SMALLER SHALL BE STANDARD GROUND JOINT BRASS TO IRON SEAT, MALLEABLE IRON, SCREWED. UNIONS 2-1/2" AND LARGER SHALL BE STANDARD CAST IRON FLANGED UNIONS 125# CLASS. 7. VALVES SHALL BE MANUFACTURED BY VA/COR APPROVED VALVES SHALL BE MANUFACTURED BY VA/COR APPROVED VA/COR APPROVED APPROVED MANUFACTURERS. REFER TO SPECIFICATION SECTION 22 05 23 GENERAL DUTY VALVES. 8. DOMESTIC HOT WATER SUPPLY AND RETURN PIPING SHALL BE DOMESTIC HOT WATER SUPPLY AND RETURN PIPING SHALL BE INSULATED WITH ONE OF THE FOLLOWING: A. 1" THICK PREFORMED FIBERGLASS WITH "K" FACTOR OF 0.23 1" THICK PREFORMED FIBERGLASS WITH "K" FACTOR OF 0.23 MAXIMUM AT 75°F. MEAN TEMPERATURE. JACKET TO BE FACTORY APPLIED KRAFT PAPER WITH VAPOR BARRIER. B. 1" THICK MOLDED RIGID PHENOLIC FOAM WITH "K" FACTOR OF 1" THICK MOLDED RIGID PHENOLIC FOAM WITH "K" FACTOR OF 0.23 MAXIMUM AT 78°F MEAN TEMPERATURE WITH FACTORY APPLIED LAMINATED ALUMINUM FOILAND WHITE KRAFT PAPER VAPOR BARRIER JACKET. 9. DOMESTIC COLD WATER PIPING AND SUSPENDED HORIZONTAL STORM DOMESTIC COLD WATER PIPING AND SUSPENDED HORIZONTAL STORM SEWERS SHALL BE INSULATED WITH: A. 1/2" THICK INSULATION FOR PIPING UP TO 1-1/4" DIAMETER. 1/2" THICK INSULATION FOR PIPING UP TO 1-1/4" DIAMETER. B. 1" THICK INSULATION FOR PIPING LARGER THAN 1-1/2" 1" THICK INSULATION FOR PIPING LARGER THAN 1-1/2" DIAMETER. 10. PIPE INSULATION AT ALL PIPE HANGERS SHALL CONSIST OF PIPE INSULATION AT ALL PIPE HANGERS SHALL CONSIST OF INSUL-SHIELD FIBERGLASS PIPE SUPPORTS AS MANUFACTURED BY INSUL-COUSTIC, OR A VA/COR APPROVED, AND A/E SUCCESSFULLY VA/COR APPROVED, AND A/E SUCCESSFULLY APPROVED, AND A/E SUCCESSFULLY REVIEWED EQUAL. 11. HANGERS SHALL BE OF STANDARD WEIGHT STEEL OR IRON ROD AND HANGERS SHALL BE OF STANDARD WEIGHT STEEL OR IRON ROD AND RING OR CLEVIS TYPE.

AutoCAD SHX Text

1. DISINFECTION OF POTABLE WATER SYSTEM SHALL BE AS FOLLOWS: DISINFECTION OF POTABLE WATER SYSTEM SHALL BE AS FOLLOWS: GENERAL: NEW POTABLE WATER SYSTEMS SHALL BE PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIOR TO UTILIZATION. THE METHOD TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE HEALTH AUTHORITY HAVING JURISDICTION OR, IN THE ABSENCE OF A PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652 LISTED IN CHAPTER 19, AND AS DESCRIBED IN THE VA SPECIFICATION SECTION. THIS REQUIREMENT SHALL APPLY TO "ONSITE" OR "IN-PLANT" FABRICATION OF A SYSTEM OR TO A MODULAR PORTION OF A SYSTEM. A. THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL DIRTY WATER DOES NOT APPEAR AT THE POINTS OF OUTLET. B. THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER/CHLORINE SOLUTION AT LEAST 50 PARTS PER MILLION (50 mg/l) OF CHLORINE, AND THE SYSTEM OR PART THEREOF SHALL BE VALVED OFF AND ALLOWED TO STAND FOR 24 HOURS; OR THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER CHLORINE SOLUTION AT LEAST 200 PARTS PER MILLION LEAST 200 PARTS PER MILLION (200mg/l) OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS. FOLLOWING THE REQUIRED STANDING TIME, THE SYSTEM SHALL BE FLUSHED. C. THE SYSTEM SHALL BE FLUSHED WITH CLEAN POTABLE WATER THE SYSTEM SHALL BE FLUSHED WITH CLEAN POTABLE WATER UNTIL THE CHLORINE IS PURGED FROM THE SYSTEM. D. THE PROCEDURE SHALL BE REPEATED WHERE SHOWN BY A THE PROCEDURE SHALL BE REPEATED WHERE SHOWN BY A BACTERIOLOGICAL EXAMINATION THAT CONTAMINATION REMAINS PRESENT IN THE SYSTEM. 2. PIPING SERVICE MARKING: PIPING SERVICE MARKING: VINYL CLOTH PRESSURE SENSITIVE MARKERS BLACK LETTER ON WHITE BACKGROUND A. PIPES 3" AND LARGER SPACING 30'-0" O.C. PIPES 2 1/2" PIPES 3" AND LARGER SPACING 30'-0" O.C. PIPES 2 1/2" AND SMALLER SPACING 20'-0" O.C. B. INSTALL DIRECTIONAL ARROWS ON ALL PIPING AT SAME INSTALL DIRECTIONAL ARROWS ON ALL PIPING AT SAME SPACING. 3. CONTRACTOR TO VERIFY IN FIELD AND PROVIDE EXTENSIONS REQUIRED CONTRACTOR TO VERIFY IN FIELD AND PROVIDE EXTENSIONS REQUIRED TO ADJUST ALL FIXTURES TO GRADE LEVEL TO MAINTAIN INVERTS AS DETERMINED BY ALL FIXTURES RELATED (GREASE TRAPS, MAN HOLES, ETC.). 4. PROVIDE EXTERIOR ACCESS TO ISOLATION VALVES FOR HOT AND COLD PROVIDE EXTERIOR ACCESS TO ISOLATION VALVES FOR HOT AND COLD WATER SUPPLY CUTOFF.

AutoCAD SHX Text

1. ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY HANGERS SPACED NO FURTHER THAN 8' - 0" APART (4' -0" APART FOR PVC PIPING). NO PIPING SHALL BE SELF-SUPPORTING NOR BE SUPPORTED FROM EQUIPMENT CONNECTIONS. 2. ALL PARALLEL PIPES (TWO (2) OR MORE) SHALL BE SUPPORTED ON A ALL PARALLEL PIPES (TWO (2) OR MORE) SHALL BE SUPPORTED ON A CHANNEL TYPE TRAPEZE HANGER. 3. SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE EXPANSION AND CONTRACTION IN PIPING SYSTEMS UNLESS PIPE REQUIRES FIRM ANCHOR CONTROL. 4. HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT LESS THAN 1/8" PER FOOT AND SHALL BE HELD CLOSE TO THE CONSTRUCTION TO MAINTAIN A MAXIMUM OF HEAD ROOM. ALL CHANGES OF DIRECTION AND JUNCTIONS SHALL BE MADE WITH "Y" FITTINGS AND 1/8" BENDS. NO LINES OF ANY KIND SHALL BE LOCATED BELOW FREEZERS. ALL DRAIN LINES SHALL BE PROTECTED FROM FREEZING. 5. HOT AND COLD WATER PIPING SHALL BE PROPERLY PITCHED TO LOW HOT AND COLD WATER PIPING SHALL BE PROPERLY PITCHED TO LOW POINTS IN THE SYSTEM WHERE DRAINS SHALL BE INSTALLED. 6. CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT CHANGES OF CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT CHANGES OF DIRECTION, AT 50'-0" INTERVALS ON HORIZONTAL RUNS, OUT OF HIGH TRAFFIC AREAS, (NOT UNDER CASES) ETC. WHERE CLEANOUTS OCCUR IN CONCEALED SPACES, THEY SHALL BE PROVIDED WITH EXTENSIONS TO FLOOR ABOVE OR TO WALLS. A HAND-HOLE TEST TEE SHALL BE PLACED AT THE BASE OF EACH STACK. 7. VENT STACKS EXTENDING UP THROUGH THE ROOF SHALL BE FLASHED VENT STACKS EXTENDING UP THROUGH THE ROOF SHALL BE FLASHED WITH SIX POUND SHEET LEAD. FLASHING SHALL EXTEND 12" IN ALL DIRECTIONS FROM THE VENT, CARRIED OVER AND TURNED DOWN THE INSIDE OF THE VENT. ALL SEAMS AND JOINTS OF FLASHING SHALL BE SOLDERED AND PROVEN WEATHERTIGHT. EXTEND VENTS A MIN. OF 12" ABOVE ROOF, AND 30" AWAY FROM PARAPET. 8. ALL SUPPLY PIPING TO BE RUN OVERHEAD, UNLESS NOTED OTHERWISE. ALL SUPPLY PIPING TO BE RUN OVERHEAD, UNLESS NOTED OTHERWISE. 9. ALL SUPPLY PIPING TO BE A MINIMUM OF 3/4" DIA. ALL SUPPLY PIPING TO BE A MINIMUM OF 3/4" DIA. 10. EACH FIXTURE WILL HAVE A 1/2" X 12" AIR CHAMBER. EACH FIXTURE WILL HAVE A 1/2" X 12" AIR CHAMBER. 11. PROVIDE SERVICE VALVE AT BRANCHES AND AT ALL APPLIANCES. PROVIDE SERVICE VALVE AT BRANCHES AND AT ALL APPLIANCES. 12. ALL FIXTURES WILL BE FURNISHED WITH INTEGRAL STOPS. ALL FIXTURES WILL BE FURNISHED WITH INTEGRAL STOPS. 13. BURIED SANITARY AND WASTE LINES WILL BE A MINIMUM OF 4" DIA. BURIED SANITARY AND WASTE LINES WILL BE A MINIMUM OF 4" DIA. 14. ALL FLOOR DRAINS AND FIXTURES TO BE VENTED IN ACCORDANCE WITH ALL FLOOR DRAINS AND FIXTURES TO BE VENTED IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL CODES AND REGULATIONS. 15. ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FINISHED CEILINGS ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FINISHED CEILINGS AND SLOPED UP TOWARD MAIN STACK. 16. THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING MATERIAL IN OR THROUGH FIRE RATED ASSEMBLIES. 17. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN 1/4" HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN 1/4" PER FOOT FOR PIPING 3" DIA. AND UNDER. 18. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THEN 1/8" HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THEN 1/8" PER FOOT FOR PIPING 4" DIA. AND OVER. 19. ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A MANNER TO FACILITATE EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT DISRUPTING SERVICE AND CAUSING MAJOR PIPING REVISIONS.

AutoCAD SHX Text

PLUMBING MATERIALS AND PROCEDURES NOTES

AutoCAD SHX Text

DISCIPLINE SPECIFIC

AutoCAD SHX Text

MATERIALS

AutoCAD SHX Text

1. SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL REQUIREMENTS LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AND AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED BELOW. 2. EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) BASIS OF DESIGN (BOD) PROTOCOLS” ARE TO BE FOLLOWED FOR ALL EQUIPMENT, MATERIALS ARE TO BE FOLLOWED FOR ALL EQUIPMENT, MATERIALS ALL EQUIPMENT, MATERIALS EQUIPMENT, MATERIALS AND ASSEMBLIES SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE FULL BOD EQUIVALENCY SUBSTITUTION REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED. 3. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS AND ENTIRE PROJECT SPECIFICATIONS. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS/HER WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK. 4. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/COR AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR BETWEEN THEIR WORK AND THE WORK OF OTHER TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTS EXIST. 5. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL CHARACTER, REQUIREMENTS AND LOCATION OF THE WORK SHOWN AND INCLUDED. THE WORK INDICATED, BUT HAVING MINOR DETAILS OBVIOUSLY OMITTED, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE VA. 6. THE CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, THE WORK THE CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, THE WORK SHOWN ON THE DRAWINGS AND PROVIDED IN THE SPECIFICATIONS WITHOUT DEVIATION, WITH THE EXCEPTION OF ANY BASIS OF DESIGN (BOD) EQUIVALENCY SUBSTITUTIONS. THESE REQUESTED SUBSTITUTIONS WILL NEED TO BE IDENTIFIED, SUBMITTED AND APPROVED BY THE VA/CO DURING THE BIDDING PHASE AND IF DURING CONSTRUCTION BY THE VA/COR AND THE VA/CO RESPECTIVELY. CONTRACTOR IS REQUIRED TO PREPARE A DETAILED LIST OF THE PROPOSED EQUIVALENCY SUBSTITUTION ITEMS ALONG WITH THE DOCUMENTED COMPARATIVE ANALYSIS AND THE LISTING OF ALL VARIANCE IMPACTS TO THE PROJECT FOR EACH REQUESTED ITEM OF WORK. EQUIVALENCY SUBSTITUTIONS REQUESTS FOR VA CONSIDERATION WILL FIRST NEED TO BE APPROVED BY THE VA BEFORE PROCEEDING WITH ANY BIDDING AND ANY OF THE WORK. ALL REQUESTED BOD EQUIVALENCY SUBSTITUTIONS WILL FIRST NEED TO BE FULLY REVIEWED, EVALUATED AND APPROVED BY THE VA/CO PRIOR TO BID SUBMISSION AND IF OCCURRING DURING CONSTRUCTION BY THE VA/COR AND IN TURN THE VA/CO BEFORE ANY WORK CAN AND IN TURN THE VA/CO BEFORE ANY WORK CAN BE PERFORMED. 7. THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL LABOR AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. WHERE THERE IS NO MENTION OF THE RESPONSIBLE PARTY FOR A SPECIFIC ITEM TO BE FURNISHED OR INSTALLED ON THE DRAWINGS, THE DRAWING'S TRADE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR ALL RELATED PURCHASES AND LABOR FOR PROVIDING A COMPLETE OPERATING SYSTEM FOR THIS ITEM. 8. WHEN PERFORMING ANY CUTTING OR PATCHING (RESTORE TO ORIGINAL WHEN PERFORMING ANY CUTTING OR PATCHING (RESTORE TO ORIGINAL STATE) ALL BUILDING MATERIALS AND FINISHES AS REQUIRED TO PROVIDE A FINISHED PRODUCT THAT IS LIKE NEW AND DOESN'T STAND OUT AS BEING DIFFERENT OR DISTINGUISHABLE AS A PATCH OR REPAIR. 9. THIS CONTRACTOR SHALL VERIFY AND COORDINATE ALL MOUNTING, THIS CONTRACTOR SHALL VERIFY AND COORDINATE ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN AS REQUIRED BY THE VA DESIGN GUIDES/MANUALS ALONG WITH THE EXPRESSED DESIGN INTENT PRESENTED WITHIN THESE DOCUMENTS. 10. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES THRU THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES THRU WALLS AND THROUGH FLOORS, INCLUDING CORING IF REQUIRED. 11. PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL EXISTING SANITARY, STORM AND WATER SUPPLY ON THE SITE PRIOR TO THE PERFORMANCE OF ANY WORK. 12. PROVIDE SERVICE VALVES AT ALL BRANCH SUPPLY PIPING. SUCH PROVIDE SERVICE VALVES AT ALL BRANCH SUPPLY PIPING. SUCH SERVICE VALVES SHALL BE AS PER THE SPECIFICATIONS AND IN KEEPING WITH THE VA STANDARDS AND REQUIREMENTS. 13. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT GOVERNING LOCAL, COUNTY, STATE, AND FEDERAL BUILDING CODE REQUIREMENTS AND REGULATIONS PLUS COMPLIANCE WITH LOCAL UTILITY COMPANY REQUIREMENTS. 14. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY WORKMANSHIP. 15. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF ALL PERSONNEL THRU ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, INC., 20TH AND E. STREETS, N.W. WASHINGTON, D.C. 16. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING OF ALL NEW EQUIPMENT AND MATERIALS FURNISHED BY THIS CONTRACTOR ALONG WITH EQUIPMENT FURNISHED BY THE VA AND INSTALLED BY THIS CONTRACTOR. PROVIDE PROTECTION FROM DAMAGE BY THE CONSTRUCTION, HANDLING, VANDALISM AND WEATHER DURING ALL PHASES OF CONSTRUCTION UNTIL COMPLETION OF THE WORK. 17. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN THE NUMBERS THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN THE NUMBERS REQUIRED BY THE SPECIFICATIONS PRIOR TO THE START OF INSTALLATION FOR VA/COR APPROVAL AND A SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER. 18. THIS CONTRACTOR SHALL FURNISH AS-BUILT CONTRACT DOCUMENTS THIS CONTRACTOR SHALL FURNISH AS-BUILT CONTRACT DOCUMENTS TO THE VA/COR BEFORE FINAL PROJECT CLOSE-OUT CAN OCCUR. THE CONTRACT RECORD AS-BUILT DOCUMENTS SHALL BE PROVIDED IN ELECTRONIC REPRODUCIBLE FORM. 19. BEFORE PLACING WATER SYSTEM IN OPERATION, CHLORINATE ENTIRE BEFORE PLACING WATER SYSTEM IN OPERATION, CHLORINATE ENTIRE SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL PLUMBING CODES ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND LOCAL. WHEN PROPERLY COMPLETED AND APPROVED BY THE VA/COR PROVIDE THE SPECIFIED CERTIFICATION(S). 20. ALL NEW SANITARY PIPING SHALL BE GIVEN A FULL STATIC PRESSURE ALL NEW SANITARY PIPING SHALL BE GIVEN A FULL STATIC PRESSURE TEST. METHOD OF TEST AND REQUIREMENTS TO BE MET SHALL BE AS PER THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL CODE REQUIREMENTS ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND LOCAL. 21. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PUMPING PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PUMPING AND DRAINING OF TRENCHES OR PITS NECESSARY FOR THE INSTALLATION OF THEIR WORK. 22. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF THEIR WORK, CLEAN EQUIPMENT AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE PROPERTY, LEAVE THE WORK IN NEAT AND CLEAN ORDER, AND PROVIDE A COMPLETED SYSTEM(S) THAT HAS BEEN FULLY TESTED AND IS IN GOOD WORKING CONDITION. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THIS CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS.

AutoCAD SHX Text

CO

AutoCAD SHX Text

CLEANOUT

AutoCAD SHX Text

CW

AutoCAD SHX Text

DOMESTIC COLD WATER

AutoCAD SHX Text

HW

AutoCAD SHX Text

DOMESTIC HOT WATER

AutoCAD SHX Text

DN

AutoCAD SHX Text

DOWN

AutoCAD SHX Text

CO

AutoCAD SHX Text

FLOOR CLEANOUT

AutoCAD SHX Text

FD

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

HWR

AutoCAD SHX Text

HOT WATER RECIRCULATION

AutoCAD SHX Text

SAN

AutoCAD SHX Text

SANITARY

AutoCAD SHX Text

TYP

AutoCAD SHX Text

TYPICAL

AutoCAD SHX Text V

AutoCAD SHX Text

VENT

AutoCAD SHX Text

DOMESTIC COLD WATER

AutoCAD SHX Text

DOMESTIC HOT WATER

AutoCAD SHX Text

DOMESTIC HOT WATER RECIRCULATION

AutoCAD SHX Text

VENT

AutoCAD SHX Text

RISER DOWN

AutoCAD SHX Text

RISER UP

AutoCAD SHX Text

CONNECTION TO EXISTING

AutoCAD SHX Text

SHUT-OFF VALVE

AutoCAD SHX Text

EQUIPMENT TAG

AutoCAD SHX Text

PC

AutoCAD SHX Text

PLUMBING CONTRACTOR

AutoCAD SHX Text

SANITARY WASTE

AutoCAD SHX Text

POINT OF DISCONNECTION

AutoCAD SHX Text

DEMOLITION PIPING

AutoCAD SHX Text

PLUMBING SYMBOL LIST

AutoCAD SHX Text

PLUMBING NOTES, SYMBOLS AND ABBREVIATIONS

AutoCAD SHX Text

CZ

AutoCAD SHX Text

SR

AutoCAD SHX Text P001

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ARCHITECT & ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VA CONTRACT NO: 36C25618D0004

AutoCAD SHX Text

CONSULTANT:

AutoCAD SHX Text

35%%% SD SUBMITTAL

AutoCAD SHX Text 10/06/2018

AutoCAD SHX Text

65%%% DD SUBMITTAL

AutoCAD SHX Text 11/14/2018

AutoCAD SHX Text

65%%% DD RESUBMITTAL

AutoCAD SHX Text 12/19/2018

AutoCAD SHX Text

65%%% DD RESUBMITTAL WITH MOD

AutoCAD SHX Text 05/10/2019

AutoCAD SHX Text

95%%% CD SUBMITTAL

AutoCAD SHX Text 06/01/2019

AutoCAD SHX Text

100%%% BID DOCUMENTS

AutoCAD SHX Text 06/17/2019

T: F:

www.bancroft-ae.com Bancroft-AE Project No. 17-119 www.bancroft-ae.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

100% BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMP RENOVATE NFS KITCHEN JLM

4300 WEST 7TH STREET, LITTLE ROCK, AR 72205

598-18-113

06/17/19

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)4"SAN (E)2"VENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text

(E)4" VENT UP

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text

(E)2"VENT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)2"VENT

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)1/2"HW

AutoCAD SHX Text

(E)1/2"CW

AutoCAD SHX Text

AutoCAD SHX Text

(E)2-1/2"CW

AutoCAD SHX Text

(E)2-1/2"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)3/4"CW

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

CAP

AutoCAD SHX Text

(E)2-1/2"CW

AutoCAD SHX Text

(E)2-1/2"HW

AutoCAD SHX Text

(E)3/4"HWR

AutoCAD SHX Text

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)3"SAN GREASE INTERCEPTOR

AutoCAD SHX Text

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)3"VENT UP

AutoCAD SHX Text

CAP

AutoCAD SHX Text

(D)3/4"CW

AutoCAD SHX Text

(D)3/4"HW

AutoCAD SHX Text

AutoCAD SHX Text

(E)6"SAN

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text

(E)2"VENT DN

AutoCAD SHX Text

CAP

AutoCAD SHX Text

(D)3"SAN

AutoCAD SHX Text

(D)3"SAN

AutoCAD SHX Text

(D)2"VENT

AutoCAD SHX Text

AutoCAD SHX Text

TO SERVE PLUMBING FIXTURES

AutoCAD SHX Text

(E)2"VENT RELIEF

AutoCAD SHX Text

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"VENT UP

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text

AutoCAD SHX Text

CAP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)1/2"CW

AutoCAD SHX Text

(E)1/2"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)1/2"CW

AutoCAD SHX Text

(E)1/2"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FD

AutoCAD SHX Text

(E)1"CW

AutoCAD SHX Text

(E)1"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)2"VENT

AutoCAD SHX Text

(E)2"VENT

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)3"SAN GREASE INTERCEPTOR

AutoCAD SHX Text

(E)2-1/2"CW

AutoCAD SHX Text

(E)2-1/2"HW

AutoCAD SHX Text

(E)3/4"HWR

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

EXISTING TO REMAIN

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(D)3"V DN

AutoCAD SHX Text

(E)2"LV

AutoCAD SHX Text

(E)1"LA

AutoCAD SHX Text (E)3"G

AutoCAD SHX Text

CAP

AutoCAD SHX Text (D)1-1/4"G

AutoCAD SHX Text

(D)1/2"LA

AutoCAD SHX Text

(D)3/4"LV

AutoCAD SHX Text

(D)DE

AutoCAD SHX Text

(D)CW

AutoCAD SHX Text

(D)HW

AutoCAD SHX Text

(D)HWR

AutoCAD SHX Text

(E)CW

AutoCAD SHX Text

(D)DE

AutoCAD SHX Text

(D)HW

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text

(E)SAN

AutoCAD SHX Text

(D)4" SAN

AutoCAD SHX Text

CAP

AutoCAD SHX Text

(E)CW UP

AutoCAD SHX Text

CAP

AutoCAD SHX Text (E)3"V

AutoCAD SHX Text

(D)CO

AutoCAD SHX Text (D)3"V

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

CAP

AutoCAD SHX Text

CAP

AutoCAD SHX Text

PREPARE FOR NEW CONNECTION

AutoCAD SHX Text

(E)3/4"DE

AutoCAD SHX Text

(E)1-1/4"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)1-1/2"CW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING- DEMOLITION FLOOR PLAN GROUND FLOOR

AutoCAD SHX Text

CZ

AutoCAD SHX Text

SR

AutoCAD SHX Text

PD10G

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

GROUND FLOOR KEY PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ARCHITECT & ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VA CONTRACT NO: 36C25618D0004

AutoCAD SHX Text

CONSULTANT:

AutoCAD SHX Text

35%%% SD SUBMITTAL

AutoCAD SHX Text 10/06/2018

AutoCAD SHX Text

65%%% DD SUBMITTAL

AutoCAD SHX Text 11/14/2018

AutoCAD SHX Text

65%%% DD RESUBMITTAL

AutoCAD SHX Text 12/19/2018

AutoCAD SHX Text

65%%% DD RESUBMITTAL WITH MOD

AutoCAD SHX Text 05/10/2019

AutoCAD SHX Text

95%%% CD SUBMITTAL

AutoCAD SHX Text 06/01/2019

AutoCAD SHX Text

100%%% BID DOCUMENTS

AutoCAD SHX Text 06/17/2019

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 12'

AutoCAD SHX Text 3/16"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLUMBING PLAN- GROUND FLOOR

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 12'

AutoCAD SHX Text 3/16"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

DEMOLITION PLUMBING PLAN- GROUND FLOOR

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. ALL ASSOCIATED PIPING INCLUDING BUT IS NOT LIMITED TO THE ALL ASSOCIATED PIPING INCLUDING BUT IS NOT LIMITED TO THE FOLLOWING SYSTEM: CW, HW, HWR, SANITARY, AND VENT PIPING. 2. ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED ALL DOMESTIC PIPING BEING DEMOLISHED TO MAIN SHALL BE CAPPED AT 1.5x THE DIAMETER OF THE BRANCH PIPING. NO DEAD LEG OR STUBS ARE ALLOWED IN DOMESTIC WATER, SANITARY WASTE OR VENT PIPING. ALL DEAD LEG PIPING MUST BE REMOVED. 3. SHUT OFF DOMESTIC WATER AT EACH FIXTURE PRIOR TO DEMOLITION. SHUT OFF DOMESTIC WATER AT EACH FIXTURE PRIOR TO DEMOLITION. 4. REMOVE ALL EXISTING FLOOR DRAINS COVERS. PREPARE EXISTING DRAIN REMOVE ALL EXISTING FLOOR DRAINS COVERS. PREPARE EXISTING DRAIN PIPING FOR INSTALLATION OF NEW FLOOR DRAINS COVERS.

AutoCAD SHX Text

PLUMBING GENERAL NOTES

AutoCAD SHX Text

1. REMOVE EXISTING WATER CLOSET AND PREPARE EXISTING PIPES FOR INSTALLATION OF REMOVE EXISTING WATER CLOSET AND PREPARE EXISTING PIPES FOR INSTALLATION OF NEW WATER CLOSET. CONTRACTOR TO UTILIZE EXISTING CARRIERS PROVIDE TEMPORARY CAP TO DOMESTIC COLD WATER, SANITARY AND VENT LINES. 2. DEMOLISH AND REMOVE EXISTING WATER CLOSET AND PREPARE EXISTING PIPES FOR DEMOLISH AND REMOVE EXISTING WATER CLOSET AND PREPARE EXISTING PIPES FOR INSTALLATION OF NEW WATER CLOSET MOUNTED AT ADA HEIGHT. PROVIDE TEMPORARY CAP TO DOMESTIC COLD WATER, SANITARY AND VENT LINES. 3. DEMOLISH AND REMOVE EXISTING SHOWER, EXISTING SHOWER HEAD AND EXISTING DRAIN. DEMOLISH AND REMOVE EXISTING SHOWER, EXISTING SHOWER HEAD AND EXISTING DRAIN. DEMOLISH AND REMOVE COLD WATER, HOT WATER, AND HOT WATER RETURN BACK TO MAINS. CAP AND SEAL ALL PIPING AT MAIN. PREPARE SANITARY PIPING TO ACCOMMODATE NEW FLOOR DRAIN, FLOOR DRAIN TO BE FLUSH WITH FLOOR. 4. DEMOLISH AND REMOVE EXISTING LAVATORY. PREPARE EXISTING PIPING FOR INSTALLATION DEMOLISH AND REMOVE EXISTING LAVATORY. PREPARE EXISTING PIPING FOR INSTALLATION OF NEW LAVATORY. PROVIDE TEMPORARY CAP TO DOMESTIC WATER, SANITARY AND VENT LINES. 5. DEMOLISH AND REMOVE EXISTING LAVATORY. PREPARE EXISTING PIPING FOR INSTALLATION DEMOLISH AND REMOVE EXISTING LAVATORY. PREPARE EXISTING PIPING FOR INSTALLATION OF NEW LAVATORY MOUNTED AT ADA HEIGHT. PROVIDE TEMPORARY CAP TO DOMESTIC WATER, SANITARY AND VENT LINES. 6. REMOVE EXISTING PLUMBING FIXTURES PRIOR TO WALL RENOVATIONS. EXISTING FIXTURES REMOVE EXISTING PLUMBING FIXTURES PRIOR TO WALL RENOVATIONS. EXISTING FIXTURES WILL BE RE-INSTALLED AFTER RENOVATION WORK IS COMPLETE. COORDINATE WITH ARCHITECT AND GENERAL CONTRACTOR. PROVIDE TEMPORARY CAP TO DOMESTIC WATER, SANITARY AND VENT LINES. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS. 7. EXISTING FLOOR MOUNTED MOP SINK TO REMAIN. TAKE PRECAUTIONS TO PROTECT THE EXISTING FLOOR MOUNTED MOP SINK TO REMAIN. TAKE PRECAUTIONS TO PROTECT THE EXISTING MOP SINK DURING CONSTRUCTION. 8. DEMOLISH AND REMOVE EXISTING SINK. PREPARE EXISTING PIPING FOR INSTALLATION OF DEMOLISH AND REMOVE EXISTING SINK. PREPARE EXISTING PIPING FOR INSTALLATION OF NEW SINK WITH WATER SAVER EYE WASH. PROVIDE TEMPORARY CAP TO DOMESTIC WATER, SANITARY AND VENT LINES. 9. DEMOLISH AND REMOVE EXISTING EYE WASH STATION. DEMOLISH AND REMOVE EXISTING DEMOLISH AND REMOVE EXISTING EYE WASH STATION. DEMOLISH AND REMOVE EXISTING DOMESTIC WATER SERVING EXISTING EYE WASH AND CAP AND SEAL AT MAIN. 10. REMOVE EXISTING FLOOR DRAIN AND ALL ASSOCIATED SANITARY WASTE AND VENT PIPING REMOVE EXISTING FLOOR DRAIN AND ALL ASSOCIATED SANITARY WASTE AND VENT PIPING BACK TO EXISTING MAINS. CAP SANITARY WASTE AND VENT PIPING AT MAINS. 11. DEMOLISH AND REMOVE EXISTING COLD WATER, HOT WATER, SANITARY WASTE AND VENT DEMOLISH AND REMOVE EXISTING COLD WATER, HOT WATER, SANITARY WASTE AND VENT PIPING RUNNING INSIDE PARTIAL HEIGHT WALL. PREPARE CONNECTIONS FOR RECONNECTION TO NEW PIPING IN NEW CADDY WALL. 12. TO EXISTING MAIN. TO EXISTING MAIN. 13. REMOVE EXISTING DOMESTIC WATER VALVES AND PIPING STUBBED IN THIS LOCATION. REMOVE EXISTING DOMESTIC WATER VALVES AND PIPING STUBBED IN THIS LOCATION. 14. TO SERVE EXISTING FIXTURES IN POT WASHING CENTER. TO SERVE EXISTING FIXTURES IN POT WASHING CENTER. 15. DEMOLISH AND REMOVE DOMESTIC COLD WATER TO SERVE ICE MACHINE BACK TO MAIN. DEMOLISH AND REMOVE DOMESTIC COLD WATER TO SERVE ICE MACHINE BACK TO MAIN. CAP AND SEAL PIPING. 16. EXISTING WATER COOLER TO BE REPLACED WITH NEW. PROVIDE TEMPORARY CAP FOR EXISTING WATER COOLER TO BE REPLACED WITH NEW. PROVIDE TEMPORARY CAP FOR DOMESTIC COLD WATER, SANITARY AND VENT LINES. 17. DEMOLISH AND REMOVE ALL GAS, LABORATORY AIR AND LABORATORY VACUUM PIPING DEMOLISH AND REMOVE ALL GAS, LABORATORY AIR AND LABORATORY VACUUM PIPING SERVING ROOM GC143. CAP AND SEAL ALL PIPING AT MAIN. 18. DEMOLISH AND REMOVE PIPING FROM PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. DEMOLISH AND REMOVE PIPING FROM PLUMBING FIXTURE AND ALL ASSOCIATED PIPING. CAP AND SEAL ALL PIPING AT MAIN. 19. REMOVE EXISTING PLUMBING FIXTURES PRIOR TO WALL RENOVATIONS. EXISTING FIXTURES REMOVE EXISTING PLUMBING FIXTURES PRIOR TO WALL RENOVATIONS. EXISTING FIXTURES WILL BE RE-INSTALLED AFTER RENOVATION WORK IS COMPLETE. COORDINATE WITH ARCHITECT AND GENERAL CONTRACTOR. DEMOLISH AND REMOVE DOMESTIC WATER, SANITARY AND VENT PIPING AND PREPARE FOR NEW CONNECTION TO NEW CADDY DISTRIBUTION PANEL. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS.

AutoCAD SHX Text

PLUMBING DEMOLITION KEY NOTES

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

MATCH LINE

MATCH LINE

www.bancroft-ae.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

100% BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMP RENOVATE NFS KITCHEN JLM

4300 WEST 7TH STREET, LITTLE ROCK, AR 72205

598-18-113

06/17/19

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

FD

AutoCAD SHX Text

EXISTING TO REMAIN

AutoCAD SHX Text

(E)4"SAN (E)2"VENT

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text

(E)2"VENT

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)2"VENT

AutoCAD SHX Text

TO DISHWASH

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)1/2"HW

AutoCAD SHX Text

(E)1/2"CW

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text

(E)2-1/2"CW

AutoCAD SHX Text

(E)2-1/2"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)3/4"CW

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)2-1/2"CW

AutoCAD SHX Text

(E)2-1/2"HW

AutoCAD SHX Text

(E)3/4"HWR

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)3"SAN GREASE INTERCEPTOR

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

FD

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text

FD

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

FD

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text P-708

AutoCAD SHX Text P-530

AutoCAD SHX Text P-502

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text P-608

AutoCAD SHX Text P-103

AutoCAD SHX Text P-103

AutoCAD SHX Text P-408

AutoCAD SHX Text P-408

AutoCAD SHX Text

FD-1

AutoCAD SHX Text P-403

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

UDS-D

AutoCAD SHX Text

UDS-E

AutoCAD SHX Text

3/4"CW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)4" VENT UP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text Q

AutoCAD SHX Text P

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text C

AutoCAD SHX Text

(E)3"VENT UP

AutoCAD SHX Text

FD

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)6"SAN

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

FD

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text

(E)2"VENT DN

AutoCAD SHX Text

TO SERVE

AutoCAD SHX Text P-403

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text P-502

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

TO SERVE

AutoCAD SHX Text

(E)2"VENT RELIEF

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"VENT UP

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text K-1431

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text K-1431

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text P-403

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)1/2"CW

AutoCAD SHX Text

(E)1/2"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)1/2"CW

AutoCAD SHX Text

(E)1/2"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

FD

AutoCAD SHX Text

(E)3"VENT

AutoCAD SHX Text

(E)1"CW

AutoCAD SHX Text

(E)1"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)2"VENT

AutoCAD SHX Text

(E)2"VENT

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)3"SAN GREASE INTERCEPTOR

AutoCAD SHX Text

(E)2-1/2"CW

AutoCAD SHX Text

(E)2-1/2"HW

AutoCAD SHX Text

(E)3/4"HWR

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

EXISTING TO REMAIN

AutoCAD SHX Text W

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text S

AutoCAD SHX Text 2A

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text P-403

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text P-608

AutoCAD SHX Text P-708

AutoCAD SHX Text P-403

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text

FD

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

FD

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

FD

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

(E)3"SAN

AutoCAD SHX Text P-502

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text P-530

AutoCAD SHX Text P-608

AutoCAD SHX Text

(E)2"LV

AutoCAD SHX Text

(E)1"LA

AutoCAD SHX Text (E)3"G

AutoCAD SHX Text

(E)CW

AutoCAD SHX Text

(E)CW UP

AutoCAD SHX Text (E)3"V

AutoCAD SHX Text 3"V

AutoCAD SHX Text

CO

AutoCAD SHX Text 3"V

AutoCAD SHX Text

(E)FD

AutoCAD SHX Text

(E)3/4"DE

AutoCAD SHX Text

(E)1-1/4"HW

AutoCAD SHX Text

(E)1/2"HWR

AutoCAD SHX Text

(E)1-1/2"CW

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

(E)4"SAN

AutoCAD SHX Text

UDS-C

AutoCAD SHX Text

UDS-B

AutoCAD SHX Text

3/4"CW

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

(E)CO

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING- FLOOR PLAN GROUND FLOOR

AutoCAD SHX Text

CZ

AutoCAD SHX Text

SR

AutoCAD SHX Text P10G

AutoCAD SHX Text

NTS

AutoCAD SHX Text

AutoCAD SHX Text

GROUND FLOOR KEY PLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

ARCHITECT & ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VA CONTRACT NO: 36C25618D0004

AutoCAD SHX Text

CONSULTANT:

AutoCAD SHX Text

35%%% SD SUBMITTAL

AutoCAD SHX Text 10/06/2018

AutoCAD SHX Text

65%%% DD SUBMITTAL

AutoCAD SHX Text 11/14/2018

AutoCAD SHX Text

65%%% DD RESUBMITTAL

AutoCAD SHX Text 12/19/2018

AutoCAD SHX Text

65%%% DD RESUBMITTAL WITH MOD

AutoCAD SHX Text 05/10/2019

AutoCAD SHX Text

95%%% CD SUBMITTAL

AutoCAD SHX Text 06/01/2019

AutoCAD SHX Text

100%%% BID DOCUMENTS

AutoCAD SHX Text 06/17/2019

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 12'

AutoCAD SHX Text 3/16"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING PLAN- GROUND FLOOR

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 2'

AutoCAD SHX Text 12'

AutoCAD SHX Text 3/16"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

PLUMBING PLAN- GROUND FLOOR

AutoCAD SHX Text

MATCH LINE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1. REFER TO PLUMBING FIXTURE ROUGH-IN SCHEDULE LOCATED ON SHEET REFER TO PLUMBING FIXTURE ROUGH-IN SCHEDULE LOCATED ON SHEET P501 FOR BRANCH CONNECTION TO FIXTURE. 2. ALL PIPING TO BE 3/4" MINIMUM UNLESS OTHERWISE NOTED. ALL PIPING TO BE 3/4" MINIMUM UNLESS OTHERWISE NOTED. 3. ALL ASSOCIATED PIPING SHALL INCLUDE BUT NOT BE LIMITED TO CW, ALL ASSOCIATED PIPING SHALL INCLUDE BUT NOT BE LIMITED TO CW, HW, HWC, SANITARY, AND VENT PIPING. 4. ALL HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN ALL HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN 1/8" PER FOOT FOR PIPING 4" DIAMETER AND OVER. 5. ALL HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN ALL HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN 1/4" PER FOOT FOR PIPING 3" DIAMETER AND UNDER. 6. PROVIDE NEW SHUT-OFF VALVES FOR ALL NEW FIXTURES. PROVIDE NEW SHUT-OFF VALVES FOR ALL NEW FIXTURES. 7. PROVIDE NEW SHUT-OFF VALVES FOR ALL EXISTING FIXTURES THAT WILL PROVIDE NEW SHUT-OFF VALVES FOR ALL EXISTING FIXTURES THAT WILL BE RE-INSTALLED.

AutoCAD SHX Text

PLUMBING GENERAL NOTES

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

1. FURNISH AND INSTALL NEW WATER CLOSET PER MANUFACTURER'S INSTALLATION FURNISH AND INSTALL NEW WATER CLOSET PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. REMOVE TEMPORARY CAP AND MAKE NEW CONNECTIONS TO EXISTING DOMESTIC AND SANITARY LINES. 2. FURNISH AND INSTALL NEW WATER CLOSET PER MANUFACTURER'S INSTALLATION FURNISH AND INSTALL NEW WATER CLOSET PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL AT ADA HEIGHT. REMOVE TEMPORARY CAP AND MAKE NEW CONNECTIONS TO EXISTING DOMESTIC, SANITARY AND VENT LINES. 3. FURNISH AND INSTALL NEW LAVATORY PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. FURNISH AND INSTALL NEW LAVATORY PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. REMOVE TEMPORARY CAP AND MAKE NEW CONNECTIONS TO EXISTING DOMESTIC, SANITARY AND VENT LINES. 4. FURNISH AND INSTALL NEW LAVATORY PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. FURNISH AND INSTALL NEW LAVATORY PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. INSTALL AT ADA HEIGHT. REMOVE TEMPORARY CAP AND MAKE NEW CONNECTIONS TO EXISTING DOMESTIC, SANITARY AND VENT LINES. 5. FURNISH AND INSTALL NEW FLOOR DRAIN PER MANUFACTURER'S INSTALLATION FURNISH AND INSTALL NEW FLOOR DRAIN PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. MAKE NEW CONNECTIONS TO EXISTING UNDERGROUND SANITARY WASTE PIPING AND EXISTING VENT PIPING. 6. FURNISH AND INSTALL NEW SINK WITH WATER SAVER EYE WASH STATION ATTACHMENT FURNISH AND INSTALL NEW SINK WITH WATER SAVER EYE WASH STATION ATTACHMENT PER MANUFACTURER'S INSTALLATION INSTRUCTIONS. FURNISH AND INSTALL NEW THERMOSTATIC MIXING VALVE. MAKE NEW CONNECTIONS TO EXISTING COLD WATER, HOT WATER, SANITARY WASTE AND VENT PIPING. 7. RE-INSTALL EXISTING KITCHEN FIXTURES IN THEIR PREVIOUS LOCATIONS AFTER RE-INSTALL EXISTING KITCHEN FIXTURES IN THEIR PREVIOUS LOCATIONS AFTER RENOVATION WORK TO WALLS IS COMPLETE. COORDINATE WITH ARCHITECT AND GENERAL CONTRACTOR. REMOVE TEMPORARY CAP AND MAKE NEW DOMESTIC, SANITARY AND VENT CONNECTIONS TO NEW CADDY DISTRIBUTION PANEL. 8. MAKE NEW COLD WATER, HOT WATER, SANITARY WASTE AND VENT CONNECTIONS TO NEW MAKE NEW COLD WATER, HOT WATER, SANITARY WASTE AND VENT CONNECTIONS TO NEW CADDY WALL. 9. TO EXISTING MAINS. TO EXISTING MAINS. 10. RE-INSTALL EXISTING FIXTURES IN THEIR PREVIOUS LOCATIONS AFTER RENOVATION WORK RE-INSTALL EXISTING FIXTURES IN THEIR PREVIOUS LOCATIONS AFTER RENOVATION WORK TO WALLS IS COMPLETE. COORDINATE WITH ARCHITECT AND GENERAL CONTRACTOR THAT SERVES FIXTURES IN POT WASHING CENTER. 11. FURNISH AND INSTALL NEW WATER COOLER. REMOVE TEMPORARY CAP AND MAKE NEW FURNISH AND INSTALL NEW WATER COOLER. REMOVE TEMPORARY CAP AND MAKE NEW CONNECTIONS TO EXISTING COLD WATER, SANITARY AND VENT LINES. EXTEND PIPES AS NECESSARY PER NEW FINISHES. 12. RECONNECT HWR TO HW AT NEW LOCATION. RECONNECT HWR TO HW AT NEW LOCATION. 13. MAKE NEW COLD WATER PIPING CONNECTION TO NEW CADDY DISTRIBUTION PANEL. MAKE NEW COLD WATER PIPING CONNECTION TO NEW CADDY DISTRIBUTION PANEL. 14. CONTRACTOR TO ROUTE COLD WATER PIPING TO SERVE COFFEE MACHINE. PROVIDE DUAL CONTRACTOR TO ROUTE COLD WATER PIPING TO SERVE COFFEE MACHINE. PROVIDE DUAL CHECK SIMILAR TO WATTS SD-2 OR VA APPROVED EQUAL.

PLUMBING KEY NOTES

www.bancroft-ae.com

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

100% BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

STAMP RENOVATE NFS KITCHEN JLM

4300 WEST 7TH STREET, LITTLE ROCK, AR 72205

598-18-113

06/17/19

AutoCAD SHX Text

WATER CLOSET (P-103)

AutoCAD SHX Text

1.1 GPF ELONGATED WALL HUNG HANDS FREE FLUSH VALVE TOILET SYSTEM. VITREOUS CHINA, ELONGATED FRONT RIM, 2-1/8" FULLY GLAZED TRAPWAY AND HIGH EFFICIENCY SIPHON JET FLUSH ACTION. MANUFACTURERS: ZURN Z5615 OR APPROVED EQUAL. REFER TO SPECIFICATION 22 40 00 PLUMBING FIXTURES FLUSH VALVE: EXPOSED SENSOR OPERATION, 1.1 GPF BATTERY POWERED FLUSH VALVE, DUAL SEAL DIAPHRAGM WITH CLOG RESISTANT BY-PASS. VALVE 6VDC MOTOR ACTUATOR, HIGH IMPACT RESISTANT POLYCARBONATE HOUSING AND CHROME PLATED PLASTIC COVER, HIGH BACK PRESSURE VACUUM BREAKER. MANUFACTURERS: ZURN ZER6000AV-OBE-CPM OR APPROVED EQUAL. REFER TO SPECIFICATION 22 40 00 PLUMBING FIXTURES PROVIDE RETRO-FIT NUT KIT FOR EXTENDING CARRIER STUDS FROM EXISTING WALL. ELONGATED, STANDARD WHITE, OPEN FRONT TOILET SEAT LESS COVER WITH STAINLESS STEEL CHECK HINGE. SHALL MEET ANSI A117.1 REQUIREMENTS WHEN INSTALLED. FOR ADA COMPLIANCE, TOP OF SEAT HEIGHT SHOULD BE INSTALLED AT 17"-19"FROM FINISHED FLOOR. WATER HAMMER ARRESTOR- PRECHARGED BELLOWS TYPE, STAINLESS STEEL CONSTRUCTION. - PRECHARGED BELLOWS TYPE, STAINLESS STEEL CONSTRUCTION. CERTIFIED ANSI A112.26.1M, ASSE 1010, AND PDI. MANUFACTURERS: ZURN MODEL Z1700 OR APPROVED EQUAL. REFER TO SPECIFICATION 22 40 00 PLUMBING FIXTURES.

AutoCAD SHX Text

ELECTRIC WATER COOLER (P-608)

AutoCAD SHX Text COMPLETE COOLER AND BOTTLE FILLING STATION IN A CONSOLIDATED SPACE SAVING ADA COMPLIANT DESIGN. BOTTLE FILLER FEATURES SANITARY NO-TOUCH SENSOR ACTIVATION WITH AUTOMATIC 20-SECOND SHUT-OFF TIMER. TOUCHLESS, SENSOR ACTIVATION (BOTTLE FILLER) DESIGNED FOR EASY USE; EASY-TO-OPERATE PUSH-BAR ACTIVATION (BUBBLER). FILL RATE IS 1.5 GPM. GREEN TICKER INFORMS USER OF NUMBER OF 20 OZ. PLASTIC WATER BOTTLES SAVED FROM WASTE. LAMINAR FLOW PROVIDES CLEAN FILL WITH MINIMAL SPLASH. SILVER ION ANTIMICROBIAL PROTECTION ON KEY PLASTIC COMPONENTS TO INHIBIT THE GROWTH OF MOLD AND MILDEW.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.